HomeMy WebLinkAboutResolution 2025-33734RESOLUTION NO. 2025 - 33734
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE
FINANCE AND ECONOMIC RESILIENCY COMMITTEE, AT ITS JUNE 4, 2025
MEETING, DIRECTING THE ADMINISTRATION TO CONSIDER AS PART OF
THE FISCAL YEAR 2027 BUDGET PROCESS DIVIDING AREA 2 INTO TWO
(AREAS/ZONES): EAST OF INDIAN CREEK AND WEST OF INDIAN CREEK,
AND FUNDING FOR ANY ADDITIONAL POLICE OFFICERS NECESSARY TO
PROPERLY STAFF THIS INITIATIVE.
WHEREAS, at the October 30, 2024, City Commission meeting, the Mayor and City
Commission approved a referral to the Finance and Economic Resiliency Committee
("FERC") to discuss dividing Mid -Beach ("Area 2") into two (areas/zones): east of Indian Creek and
west of Indian Creek, and funding for any additional police officers necessary for Fiscal Year 2026
to properly staff this initiative; and
WHEREAS, the item was subsequently heard at the June 4, 2025 FERC meeting and the
Committee unanimously agreed to move the item to the full commission with a favorable
recommendation to be considered as part of the FY 2026 budget process; and
WHEREAS, atthe June 25, 2025, City Commission Meeting, the Mayorand City Commission
directed the Administration to consider dividing Mid -Beach ("Area 2") into two (areas/zones) as part
of the FY 2027 budget process; and
WHEREAS, the current configuration of Area 2 begins at Dade Boulevard to the South and
extends west along the Venetian Causeway, east to 2V Street, and north to W Street, and is
currently staffed with patrol coverage, beat officers, and overtime detail; and
WHEREAS, the City Commission's proposal to create a standalone area, which would
adhere to the requirements and the same standards of service as the four (4) current official MBPD
geographical areas, would necessitate thirty-four (34) personnel and three (3) specialized units; and
WHEREAS, estimated costs to establish and maintain a proposed new Area as a stand-
alone zone are approximately $7,000,000.00 for the first year, including personnel salaries and
benefits, specialized equipment and vehicles, and other operational costs; and
WHEREAS, the Administration recommends an alternative staffing solution through the
creation of an Area 2 Seaside designation, permanently assigning ten (10) officers, two (2)
supervisors, and specialized units to provide targeted coverage; and
WHEREAS, based on budget enhancement projections, the estimated total cost to
implement this alternative solution is approximately $2,500,000 for the first year; and
WHEREAS, for immediate and temporary implementation, an overtime detail for one (1)
sergeant and five (5) officers could be considered with an estimated cost of $1,900,000 for the first
year; and
WHEREAS, the Administration has determined that the long -tern implementation of the
requested enhancements is not feasible without significant additional funding as outlined above.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION
OF THE CITY OF MIAMI BEACH, FLORIDA, accepting the recommendation of the Finance and
Economic Resiliency Committee, at its June 4, 2025 meeting, discussing the division of Area 2 into
two (areas/zones): east of Indian Creek and west of Indian Creek, and funding for any additional
police officers necessary for Fiscal Year 2027 to properly staff this initiative.
PASSED and ADOPTED this g day of 2025.
ATTEST:
0 wl_
Steven Meiner, Mayor
FEB 2 0 2026
Rafael E. Granado, City Clerk
i
�IXCOAP OXAifD �
.'
,y�CH 19, r
APPROVED AS TO
FORM &LANGUAGE
& FOR EXECUTION
Cify Atfo"v y�pr ZJ��a02(p
Resolutions - C7 Y
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Eric Carpenter, City Manager
DATE: June 25. 2025
TITLE: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE
FINANCE AND ECONOMIC RESILIENCY COMMITTEE, AT ITS JUNE 4, 2025
MEETING, DIRECTING THE ADMINISTRATION TO CONSIDER, AS PART OF THE
FISCAL YEAR 2026 BUDGET PROCESS, DIVIDING MID -BEACH ('AREA 2') INTO
TWO (ARFAS2ONES): EAST OF INDIAN CREEK AND WEST OF INDIAN CREEK,
AND TO ALLOCATE FUNDING FOR ANY ADDITIONAL POLICE OFFICERS
NECESSARY TO PROPERLY STAFF THIS INITIATIVE.
RECOMMENDATION
The Administration recommends keeping the current configuration of two (2) patrol officers
assigned to the seaside area of Mid -Beach on a high -visibility overtime detail funded through the
fiscal year. If, however, a more robust enhancement is desired in the future, the Commission
could consider a future allocation for permanent officers assigned to patrol the seaside area of
Mid -Beach.
The Administration recommends that while the Commission evaluates these configurations, it
also carefully considers several critical factors that will significantly impact the General Fund
budget, beginning in FY 2026:
1. The City's increasing unfunded capital improvement program
2. Long-term General Fund financial projections indicating a potential shortfall in upcoming
fiscal years
3. The passage of Amendment 5 in November 2024, which increases the homestead
exemption and further constrains the growth of taxable property values
These considerations are essential to ensure that decisions regarding the configuration of Area 2
align with the City's broader long-term financial stability and strategic prionties. if the Committee
recommends funding a plan, the Administration recommends it be considered as part of the FY
2026 budget process.
BACKGROUNDIHISTORY
At the October 30, 2024 City Commission Meeting, at the request of Commissioner Alex
Fernandez, the Mayor and City Commission approved a referral (C4 R) to the Finance and
Economic Resiliency Committee ("FERC") to discuss dividing the Mid -Beach area into two
(areas/zones): east of Indian Creek and west of Indian Creek, and funding for any additional police
officers necessary for Fiscal Year 2026 to property staff this initiative.
The item was heard at the June 4, 2025 FERC meeting and moved to the full Commission with a
favorable recommendation to be considered as part of the FY 2026 budget process.
889
ANALYSIS
This memorandum outlines the costs associated with the proposed creation of a new, stand-alone
policing zone within Mid -Beach in the area known to the Miami Beach Police Department (MBPD)
as "Area 2". Costs for this expansion are compared with an alternative staffing option to address
the current requests of residents of Mid -Beach.
Current Configuration of Area 2
Area 2, also known as Mid -Beach, is the largest geographical area within MBPD's jurisdiction.
The current configuration begins at Dade Boulevard to the south and extends west along the
Venetian Causeway, east to 23rd Street, and north to 63rd Street, encompassing the
beach/waterline and stretching west to the bay.
Area 2 is currently staffed as follows:
• Patrol Coverage: " police officers per shift, with one officer permanently assigned to
the Venetian Causeway 24/7. The remaining 4-5 officers cover the rest of Area 2 during
all shifts.
• Beat Officers: Two officers are Permanently assigned to the 41st Street Corridor,
providing coverage from 10:00 A.M. to 8:00 P.M., seven days a week.
• Overtime Detail: A high -visibility overtime detail operates from 7:00 A.M. to 11:00 P.M.,
seven days a week. This detail is staffed by one sergeant and five officers, with two officers
conducting directed patrols east of Indian Creek:
o One (1) officer patrolling from 41st Street north to 63rd Street
o One (1) officer patrolling from 41st Street south to 23rd Street
It is important to note that officers assigned to the High -Visibility Detail are also tasked with
conducting the Traffic Mitigation Plan during aftemoon rush hours Monday through Friday.
Proposed Staffing Options
1. Stand -Alone Area
A proposed Seaside Area within Area 2 as proposed by the City Commission would consist of the
eastern portion of the current Area 2, bounded by Indian Creek to the west, the beach/watedine
to the east, 23rd Street to the south, and 63rd Street to the north. This designated zone would
also include the beachwalk and the beach along these boundaries.
The creation of a stand-alone patrol zone in Area 2 would require long-term commitment to new
positions, operational and hierarchical infrastructures. The proposed staffing and resources
necessary to create a stand-alone area and adhere to the requirements and the same standards
of service as the four (4) official MBPD geographical areas include:
Personnel:
1 Area Captain
1 Neighborhood Resource Officer (NRO)
1 Come Analyst
1 Crime Scene Technician
4 Public Safety Specialists
20 Police Officers (to provide 2417 coverage)
4 Sergeants
2 Lieutenants
Specialized Units:
o ATV/Beach Patrol
o Beachwalk Patrol
o Road Patrol
891
2. Seaside Desionalion Alternative Staffin
As an alternative to the complex and lengthy creation of an official and full-fledged area, the
Administration recommends an alternative permanent staffing solution through the creation of an
Area 2 Seaside designation to address specific needs in the specified east area of Area 2. This
approach would staff critical functions without requiring the creation of hierarchical infrastructure,
while assigning the necessary resources to the area in question.
The costs for this alternative would require a budget enhancement to fund:
• A permanent assignment of 10 assigned officers and two (2) supervisors
• Dedicated use of specialized units to provide targeted coverage
Officers would operate from 11:00 A.M. to 9:00 P.M., seven (7) days a week, delivering enhanced
visibility and coverage in the Seaside area of Area 2 at a reduced cost and in a timelier manner
as an immediate enhancement to the Department's current recruiting efforts. This structure could
be a replication of the longstanding and proven City Center Redevelopment Agency (RDA) which
oversees City Center and Lincoln Road.
For immediate, temporary implementation, an overtime detail for one (1) sergeant and five (5)
officers could be considered.
FISCAL IMPACT STATEMENT
Cost Analysis
Stand -Alone Ares
The estimated costs to establish and maintain a proposed new Area as a stand-alone zone
with the same responsibilities and policing services as the four (4) other geographical areas
of the City are approximately $7,000,000.00 for the first year. This includes the resources
described in the proposed plan and accounts for:
• Personnel salaries and benefits
• Specialized equipment and vehicles
• Operational costs (e.g., training, technology, and support services)
Seaside Designation Alternative Staffing
The alternative Seaside designation alternative staffing approach involves assigning
permanent officers as delineated above. The annual cost for the first year of this option is
estimated at approximately $2.5 million. This funding would provide:
• 2 Sergeants
• 10 PoliceOfficers
The temporary implementation of an overtime detail has an estimated annual cost of $1.9 million.
CONCLUSION
The Miami Beach Police Department remains dedicated to delivering the professional public
safety and community policing services residents and visitors expect and deserve. This
enhancement to the Mid -Beach area, a direct request from the community via its elected officials,
has been assessed based on current resources and fiscal realities.
892
The Administration does not believe that the creation of a stand-alone police area would be
necessary to achieve the goals of increasing police presence and public safety to Mid -Beach and
would in turn be fiscally and operationally challenging. Additionally, the Administration has
determined that the long -tens implementation of the requested enhancements is not feasible
without significant additional funding as outlined above.
For immediate, temporary implementation, the Administration recommends allocation of funding
for an overtime detail with the intention of a permanent solution through a potential budget
amendment. The long-term alternative Seaside designation of permanent officers assigned to
provide public safety services to the seaside area of Mid -Beach would need a budget
enhancement and recurring allocation through the upcoming budgetary cycles.
Applicable Area
Middle Beach
Is this a "Residents Right to Know" item, Is this item related to a G.O. Bond
pursuant to City Code Section 2-17? Project?
No No
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2481,
includes a principal enaaaed in lobbyina? No
If so, specify the name of lobbyist(s) and pnncipal(s):
Department
Police
Sponsors)
Commissioner Alex Fernandez
Co-sponsors)
Condensed Title
Accept ReclDivide Area 2 Into 2 (AmaslZonesyEast 8 West of Indian Creek. (Fernandez) PD
Previous Action (For City Clerk Use Only)
893
Committee Referrals - C4 S
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Commissioner Alex Fernandez
DATE: October 30, 2024
TITLE: REFERRAL TO THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE TO
DISCUSS DIVIDING AREA 2 INTO TWO (AREAS/ZONES): EAST OF INDIAN
CREEK AND WEST OF INDIAN CREEK, AND FUNDING FOR ANY ADDITIONAL
POLICE OFFICERS NECESSARY FOR FY 26 TO PROPERLY STAFF THIS
INITIATIVE.
Please place on the October 30, 2024 City Commission agenda a referral to the Finance and
Economic Resiliency Committee to discuss dividing Area 2 into two areas/zones and funding for
additional police officers necessary for FY26 to property staff this initiative.
The Police Department presently divides the City into four (4) distinct areas: Area 1 (south of
Dade Boulevard); Area 2 (from Dade Boulevard to 63rd Street); Area 3 (from 63rd Street to the
North end of the City; and Area 4 (the "ADCD'). More specifically, Indian Creek divides Area 2,
from the east consisting of densely populated hotels, condominiums, a busy Beachwalk and
Beachfront, and the west comprising of predominantly single-family homes, schools, a business
corridor, religious institutions and Mount Sinani Medical Center.
On the October 18, 2023, 1 placed a referral to the Public Safety and Neighborhood Quality of Life
Committee (PSNQLC) to discuss the status of, and options to enhance, MBPD patrols in the Mid.
Beach area. The Police Department presented its Mid -Beach police patrol efforts including the
feasibility of assigning designated officers to patrol Collins Avenue and Indian Creek Drive in Mid -
Beach. The PSNQLC unanimously voted to have MBPD prepare a plan to divide Area 2 as part
of the FY25 budget process.
As part of this referral, I request that the City Administration be prepared at Committee to present
a plan to split the east side of Area 2 from the west side, and discuss the potential funding for FY
26 for additional police officers in order to patrol the Beachwalk and High Speed Details to address
noise and quality of life offenses.
ANALYSIS
FISCAL IMPACT STATEMENT
NIA
894
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
If applicable, the Business Impact Estimate (BIE) was published on:
See BIE at: https://www miamibeachFl gov/city-hall/citytlerk/meeting-notices/
CONCLUSION
Applicable Area
Citywide
Is this a "Residents Right to Know" item,
Pursuant to City Code Section 2-17?
Yes
Is this item related to a G.O. Bond
Project?
No
Was this Agenda Item initially requested by a lobbyist which as defined in Code Sec. 2-481
includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s).
Departmen!
Office of Commissioner Alex Fernandez
Sponsor(s)
Commissioner Alex Fernandez
Co-spon5gr(s)
Condensed Title
Ref: FERC - Divide Area 2 into East/West; Fund Additional Police Officers as Necessary FY 26
(Fernandez)
895