Loading...
HomeMy WebLinkAboutResolution 2025-34040RESOLUTION NO. 2025-34040 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE FIRST AMENDMENT TO THE CAPITAL BUDGET FOR FISCAL YEAR 2026 AS SET FORTH IN ATTACHMENTS A, "PROJECTS"; B, "SOURCE OF FUNDS"; AND C "PROGRAMS." WHEREAS, on September 30, 2025, the final Capital Improvement Plan (CIP) for Fiscal Years 2026 — 2030 and the final Capital Budget for FY 2026 was adopted via Resolution No. 2025-33948; and WHEREAS, it is recommended by the Administration that the FY 2026 Capital Budget be amended to increase appropriations by $3,963,968.00 and re -align $15,959,150.40 between existing projects as highlighted in Attachments A, "Projects"; B, "Source of Funds"; and C, "Programs." NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that following a duly noticed public hearing on December 17, 2025, the Mayor and City Commission hereby adopt the First Amendment to the Capital Budget for Fiscal Year 2026 as set forth in Attachments A, "Projects" B, "Source of Funds"; and C, "Programs." PASSED AND ADOPTED this 17" day of December 2025. ATTEST: Steven Meiner, Mayor Z-V DEC Rafael . Granado, City Clerk 2 2 2025 ewe:' APPROVED AS TO FORM &LANGUAGE & FOR EXECUTION ATTACHMENT FY 2026 CAPITAL A BUDGET PROJECTS AMENDED 1VI7/2025 Adopted R d A Capital ,ject Name FY 20M FY 2026 Capital Budget I2IVI Capita Budget WATER& WASTEWATER MAI NS AND REHAB - FIRE FLOW $ 4W9458 $ (4,999,4W) $ - PROJECT 9-HOSPITAL4I ST (Project # 64032) WATER B WASTEWATER MAI NS AND REHAB - WATER MAIN 4,189759.00 (4,111S.7%O0) - REPI-ACPMEMLOLLINS 4-15 (Project Is 642ffi) WATER PUMP STATIONS IMPROVEMENTS - WATER 3,430,000.00 (3,389,0114.40) 40.995.60 BOOSTER STATIONBal-E ISLE (Project It 64532) WATER PUMP STATIONS IMPROVEMENTS - WATER 2,354,929.00 (2,354,929.00) - BOOSTER STATIONTERMINAL ISLE (Project # 64432) WATER PUMP STATIONS IMPROVEMENTS - WATER 217W,W8.00 (TOM.OW.00) 1,733,558.00 BOOSTER STATI0N25TH ST (PnI # 63732) WATER& WASTEWATER MAINS AND RENNB-PSI 4 SEWR - 4,13N,394.00 4,6n,394.Ip DSCH4G FORCE MAIN RPLCMNT (Project Is 6Wn) WATER & WASTEWATER MAINS AND REINB- FORCE MAIN - 3,528,9W.W 3,528,988.00 REPLACEMENT-HA'MFDRNE(Project If 6T0M) WATER& WASTEWATER MAINS AND REHOB(Project# 78,T90,395O0 2,382,2W.00 81,172,675.00 28520) WATER& WASTEWATER MAINS AND REHAB-PS22 - 1,928,892.00 1,926,89200 DSCHRG FRC MAINNORMANDY ISLE (Project # 66032) WASTEWATER STATIONS REHABILITATION -SEWER PIMP - I,BW,113O0 1,M,113.00 STATION 2 REHABILITATION (Project Is 64732) WATER PUMP STATIONS IMPROVEMENTS -WATER 3,030,984.00 1,826,OM.W 4,8M,984.W BOOSTER STATIONTSTH ST (Project # 64632) WATER& WASTEWATER MAI NS AND REHAB - FORCE MAIN 4,98T,295.00 1,808,T20.W 6,5T4.016.00 REPLACEMENT-DADE BLVD MT (Project # Mn) WATER & WASTEWATER MAINS AND REHAB - AERIAL WTR - 91 T,BB5.40 91T,B95.40 MAIN RPLCMNT411MRDNYCHS(Project#6T4M) WASTEWATER STATIONS REHABILITATION -SEWER PIMP 3,221,83300 792,976.00 4,014,809.W STATION 1 REHABILITATION (Project If 6W32) NSPYC RESTROOMS(Project# 20600) 2,2W,958.00 3W,OW00 2,5W,9%.00 MARINE PATROL DOCK IMPROVEMENTS (Project # 21025) 93,900.00 85,000.00 178,900.00 WASTEWATER STATIONS REHABILITATION 43,698,402.00 18.880.00 43,717,2B2.00 (Project # 2W 19) N. 1.)$4,M9 .MMfondingsillbetre %W fromtbe Fire Flax Pn d&Hmp"141stproject(#64032)bdu NM ngprojects a.WaWr&Waatmy rMains Snd Rehab(ProjacWMM)-$7N., 7.00 b. Sewer Pu, &mon No.2 ReMbilHetlan (PmjecW "M2)-$1,8W,Il3,W c. pone Mein Repbrcaenl-0a]e Blvd Mt (Project# AMA-$1.606,M0.W 0. $e+rer Pun, Station l ReMbileamon (ProjectO 6302)-$782,6711.09 2.) $4,189,759.110 afunda,.11 be hawtrm from Ve WSW Mein Replacement Colons 4-15 proem (064232) b the Witsvi pT projecb: a. WaebweW Seldom RMadl ww (PmlecU W619)- $18.8W W b. Water & Waebwater maim am Rebab (Project# 28520)-$1,6Y2.333.00 , Water Banner SAW. 750 St (Pmpcb 64632)- 5800,WO 00 A, PS22 DisduMe Face Main - Nome dy Isle (Projet# M832)-$830.6W.60 0. MASI Water Main Replacement 415t#.lergianlCbase (PmjeM 67432)-$91],095.40 3) $3,369,M4.40 M Mndng will ba transferred flan the Water Bowler SbibnEelle Isle project (#64532) t to bllpwing project: e. PS22 Diaclmrge Force Main - Nomand, We (Prolec6166832)-$18,879.66 W PS14 Sewer Distmi to Fome Main Replacement (Pmjec01(8632)-&T,M9,8M.T4 a Se..er Petry Stallion 1 ReMbllXa4on (Projedx 63632)-$10.N8,00 4.)$2,354,929.00 Of funding will be tuwtearredTom flu Water Booser St0on- Teminal Isle project WK 2) to Me folbMn9 project: a. PS22 DWbage Face Main - NpmerMy Isle (Project# 66832)-$l.V7. 6114 to. PSI Sewer Di.IW,e Force Main Replt..(P.,x,# 66832)-$1.277.567.26 5.) STOX.00D MMm, will a turubrsed from tle Water Booster SWbO25M St project (#63732) b TO bllowitg project: e. Water Bower St8pn75A St( rOI 84632)-$1.o2Q000.00 i1. SOURCE Rting beurp OF FUNDS .dewae v assail An1.lre.a 1LI]INO flera..a OMtllyltt ienp Fune s 2.m6Do $ b )A)8430.00 Ceplbl Renewal B RghmnM 59J6Ill ei 3.938.3H.M TnesePnes-emT,beenal 110 a0a OG 110,000M NaMBeub PudicOntlY ill "Iil 141,3a3.D ]b Asset Ge We 1020.000A6 immoDoo Minhels"Repo ]5A00A0 7640003 Fill In Liu..., 3SCA9100 2.L.Al. Cananervy Wneges-illessabl Fame 1250}7D DO 12.,7s Jai Cmwmncy Meamens Fune (161.00A.00) (161.p00W1 RDACTyCenkr Renwel B Reple¢menl DM621W 360,62]00 L-1 Option Gas Ten (300.OW.W) (WO.000oo) C-PIMI Pmbcb Rnenpe SyMer Funds 1.Ofi2=An 1A630i300 Pamyh Ym Go -Cases Fund 23T61.990W 25T57,39BA0 CeplhlRwePe e2i0.92B➢3 435.000.00 A)0592600 flu.,a- Souse bM 2,335.336➢3 1.191D6A0 R®MTee-W1 Se. 3,Ii0.113M 3,170.11500 RoplTu-..IWO 3Ae 2.AA D.D.b.➢0 2015 Re¢an Is Rewnue 0m6 2A1351I 2b13,N3A0 RDADene52015A IA04... 1,gY,i88A0 ZIAy MRDACeplbl Fune IA229)iA0 1A22,AOA0 I- GO Bond¢ Negnduc. Irs'.. <BSAD 465W 2AA GO Ann. Fm A., 22916A0 22,%SDO 2CO3 GO Bonds Pu43 R. 13A11A0 13011A0 2CO3 GO donee h.sliunonee 16MOA0 IB.�SAO Scu61 Pointe Cep'NI 2.776.00 2.T6➢0 2019 GO Rands- delgneomwee s a..... 76,11800 76.74040 2023A M 11. ill. 3 Fed6Aee GCB I.Can.1 Aab}B9A. IMA.Te9A0 M238M. 1a.1.3 FoleasGCB I.D. 400MOA0 aOD.. 2025Webr6 - Bcnds 5N,1gB3a S .7WAe WeW. hexer CaplY l Pr. N na. tern Ctxe6ons IA1.ASAA0 2AM161 18,12a}51A6 201]YNYr63ewx Bcne¢ 3,79.72I.110 WeW..w.ne seed¢ W10 AUSDA 835.W ....less., bMFees b3,mW 363}T 00 Gull.. 2006 me AD 5T21.LB 2000 Wasr a sewer annex 21AI0W 21 AID SMmweNr Prolec6-NCCILA 206.952.AD 280A..0 hum We&r lentil notBanda 1297.M LB 1T9]]W.OD Cm2ndan Center Opo-eAng Fund 1I .DDDo I lime.73940 Conwnecn Center Renewal. Rewapment 1A53000A3 1/63000A0 ROAGamges .0lADA MOAOOAO sage Fund 9W AOOM NOMAD ROACOIIme Geroge Opeatona SSA➢0ow 330,00040 19H Call 5eMce CcnaWCCm 122IDA. 122A30A0 2010 Palling Acres As, MAD 613815A0 2015 Pa., Rewnue donee 113256W 113 ADID) PeNrp Caplu nail bones 2BA74AMM 2BA74AMOO FIeHnYmgemsl 4587AOO.CO e..,AD 00 CommumMons 39.000DA 39p00 in N)..Al e.. asseargr.111 ne nnehmd Fpm Ne Rm Fbx PreatYdmllia.l 1projM(e81032)b Ne blbwing pmvb: W ..whassa Mlinsib Beneb(l. o.28520)STS.Z00 d..-ra-p 6bdm No, 2 RMe1,11.1.1 (Pmle-b' 641321' $I A50.11D .Faro WInls.0h. I..de&W M(PmpW 638321' 11".12000 d.hmrPump h6AmlReNdgM1am(ProptlY6Y32)-biBtb]B 00 2)H1bg.]59A0011unns,-111. nab-IM1pn Ne WeM1Min Rgleuhank.I.I.<-IS propmeD.232) Y Te bllning p s.Waelm'aYrhds... Rena WiYdm(Pmjd20619)-bleMAO E. Well. We¢beeW Wins eM Rehab(Pmpd 28520)- E1S12.33103 . Water Bowbrsbtlan)RADFmpd36a632)-11800.000 D M22 Discharge Forte Win - Normendyise(Project sesi2)-18160 e. pvlY Web' WIn ReplepmeMtlabMndien6lra¢e(Prcjette fi]6321' 391]A95a0 3)E3,389A04 40 Va,rdmg w,a MaenabrrMM1pm Ne We&r dmsWhYOonAYls Isle proeetbl 532)b Ne HlwNg pmpcb: e.PM2DYcnege Form Mln-Narmendyisle(Pmjx 668R) 318479A6 b.P514Smer015cnagel-W1nR l..mM(Pmjed66632)-53,MA2614 aSe Pump Sdton1RenabilibBm(PrG 6MMI'1ID296A0 4.)U2 M,929000,dingwill We ns"d M1Om Na WakrMmOrhb n-Tamlmimi YMpm (YMa.32)btablwag Penes. e. ph220iecMge FOrp Wn-Nmmaney Ble(Pmiec1Y 88033631pT %1.N b. Ph1a SexerDlaNege Forte Win RepYmmM(PmjeW 6fifi33)-31T]rAfii26 5)51.028.gI0dNndlry Mllbeben¢bmd M1wn qe WaMhmMhlebnR6X hlpmytl(Y63]33)IomeMlvnnp pmjxY: e. WSMettaMBYtlan-)bq by(Prpjeap6a632)-Etp26,g1000 BUDGETATTACHMENT C PROGRAMS 'idol Amended Revised Program Area FY2026 12/172026 FY2026 Capital Budget Capital Budget M in Public Places $ 75,000.00 $ - $ 75,000.00 Bridges 600.000.00 - 600,000.00 CommunityCenters 2,645,789.00 350,000.00 2,995,789.00 Convention Center 16,380,110.00 - 16,380,110.00 Cultural Seroces 400.000.00 - 400,000.00 Endronmental 470.000.00 - 470,000.00 Equipment 12.844.291.00 - 12,844,291.00 General Public Buildings 24,389,860.00 85,000.00 24,474,860.00 Golf Courses 3,494,000.00 - 3,494,000.00 Monuments 133,000.00 - 133,000.00 Parking 11.808.236.00 - 11,808,236.00 Parks 27,629,840.00 - 27.629.840.00 Seawalls 8,322,374.00 - 8,322,374.00 Streetsroidewalks/Streetscapes Improvements 5,094,163.05 - 6,094,163.00 Trans iV Transportation 387,773.00 - 387,773.00 tltllifiea 23,984,804.00 3,528,988.00 27,513,772.00 8 00 S 142 62 3 208t Nate: 1.) $4,999,458.00 of funding will be transferred from the Fire Flow Project 9-Hospital-41 st project (#64032) to the following projects: a. Water 6 Wastewater Mains and Rehab (Pmject# 28520)-$759,947.00 b. Sewer Pump Station No. 2 Rehabilitation (Projects 64732) - $1,850,113.00 c. Force Mein Replacement -Dade Blvd M(PmjecM 63632)-$1,606,720.00 d. Sewer Pump Station 1 Rehabilitation (Projec# 63632) - $782.678.00 2.) $4,189,759.00 offunding will be transferred from the Water Main Replacement Collins 4.15 project (#64232) ro the fallowing projects: a. Wastewater Stations Rehabilitation (Projects 20619) - $18,880.00 b. Water 6 Wastewater Mei ns and Rehab (Projects 28520) - $1,622.333.00 c. Water Booster Station 76th St (Project# 64632) - $800,000.00 d. PS22 Discharge Force Main — Normandy Isle (Project# 66832) - $830,650.60 e. Aerial Water Main Replacement 41 a I'Mend ian/Chas a (Projects 67432) - $917,895.40 3.) $3,389,004.40 of funding will be transferred from the Water Booster Station -Belle Isla project (#64532) M the following projects: a. PS22 Discharge Force Main — Normandy Isle (Project# 66832) - $18,879.66 b. PSI Sewer Discharge Force Main Replacement (Project# 66632) - $3.359.826.74 c. Sewer Pump Station 1 Rehabilitation (Project# 63632) - $10,298.00 4.) $2,364,929.00 of funding will be transferred from the Water Booster Station - Terminal Isle project (#64432) to the fallowing projects: a. PS22 Discharge Force Main — Normandy Isle (Project# 66832) - $1,077,361.74 b. PS14 Sewer Discharge Force Main Replacement (Projects 66632) - $1,277,567.26 5.) $1,026,000 of funding will be transferred from the Water Booster Station-25th St project (#63732) to the following projects: a. Water Booster Station-75th St (Project# 64632) - $1,026,000.00 Resolutions - R7 A MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor Steven Meiner and Members of the City Commission FROM: Eric Carpenter, City Manager DATE: December 17, 2025 2:00 p.m. Public Hearing TITLE: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE FIRST AMENDMENT TO THE CAPITAL BUDGET FOR FISCAL YEAR 2026 AS SET FORTH IN ATTACHMENTS A, "PROJECTS"; B, "SOURCE OF FUNDS"; AND C "PROGRAMS." RECOMMENDATION The Administration recommends that the Mayor and City Commission adopt the attached Resolution. Planning for capital improvements is an ongoing process; as needs change within the City of Miami Beach (the "City"), capital programs and priorities must be adjusted accordingly. The Capital Improvement Plan ("CIP") serves as the primary policy and planning tool for systematically identifying, prioritizing, and assigning funds to critical City capital improvement projects. The City's CIP and Capital Budget development process begins in the winter when all departments are asked to prepare updates and requests on their department's ongoing and new proposed capital projects. Individual departments prepare submittals identifying potential funding sources and requesting commitment of funds for their respective projects. The CIP is updated annually and submitted to the Mayor and City Commission for adoption. The Fiscal Years ("FY") 2026 — 2030 CIP and FY 2026 Capital Budget was adopted on September 30, 2025 by Resolution No. 2025-33948. ANALYSIS FIRST AMENDMENT TO THE FY 2026 CAPITAL BUDGET The proposed First Amendment to the FY 2026 Capital Budget reflects an overall increase of $3,963,968.00 and the re -alignment of $15,959,150.40 for the following capital projects: 1. Water and Wastewater Mains and Rehabilitation - Pump Station 14 Sewer Discharge Force Main Replacement (66632): The City operates two sanitary sewer pump stations on the Sunset Islands, identified as Sewer Pump Station 13 and Sewer Pump Station 14. Both stations are critical components of the sewer transmission system serving all four islands. Sewer Pump Station 14, located on Sunset Island No. 2, receives sewer flows from Sewer Pump Station 13 and conveys flows from the Sunset Islands to the mainland and onward to Sewer Pump Station 28. The need for force main replacements on the Sunset Islands was identified following the failure of the subaqueous portion between Islands 2 and 3, which resulted in sanitary sewer overflows (SSO). The Sunset Islands 2 8 3 Sewer Force Main Replacement Project ("Project 1") is currently under construction, and the Pump 2348 of 3458 Station 14 Force Main Replacement Project ("Project 2") will provide improvements from Pump Station 14 to the mainland. Based on the estimated construction costs, the Pump Station 14 Force Main Replacement Project ("Project 2") will require approximately $4,637,394 to address the immediate financial needs of the project. Funding for this proposed amendment would come from the Water and Sewer Capital Projects funded from Operations Fund (Fund 418) which was previously appropriated to the following projects that remain nece>sary but are currently on hold due to a shift in utility project priorities within the Public Works Department. • Water Booster Station -Terminal Isle (#64432) - $1,277,567.26 • Water Booster Station -Belle Isle (#64532) - $3,359,826.74 Prior Years' Appropriations $0.00 December 17, 2025 Budget Amendment 4,637,394.00 Proposed Total Appropriations $4,637,394.00 2. Water and Wastewater Mains and Rehabilitation - Hawthorne Force Main Replacement (#67032): The City of Miami Beach experienced two major failures of the Pump Station (PS) 24 — 16-inch Ductile Iron Force Main in May 2023 and October 2025. This critical sewer line serves Biscayne Beach and Biscayne Point, transporting wastewater across the Tatum Waterway and through environmentally sensitive areas to Pump Station 23 and ultimately to the Miami -Dade County Wastewater Treatment Plant. While temporary repairs were completed following both incidents, the second break exposed extensive pipe deterioration. Subsequent inspections confirmed that the force main has exceeded its service life and is at high risk of continued failure, posing immediate threats to public health, environmental integrity, and the surrounding properties. Although the force main is included in the City's Capital Improvement Master Plan for replacement between 2026 and 2032, the severity of its condition now requires accelerated emergency replacement. Additional funding is, therefore, needed to initiate this unplanned but urgent infrastructure project to prevent further system disruptions. Funding for this proposed amendment would come from fund balance that is available for appropriation in the Water and Sewer Operating Fund (Fund 425) that will be transferred to the Water and Sewer Capital Projects funded from Operations Fund (Fund 418). Prior Years'Appropriations $0.00 December 17, 2025 Budget Amendment 3,528,968.00 Proposed Total Appropriations $3,528,968.00 3. Water and Wastewater Mains and Rehabilitation (#28520): The City of Miami Beach is undertaking a critical infrastructure project to rehabilitate the existing 10-inch subaqueous sanitary sewer force main located beneath the MacArthur Causeway and Terminal Island. This pipeline has been out of service for several years due to a failure, prompting the installation of a temporary aboveground high -density polyethylene (HDPE) bypass system to maintain sewer service between Pump Station 30 (Terminal Island) and Pump Station 2 (Star Island). Restoration of the original force main is essential to eliminate the temporary bypass and ensure long-term reliability. 2349 of 3458 This initiative, designated as a Critical Project in the 2019 Sewer Master Plan and requested by Miami -Dade DERM, is part of a broader effort to reinforce the City's wastewater transmission system. Concurrently, the City is replacing two aging 30-inch force mains along Pine Tree Drive, which are vital for conveying wastewater from northern Miami Beach and neighboring municipalities to the Miami -Dade Central District Wastewater Treatment Plant. During construction, the contractor encountered several unforeseen site conditions, including undocumented underground utilities, unexpectedly deep pipe elevations, and malfunctioning isolation valves. These challenges necessitate a construction change order to implement a sanitary sewer bypass system and procure additional materials such as pipes, fittings, and appurtenances. As a result, additional funding is required to address these conditions and ensure the successful completion of this high -priority infrastructure project. Funding for this proposed amendment would come from the 2025 Water and Sewer Bond Funds (Fund 417) which were previously appropriated to the following projects that remain necessary but are currently on hold due to a shift in utility project priorities within the Public Works Department. • Water Main Replacement on Collins Avenue from 4" Street to 15' Street (#64232) - $1,622,333.00 • Fire Flow Project 9 -Hospital and Water Main Replacement along the 415' Street Corridor (#64032) - $759,947.00 Prior Years' Appropriations $78,790,395.00 December 17, 2025 Budget Amendment 2,362,280.00 Proposed Total Appropriations $81,172,675.00 4. Water and Wastewater Mains and Rehabilitation - Normandy Isle Pump Station 22 Discharge Force Main Replacement (#66832): The City of Miami Beach is advancing a critical infrastructure project to replace the discharge force main serving Sanitary Sewer Pump Station 22 in Normandy Shores. This 12-inch pipeline, originally constructed decades ago, has reached the end of its service life and now poses a significant risk to the reliability of the City's wastewater transmission system. Pump Station 22's force main is the sole conduit for conveying all sewer flows from Normandy Shores. In recent years, the pipeline has suffered multiple breaks, including a major failure in 2024 on the Normandy Shores Golf Course. These incidents have underscored the vulnerability of the system and the potential for costly service disruptions, environmental impacts, and public health concerns if the line is not replaced. The 2019 Sanitary Sewer Master Plan identified this force main as a priority replacement within the 2020-2025 planning horizon. While permitting is underway, additional funding is required to ensure timely completion of the project. Securing these resources will allow the City to mitigate further risk, maintain regulatory compliance, and safeguard essential wastewater services for the Normandy Shores community. Funding for this proposed amendment would come from both the 2025 Water and Sewer Bond Funds (Fund 417) and the Water and Sewer Capital Projects funded from Operations Fund (Fund 418) previously appropriated to the following projects that 2350 of 3458 remain necessary but are currently on hold due to a shift in utility project priorities within the Public Works Department. Water Main Replacement on Collins Avenue from 4' Street to 1P Street (#64232) - $830,650.60 Water Booster Station — Terminal Isle (#64432) - $1,077,361.74 Water Booster Station — Belle Isle (#64532) - $18,879.66 Prior Years' Appropriations $0.00 December 17, 2025 Budget Amendment 1,926,892.00 Proposed Total Appropriations $1,926,892.00 5. Wastewater Stations Rehabilitation - Sewer Pump Station No. 2 Rehabilitation (#64732): The City of Miami Beach owns and operates Sewer Pump Station No. 02 (PS 02), located on Star Island. This facility is a vital component of the City's wastewater collection and transmission system. In addition to serving Star Island directly, PS 02 repumps flows received from Palm Island and Hibiscus Island, and conveys all wastewater across Biscayne Bay to the Miami Beach main island. From there, flows are directed to regional Pump Station No. 01 for transmission to the Miami - Dade County Central District Wastewater Treatment Plant at Virginia Key. Due to its deteriorating condition, PS 02 requires comprehensive rehabilitation to ensure continued reliable operation. The project design and permitting phases have been completed, and the work is now ready to advance into construction. Timely rehabilitation is essential given the station's role in handling flows from multiple islands and transmitting them across Biscayne Bay, where system redundancy is limited. Any failure at this facility would pose significant risks to service continuity, environmental protection, and public health. Funding for this proposed amendment would come from the 2025 Water and Sewer Bond Funds (Fund 417) previously appropriated to the following project that remains necessary but is currently on hold due to a shift in utility project priorities within the Public Works Department. • Fire Flow Project 9 — Hospital and Water Main Replacement along the 41�t Street Corridor (#64032) - $1,850,113.00 Prior Years' Appropriations $0.00 December 17, 2025 Budget Amendment 1,850,113.00 Proposed Total Appropriations $1,850,113.00 6. Water Pump Stations Improvements - Water Booster Station — 75' Street (#64632): The City of Miami Beach owns and operates the Water Booster Pump Station at 75" Street, located adjacent to Park View. This facility is a critical element of the City's potable water distribution system, ensuring reliable service and adequate fire protection for residents and businesses in the North Beach area. The booster station manages flows to and from the onsite storage tanks, equalizes pressures, and maintains stable water distribution across the system. Most importantly, it provides the capacity to sustain required fire flow pressures during emergency events, thereby safeguarding public safety and property throughout North Beach. 2351 of 3458 Given its essential role in equalizing system flows and maintaining fire flow rapacity, timely rehabilitation of this facility is considered a critical priority. Continued operation without improvements risks service reliability and the City's ability to respond effectively to emergency conditions. The project requires additional funding to advance rehabilitation efforts and ensure the long-term resilience of the potable water distribution system. Funding for this proposed amendment would come from the 2025 and 2017 Water and Sewer Bond Funds (Fund 417 and 419) previously appropriated to the following projects that remain necessary but are currently on hold due to a shift in utility prcject priorities within the Public Works Department. Water Main Replacement on Collins Avenue from 4' Street to 15� Street (#64232) - $800,000.00 Water Booster Station — 25 ° Street (#63732) - $1,026,000.00 Prior Years' Appropriations $3,030,9a4.00 December 17, 2025 Budget Amendment 1,826,000.00 Proposed Total Appropriations $4,856,984.00 7. Water and Wastewater Mains and Rehabilitation - Force Main Replacement at Dade Boulevard (#63832): The City of Miami Beach owns and operates its sanitary sewer collection and transmission system, which includes a subaqueous force main that has been in service for more than 50 years. This pipeline has exceeded its expected service life and, as identified in the 2019 Sewer Master Plan, represents a critical asset with a high probability of failure. A failure of this line could cause environmental issues, particularly for local waterways. The goals of the project are to enhance system reliability, increase capacity and resiliency, and prevent environmental harm in the event of a failure. The City has completed the design phase and is now proceeding with the issuance of an Invitation to Bid (ITB) for construction. Given the age and condition of this subaqueous force main, timely replacement is essential to safeguard public health, protect the environment, and ensure the continued reliability of the City's wastewater transmission system. Additional funding is required to advance the project into construction and deliver the improvements necessary to secure long-term system resiliency. Funding for this proposed amendment would come from the 2025 Water and Sewer Bond Funds (Fund 417) previously appropriated to the following project that remains necessary but is currently on hold due to a shift in utility project priorities within the Public Works Department. • Fire Flow Project 9 — Hospital and Water Main Replacement along the 4V Street Corridor (#64032) - $1,606,720.00 Prior Years' Appropriations $4,967,295.00 December 17, 2025 Budget Amendment 1,606,720.00 Proposed Total Appropriations $6,574,015.00 8. Water and Wastewater Mains and Rehabilitation - Aerial Crossing Water Main Replacement along 410 Street between Meridian Avenue and Chase Avenue (#67432): The City of Miami Beach owns, maintains, and operates its water 2352 of 3458 transmission and distribution system, which receives potable water from the mainland through four transmission mains connected to the Miami -Dade Water and Sewer Department (WASD). This project addresses one of those mains, serving customers in the Mid -Beach neighborhood. As identified in the 2019 Water Master Plan (Project W-38), this asset is critical to the City's water infrastructure. The project involves the complete replacement of approximately 155 linear feet of 8-inch Cast Iron Pipe (CIP) water main currently suspended beneath Bridge No. 870054 along West 41� Street, between Meridian Avenue and Chase Avenue. The existing pipe has exceeded its useful service life and is severely deteriorated. In addition, the project includes rehabilitation of the existing 30-inch CIP transmission water main located on the north end of the bridge. The purpose of this project is to improve service reliability, expand system capacity, and enhance the resiliency of the City's water transmission and distribution system for future generations. Timely funding is required to advance construction and ensure that the Mid -Beach community continues to receive reliable potable water service and adequate fire protection capacity. Funding for this proposed amendment would come from the 2025 Water and Sewer Bond Funds (Fund 417) previously appropriated to the following project that remains necessary but is currently on hold due to a shift in utility project priorities within the Public Works Department. • Water Main Replacement on Collins Avenue from 41° Street to 15' Street (#64232) - $917.895.40 Prior Years' Appropriations $0.00 December 17, 2025 Budget Amendment 917,895.40 Proposed Total Appropriations $917,895.40 9. Wastewater Stations Rehabilitation - Sewer Pump Station 1 Rehabilitation (#63632): The City of Miami Beach owns and operates Sewer Pump Station No. 01 (PS 01), which is a critical facility that provides sewer service to all of South Beach and also receives flows from Star Island, Palm Island, and Hibiscus Island. As one of the most strategically located and heavily relied upon pump stations in the system, PS 01 plays a vital role in conveying wastewater flows southward for treatment at the Miami -Dade County Central District Wastewater Treatment Plant in Virginia Key. PS 01, which shares its site with Fire Station No. 1, has structural deficiencies that pose a significant risk to the reliability of the facility and the broader sewer conveyance system. Given the pump station's importance in serving high -profile residential and commercial areas, postponement of these improvements is not an option. Addressing the structural rehabilitation of PS 01 is, therefore, considered an immediate and critical priority to ensure uninterrupted sewer service, protect public health, and maintain compliance with regulatory requirements. In addition, regulators have directed that an asbestos survey be conducted at this facility prior to completing permitting efforts. This amendment incorporates the asbestos survey scope along with the structural improvements, ensuring compliance with regulatory directives and the safe completion of the project. Funding for this proposed amendment would come from both the 2025 Water and Sewer Bond Funds (Fund 417) and the Water and Sewer Capital Projects funded from Operations Fund (Fund 418) previously appropriated to the following projects that 2353 of 3458 remain necessary but are currently on hold due to a shift in utility project priorities within the Public Works Department. • Fire Flow Project 9 — Hospital and Water Main Replacement along the 41" Street Corridor (#64032) - $782,678.00 • Water Booster Station -Belle Isle (#64532) - $10,298.00 Prior Years' Appropriations $3,221,833.00 December 17, 2025 Budget Amendment 792.976.00 Proposed Total Appropriations $4,014,809.00 10. Wastewater Stations Rehabilitation (#20619): The Cityof Miami Beach is advancing the rehabilitation of Pump Station No. 29, one of the largest and most critical elements of the City's sewer infrastructure. This facility receives sewer flows from smaller stations in North Beach, the Town of Surfside, Bal Harbour Village, and Bay Harbor Islands, making its reliable operation essential to the broader wastewater transmission system. The rehabilitation project includes replacement of mechanical components such as pumps, piping, valves, and meters, as well as 800dproofing and storm proofing of aboveground components. These improvements will extend the service life of the station and enhance its resilience against extreme weather events. A change order has been identified to incorporate the design of additional mechanical pipes within the pump station yard. This enhancement will ensure compatibility with future force main projects connecting to the station. By including this scope in the current project, the City anticipates reduced disruptions to the adjacent FOOT roadway during future construction, ultimately lowering overall costs and minimizing impacts to the public. Funding for this proposed amendment would come from the 2025 Water and Sewer Bond Funds (Fund 417) previously appropriated to the following project that remains necessary but is currently on hold due to a shift in utility project priorities within the Public Works Department. • Water Main Replacement on Collins Avenue from 4' Street to 15'h Street (#64232) - $18,880 Prior Years' Appropriations $43,698,402.00 December 17, 2025 Budget Amendment 18,880.00 Proposed Total Appropriations $43,717,282.00 11. North Shore Park Youth Center Restrooms (#28600): This project contemplates a new building adjacent to the North Shore Park Tennis Center, which includes new restroom facilities for general park users within the proximity of the fields, and a shell space intended to be used as a future concession space. In December 2024, the Parks and Recreation Department received a request from Van Daalen Tennis, LLC. (Operator), the operator of the Miami Beach Tennis Center, to add a terrace area on the east side of the future concession space. In January 2025, the Office of Capital Improvement Projects (CIP) received an updated request from the Operator to expand the requested terrace to accommodate an enlarged outdoor seating area for the future concession space. 2354 of 3458 On April 8, 2025, the North Beach Community Redevelopment Agency (CRA) Advisory Committee recommended that the CRA allocate up to $350,000 toward the enhancement of the Project's current scope. The CRA funds would support the completion of facility enhancements, including, but not limited to, structural improvements, expansion of the terrace area and additional lighting, relocation of the ADA ramp, and other related work to accommodate the requested outdoor seating area. On July 6, 2025, the City Attorney's Office (CAO) determined that the CRA funds could not be used for this work, pursuant to Section 163.370(3)(b), of the Florida Statutes, since CRA TIF Revenue cannot be utilized for "the installation, construction, reconstruction, repair, or alteration of any publicty owned capital improvements or projects if such projects or improvements were scheduled to be installed, constructed, reconstructed, repaired, or aftered within 3 years of the approval of the community redevelopment plan..." While the CRA Advisory Committee and City staff were working under the interpretation that the request for the additional outdoor terrace was an added and independent scope to the Project, the CAD clarified that this work fell within the three-year prohibition and met the definition of an alteration to an existing capital project. City staff had discussions with the Operator and the Parks and Recreation Department to clarify the scope being requested and associated costs. The additional scope requested includes 1) an expanded terrace along the east face of the shell space, 2) additional lighting as required by code, 3) additional railings along the new terrace, 4) modification of the existing roof ladder, 5) design and installation of a grease trap system and 6) alteration and installation of the required ADA ramp. City staff reviewed the above scope with the consultant and contractor and developed an estimated total budget of approximately $350,000, including design, permitting, fees and construction costs. Recently, the Operator has indicated a desire to improve and complete the interior of the shell space in order to provide the intended cafe offerings contemplated in the Management and Operation Agreement and has informed City staff that they are prepared to commence preparation of design and construction documents. Pursuant to the recommendation of the Finance and Economic Resiliency Committee (FERC) at its October 15, 2025 meeting, the scope of the project is recommended to be expanded to include additional structural improvements, terrace expansion, enhanced lighting, ADA ramp modifications, and the installation of a grease trap system. Accordingly, this budget amendment is being presented in conjunction with a companion item on today's agenda, which seeks the Mayor and City Commission approval of the FERC recommendation. The proposed amendment reflects the funding necessary to support the expanded project scope and facilitate implementation upon Commission approval. Funding for this proposed amendment would come from fund balance that is available for appropriation in the Capital Reserve Fund (Fund 304). Prior Years' Appropriations $2,200,956.00 December 17, 2025 Budget Amendment 350,000.00 Proposed Total Appropriations $2,550,956.00 2355 of 3458 12. Marine Patrol Dock Improvements (#21025): The City of Miami Beach is advancing a project to reconstruct the Marine Patrol Facility Dock, located adjacent to the existing docking and twat ramp facilities at Maurice Gibb Memorial Park. The existing dock is proposed to be demolished and reconfigured to accommodate the mooring of vessels for both the City's Police Department Marine Patrol and the City's Fire Department. This reconfiguration will enhance operational readiness and ensure adequate docking capacity for critical public safety functions. Initially, the permit budget for this project was estimated based on conceptual costs. While advancing and refining the project scope and design through the permitting phase, we have identified a probable budget shortfall. This determination is based on the current permit fees for other projects of similar size and scope with the relevant regulatory agencies and the City of Miami Beach (CMB) Building Department. As a result, additional funding is specifically needed to cover permitting fees not currently accounted for in encumbered funds. These fees include those required by regulatory agencies such as the Department of Environmental Resources Management (DERM), the Flodda Department of Environmental Protection (FDEP), the U.S. Army Corps of Engineers (USACE), and the City's Building Department, as well as Capital Improvement Project (CIP) fees based on actuals from FY 2025. Given the facility's importance in supporting police and fire marine operations, timely approval of supplemental funding is essential to ensure compliance with regulatory requirements and the safe, efficient completion of the project. Funding for this proposed amendment would come from fund balance that is available for appropriation in the Capital Reserve Fund (Fund 304). Prior Years' Appropriations $93,9W.00 December 17, 2025 Budget Amendment 85,000.00 Proposed Total Appropriations $178,900.00 FISCAL IMPACT STATEMENT See detailed information provided above. Does this Ordinance require a Business Impact Estimate? (FOR ORDINANCES ONLY) If applicable, the Business Impact Estimate (BIE) was published on: See BIE at: https://w w.miamibeachfi.gov/city-hallicitytlark/meetino-notices/ FINANCIAL INFORMATION See detailed information provided above. CONCLUSION The City Administration recommends that the Mayor and City Commission adopt the First Amendment to the Capital Budget for FY 2026 described herein and further detailed in Attachments A-C of the accompanying Resolution. EC/JDG/TOS 2356 of 3458 Applicable Area Citywide Is this a "Residents Riaht to Know" item. Is this item related to a G.O. Bond pursuant to City Code Section 2.177 Project? Yes Nc Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2.481, includes a principal ennaaed in lobbying? No If so, specify the name of lobbyist(s) and pdncipal(s): Department Management and Budget Sponsor(s) Co-sponsor(s) Condensed Title '2:00 p.m. PH, Adopt 1st Amendment to the FY 2026 Capital Budget. OMB Previous Action (For City Clerk Use Only) 2357 of 3458 ATTACHMENT A FY 2026 CAPITAL BUDGET PROJECTS AMENDED ID17IM25 Mopto ReYWO Capital Psaj A Name FY Mn 1ZInMUS FT MI C.,Ral BuE9at CaPMI Budget WATER B WASTEWATER MAINS AND REHAB - FIRE FLOW S 4.999,458 S 14,999.s5B) f - PROJECT %HOSPITA.JIST (PMOct N 610J2) :WATER A WASTEWATER MAINS AND REHAB - WATER "N 4,189MM (4,1M.TSM) - RERACEMEM-COLLINS 4-15(PMjw R WV) WATER PUMP STATIONS IMPROVEMENTS - WATER BOOSTER STATION -BELLE ISLE (Pmpd Y 8M532) 3.430.000.110 13,3B9.W4401 40.995.60 WATER PUMP STATIONS IMPROVEMENTS - WATER 2.351.929.00 (2.354,928.00) - BOOSTER STATK3NMI TERNAL ISLE Mropd S 0"321 WATER PUMP STATIONS IMPROVEMENTS - WATER 2,I59.568.00 I1.0M.000.m) 1133.SBBBO BOOSTER STATI0N25TH ST (Propet N 6JTJ2) WATER B WASTEWATER MAINS AND REHAB -PSI4 SEWR - 4.07.3%M 4,63T,394.00 DSCHRG FORCE MAIN RPLCMNT (Propel N 86832) WATER B WASTEWATER MAINS AND RENIB - FORCE MMN - 3.U8,968.M 3, 5M.96BM REPLACEMENT-HIAWTH ORW (Pmpd N 670M) WATER S WASTEWATER MAINS AID REuKAB(PMjMN 70,790,39500 2.382380.00 81,172,67500� !28520) WATERB WASTEWATER MAINS AND REINS-PSi2 - 1,9M.882.00 1,928,892.00 DSCHRG FRC MAINNORMAHDY ISLE (Pr N668321 !WASTEWATER STATIONS REHABILITATION - SEWER PUMP - 1,BW.11 J.00 1.BSO,t 13.00 STATION 2 REHABILITATION (Roper 4 64132) IWATERPUMPSTATIONSIMPROVEMENTS-WATER BOOSTER STATION75TH ST (Pr131N1 N 64632) 3=1*4.M 1.828000.00 4.8%.994.M WATER E WASTEWATER MAINS AND REHAB - FORCE MAIN 4.967,2%M i,606TM.00 6.57A,015,M REPLACE MENT-DAOE BLVD MT (Pmpd N 63832) WATER A WASTEWATER MAINS AND REHAB -AERIAL WTI - 917,895.40 917,895.40 MAIN RPLCMNTJIMRUNCIIR (Pr*d N 674M2 WASTEWATERSTATIONS REHABILITATION - SEWER PUMP 3,221.BJ3.Op i92.9T8.00 4,D14.IKR.00 STATION 1 RE UTATION (PrcjM N 153632) NSPYC RESTROOMS(PMJW S 21MII 220D956.00 M."w 2, 5W.95 M MARINE PATROL DOCK IMPROVEMENTS (Pmpd 021M) 93.900.M MMM 176.900 M WASTEWATER STATIONS REHABILITATION 43.6N 4M W 18.880.00 43. 717,2U W (Propel•206181 1.) as Mtrwulra(Pm MFse)) Ptcpa 4HwPHY 41 st Ptasd lN8lpYllb Bro bbwap pgecb 5A W0bleaan aWW 8WaW a Waha a50.1W W2Ia111RaMa (P 64732)-VMW e.Fe Punyap W2RaMMNMrtmMW15 c. Fan Man R4plant Bv8MI(Pt 12)y Ift I R*I, 53a3622)751808.)ZOOp 0 Saw Puttp Slapm 1 RenaHY4n (PtgeM 6i[321-SI82fiR N 2.) f4. 1079 W W NMm9 wil n VaMl "Ne Water Man Rep'an tCWMS 4.15 prgea (N84232) b tM blbmlq M,ecla a Wase tx Slet*ns RMe Mateo IF"" 2[619)-f18810W E. Wabr8 Wtala w wons am Renab(Prolecp 28520) $1812333M c Water BaoNr Sta.]5A St(PtopM WM)- WIN)M N N. PS22 Ds WFan Main -N mly Isle (PrgacNt 8863]) f830.SMW a WW.WMan Regxnront41LLAWbiwT;Mse(Pm 8I432)-S91].89540 3) 533119,(MM Q d krWV Ml n laaml* ]han tla WM 9orn1er 5Yban9tlb W agec11N64532110 tM tlx pgx4 a. PS14 DnW9e Taw Man- NOn Isle lPtgasN fi88T2)-11a,N]988 P514S Rwu 8321-13.359828 ]4 Taw HMn Raplawt c SbwuIe [ Sew PwP SIaOm 1 ReMdIRWn (aaa'Sr 838321 � f m298 W 83832)cIID 4) U 354.In M dM , M n PamlarW Ban nn Walw Llyaw Slats- Temswl Isle lltPlssl (A M432I b. ImO" P olaea a. PS22 Dadaaaa Faw Man-Na my W(Pmp"0MMU)-$1on MI. 74 b PSMSaw DM Fotw Man RgRa[wtwR(PmRwrMM)-112TT5BTM 5.1 SI.OM.9W d LIMvy M n hanMeR Imm Pe Wabr &pMer Stabam25Nl Si ages (N83]321b Bb Monrp agacb a Warr Bwrer SMbon>Slb St IPtaacM 64832) St @B o50 W 2358 of 3458 .TTACHNIENT FY SOURCE MENDED fvONfv, c. CMITA BUDGET OF FUNDS IZ17� bpwlRpr nE�i]ma Rxpi. uvRueNy.r �Inr..]F.m t W t newom <xT p Rwnnla—+l seY,]Mm Se]e,JMm Fp nw Ilpamm Nmrb.rn vw.e enrwu m xi].]m +n BRxl irnl. IpW.mWpm Ipm.opa.m pwe+pbe. r3oppm 1pamm xpa lnm x.wxmW Cmen.nyw+gmmswa]mNFw ISle,n]m 13M.r]]m Cxunny MgxeriW Iltlppm 1161mOm Pp.CM[nnr x.�ueRwYanxn Xppzlm Mp N]m tom Ma�W In lempm ml MJmpml CPYIPrym F.w pep�x Fw, Im}IRm Ip4A]iW PMN Yw fa LrpelFwN II]y ]%m }133.30.W CpilY Rwxr .3M YJm .]5Mm .1mRem Pxm bM� i3Jl.I 1.No RxM\m M1Bw9. II ]1]O tllm lllpllSm Rwen]u bxA NISNW Ye]PIm I }p131x.e1tu R.Yiw. Pma 2111.m Ee1J,bJm RO}.lFriw mlll I... 1m nsw CMLnwr Rpl.fanul FwN Im. m Ipl1,>].m IMp p]NM bgNerletl ]ngoxnxx M!m w arr apxm uwm xow ao ema pw apx upllm ISOIIm xawmearx NrcmxNmx lepesm Iu3.m Ixn pw,. cxM SrnW 3]+em norms-xyyYmxm.aT x Rpx.MMLrxrxl.a FxdbFxf2 iuExmq N IDII,IWm 14l,rypW }w3e Mtwuaitlw. R9)u!Y .mtmm Mpmpm Ewl MYra4w YN l4.iMY W,1MM WW aIFwrLyxlR}m WMxlpmGpxun i.YY.IM4 II'll 2011 W]Yraawv bxF 1 JIII RIm 1111121 n,0 ]III,WSW WYral.wppxbilp IDlO e]!m WSW wrraa.wrMxgFw. xiE3nm w.n>W oxsw xm] ]mW lnrm :ppovxwae... mw xIIIpW rllpm BMmwMPrtw!-SOC4 $Y➢5$.W }N wzW BMn WxRCpiW MbiW IAl]ppW LgMF.bnCxrpgw.Yq Fuip II1yNM,IN1%N 11]i l]pW CwiMnCRYRwwxl6RMu'nwll Iawpmm IWfmm O. frp.. Yp,mpm FUY NJ(mm Rp. RDAuwc..e.mx.vonr M smpmmG .. lIp.WU.m IxAl pplluq CauNOan 1]}Imm I}3.aMW zolo P.nup Barq. 113 Mp Nlm axbp P.xrn.bq. IIl2M 3YW II]35em Prrnp CVYlMbvtl. Ap].AYm }ellJpxim FlwlMnpnnxl xm]BWW BN1 Wpm Cmmmumxx'n lPWlm Jp.COpm NOY 1 I M W].M m W Yedpwlum.xnwxm MFn Aw pmrapwmpix�tYpgglxrowleMm�y gI11Fm • WYNaYMYOYrIMnxq RNpinrMuxxAl-t]•A.x]m R.rnr...on I..M.ea+vl-x em.Ixm • Faq yn PypnrrMu. xu YlPigr.>6wwl' a we.]W W e.�rwnpp..nr 1 RM.u.r.n IprM.nexiul' nez.exm ] I41N INm WNmy wee xn]xn0]pn MNYYr Min RwbrnxNCxm Rn3pgre IPlIEl3lbMtlbnn3 qq.9 AumP xiuNxr 1pipxi }Wln-gOeWm L W W 6YMNNxar]wm N R.nxIIRVO ielMl, it e1x.II] W nor Wort SNon]m AlPmxe.RN]EI' YW WE W C ppE3 WmrT iertt Min-NumxgYNN IF]gNr[ee]31-NJpBmep IwM VM1.r Min RpYYm.n.IrM.wnnKbwlFigFt. ex131-1p11 N]M ] I J] ]M.pN M M N� W y nll N MrYmO bm MWrw Bvrw fYrervBx. Y M pnlru IYNSl31 b M Mb+rq pipb9 . pazzp.u.T Fore Min-}wrmwrNYlxN.sem]]I'sle epee MN.T Fev ]wn Rglsn.X I}NMr�e eM JE i - t] l!p eM n Fn+rrp�mPJbwn I RMMlnem (RgxY em]}It103xm .I i} ]L DN m NNM.ry+.11 Mxn.Fn<bm M'MNr Baerrx Mwn. ]amr.vi b4prgw V4.JEl bM4av+p pr4r1 • P83i Cnwx. Face Wn-Nmm.xYNN IPrq a Yeul.f l pl1p pen 9.� 4rJrq Fae Mn RrggrnNn IMRr�mOltl-11I11501M f IUOM WppWrywrbrxrNa.Y FmM Wrw eanwJfgn}!n $pgvJlM]lylbM Gxwypgx\ w 1♦xnAN dlpMv.Cre]]IJ 2359 of 3458 BUDGETATTACHMENT C PROGRAMS Adopted Revised Program Ma FY2026 AmenMsa Amended ed FY2026 capital Budget capital Budget Art in Public Places $ 75.000.00 $ - $ 75,00000 Bridges 600.000.00 - 600,000.00 Community Centers 2,645,789.00 350.000.00 2,995,789.00 Conwntion Center 16,380,110.00 - 16,380.110,00 Culture Services 400.000.00 - 400,000,00 Environmental 470,000.00 - 470.000.00 Equipment 1284429100 - 12,844,291.00 General Public Buildings 24,389,860.00 85.000.00 24,474.86000 Goa Courees 3,494,000.00 - 3.494.000.00 W riumeot 133,000.00 - 133,000,00 Parking 11,808.236,00 - 11.808,23600 Parks 27,629,840.00 - 27,629,84000 Seawalls 8,322,374.00 - 8,322,374.00 Streets5idewalksiStreetsrapes knprowmenfs 5,094,163.00 - 5,094,163.00 Trans.0Tmnspombon 387,773,00 - 387,773,00 UuIs. 23,984,804.00 3,528,968.00 27,513,]72.00 08 r Note: 1.) $4.999,458.00 of funding will be transferred from the Fire Flow Project 9-Hospi @141st project (064032) to the following projects: a. Water S Wastewater Mains and Rehab (Projects 28520) - $759.947,00 b. Sewer Pump Station No. 2 Rehabilitation (Pmjecst 64732) - $1,850,113 00 c. Force Wain Replacement -Dade BIW M (Projects) 63832) - $1.606,720.00 it. Sewer Pump Station 1 Rehabilitation (Projects 63632)- $782,678,00 2.) $4,189,759 00 of funding will be transferred from ale Water Main Replacement Collins 4-15 project (964232) to the following project a. Wastewater Stations Rehabilitation (Projei 20619) - $18,880.00 It. Water 8 Wastewater Wine and Rehab (Projects 28520) - $1,622,333.00 c. Water Booster Station 75th St (Projects 64632) - $800.000.00 d. PS22 Discharge Force Main - Norm endy Isle (Projects 66832) - $830,650.60 e. Penal Water Main Replacem ant 41 stWndian/Chase (Projects 67432) - $917.895.40 3.) $3.389.004 40 of funding will be transferred from the Water Booster Station -Belle Isle project (064532) to the ful lowing projects: a. PS22 Discharge Force Wain - Normandylsle (Projecel66832) - $18,879.66 b. PS14 Sewer Discharge Force Mein Replacement (Projects 66632) - $3.359,82i c. Sewer Pump Station 1 Rehabllia6on (Projects 63632)-$10,298.00 4.) $2.354,929.00 of funding will be transferred from the Water Booster Station - Terminal Isle project(s64432) to the following project: a. PS22 Discharge Force Wain - Normandy Isle (Projects# 66832) - $1,077,361.74 b. PS14 Sewer Discharge Force Wain Replacement (Projects 66632) - $1.277.567 26 5.) $1,026.000 of funding will be transferred from the Water Booster Sts ion-25N St project (063732) to the following projects a. Water Booster Station-751b St (Prolli 64632) - $1.028 000 00 2360 of 3458