HomeMy WebLinkAboutDRB 20020820CITY OF MIAMI BEACH
PLANNING DEPARTMENT
DESIGN REVIEW BOARD
AFTER ACTION REPORT
FOR MEETING HELD
TUESDAY, AUGUST 20, 2002
1. Joint Design Review Board/Historic Preservation Board Meeting; Time Certain of
10:00AM:
a. DRB File No. 15945 (HPB File No. 1294), various locations in the public right-
of-way, city-wide. The applicant, Clear Channel Adshel, Inc., is requesting
a Certificate of Appropriateness for the installation of new bus shelters and
other miscellaneous street fixtures and furniture in various locations
throughout the city.
APPROVED
PASSED JOINT DRB/HPB RESOLUTION TO THE CITY COMMISSION REGARDING THE
DEMOLITION OF ARCHITECTURALLY SIGNIFICANT SINGLE-FAMILY HOMES AND THE
SINGLE-FAMILY RESIDENTIAL REVIEW BOARD.
2. Requests for Extensions of Time:
a. DRB File No. 14746, 321 - 327 Michigan Avenue. The applicant, the
Housing Authority of the City of Miami Beach, is requesting a one (1) year
Extension of Time to obtain a Building Permit for a previously issued Design
Review Approval for the construction of a four (4) story, fifteen (15) unit,
single parent/family transitional housing structure.
APPROVED
b. DRB File No. 15013, 4144 Chase Avenue - Temple Beth Sholom. The
applicant, Temple Beth Sholom, Inc., is requesting a one (1) year Extension
of Time to obtain a Building Permit for a previously issued Design Review
Approval to demolish an existing one (1) story administration building in order
to construct a new two (2) story administration building and a two (2) story
addition to an existing educational facility. The applicant is also proposing
to create a parking lot on an adjacent lot, as well as alterations to the
temple's entry courtyard.
Page 2 of 2
Design Review Board After Action Report
Meeting Date: August 20, 2002
APPROVED
3. Requests for Clarifications of Conditions:
a. DRB File No. 15703, 7744 Collins Avenue. The applicant, 7744 Collins, LLC,
is requesting a Clarification of a Condition of the Final Order for a previously
issued Design Review Approval for the demolition of an existing residential
structure in order to construct a five (5) story apartment building.
DENIED
II. NEXT MEETING DATE REMINDER
Tuesday, September 17, 2002
F:\PLAN\$DRB\DRB02\Augdrb02\afteract02.aug.doc