R7F-Execute Amendment 2 Palm And Hibiscus Islands ROW Infrastructure ImprovementCOMMISSION ITEM SUMMARY Gondensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Authorizing The Mayor And City Clerk To Execute Amendment No. 2 To The Design-Build Agreement Between The City Of Miami Beach, Florida, And Lanzo Construction Co., Florida, For Design-Build Services For Neighborhood No. 13: Palm And Hibiscus lslands Right-Of-Way lnfrastructure lmprovements (The Project), Dated September 18,2014 (The Contract); The Amendment lncludes Additional Design Services Required To Meet The Revised City Landscape Ordinance, Home Owners Association (Hoa) Comments And Fire Code Analysis ln The Not-To-Exceed Amount Of s73.240 With infrastructure with full accountabi pporting Data (Surveys, Environmental Scan, etc.): The 2014 Customer Satisfaction Survey indicated that over 77oh of residents rated recently completed capital improvement proiects as "excellent" or "qood". Item On July 17,2013, the City Commission approved the negotiations with Lanzo Construction Co., Florida (Lanzo) pursuant to Request for Qualifications (RFQ) No. 251-2013TC, for Design-Build Services for Neighborhood No. 13: Palm and Hibiscus lslands Right-of-Way lnfrastructure lmprovement Project. The City negotiated Design and Pre- Construction Services with Lanzo Construction Co. in the lump sum amount of $599,464, based on the DCP included in the original solicitation. On February 12,2014, the City Commission approved the recommendation by the Mayor's Blue Ribbon Panel on Flooding and Sea Rise and the Flooding Mitigation Committee to amend the City's Stormwater Management Master Plan by modifoing the design criteria for the tailwater elevation and adopted an elevation of 2.7 ft-NAVD for all tidal boundary conditions. The City's Public Works Department (PWD) has requested that staff implement the enhanced stormwater system criteria. On December 1,2014, Amendment No.1 was executed per Resolution 2015-28852 adopted on November 19, 2014, in the amount of $251,016, which included additional design services associated with the adopted enhanced Storm Water Criteria. The City adopted Tree Ordinance Number 2014-3904, assuming jurisdiction from Miami-Dade County starting June 15, 2015. As such, additional design services are needed in order to meet the revised City landscape ordinance specifying more stringent mitigation requirements. Secondly, additional design services are required in order to incorporate HOA comments, PWD change in criteria relating to transformers placement within City Right-of-Way, and other design criteria clarification into the 60% Design Documents. Lastly, based on review comments from the City's Fire Department of the 60% Design Documents, additional maneuverability analysis as well as corridor improvements (intersection enhancement and widening corridors) were required and were not included in the DCP. Pursuant to these required design modifications, the Design-Build Firm submitted a proposal for these additional services in the not-to-exceed negotiated amount of $73,240. Amendment No.2 (aftached) will revise the total contract sum for design and pre-construction services to a not-to-exceed total of $923,720. City staff along with the Design Criteria Professional (Stantec Consulting Services) has evaluated the Design-Build cost proposal for the additional services and is in agreement that the proposal is fair and reasonable. The Administration recommends approval of the resolution. Financial lnformation: Amount Account 1 $73,240 Fund 384-2338-061357 - 2003 G.O. Bond Neighborhood 2 OBPI Total $73,240 Financial Impact Summary: N/A lm and Hibiscus - Lanzo Amendmenl 2 - Rlr ro-lFrrq MIAMISrACH lJl/MARY.dccx AGENDA OAT*740 r9r5.2015 City of Miomi Beoch, 1700 Convention Center Drive, Miomi Beoch, Florido 33139, www.miomibeochfl.gov C ISSION MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor Philip Levine and Members Jimmy L. Morales, City Manager October 14,2015 the City mtsston A RESOLUTION OF THE MA AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,NG THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.2 TO THE DESIGN.BUILD AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND LANZO CONSTRUCTION CO., FLORIDA, FOR DESIGN-BUILD SERVICES FOR NEIGHBORHOOD NO. 13: PALM AND HIBISCUS ISLANDS RIGHT.OF.WAY INFRASTRUCTURE IMPROVEMENTS (THE PROJECT), DATED SEPTEMBER 18, 2014 (THE CONTRACT); THE AMENDMENT INCLUDES ADDITIONAL DESIGN SERVICES REQUIRED TO MEET THE REVISED CITY LANDSCAPE ORDINANCE, HOME OWNERS ASSOCIATION (HOA) COMMENTS AND FIRE CODE ANALYSTS IN THE NOT-TO- EXCEED AMOUNT OF $73,240 WITH PREVIOUSLY APPROPRIATED FUNDING. ADMI NISTRATION RECOMMEN DATION Adopt the Resolution. KEY INTENDED OUTCOME Build and maintain priority infrastructure with full accountability. FUNDING $73.240 Fund 384-2338-061357 - 2003 G.O. Bond Neighborhood $73,240 Tota! BACKGROUND On July 17, 2013, the City Commission adopted Resolution No.2013-28251 approving the negotiations with Lanzo Construction Co., Florida (Lanzo) pursuant to Request for Qualifications (RFQ) No.251-2013TC, for Design-Build Services for Neighborhood No. 13: Palm and Hibiscus lslands Right-of-Way lnfrastructure lmprovement Project, further authorizing the Mayor and City Clerk to execute an agreement for pre-construction services upon completion of successful negotiations. On February 12, 2014, the City Commission approved the recommendation by the Mayor's Blue Ribbon Panel on Flooding and Sea Rise and the Flooding Mitigation Committee to amend the City's Stormwater Management Master Plan by modifying the design criteria for the tailwater elevation and adopted an elevation of 2.7 ft-NAVD for all tidal boundary conditions. 741 Commission Memorandum - Lanzo Construction Palm and Hlblscus - Preconstruction Services Neighborhood 13 Project October 14, 2015 Page 2 The City's Public Works Department (PWD) has requested that staff implement the enhanced stormwater system criteria. The Design Criteria Package (DCP) that was originally included in the RFQ had to be revised to incorporate the new enhanced stormwater criteria, which required additional negotiations with the Design-Build Firm. The City negotiated Design and Pre-Construction Services with Lanzo Construction Co., in the lump sum amount of $599,464, based on the DCP included in the original solicitation. On December 1,2014, Amendment No.1 was executed per Resolution 2015-28852 adopted on November 19,2014, in the amount of $251,016, which included additional design services associated with the adopted enhanced Storm Water Criteria. ANALYSIS On November 19, 2014, the City adopted Tree Ordinance Number 2014-3904, assuming jurisdiction from Miami-Dade County starting June 15, 2015. As such, additional design services are needed in order to meet the revised City landscape ordinance specifying more stringent mitigation requirements. Secondly, additional design services are required in order to incorporate HOA comments, PWD change in criteria relating to transformers placement within City Right-of-Way, and other design criteria clarification into the 60% Design Documents. Lastly, based on review comments from the City's Fire Department of the 60% Design Documents, additional maneuverability analysis as well as corridor improvements (intersection enhancement and widening corridors) were required and were not included in the DCP. Pursuant to these required design modifications, the Design-Build Firm submitted a proposal for these additional services in the not-to-exceed negotiated amount of $73,240. Amendment No.2 (attached) will revise the total contract sum for design and pre-construction services to a not-to-exceed total of $923,720. City staff along with the Design Criteria Professional (Stantec Consulting Services) has evaluated the Design-Build cost proposal for the additional services and is in agreement that the proposal is fair and reasonable. CONCLUSION: The Administration recommends approval of the Resolution. ATTACHMENTS: Attachment A - Lanzo Construction Co., Florida Amendment No. 2 Attachment B - Stantec Consulting Services JLM\EC\DM T:\AGENDA\201s\October\ClP\Palm and Hibiscus - Larzo Amendment 2 - l\lEtulO.docx 742 Attachment A AMENDMENT NO.2 TO THE AGREEMENT BETWEEN CITY OF MIAMI BEACH, FLORIDA AND LANZO CONSTRUCTION CO., FLORIDA., FOR PROGRESSIVE DESIGN.BUILD SERVICES FOR NEIGHBORHOOD NO. 13: PALM AND HIBISCUS ISLANDS RlG HT.OF.WAY I N FRASTRUCTU RE ! M PROVE M E NT PROJ ECT DATED SEPTEMBER 18, 2014 This Amendment to the Agreement made and entered this _day of 2015 by and between the City of Miami Beach, a Municipal Corporation existing under the laws of the State of Florida (hereinafter referred to as CITY), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and LANZO CONSTRUCTION GO., FLORIDA, a Florida Corporation with its principal place of business located at 125 SE sth Court, Deerfield Beach, Florida 33441 (Design-Builder). RECITALS WHEREAS, On July 17, 2013, the City Commission adopted Resolution No.2013-28251 approving the negotiations with Lanzo Construction Co. Florida (Lanzo) pursuant to Request for Qualifications (RFQ) No. 251-2013TC, for Design-Build Services for neighborhood No. 13: Palm and Hibiscus lslands Right-of-Way lnfrastructure lmprovement Project, further authorizing the Mayor and City Clerk to execute an agreement for pre-construction services upon completion of successful negotiations; and WHEREAS, The City negotiated Design and Pre-Construction Services with Lanzo Construction Co. in the lump sum amount of $599,464; and WHEREAS, On February 12, 2014, the City Commission approved the recommendation by the Mayor's Blue Ribbon Panel on Flooding and Sea Rise and the Flooding Mitigation Committee to amend the City's Storm Water Management Master Plan by modifying the design criteria for the tailwater elevation and adopted an elevation of 2.7 ft-NAVD for all tidal boundary conditions; and WHEREAS, On December 1st, 2014, the City Commission executed Resolution No. 2014-28852, approving Amendment No. 1 to the Agreement, in an amount not-to-exceed $251,016, to include additional design services associated with the adopted enhanced Storm Water Criteria ; and WHEREAS, this Amendment No. 2 to the Agreement incorporates additional design services required to meet the revised city landscape ordinance, comments from Home Owners Association (HOA), fire code analysis, Public Works Department (PWD) change in criteria relating to Florida Power and Light (FPL) transformers placement within City Right-of-Way, and other design criteria clarification; and WHEREAS, pursuant to these required design modifications, the Design-Build Firm submitted a proposal for these additional services in the not-to-exceed negotiated amount of $73,240; and 743 Attachment A WHEREAS, City staff along with the Design Criteria Professional (Stantec Consulting Services) has evaluated the Design-Builder cost proposal for the additional services and is in agreement that the proposal is fair and reasonable; and WHEREAS, Amendment No. 2 to the Agreement revises the total contract sum to a not- to-exceed total of $923,720. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as part of this Amendment No.2. 2. MODIFICATIONS The Agreement is amended to include "Attachment A-2", which is attached and incorporated herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4, RATIFICATION. The CITY and DESIGN-BUILDER ratify the terms of the Agreement, as amended by this Amendment No.2. lN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 2 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST:CITY OF MIAMI BEACH Rafael Granado, City Clerk Philip Levine, Mayor ATTEST:DESIGN-BUILD: LANZO CONSTRUCTION CO., FLORIDA., By TITLE:TITLE: Print Name Attachment: Attachment A-2 By Print Name 744 C Stantec Attachment B 21301 Powerline Road, Suite 31 1 Boca Raton, FL 33433 Tel: (561) 487-3379 Fax: (561) 487-3466 September 22,2015 Olga Sanchez, E.1., LEED AP Capital Projects Coordinator CAPITAL IMPROVEMENT PROJECTS OFFICE 1700 Convention Center Drive Miami Beach, FL 33139 Re:Palm and Hibiscus Neighborhood lmprovements City of Miami Beach, Florida Additional Work Cost Presentation Dear Ms. Sanchez: Please note that Stantec Consulting has reviewed the request for additional services from Lanzo Construction dated September 18th, 2015. The project additional services are to meet the revised city landscape ordinance, comments from Home Owners Association (HOA), fire code analysis, Public Works Department (PWD) change in criteria relating to transformers placement within City Right-of-Way, and other design criteria clarification. The Contractor has requested additional payment for various services valued at $73,240.00. ln our capacity as the Design Criteria Professional, Stantec has reviewed the submitted request for additional services. We have found that it is warranted based on the conditions affecting the project and recommend approval. lf you have any questions, please feel free to contact me at any time. Sincerely, STANTEC GONSULTING SERVICES INC. Jeffrey Crews, P.E., LEED AP Senior Associate V:\2'1 56\activeUl 56 1 2258\cotrespondence\Add Seryices Recomend.docx Design with community in mind 745 RESOLUTION TO BE SUBMITTED 746 THIS PAGE INTENTIONALLY LEFT BLANK 747