Loading...
R9N-Discuss- Biscayne Point Island Entrance EnhancementCity of Miomi Beoch, 1700 Conveniion Center Drive, Miomi Beoch, Florido 33139, www.miomibeochfl.gov COMMIS ION MEMORANDUM MIAMIBEACH TO: Mayor Philip Levine and FROM: Jimmy Morales, City Ma DATE: October 14,2015 Mem of the C mtsslon SUBIECT: DISCUSSION ON BISCAYNE ISLAND ENTRANCE ENHANCEMENT BACKGROUND Construction of the Biscayne Point lsland Neighborhood project started in March 2009 and was substantially completed in Octobet 2013. As part of the Substantial Completion punch list, the Biscayne Point lsland residents requested additional items to be incorporated into the scope of the project to enhance the entnyway to the neighborhood and complement the island. The requested modifications include, new entry monument, enhanced landscaping and up-lighting, modifications to existing columns, removalof existing Miami Beach red sidewalks and pavers and replacementwith grey color, guardhouse improvements, and additional lighting. At the July 23, 2014, Commission Meeting, the Commission was informed that the estimated cost to complete the entrance enhancement project was $376,398; or $315,918, if Public Works Department assisted with some of the labor. The available funding to complete this project consisted of $200,000 from the Biscayne Point Neighborhood project and approximately $30,000 from the Bridge Lights at77lh Street and HaMhorne Avenue project. The available funding was not sufficient to complete the requested work, thus City Commission approved the concept and directed Staff to present this item to the Finance and Citywide Projects Committee. On August 13,2014, the Finance and Citywide Projects Committee authorized additionalfunding for this project in the amount of $50,000. Thus, making the available funding forthis project $280,000. ANALYSIS As requested by the residents, the scope of work was further developed and modified to include additional roadway reconfiguration, elimination of existing pedestrian walkways, and enhanced landscaping. These modifications along with a more accurate cost estimate contributed to the project cost increase. The current cost estimate for all these improvements is approximately $614,400; there is a funding shortfall of $334,400. At the September 30,2015, Commission Meeting, there was a referral item to Finance and Citywide Projects Committee for this project. At this meeting, Commission was informed that additional funding was required to complete the Biscayne Point lsland Entrance Enhancement project and referred this item to the Finance and Citywide Projects Committee. Agenda ltem Date937 City Commission Memorandum - A Discussion on Biscayne Point lsland Entrance Enhancement October 14, 2015 Page 2 of 2 On Octobet 5,2015, during the Finance and Cityruide Projects Committee meeting, the Biscayne Point Residents, with assistance from the Capital lmprovement Projects and Planning Departments, presented a request to add $334,400 to the FY1 5/16 budget for the Biscayne Point lsland Entrance Enhancement project. The Finance and Citywide Projects Committee approved this request pending verification of fund ing availability. RECOMMENDATION The Administration is seeking authorization from the Commission to approve the additional funding of $334,400, and include it as part of the first Capital Budget Amendment for FY15/16. Attachment - Construction Cost Estimate JM'&# F:\T_Drive\AGENDA\201S\October\ClP\BP Entrance\2015-10-06 - Biscayne Point Entrance - Commission Memorandum - October 2015.doc 938 Biscayne Point Island Entrance Enhancement Gonstruction Gost Estimate Summory of ltems Revised Costs - August 27,2015 Line Item HOA Item UNIT QNTY Unit Cost TOTAL ITEM DESCRIPTION Entrance Median t 1,28 LS 1.00 20,000.0c $ 20,000 Demolition of existing neighborhood entry monument and construction of new entry monument with Biscayne Point marquee, including uplighting. 2 2 LS 1.00 3,1 15.00 $ 3,1 15 Provide colorful plants on median around new monument. 3 3 EA 2.00 $ 10,000.00 $ 20,000 lnstalltwo (2) Medjool Palm Trees in entrance median. 4 N/A LS 1.00 $ 27,045.00 $ 27,045 Provide new landscaping along S. Biscayne Point Rd. from Hawthorne Ave. to the east end of the bridge. 5 N/A LS 1.00 $ 5,000.00 $ 5,000 Removal and replacement of existing vehicle loop at intersection of HaMhorne Ave. and 77th Street. SUBTOTAL $ 75,160 Road and Bridge Re rove/lnstall Fence & Landscaping 1 13 LF 60.00 $ 10.00 $600 Relocation of existing black aluminum fence along the Southwest property to the marked ROW line. 2 11,13 ,14 LS 1.0c s 2,000.00 $ 2,ooo Relocation of existing aluminum fence on the Northeast and Southeast corner of the bridge to the ROW line. 3 N/A LS 1.0c $ 7,250.00 $ 7,250 Provide new landscaping at Northwest and Southwest corners of the bridge once fences are relocated to the ROW. 4 N/A EA 1.0c $ 750.00 $ 750 Removal of existing sabal palm in conflict with overhead lines at the Northwest corner of the bridge. As noted by Planning schematic design. SUBTOTAL $ 10,600 Modifications to Columns L I EA 12.0C s 600.00 $ 7,200 Modifications to columns along the entryway to provide a consistent elevation. 2 I EA 72.O0 S zoo.oo $ 8,400 Removal of existing brick and stone finishes from columns and place a new stucco fagade. 3 10 EA 4.00 S soo.oo $ 2,ooo Provide new electrical service to existing columns without service. 4 10 EA 12.00 $ 2,s00.00 $ 30,000 lnstall new decorative light fixture on each of the columns. SUBTOTAL $ 47,600 Road and Sidewalks 1 20 LS 1 $ 36,846.40 $ 36,846 Removal and replacement of existing Miami Beach red sidewalks with 4-inch and 6-inch thick gray sidewalks. 2 24 SF 6,1 10 $ 15.00 5 91,650 Removal and replacement of existing red concrete pavers along entryrvay at exsting locations from Hawthorne Ave. and up to the guardhouse with grey concrete pavers. SUBTOTAT $ 128,496 Attachment Page 1 of 3939 Biscayne Point Island Entrance Enhancement Gonstruction Gost Estimate Summory of Items Revised Costs - August 27,20'|.5 Line Item HOA Item UNIT QNTY Unit Cost TOTAL ITEM DESCRIPTION Guardhouse L 18 LS 1.00 s 7,000.00 $ 7,000 Replace guardhouse existing tile roof with standing-seam (approx. 170 SF) in a color to match aluminum fencing. 2 19 EA 2.00 s 8oo.oo $ 1,600 Replace existing windows on guardhouse (without muntins) with impact-resistant windows to match aluminum fencing. 3 20 LF 210.00 s 14.00 $ 2,940 Removal and replacement of existing Miami Beach red curb around the guarhouse island with gray concrete Type "D" Curb. 4 21 SF 120.00 S 10.00 $ 1,200 Replacement of existing tile flooring outside of guardhouse 5 22 LS 1.00 s 2,500.00 $ 2,500 lnstall new lights outside guardhouse 6 27 LF 189.00 $ 14.00 $ z,o+o Placement of new gray concrete Type "D" Curb around swale areas west of quardhouse. 7 27 LS 1.00 $ 9,000.00 $ 9,000 Provide new soil, sod, and landscaping for swales west of guardhouse. 8 15, '16, 23 LS L.00 $ 15,000.00 $ 15,000 Plant different focal tree (Medjool Palm if approved by PW GS) in east median of guardhouse. Provide colorful plants on planter east of guardhouse. I N/A SY 818.56 $ 4.00 $ 3,274 Milling of asphalt pavement in a section west of the guardhouse and up to the intersection of S. Biscayne Point Rd. and Noremac Ave. 10 N/A TN 98.96 $ 100.00 $ 9,896 2-inch asphalt, including expansion over existing crosswalks, and swales. 11 N/A LS 1.00 $ 2,500.00 $ 2,500 Pavement markings west of guardhouse, including relocation of an existing stop sign and placement of new "Right Turn Only" sign at intersection of Noremac Ave. and S. Biscayne Point Rd. SUBTOTAT $ 57,556 Right urn at the lntersection of Noremac Ave. & S. Biscayne Point Rd. 1,2 1,25, 26 LS 1.00 $ 81,485.00 $ 81,485 Placement of new landscaping and irrigation to swale area and landscape island at the dedicated right turn lane at the intersection of S. Biscayne Point Rd. and Noremac Ave. Existing roadway/swale drainage configuration to be maintained at this intersection. The landscape island adjacent to the dedicated right turn lane is going to be enlarged for placement of additional landscaping. The existing crosswalks at the intersection of S. Biscayne Point Rd. are to be removed. 3 N/A SY 50.33 $ 31.s0 $ 1,585 Asphalt expansion over existing crosswalks and small swale area (12" subgrade & 8" base). 4 N/A SF 260.0c $ 1.00 $260 Removal of existing Miami Beach red brick pavers over existing crosswalks. Attachment Page 2 of 3940 Biscayne Point lsland Entrance Enhancement Gonstruction Gost Estimate Summory of ltems Revised Costs - August 27,2015 Line Item HOA Item UNIT QNTY Unit Cost TOTAL ITEM DESCRIPTION 5 N/A LF 133.00 $ 3.15 $419 Removal of existing concrete header curb at existing crosswalks. 6 N/A LF 75.00 s 3.00 $225 Removal of existing concrete Type "D" curb at existing landscape island. 7 N/A SF 197.00 $ 1.00 $197 Removal of existing sidewalk in landscape island and sidewalk ramps at existing crosswalks. SUBTOTAT $ 84,171 TOTAL $ 403,584 TION & GNRL.$ 69,286 SUBTOTAL TOTAL ESTIMATED PROFESSIONAL OWNER'S CONTINGENCY GRAND TOTAL PRIOR TO cMB FEES (CrP) GRAND TOTAL WITH $ $ 12.00% $ 10.00% $ 6.50% 69,286 472,870 56,744 47,287 lT-zo-,dofl $ sz,+gg h 6-iZ76d'l Attachment Page 3 of 3941 THIS PAGE INTENTIONALLY LEFT BLANK 942