A. PROGRESS REPORTS
1. FILE NO. 3169 PROJECT DEVELOPMENT, LLC.
a/k/a W WINE BOUTIQUE
1328 ALTON ROAD
LOTS 3 and 4; BLOCK 81
THIRD COMMERCIAL SUBDIVISION
PLAT BOOK 7, PG 160;
MIAMI-DADE COUNTY, FLORIDA
The applicant will present a progress report associated with the approval
of a modification granted on November 5, 2010 regarding a business that
sells wine and liquor within the minimum required distance separation
from an educational facility.
NO FURTHER PROGRESS REPORTS.
2. FILE NO. 3481 GALILEO ENTERPRISES, LLC. /
CRISTINA ESPEJO HALABI, MANAGER
447 ESPANOLA WAY
LOT 1, 2, 3, 4, 5, AND 6 OF BLOCK3 A,
OF FIRST ADDITION TO WHITMANS SUBDIVISION
OF ESPANOLA VILLAS,
PLAT BOOK 9, PG 147;
MIAMI-DADE COUNTY, FLORIDA
The applicant will be presenting a progress report associated with the
BOARD OF ADJUSTMENT AFTER ACTION REPORT
FEBRUARY 4, 2011
Page 2 of 6
approval of a variance granted on November 5, 2010 regarding a
restaurant that sells/serves alcoholic beverages within the minimum
required distance separation from an educational facility.
PROGRESS REPORT DUE 90 DAYS AFTER A CERTIFICATE OF
OCCUPANCY IS ISSUED.
3. FILE NO. 3370 PLAZA HOTEL, LLC.
418-422 & 426 MERIDIAN AVENUE
LOT 3-4, BLOCK 75 OF OCEAN BEACH ADDITION
NO. 3, PLAT BOOK 2, PG 81;
MIAMI-DADE COUNTY, FLORIDA
The applicant will present a progress report associated with the approval
of a modification/extension of time granted on November 6 2009,
regarding the construction of a new, four-story structure. The progress
report is required to address possible violations of the conditions of the
variance order. At this progress report, the Board of Adjustment will
consider the issue of noncompliance with the conditions of approval, and
may set a public hearing for the possible modification or revocation of the
variance.
APPLICANT TO APPEAR IN FRONT OF THE BOARD ON APRIL 1,
2011 FOR POSSIBLE REVOCATION OF THE ORDER.
B. CONTINUED CASE
4. FILE NO. 3487 E.D.Y., INC. d/b/a SURFSTYLE
1155 COLLINS AVENUE
LOTS 13 and 14; BLOCK 16
OCEAN BEACH ADDITION NO. 2
PLAT BOOK 2-56;
MIAMI-DADE COUNTY, FLORIDA
The applicant is requesting the following variances in order to permit the
placement of building signage:
1. A variance to relocate an allowable building identification sign on a
three (3) story building from the north parapet facing 12th Street to a
vertical architectural feature facing an alley to the east, Ocean
Court.
2. A variance to waive the requirement of a building identification sign
to be located on the parapet of the building in order to provide a
BOARD OF ADJUSTMENT AFTER ACTION REPORT
FEBRUARY 4, 2011
Page 3 of 6
building identification sign on an architectural feature facing an
Collins Avenue.
APPROVED WITH ADDITIONAL CONDITIONS.
C. MODIFICATION
5. FILE NO. 3433 DELPHINE DRAY
2740 NORTH BAY ROAD
LOT 10, IN BLOCK 12 OF “AMENDED
PLAT OF SUNSET LAKE SUBDIVISION”
PLAT BOOK 8, PG 52;
MIAMI-DADE COUNTY, FLORIDA
(FOR COMPLETE LEGAL DESCRIPTION
PLEASE CONTACT THE PLANNING DEPT.)
The applicant is requesting the following modification to a condition of
approval for a variance associated with an addition to an existing two-story
single family home:
Final Order: Modified Condition # 4:
4. The applicant shall be permitted to remove the existing strangler fig
located at the north side of the property, directly adjacent to the
existing garage, to be replaced by four (4) or five (5) Gumbo Limbo
trees.
4. The applicant shall comply with all the conditions proffered in the
Staging, Pruning and Construction Procedures letter dated
September 22, 2009, including the following:
(A) Foundation.
1. The owner will pour a new foundation over the
existing foundation. This new foundation will be a pile
foundation.
2. The proposed structure shall be constructed on
piles with a grade beam bridging existing roots. There
shall not be a continuous footer excavated within the
root zone of the subject tree.
3. There will be grade beams running between the
piles designed to bridge any major tree roots.
4. While the existing slab is damaged based upon the
root intrusion, it will remain in place so as not to hurt
the roots. Air space shall be maintained between the
old and new floors.
5. The new raised floor slab will be approximately
BOARD OF ADJUSTMENT AFTER ACTION REPORT
FEBRUARY 4, 2011
Page 4 of 6
three (3) feet above the existing floor slab, and over
the existing tree roots.
6. The piles or columns shall be located in areas
where major roots will not be affected.
(B) Construction Staging for Northern Portion of Home.
1. Construction staging shall be done in the front or
south of the existing garage.
2, Any cranes will be operated from the south side of
the garage
where the open driveway provides ample space,
3, The scaffolding that will be used to construct the
block walls and to install the trusses will be erected
from within the structure,
4, During construction, the boom will come from the
south side and will not extend over or into the tree,
5, The area located between the existing garage and
the property line shall be kept free of heavy
equipment operation, storage of materials, dumping,
or other construction activities which could cause
damage to the tree, There shaIl be no grade changes,
bulldozing, scarifying or any other type of soil
disturbance within this area,
(C) Pruning (to be observed prior to, during and after
construction):
1, There shall be no damage, wounding, or other
types of physical injury made to the tree trunk,
buttress roots, surface roots, limbs, branches, or other
exposed parts of the tree,
2, Prior to construction activities, the tree shall be
pruned following the guidelines in the most recent
edition (2008) of the American National Standards
Institute (ANSI) A- 300 document, Only the part of the
tree on Applicant's property shall be pruned,
3, The pruning method to be performed on the tree
shall incIude crown cIeaning and crown raising, as
defined in the ANSI A-300 document,
4, The crown shall be cIeaned to "remove one or
more of the following non-beneficial parts: dead,
diseased, and/ or broken branches", Minimum branch
size to be removed shall be one (1)
inch,
5. The crown shall be raised to "provide vertical
clearance", The height to which the crown shall be
raised shall be approximately 30 feet from grade,
Minimum branch size to be removed shall be one
BOARD OF ADJUSTMENT AFTER ACTION REPORT
FEBRUARY 4, 2011
Page 5 of 6
inch, Existing limbs and branches which have
previously be pruned shall be removed back to parent
limbs or suitable lateral branches. Epicormic shoot
growth ("suckers") emanating from behind the old cuts
shall be removed.
6. Scaffolding limbs higher than 30 feet above grade
shall not be pruned or removed.
7. Not more than 25 % of the tree's live foliage shall
be removed during the pruning operation.
8. The live crown ratio (crown height relative to overall
plant height) shall not be reduced to less than 50%.
APPLICANT REQUESTED CONTINUANCE TO THE MARCH 18, 2011
MEETING.
D. NEW CASE
6. FILE NO. 3489 MAJESTIC ORGANIZATION, LLC
1020-1050 WASHINGTON AVENUE
LOTS 1 THROUGH 6, BLOCK 36,
OCEAN BEACH, FLA, ADDITION NO. 3,
PLAT BOOK 2, PG 81;
MIAMI-DADE COUNTY, FLORIDA
(FOR COMPLETE LEGAL DESCRIPTION PLEASE
CONTACT THE PLANNING DEPARTMENT)
The applicant is requesting variances in order to relocate allowable
building identification signage:
1. A variance to relocate a flat business sign from the east side (facing
Washington Avenue) of the building at the ground floor in order to
locate on an existing perimeter wall on the southwest corner of
Washington Avenue and 11th Street.
2. A variance to relocate a building identification flat sign from its
permitted location facing Washington Avenue to the south side of
the building, not facing a street.
APPROVED WITH MODIFIED CONDITION.
E. NEXT MEETING DATE
March 18, 2011
BOARD OF ADJUSTMENT AFTER ACTION REPORT
FEBRUARY 4, 2011
Page 6 of 6
In accordance with the Americans With Disabilities Act of 1990, persons needing special accommodation
to participate in this proceeding, persons with disabilities, or to request material in accessible format,
contact the Board's administrator at (305)673-7550 no later than four (4) days prior to the proceeding.