Loading...
98-22975 RESO RESOLUTION NO. 98-22975 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, GRANTING THE REQUEST BY R.D.P. ROYAL PALM HOTEL L.P. FOR A CERTIFICATE OF APPROPRIATENESS FOR DEMOLITION TO DEMOLISH THE REMAINING PORTIONS OF THE ROYAL PALM HOTEL, A HISTORIC STRUCTURE LOCATED AT 1545 COLLINS AVENUE, IN ORDER TO CONSTRUCT A FIRST CLASS LUXURY CONVENTION CENTER/RESORT HOTEL WITH 412 GUEST ROOMS AND SUITES. WHEREAS, the Mayor and City Commission of the City of Miami Beach recognize that a process for the review of Certificates of Appropriateness for Demolition has been established under Section 118-501, et. seq. of the Code of the City of Miami Beach; and WHEREAS, the applicable provisions of the land development regulations require that the Historic Preservation Board make a recommendation to the City Commission following a public hearing prior to the City Commission considering a request for a Certificate of Appropriateness for Demolition for the demolition of an "historic" structure; and WHEREAS, the Historic Preservation Board, at a special meeting on November 16, 1998, held a public hearing, whereby it was unable to reach a consensus as to whether sufficient evidence has been submitted to satisfy Certificate of Appropriateness Criteria No. 7 and No. 8 of Section 19 of Ordinance No. 89-2665, applicable pursuant to Section 118-535 of the Code of the City of Miami Beach, and leaves to the determination of the City Commission the decision of whether the Certificate of Appropriateness for Demolition Criteria are satisfied and whether the Certificate for Appropriateness for Demolition requested by R.D.P. Royal Palm Hotel LP for the property at 1545 Collins Avenue should be granted. WHEREAS, based on the evidence submitted and presented at the public hearing and testimony from structural and engineering experts (including the City'S independent engineer) the Commission has determined that the Royal Palm Hotel cannot be structurally restored due to an irreparable highly advanced and unique state of structural deterioration which is a threat to the safety of the subject site and adjacent sites. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA: That City Commission hereby grants the request by R.D.P. Royal Palm Hotel LP for a Certificate of Appropriateness for Demolition to demolish the remaining portions of the Royal Palm Hotel, an Historic Structure located at 1545 Collins Avenue, in order to construct a first class luxury convention center/resort hotel with 412 guest rooms and suites, subject to approval by the Joint Design Review/Historic Preservation Board and further subject to all applicable regulations and procedures. PASSED and ADOPTED this 18th day of November , 1998. ~ d' ~t~ CITY C ERK ~/1 MAYOR TRM:tm T:\AGENDA\NOV189S\REGULAR\RES-RPDM.WPD APPROVED ,.s TO FORM & lANGUAGE & FOR EXECUTION 1f:~ nIJ2/!i CITY OF MIAMI BEACH HISTORIC PRESERVATION BOARD RESOLUTION November 16, 1998 Re: Historic Preservation Board File No. 1046 - 1535 and 1545 Collins A venue - The Shorecrest and Royal Palms Hotels. The applicants, R.D.P. Royal Palm Hotel Limited Co. and R.D.P. Shorecrest Hotel Limited Co., are requesting a Certificate of Appropriateness for Demolition to demolish those remaining portions of the Royal Palm Hotel inclusive of the existing seven (7) story front facade section of the building, in order to construct a first class luxury Convention Center/Resort Hotel with 412 guest rooms and suites. WHEREAS, a process for the review of Certificates of Appropriateness for Demolition has been established under Section 19 of the Zoning Ordinance; and WHEREAS, on November 16, 1998, the Miami Beach Historic Preservation Board held a special meeting to consider a request for a Certificate of Appropriateness for Demolition for the demolition of the remaining portions of the existing Royal Palm Hotel; and WHEREAS, the Royal Palm Hotel is a designated "Historic" structure located in the Ocean Drive/Collins Avenue Local Historic District; and WHEREAS, the Historic Preservation Board, at the November 16, 1998 meeting, concluded that it was angry at being put in the position of having to review a request for a Certificate of Appropriateness for Demolition of such a significant "Historic" structure; and WHEREAS, the Historic Preservation Board, at the November 16, 1998 meeting, concluded that it is a breach of the covenant that was made with the community when it was originally proposed that the subject site would be within the Convention Center Village; and WHEREAS, the Historic Preservation Board, at the November 16, 1998 meeting, concluded that there has been extensive engineering testimony given which indicates that the deterioration of the existing Royal Palm Hotel is in a very advanced state; and WHEREAS, the Historic Preservation Board, at the November 16, 1998 meeting, concluded that there is the need for immediate remedial attention to all other structures within the City I s Historic Districts which are in a similar state of structural disrepair as the Royal Palm Hotel; and WHEREAS, the Historic Preservation Board, at the November 16, 1998 meeting, was unable to reach a consensus as to whether there is sufficient evidence to rule out any economically viable repairs to the existing Royal Palm Hotel other than complete demolition. THEREFORE, it is hereby resolved as follows: The Historic Preservation Board is unable to reach consensus as to whether sufficient evidence has been submitted to satisfy Certificate of Appropriateness Criteria No.7 and No.8 of Section 19 of Ordinance No. 89-2665, applicable pursuant to Section 118-535 of the Code of the City of Miami Beach. Therefore, the Historic Preservation Board makes no further recommendation to the City Commission as to whether the requested Certificate of Appropriateness for Demolition for the Royal Palm Hotel should be granted, and leaves to the determination of the City Commission the decision of whether the Certificate of Appropriateness for Demolition Criteria are satisfied and whether the Certificate for Appropriatenss for Demoltion should be granted. PASSED AND ADOPTED THIS 16TH DAY HPB Vote: 7-1 (L. Polansky) - 1 (Vacancy) TRM:WHC F: \PLAN\$HPB\RES-l 046. WPD - 2 - 19.{"C .6. Should tlr Commission grant a S14y for Demolition, the length of such a S14y shall be detennmed by the Conurussion based upon the relative significance of the Structure and tlr probable time required to arrange a possible alternative to Demolition. The effective date of the S14y shall be from the date of the Historic Preservation Board's public hearing. 5. Certificate of Appropriateness for Demolition a. Demolition of a historically designated Building, Structure, Improvement or Site may occur pursuant to an order of a government agency or a Court of appropriate jurisdiction or, if granted, pursuant to an applkatioD by the owner for a Certificate of Appropriateness for the Demolition of a designated Historic Building, Structure, Improvement or Site. b. Government agencies baving the authority to demolish unsafe Structures shall receive notice of historic designation of individual Buildings, Structures, fnllrovemetlS or Sites, districts or Archeological Sites pursuant to this Ordinance. The Historic Preservation Board shall be deemed an interested party and shall be entitled to receive notice of any public hearings conducted by such government agen.-y regarding Demolition of historically designated Structures or Buildings. The Board may make recommendations and suggestions to the government agency and the owner(s) relative to the feasibility of and the public interest in preserving the historically designated Structure or Building. c. No permit for volw1ary Demolition of a historically designated Building, Structure, fnllrovemett or Site shall be issued to the owner(s) thereof until an application for a Certificate of Appropriateness for Demolition bas been submitted and approved pursuam to the procedures in this Ordinance. Refusal by the City Commission to grant a Certificate of Appropriateness for Demolition shall be evidenced by written order detailing the public interest which is sougln to be preserved. In determining their recommendation, the Historic Preservation Board shall be guided by the criteria cottaired in subsection 19.{"C.5.d. After a Demolition denial, or during a Demolition delay period, the Historic Preservation Board and/or the City Commission may take such steps as it deems necessary to preserve the Structure coocemed in accordance with the purposes and procedures of this Ordinance. Such steps may include, bul shall not be limited to, consul14tion with civil groups, public agencies and interested citizens, recommendations for acquisition of propeny by public or private bodies or agen.:ies, and exploration of the possibility of moving one or more Structure or other feature. d. Evaluarion Criteria - The City Commission and the Historic Preservation Board shall consider the Miami Beach Historic Properties Database (a listing of historic and non-historic properties as approved by the City Commission in the following locally designated districts: Ocean Drive/Collins Avenue, Espanola Way, and Altos del Mar) as a guideline in determining whether a Certification of Appropriateness for Demolition should be issued. The City Commission and the Board shall also consider the following criteria in evaluating applications for a Certificate of Appropriateness for Demolition of designated historic Buildings, Structures,Improvements or Sites: (1) The Building, Structure ,Improvement , or Site is designated on either a national, S14te, or local level as an historic preservation district or an architectural landmark or Site. (2) The Building, Structure, Improvement, or Site is of such design, craftsmanship, or material that it could be reproduced only with great difficulty and/or expense. 19.11 DONOHOE DEVELOPMENT COMPANY ] 530 Collins Avenue, #20] Miami Beach, FL 33 ]39 (305) 604-8690 - FAX (305) 604-8266 E-mail: danielg@donohoe.com ~' ~. r' - '.. I!. c,..... i= j.:;;~.'-O MEMORANDUM November J 2, J 998 to: Janet Gavarrete from: Daniel Grimm subject: Fayade Concrete Compressive Test Results copies: C. Bruch, R. Matlof, C. McDowell, D. Cates Attached are copies of A TC's reports containing the results from the fayade concrete compressive strength and chloride-ion content tests. As seen in the attached table, 14 concrete cores were taken from the fayade. The program was to sample one beam and one column from the fayade per floor. Also, we were asked by the City to determine the feasibility of saving portions of the first floor slab and the associated terrazzo, so we instructed A TC to sample that slab in two separate locations. The average compressive strength of the fayade is 2,158 p.s.i., with a high of 3,320 p.s.i. and a low of 1,120 p.s.i.. The average strength of the first floor slab is 840 p.s.i., with a high of 990 p.s.i. and a low of 690 p.s.i.. These results seem to be consistent with the rest of the structure in that the lowest compressive strengths are found on the lower levels. The chloride-ion content report is also included. A similar testing procedure was performed; two samples were taken from the fayade at each floor and the first floor slab was tested. I also instructed A TC to sample two of the beams supporting the first floor so that we would be able to determine the feasibility of saving portions of that slab. The average content of Chloride-Ion was determined to be .44%, which is more than twice the allowable level of .2%. We will be forwarding this information to our design team for further interpretation. Once they have generated a formal opinion I will forward it to your attention. Please call me with any questions. NOV-12-98 THU 09:58 AM ATEC ASSOCIATES 13058821200 P.01 9955 NW 116 Way. Suite 1 Miami. FlorteJa 33178 3058628200 Fax 305 882 1200 ASSOCIATES INC. November 11, 1998 RP Royal Palm Hotel C/o Donohoe Development 210 1 Wisconsin Avenue, NW Washington, DC 200)7 Attn.: Mr. Christopher A. Bruch RE: Report on Concrete Coring and Testing Services " Royal Palm Crowne Plaza 1535 Collins Avenue Miami Beach, Florida A TC Proiect # 03657.0002 Dear Mr. Bruch, A TC Associates Inc. (A TC) has completed the additional requested and authorized concrete coring and compressive strength testing for the above subject project. This report contains the results of the test results and data obtained. SCOPE OF SERVICES The proposed scope of services for this project included obtaining concrete core samples from one of the five facade support columns on each floor level from the second to the seventh floor. Concrete core samples were also extracted from beams identified by the client representative in the field and from two locations within the first floor slab. A total of fourteen (14) concrete core samples were extracted and transported to our Miami test facility. Each core was air dried, trimmed, capped, measured and tested for compressive strength. FoUowing is a chart of the results of the testing. NOV-12-98 THU 89:59 AM ATEC ASSOCIATES 13858821288 P.82 RDP Royal Palm Hotel C/o Donohoe Development ATC Project No.: 03657.0002 page 2 CONCRETE CORE TEST RESULTS iaYlifE...tlill. FLA First Floor Slab. northwest corner 690 FLB First Floor Slab. desk area 990 7-B Facade. column 2,710 7-C Facade. beam 2.125 6-B Facade. column 2240 6-C Facade. beam 2.900 5-B Facade. column 1.670 5-C Facade. beam 3,320 4-B Facade column 1,980 4-C Facade. beam 2060 3-B Facade. column 1,120 3-C Facade beam 1 190 2-B Facade. column 1 800 2-C Facade. beam 2780 Please call us should you have any questions or desire additional information. Thank you for this opportunity to be of service. Respectfully submitted, A TC Associates Inc. Laughn Drouillard Operations Manager ere G.-Read:PE . oJ" - , Vice .President, Engineering FI. .~: 'No,:35604 /1//.;;:/,/,;:-,. _ OCT-28-98 WED 0~:06 PM ATEC ASSOCIATES 130~8821200 P.0Z 9955 N\IIJ 116 Way. Suite 1 MIamI. FlOrida 33178 305 882.8200 rax 305.882.1200 ASSOCIATES INC. October 28, 1998 RP Royal Palm Hotel C/o Donohoe Development 210 1 Wisconsin Avenue, NW Washington, DC 20CXJ7 Attn.: Mr. Christopher A. Bruch RE: Report on Chloride Testing Royal Palm Crowne Plaza 1535 Collins A venue Miami Beach, Florida ATe ProTect # 03657.0C02 Dear Mr. Bruch, ATC Associates Inc. (ATC) has completed the requested and authorized concrete coring and chloride-ion content testing for the above subject project. This report contains the results of the test results and data obtained. SCOPE OF SERVICES The proposed scope of services for this project included obtaining concrete dust samples from two of the five facade support columns on each floor level from the secood to the seventh floor. Concrete dust samples were also taken from two locations within the first floor slab and from two locations of a first floor grade beam. A total of 16 concrete dust samples were tested for acid soluble chloride content. CHLORIDE-ION CONTENT The chloride-ion content tests were conducted in gene.ra.l accordance with ASTM C-114, Section 19. The acid soluble chloride-ion content listed below is reported as a percentage of the concrete dust sample weight, approximately 1.5 grams. This measured value wasthen adjusted by a factor of eight to arrive at a chloride-ion content as a percentage of the estimated cement weight. OCT-26-96 WED 05:0, PM ATEC ASSOCIATES RDP Royal Palm Hotel C/o Doaohoe Development 'tilt_.ll, FIG FIGB Fl Fl 2' 2 3 3 4 First F100r Grade Beam First F100r Grade Beam First Floor, Desk Area First Floor. Northwest Corner Facade Facade Facade Facade Facade Facade Facade Facade Facade Facade Facade Facade 5 5 6 7 7 13856621280 P.8:::; ATe Projt:Ct No.: 03657.0002 page 2 ,.,tilmii 0.0320 0.0088 0.0900 0.0360 0.0700 0.0490 0.2050 0.0270 0.1500 0.0340 0.0058 0.0500 0.0046 0.0090 BDL 0.0066 0.2560 0.0704 0.7200 0.2880 0.56)) 0.3920 1. 6400 0.2160 1.2(0) 0.2720 0.0464 0.4(0) 0.0368 0.0720 BDL 0.0528 Please call us should you have any questions or desire additional information. Tnank you for this opportunity. Respectfully submitted, A TC Associates Inc. . / ~ I / Al/J/1 /7/ / ~~r- '1~/ ~/~ Laughn DrouiIlard Operations ~~anag /~ Ater G. Rea ,.PE Vice President, Engineering "~arn'O c t , 2 3 1 9 J ; ~I 2: 2 8 P Mg.. elll: 10/:23/18 TIm.: 212S:08 ~ No, ~ 8 I 7 ~. 2/2 PAge 101 \ . THO R N G R AFT 0 N. ARC HIT E C T, A I A "'RCHI1'iCT~ ~ PLANNING FOR. ENVntONMENL AL, RISTOR.IC .t:l coMMUNITY RESOURCES 28 14 Chuo~l11antah Road, Coconut Grove, Fl. 33133. 30!-8!4..1083 Fax same, oall first TO: CA~LC. PLORII, ".A" V.P., AOII AI'CHITIiCTI flAX 2G....,11-1DD2 eCI ...SINALCO IORGIiI, AltQUITICTeNICA "AX 301~312.117' CAfIlTlillt MoDQWILL, ATTOlltNIY flAX prPlOM THO"N Q~"TON, AlA \It!: ~CVAL ~ALM.CROWN; PL.AZA HCTIiL. · 8TIltUOTU~L. OIIlIO'INCIIQ CA~L.OS, I AM WRITING yOU IN MY ~OLE, SUBSEQUENT TO MY RESIGNATION FROM AGF ARCHITECTS JANUA~Y 1, 1;;8, AS A sue.CONSULTANT TO YOUR FI~M FOR H1STO~IC PRESEAVATION ON THIS PROJECT. ReINAL.CO BO~CiES OF A~QUITECTONICA HAS REQUeS,.So MY W~liTeN PROFESSIONAL OPINION RI!(JARDING ,.HE NEW ~!V!LATIONS ON THE. ROYAL PALM MOT!L, AS AN A~CH1TECT I AM NOT ~~O"!SSIONALL V QUALIFIEO TO PROVloe A SiRUCTU~AL ANAL VSIS OF THE BUILDING, HOWeVER, MY OWN RECENT WALK-THRU INSPECTIONS O~ THe BUILDING, NOW THAT INTERIO~ FINISHES HAVE SEeN REMoveD, REVI:AL WHAT AF'PEAAS TO BE sueSTANTIAL STAUCiURAI. OETERIORATION, FAR BEYOND WHAT WE PReVIOUSLY WITNESSEO AND ANTICIPATED. TWO SEPAAATE STRUCTURAL. ENGINEERS. DOUG TIMMONS1 ".e. ANO H;;RSCHEI. GILLI PIE" HAVE I'ROVIOEC OPINIONS THAT THE STRUCTURE, IN ITS oeTE~IO~ATEC CONDITION, CANNOT MEET THE REQUIREMENTS OF THE SOUTH FLORIDA BUILDING coes. ANO POSES A LIFE.-SAFETY TI-tAEAT. TI-tESe OPINIONS ARE UNEQUIVOCAl.. IN THEIR UNANIMOUS RECOMMENDATION THAT TI-tE BUILDING Be OEMOLISHee. AS YOU KNOW, WE SPECIFICALLY REQUESTED AN ANSWE~ AS TO WHETHER THe wea" FAQAoe COUL.O sa RETAINEO. THE ENGINEE~'S Re:COMMeNOATION IS THAT iHE WEST ~AOAOE ALSO BE oeMOLISHED. AFTER MY DISCUSSIONS WITH THE eNGINEe~S ON THIS Issue, THEIR RECOMM!NCATIONS APFEA~ TO Be THOROU<3HL. y DOCUMENiEO, I, THEREFOAI;, FINO NO SAalS FO~ TAKING EXOEF'iION TO THE ENGINEe.R'S FINDINGS, BOTH ON THE NEEO ~OR MASS OeMOL.ITION OF THE 8UILDING, AND ON THE. INABILITY TO RETAIN THE WEST FACADe:. AFTER MY REVIEW OF THE COOUMENTATION ON THe ~ISiORIC BUILDING THAi EXIST ANO THAi SHOU~C se ~EMOVEO FROM THE SITE, I AM SATISFIED THAT HISTORICAl-I. y. FAITHFUL ANC AOOU~AiE RECONSTRUCTION OOOUMENTS OF THE BUILDING CAN se F'~eF'A~ED, PLeASE CALL WITH ANY QUESTIONS, , awall: t.lJ'tftCl+ind~.dem. Plpt till: 30!.'7~4-4d1~ F1lfrld. RIII.tend .rahJf.lat jllDOo. MlIDbllj ~m.rhl'" hutJtLlta of .rllh!tlllu IIlll1 HIIO. o Prlntld. on tR)'1llld f1L.n IDIIcIe frolll pcIlt canlum.'.....ltI. PLIAI! RJCYCLEI 8 ~OOd ~6g_ ~_~ gO~:131 ,,1"" .~'~B '~(j38tns .~IZlI8 OS? I (IH,11 86 .~Z - l:jO 11;13/98 FRI 11:50 FAX 3054410755 DeSimone Consulting Engr ~:;O.l DE 51 M 0 NE CO NS U L TI NG,'E N,.GI N EER S, P.L.L.C... November 13, 1998 PhilipR. Azan , .. DirectorlBuilding Official Ci.ty of Miami BeachBuilding Department" City Halt, 1700 Convention Center Drive Second Floor Miaini Beach, FL 33139. . .' Re:' Royal P31ni'Hotd.Miami Beach Dear Mr. Azan: , . ' .'.. 1\5' per YOUrtequeSt we have observed~eaboveeiptionedbuildingand mrver~viewed the:i' ;~ri . materiall)!ovided..... The Of>servatlonswere conducte;j~by'Willjam:()'ponn~ll on' Octo~ ~~... 998;' ., ThereP(;)rtContainedherein,~ a'eol1aboration~tWeen ~/" . .. , - .. . . -' .&,a firm;-~are. yery famil1a1"~th histon~ str1ictures, both nafioNII.ly'and.hei:ein Mi.ami. ".1\ j~i .. Beachproj~sUch asthe~tOtl~(}tel,425 and'45.5 Qce8nDrive'~ShetbourneApartmentl:,~d . tI1eShe~n_BaJ~bOur lli'e~~plesofolJl'reCentw~;H . ...... ~. .' - .. . , .- - . -.- .. .TherepOi:tdet8ilsthe'deteriOrationobs.eIVed'andre\ri~'iSSues'telated to the lIl8terilllr.eStifin:. !he ,. . c(;rrosionpiOCess,.th~$OUthF1oridaBUildiIig~Q9<fe;:8hd~~~ly presentS ourconclusioi!.' ',. ." .-'; .-'., -. .;.-,.,'........ .- >..,..... .":.' ..'..;'" . .~-' ..---.-' . .. ,--.. .. If further1lSSistance~~please c81L - .. . . .' - . .- .' . .~ . .. . - . . ..... .WALK-~yGH:OBSERV~J.;I9N . ., - . . .'_. '. ., ...,-..... _ ..... ; .:_.-:. ,r. . . ..._ c :~~~c~~ . ....- ......- '. ,2600 DOUGI.:AS ROAJ:)'SUITE~OO.' CORACGAB:LES. F~.33 I.J.( (05)Ul..07S5~FAX' (305)' H7~~" wt!.L1AM R:;O'DONNEL:v-:NCENT I. DESIMONE. ".t;~,PAcI ...BORYS L HAY;IJA. P.E. . . liXtGUTTV1t VP. .. _ c.2'.0. .. ... cna.'UVlfV.R '.. sTEVEN McGOLOs:EN.?E .,. . v-=,. .. . "~M.OO8RYN; P:E.~~\crN'(AS .. PIUiSIO&rT . -. . 5l:EPHENy. OESIMONE:Ei..E; '. i,,,,,cunvs VR- 11/13/98 FRI 11:53 FAX 3054410755 DeSimone Consulting Engr I4JO~._ 'r)rl~ _~~~t' "--,1-1 Royal Palm Hotel - Observation Report November 13, 1998 Page :: of 5 . Much of the interior finishes have been removed from. the building revealing a deteriorated stru::tura1 . frame. A substantial quantity of cone tete spalling was observed throUghout1:he.building. J-.earIy every cast-in-plage elemC?D.t observed displayed deterioration. In general, detericratiOllobs ::rwd includes~ Columns: . VertiCal and tie reinforckgisruSfuig causing co~crete to spalL Innany ... Cases, ~. tie reinforcing bas deteri~.~mpletely 8l1dis no longer pl :~ent. Beams: Beam soflitsaretypicallyspil1ling~. ~~Dle :reinfo~ingcorrosion varies. nom mil(j to. severe. As. was .coriunOll.in:tI:leitiIDeperlOd-of e.ODstruCtio~ beam '. ~sare only provided adjacent. to the supportpoints~ACllDini I:tlUm stirropsare not provided. . . . . . . Slabs: Soffits are typicallyandunlfonnlYspalling.. VisibItF reinforcing steel col"I~sion varies from mild.tosev=; :, ..q... .. . . . . _ Masonry~ Appem to be;n fiili.condjtion.' It is ttotmoWn.Whether verticaI.orhori:: ;ontal.... reinfurci11giS.proVided.<M6I'e .tluui'Iik~ly;:reirifoi'cin.g ~ .Dot pJ:esent. ... .... Joists: Steerbarjc>.fStsarc.lnreasOn.ablygoodcoridi~on.... .... .' . F oundatioris:Thes~'-vete o~y. visible from an e:l(cavatedP"rtion on the south side: if the .. bni1ding~C.3sual:observationindi1:~esth8tthey &rein reasonably .~QOd .. condition:....F~~ mvestl8ationis~~ to~inean .~verall CQnc:i.tion. . . . . . . . - . . . . MA~TESTiNG:..... ... DeSimOneCons.ultin&En~~'did'not cond\Jct.~y~test~ltg.. ~Testslul.ye beCri~vi:,~y': con~byATCAsS()ci~Ti:1cu . Copies of these. teSt.:~~H~.prOvj~to pesjmone bY. Mr: Iibilip>:., . ...d~ .lJuildingOfficial!or~~pityofMianli.,~~~:.. . . . AtepertdatedOctob.er14; 1998..provides. ~enty:. me :Comp~ssivc strengtlr:81uftWertfy l:hiee.. c~de iOllcontetlt~ues .rarSSll1ples taken. thiOugti~ut .tb~, boildi:rig.ASecOndA TCiep9rt. :I8ted . October 28',1998, provides ~ additionaLch1~dticm ,\,idues oQt.8ined in a~tloot gfade l.eam, first floor slab, and front facade cohmms 911 ~~feye.lS~ ' . . -. - - fu ~e1lera1; these test ~rtS'~ent.co~iSt~yhigJf'~htfui~iOrd#eis ~d Consimnti~l.low :con~eo~ve~~ . . . .... . . - - ])ETERl()It,ATIONMECHANlS~ ... , . ~- .' - - ,'-. . .' -' . .~ ..Miny ...factorsand.. .EIocCsses,..~..alidtnaitt!a.ltJ.1hc ..co~iCm}:~l~Dl!..:: FactorS.d .u:mS'. u.~onthatj,~...,..~ceabilitf.:CJf-:.:~~:,~i~.~~W.hi~t,. : ....-:. ....:.'-S.. .. . . · Qwility of materials: Strengthandchlonde content of aggregates, use of potable, ;ater, . chemical makeup of portland. cemen~ and.type and ~ti:y of 11/13/98 FRI 11:55 FAX 3054410755 DeSl.one Consulting Engr ~003 D.. .rl~ )' '-' .:i>....J Royal Palm Hotel--Observation Report November 13,1998. Page l of 5 admixtures used. Low water cement ratios are recognized as an important com] ,onent ofcorrosionresistmrtcona:ere.~arge an1ountsofwater with l ::spect - to cement will6Ute a lessdensC~d perhaps less alkaJineJllatrix ma1cing tb.econciete less durable, ThctfUcknessofconcretebetweeIl the. reinforcing steel-.and o.ltside faCe of!he. structural member is_critical to long term ser'll'icability. _ Chloride ions area key element to the steel corrosionp(Ocesswithin3 concrete matrix. Oth;:rkey .elementS are water (moisturc):8nd oxygen'Thest;--elementscqm6fu.e~withi11.tl1ec(Jn~e ma -rne to initiattelectrochem.icat corrosion. Other.inf1uencingfactOrs-~pH ofthe_coooretcpore :,:f'ater, . carbooation of the p()rtIandcem~paste; cracks in theconcrete,stttlycurrents,and galvanic E: :Iects due to<COilta~ between disSimilar metals. ._ - ...- . Concrete: . Cover: ,. - . . - . . - . -CaroOnation~ftbe-p()rtlandcemeDt. ~C)CcUlSWheo~reactswithcarbon dioxigetr9 ,n-the .-- .air and reduCes: the pH level toapproXimateIy8.s~_WhenpHreachesthis Iev~l,the steefbeg ins to. - reactWi~.the concrete-and:c6rrosionbegiiJs: :One fesu.lt -ofth~-piQCess is redUction or COIl crete co-mpressiye strength, - . - As thesteer~s,tbep~-otCotrosiOn~a.~vollll1iithan tbc.()riginal...~l. This. .".generates.:~~-~:Qnthe.sujro~cXmcreteWhich-wmey~yyieldand.sPaft This: , oPensdilectChanI1ets forw8ter-and:lboistUre:tO- ~;~~st~efWbictf accelerates the. con :>sion' - ...~.TheresuIts...atC:l.of_larea.Joss:ofCOncietemi-U41qssofbondbetWeenthe: _1.... _and~~n~..: .' .... .... . -.. . . - . .. .. . S~urB FLORIJ)AII~DINGPOD~ I{EQ~S~ .. '-. ". - . , ,,' - - - , '. -. . - -. . Und~~provisi~ ofSectionf04;6ftb,eSoUth;Floti.J~mJdi~g Code [SFBCj,:the. Royal F.aiJJl:_ ........~~~~~~~~~~~.z:,~~~~~.. -, ".,. . "-". -- . ; Conditions do exist irith~buiidmgthjt~W~~j-6f.ineritiol~~t6:'SPBCProvisi_<':~, . , -. . . ..", - .. - . . . J'hebUildirigftlkU~~~irtlm9:r vvaJIsWmoottikelyresis(the ivind -PressUres required bY.$~ti:on.6of ~dard 7-93 of the Arne :iean 'Se<bon2S02:..::?;&.C~'f(=~~~.~~., -Section 2508: .. -- Mllili:nmn water cement ratiOs areyery likely exceeded in the ag.- built st:iticture; . - . .. . 11,13/98 ~Rl 11:57 FAX 3054410755 DeSimone Consulting Engr I4J 004 Page 4of5 CONCLUSION' . Tbe RoyalPtdmHotel is presently in poor condition. The existing conditions indicate 8ggr :$sive electrochemica1d~()ntti~ and, very- likely, carbonation of the portland cement paste. Essei tiafly, . the effective service life of'the strncturehasexpired. . . . . ThequestionwiUarise:~tQ.whettier.thebuilding can be ~'.. The answer is yes. Tn,;: next. . . question i~ wbattlUswQi-t.:wmmtai1 and ~owlong~an the service life ~e extended. In oderto restore'~ Integrity'tO,1he building, (he followiDgmUst occur. . . . . e . ~ thecorioSioI1mCchanism ..' '.' .' .~e1D.oveunaccePta~le deteI;iorated.~ . H..... . .... .' . .... Sl:JPPleiJ?eQt the-rem~,structure to resist i'eq~loa.diDg. .e ....:,.. .' . "<ial~~protcCti6n can:.1'~:~edtocUrestthe co~ued'$teei.Co~~This.is a very 'expt'~ive',:.. ~intrusivesyst~tbatmaynotprovideUoifOttnpIotectiOD ~tS: The system dependS upOn . electricalc~ntiI1uUyJo .~~fthe reinforcing steel in the building; It would be yery diffi~: if noi .impossi~letoachieve~~._ .. .'. - ClietJ1icai.coatiDgS~_1li1.the'JIl~ettharm:e dtsigD.edtore~ersetlilicarbc;Jrti;~tion~ess .[lthe c" '. .'po#Iaod~~~;"~Y~.1t.s6~(~on~o(herbuildillgotl:~B~h ..the..... . .resuitihtidnctID:eetthe.". OIlSmd ..... . ents of the.d . team.: -. ,-.: . - ,-:'>. '--,':-':':d;': 'f_:~.,.,.;",-~~~~' ........ .. ..,...~.. ...' _', ',. .... .'._:. - Removing ~~ material is an'intruSivc'arid ~ ~ 'Tlte extent ofspaUiJ;l~!; th8t.. -, . .. is'visib1e:w;i11 ~'-a'~e~1(ious':8inount:(jf~~ .8nd~L~. be rePlaCed 111 ~e . ~ :~t . . , ..... - - . '. . .. ~. . ,. .. . . ,," . , Collltnrt. oo~ sti:e_- is -cSO l~- ~. jaC~' ~r ~laCem~-"9f .cohmms "Will:.bc req...~ . ~. ~acketittg invol\i.es,.~ a_-J1eW -co~wIm-of 8reater diinCtision tfiat enCom~ the _exi!~g .. -':colUIllil;~::~~'jh:thfs-bui1diDg~.J:towever~is that the .bigb.. c~de confenfiIttfu(eXJ !:ttng, --- ~ .-~cre~'~Y')eacl1~~~new:~~dc~.tU~.m~'cJe,terio.~ '. ". .. : ,'.Inany.'cqnc~~~~ ptoJ~..~.'m~of:~6n. ..e-'~_:'pbie.mi~.'.'8ttive. '::.T:r.Picany..:thc'~~~~y()lveS,~ng:ih~~oms'b~oot.curii.rgfbe..~.... The. ..S;ymptoms.Will~~ ilt8:laiettiiine,ei1.herin aeas-thai'weie-previeusly ~ or in new ~1'C8S. Often ~~'J ~~:~~'_'~~b.'~js;in_l~f&_iO_m'is IOciilizedand ofsnuill valUe-Wit1i"'~Pectio the b~as. aw;trole." . llilJ/9~ ~Kl 11:59 ~AX 3054410755 DeSimone Consulttng Engr I4l 005 D ",......I-. ~" . .ij '. '-4 1 ~__.. ...1 Royal Palm Hotel - Observation Report November 13~ 199.8 Page Sof5 ""Deterioration.issystemi9 in the Royal Palm HoteL In essence, much of the original COD$tI .action material will have to be removed and rep.laced to achieve. asotmd structure," The cost and. time req.uired to do so .will~ be "high, " " . Inour .professldnalopinioD; the usefu11ifespanoftheR:oYa1PalmH~tel structure has exp~(1. The bu.ildingshouldberemoved frVm the site. ~~~' . i1.......)... A.. ... ..........____ ."~ " . " " . "~ V~i 1.nc,~in1oneJ p ~~" . + ... '.' -, . ""CEO;' MIAMI BEACH CITY COMMISSION NOTICE TO THE PUBLIC The Miami Beach City Commission will hold a public hearing on Wednesday, November 18, 1998, at 5:00 pm in the Commission Chambers, City Hall, 1700 Convention Center Drive, 3rd Floor, Miami Beach, Florida 33139. At this public hearing, the Commission will review the following: HPB File No. 1046, 1535 and 1545 Collins Avenue - The Shorecrest and Royal Palm Hotels. The applicants, R.D.P. Royal Palm Hotel Limited Co. and R.D.P. Shorecrest Hotel Limited Co., are requesting a Certificate of Appropriateness for Demolition to demolish those remaining portions of the Royal Palm Hotel inclusive of the existing seven (7) story front facade section of the building, in order to construct a first class luxury Convention Center/Resort Hotel with 412 guest rooms and suites. This application lS available for public inspection during normal business hours in the offices of the Planning Department, 2nd Floor, City Hall. Inquiries may be directed to the Department at 673-7550. All persons are invited to attend this meeting or be represented by an agent, or to express their views in writing addressed to the Planning Department, 1700 Convention Center Drive, 2nd Floor, Miami Beach, Florida 33139. This item may be continued, and under such circumstances, additional legal notice would not be provided. Any person may contact the Planning Department at 673-7550 for information as to the status of this item. Pursuant to Section 286.0105, Fla. Stat., the City hereby advises the public that: If a person decides to appeal any decision made by this Board with respect to any matter considered at their meeting or hearing, such person will need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. This notice does not constitute consent by the Ci ty for the introduction' or admission of otherwise inadmissible or irrelevant evidence, nor does it authorize challenges or appeals not otherwise allowed by law. In accordance with the Americans with Disabilities Act of 1990, persons needing special accommodation to participate in this proceeding should contact the Boards' Administrator at (305) 673-7550 for assistance, no later than four (4) days prior to the proceeding. If hearing impaired, telephone the Florida Relay Service numbers, (800) 955-8771 (TDD) or (800) 955-8770 (Voice) I for assistance. Persons requiring sign language interpreters should contact the Boards' Administrator 5 days in advance, when possible. For information on access for persons with disabilities, or to request material in accessible format, please call 305-673-7550 "VOICE"; hearing impaired persons, please call 673-7219 "TDD". QCT,20.199S 10:35AM ~ OCr"lS-98 MOX 5:02 PM H. G~ "CONSLT lNGRS r-.., ~IO , sag p, 2 p, 1 HERSI-4EL.L GILL OONSULTING eNGtNEEAe. \NC. .d.S01 ~r1c. d. LeClf"lIJIVl!l. Ilw'" 3!lC' ~,.... 1I..., 1=lflr4dB t!~~4~' t~.1 ,'''.Cl81S1 , lEu ac=eJ ...,..... Oatober19.1998 Mr. Reln.ldo aorv.. AAQUlftCTONICA S50 erick.1I Avenue, Suite :ilOC MIami. Florida 33131 RefenJ"lSl: ROYAL PAI.M HOTeL HGCE File: 9821 RP Deer Reln.lde; w. nave revteW8d the rMultt gf the con~t. teeling, for the _IIU"SI "OVA~ PAI.M HOTEL. Th. ~.ult, jndlcate that 1, A hi;h level of ~Iorl'u Ie ,ree,nt i" th. concre.. 2. The lver1IQ8 CCln~ c:ompNt.I~ ItI1l"Gth Ie ,... than 2,SCO psI. with II lOW v_I"'" of 1.820 pli, . Our Inlpectlan of tne ItruotUr8 on September 5. 1 ge8 rlv,.led very .u\7ltlntlal struG'ttlral detel1oretlon of tttt ,II be, eolumnl, .nd lateral r..lltlng memb.rt. The hIgh Ilv.1 of chloride' In the conerfti will cau.. furthlr deterlol'ltlon of the cancret. and relnfOrting steel. Therefor" the opinion 01 tnll office remll". (8. prevlou.1y Ad. In our S.pt'l'l1ber 10, 1S88 letter) that thl8 Itructure ,hou[Q bedemclllhed. :;;:;U,; /fJ Mlen....1 O. Frl.d, P,E. (~1I21 ~ ~) lOa 'd ~ 6 S L v L ~ S 0 ~> 13~ 1V 'L3 ;nH3HWnS 'NlZ11H ZV:P{ (I1HL)86 ,Z{- 'AON City of Miami Beach m Building Department Memorandum Date: October, 22. 1998 To: Phil Azan, Building Official From: Flavio Gomez, P. E. Structural Plans Processor Subject: ROYAL PALM On October 21, 1998, I visited the ROYAL PALM HOTEL to observe the present condition of the structure. Also present were Phil Azan, Building Official and Richard Mcconachie, Chief Building Inspector. The Contractor has removed the concrete cover in almost all of the structural members for visual observation of the reinforcing steel. In all the exposed members, without exeption, the reinforcing steel was either absent or severally corroded beyond acceptable values of 15 % to 25 %. According to the laboratory reports presented by the owner, the concrete has levels of chloride that are also beyond allowable values of 2 %. This contamination of the concrete with chloride will result in further deterioration of the structural members. The compressive strengthof theconcrete as tested by concrete cores taken by the laboratory hired by the owner is very low. The values go as low as 1,520 psi compared to the 3000 psi design mix strength. In my opinion, the present condition of the structure qualifies this building as an unsafe structure. Because the repair will most likely require the removal and replacement of all the reinforcing steel and concrete in the members, then as per section 202.2(b)(2) the structure shall be demolished since the repairs to the structure exceed 33 % of the structural value. CITY OF MIAMI BEACH ;/TY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 lttp:\\ci.miami-beach. fl. us COMMISSION MEMORANDUM NO. {<6/-~~ TO: FROM: Mayor Neisen O. Kasdil}and Members of the City ~mmission Sergio Rodriguez City Manager A REsouh ON OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, GRANTING A REQUEST BY THE R.D.P. ROYAL PALM HOTEL L.P. FOR A CERTIFICATE OF APPROPRIATENESS FOR DEMOLITION TO DEMOLISH THE REMAINING PORTIONS OF THE ROYAL PALM HOTEL, A HISTORIC STRUCTURE LOCATED AT 1545 COLLINS AVENUE, IN ORDER TO CONSTRUCT A FIRST CLASS LUXURY CONVENTION CENTER/RESORT HOTEL WITH 412 GUEST ROOMS AND SUITES. DATE: November 18, 1998 SUBJECT: RECOMMENDATION The Administration recommends that the City Commission consider the recommendation of the Historic Preservation Board relative to a request by R.D.P. Royal Palm Hotel L.P. for a Certificate of Appropriateness for Demolition to demolish the remaining portions of the Royal Palm Hotel. BACKGROUND The Shorecrest and Royal Palm Hotels are located on two of the proposed Convention Hotel sites on Collins A venue between 15th and 16th Streets, as shown on the City Center/Historic Convention Village Redevelopment and Revitalization Area Plan. The subject structures were classified as historic structures in the City's Historic Properties Data Base. Pursuant to Subsection 19-11 of Zoning Ordinance No. 89-2665, Certificates of Appropriateness for the proposed hotel sites located between 15th and 16th Streets on the east side of Collins Avenue, as shown on aforementioned Plan, are granted or denied in accordance with procedures set forth in the former Zoning Ordinance Section 19 ( as amended, prior to May 5, 1994). Pursuant to Subsection 19-6 of former Zoning Ordinance Section 19, the procedures for granting or denying a request for a Certificate of Appropriateness for Demolition to demolish an historic structure require the applicant to obtain a Certificate of Appropriateness for Demolition from the City Commission subsequent to a formal recommendation being issued by the Historic Preservation Board after a separate public hearing. On December 3, 1996, The Joint Design Review/Historic Preservation Board granted a Certificate of Appropriateness and Design Review approval for the renovation, alteration and partial demolition of two (2) existing hotel structures and the construction of a fifteen (15) story addition to the Royal AGENDAITEM~ DATEJJ-l6' -9~ Palm Hotel and a sixteen (16) story addition to the Shorecrest Hotel. On December 12, 1996, the City's Historic Preservation Board held a public hearing, after which the Board voted unanimously (8-0) to recommend to the City Commission that the Certificate of Appropriateness for Demolition be granted, subject to the conditions enumerated in the December 12, 1996 Staff Report. On February 19, 1997, the City Commission granted a Certificate of Appropriateness for Demolition to demolish portions of the Shorecrest Hotel. an Historic Structure located at 1535 Collins Avenue, and the Royal Palm Hotel, an Historic Structure located at 1545 Collins A venue. On July 10, 1998, a Full Building permit was issued in accordance with the plans approved by the Joint Board, the Historic Preservation Board and the City Commission. Subsequent to the ground breaking for the Royal Palm and Shorecrest project on August 4th, 1998, interior demolition of the Royal Palm Hotel revealed severe concrete deterioration throughout the structure, including primary structural elements. Testing of the existing structural concrete indicated compressive strengths and chloride content levels did not comply with code requirements. On October 20th, 1998, the developer officially notified the City of the Royal Palm's structural condition and informed staff of its engineer's recommendation to demolish the structure and, in its place, to replicate that portion of the hotel which was to have been restored. The developer was advised not to take any action until the Historic Preservation and Design Review Boards had an opportunity to review the matter. On October 27th, 1998 following an on-site inspection and a detailed evaluation of the structural system of the existing Royal Palm Hotel, the Building Department concurred with the engineering reports and determined the structure to be unsafe. On October 28th, 1998 the Building Department posted an "unsafe structure" notice on the Royal Palm, preventing further work from proceeding in the building. On October 30, 1998, L TC# 153-1998, issued with attachments, addressed a number of design, preservation, legal, zoning and parking issues of the subject project. At a special meeting on November 16, 1998, the City's Historic Preservation Board will hold a public hearing, wherein it will be recommending to the City Commission whether or not a Certificate of Appropriateness for Demolition requested by the applicant should be granted. The letter from Carter McDowell (Bilzin Sumberg Dunn Price & Axelrod, LLP) dated October 22, 1998 sets forth the analysis and basis upon which this Certificate of Appropriateness request from R.D.P. Royal Palm Hotel Limited is being requested (see attached). ANAL YSIS Based on structural analyses performed by Rica, Tameness, the Engineer of record, and two (2) independent peer reviews commissioned by the applicant and performed by Hershell Gill and A TC, the developer's team is recommending and requesting demolition of the remaining portions of the existing Royal Palm structure which were to be retained and incorporated into the overall master design of the site. The developer also indicated its willingness to remove and preserve certain architecturally significant interior and exterior elements to place in the new structure. Subsequently, the City of Miami Beach hired Consulting Engineer Vincent DeSimone to prepare an independent review and evaluation report for the remainder of the Royal Palm Hotel. The DeSimone report concluded that the usefu11ifespan of the Royal Palm Hotel has expired and that the structure should be removed from the site (see attached). Any proposal to demolish substantial portions of "contributing" structures in a historic district is strongly discouraged, except when extenuating circumstances deem such demolition necessary and appropriate. Those circumstances are fully evaluated in the following Engineering Reports: 1. Herbert Gopman, P.E., July 8, 1993 2. Juan Fernandez-Barquin, P.E., February 8, 1996 3. Douglas Tameness, P.E., October 19, 1998 4. Michael Fried, P.E., October 19, 1998 5. F1avio Gomez, P.E., October 22, 1998 6. Peter Read, P.E., October 28, 1998 and November 11, 1998 7. Vincent DeSimone, P.E., November 13, 1998 The preponderance of the evidence and collective structural engineering expertise, including that of the City selected independent engineer, states that the Royal Palm Hotel is not a candidate for structural restoration, that is, it cannot be structurally restored due to an irreparable highly advanced and unique state of structural deterioration. Under these unique circumstances, the Administration recommends that the City Commission grant the Certificate of Appropriateness for Demolition as requested. CONCLUSION Based on the foregoing, the Administration recommends that the City Commission consider the recommendation of the Historic Preservation Board relative to the request by the R.D.P. Royal Palm Hotel Limited Company for a Certificate of Appropriateness for Demolition to demolish the remaining portions of the Royal Palm Hotel. SR/JoJjO/WHC/TRM Attachments T:\AGENDA \NOVI898\REGULARICM-8085. WPD ~ILZJN SUMSERG DUNN PRICE Or AxELROD LLP - r: \.:::1 CARTER N. MCOOWEL.L.. P.A. O'''CCT O''''L '3C5'35o.Z355 C-.....,L ~Olltlm.c:cm ... "''''''TNC''S..'''' 0,. "''''0'C55'O'''''L "'SSOC''''TIONS Z500 ""ST U"lIO"l "'N...NCI"'L CCNTE" ZOO SOUTH .'SCAYNC 1!I0ULCV..."O. ..,......'. 'LO",O... 33'31,Z336 TEL.C"'HONC 1305>3747580 'IN'O~,~~.l:~..., 'IV( /3051374-7593 . I!I"OWA"O '95411"~.680e; ,':'.: L: !..: ? October 22, 1998 Dean J. Grandin, Jr. Planning and Zoning Director City of Miami Beach Planning, Design and Historic Preservation Division 1700 Convention Center Drive Miami Beach, Florida 33139 Re: Royal Palm Hotel Dear Mr. Grandin: .. On behalf of RDP Royal Palm Hotel LP ("RDP"), the long term lessee of the Royal PalmlShorecrest site, please accept this letter as a formal request for a expedited special meeting of the Historic Preservation Board and/or if necessary the Joint Historic PreservationlOesign Review Board to consider a request to~ modify the existing Certificate of AporoPriateness (file number 8085J) to allow the immediate demolition of the existing Royal Palm Hotel and to begin consideration of the aopropriate e lacement of ffiis historic structure. RDP would prefer not to have to make this request, however, as explaine elow and in the atta~hed correspondence based on extensive concrete core samples and structurai analysis of the existing structure it has been determined by: (1) Aquitectonica, the project architect; (2) Riva, Timmons and Partners, the project structural engineer of record; (3) Hershell Gill Consulting Engineers, Inc., the project peer review structural engineer; and (4) AGT Architects and Thorn Grafton, the Historic Preservation Architects for the project, that the existing Royal Palm Hotel structure cannot be repaired in such a way as to meet the structural requirements of the South Florida Building Code. (See copies of letters the consultants attached to this letter.) As you are aware, all parties including both the City and RDP believed that based on the preliminary analysis that the Royal Palm Hotel structure could be repaired and preserved. Indeed, all of the plans, approvals and permits issued to date have incorporated the Royal Palm structure based on the assumption that it could be repaired to meet the South Florida Building Code requirements. Once RDP was allowed to begin interior demolition within the Royal Palm Structure, it became apparent G:\OMS\73190\10200\0211665.01 10/22/98 ~---- - - --- ------ BILZIN SUMBERG DUNN PRICE & AXELROD LLP Dean J. Grandin, Jr. Page 2 to all parties that the deterioration of the existing structure was much more extensive than originally realized. As the interior demolition revealed more of the underlying structure it was determined by both the City Building Department and the project design team that additional structural testing would be required to determine the extent of the damage. On October 14, 1998, A TC Associates Inc. reported the results of tests on twenty-five concrete core samples taken throughout the seven story Royal Palm structure. (See copy of the Report attached to this letter.) The results of these tests show that twenty-two of the twenty-five tests taken were below the minimum Building Code standard of 3,000 PSI. Moreover, the average PSI for the tests taken on the first level of the structure was only 1,843 PSI. This is of particular concern as the first level obviously carries the heaviest loads. The weak condition of the concrete is further complicated by the fact that the chloride content substantially exceeds the maximum permitted level under the applicable codes. As a result, the existing concrete itself is causing the corrosion and ultimate failure of the reinforcing steel. This condition has been described as a "cancer", causing the internal destruction of the Royal Palm Hotel structure which can only be remedied through complete removal of the existing concrete. In short, this structure cannot be saved because it will continue to self- destruct even with repair and reinforcement. In light of the above findings. the design team including Thorn Grafton have begun further documenting the existing conditions at the Royal Palm in particular the exact configuration and materials of the lobby and the westem facade of the building. This effort is greatly enhanced by the fact that there is a substantially complete set of the original building drawings. RDP is committed to immediately providing complete and thorough documentation of the historic condition of the lobby and western facade. Further, RDP is hereby committing to the City of Miami Beach and the Historic Preservation Board that if it is approved by the City and its various boards that RDP will faithfully reconstruct a western facade and lobby of the Royal Palm based on the documentation of the existing condition and the historical building plans. This will include documentation based on preservation of actual samples of the materials in the lobby area and all of the important architectural details. We are therefore seeking immediate permission from the City of Miami Beach to begin taking appropriate samples of these materials under the close supervision of \Nilliam Cary, the City's Historic Preservation Officer. We are aware that there may be a divergence of opinion within the historic preservation community and particularly the Historic Preservation Board about the most appropriate way to replace the western facade and lobby area of the Royal Palm Hotel. G\OMS\73190\10200\0211665.01 10/22/98 81LZIN SUM8ERG DUNN PRICE & AXELROD LLP Dean J. Grandin, Jr. Page 3 We are committed to working with the City, as the landlord, and the Historic Preservation/Design Review Board staff and the Joint Boards to quickly develop an appropriate set of plans for the replacement of the Royal Palm Hotel. As we have explained in our various meetings with you and other City officials, the fact that this condition was not fully revealed until the interior demolition of the Royal Palm had substantially progressed has created significant timing problems for RDP. The contractor is progressing with site work and the already approved partial demolition of the eastern most addition to the Royal Palm at the current time. Under the expected construction schedule, the contractor is due to begin staging site excavation followed by for installation of pilings and foundation on the site beginning in the first week of November. Unfortunately, the structural engineers have advised that if additional work in undertaken on the site which causes significant vibration either within the Royal Palm Hotel structure and/or in the areas immediately surrounding it that the existing hotel structure could fail. Moreover, assuming that the existing Royal Palm structure must be demolished we would need to undertake that demolition work before we stage the installation of piling and foundation work on the site so that there is not a conflict between those two operations. If we are to avoid truly significant delay in the construction of this project, we would need authorization for the demolition of the Royal Palm Hotel structure by October 30, 1998 which is next Friday. We are therefore requesting that the City call an emergency special meeting of the Historic Preservation Board as early as possible next week in order for that Board to consider authorization of the demolition of the Royal Palm Hotel. As always, we appreciate your continuing cooperation and assistance. We would also like to extend an invitation to the Historic Preservation Board members to individually view the condition of the building prior to the meeting. If any Board member would like to view the building, we would ask that they contact your office and that your office contact Michelle Kohler at 305-995-5330 so that we can arrange for them to safely view the building. We are prepared to provide any information you may reasonably need and or help in any way we can in order to assist in setting up this special meeting as soon as possible. ~~1 \ Carter N. McDowell CNM:zoe GIDMS\73190\10200\0211665.01 10/22198 i , / 81LZIN SUMBERG DUNN PRICE & AXELROD LLF' Dean J. Grandin, Jr. Page 4 cc: R. Donahue Peebles Chris Bruch Sergio Rodriguez Janet Gavarette Christina Cue/Vo William Cary .. G\OMS\73190\10200\0211665.01 10/22/98 CITY OF MIAMI BEACH :ITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 1ttp:\\ci. miami-beach. t1.us L.T.C. No. 153-1998 LETTER TO COMMISSION October 30, 1998 TO: Mayor Neisen O. Kasdin and Members of the City Commission FROM: Sergio Rodriguez A J1t!... City Manager (jJ SUBJECT: Status of the Royal Palm Hotel and Implications to the Royal Palm Crowne Plaza Hotel Project. BACKGROUND The Clark Construction Group, Inc., the contractor on the Royal Palm, has been on site since ground-breaking on August 4, 1998, performing work which includes building demolition, site work, shoringlbracing, test piles and production piles. Interior demolition of the Royal Palm Hotel has revealed severe concrete deterioration throughout the structure including all primary structural elements. Testing of the existing structural concrete by A TC, an independent testing company, indicates compressive strengths and chloride content levels do not comply with code requirements. Based on structural analyses performed by Riva, Timmons, the engineer of record and an independent peer review performed by Hershell Gill Consulting Engineers, Inc., of A TC's report, the developer's design team is recommending demolition of the remaining portions of the existing Royal Palm structure which were to be retained and incorporated into the overall master design of the site. On October 20, 1998, the developer officially notified the City of the Royal Palm's structural condition and informed staff of its engineer's recommendation to demolish the structure and in its place, to replicate that portion of the hotel which was to have been restored. The developer also indicated its willingness to remove and preserve certain architecturally significant interior and exterior elements to place in the new structure. The developer was advised not to take any action until the Historic Preservation and Design Review Boards had an opportunity to review the matter as required by the Zoning Ordinance and the Development Agreement. On October 26, following an on-site inspection and a detailed evaluation of the structural system of the existing Royal Palm Hotel, the Building Department concurred with the engineering reports and determined the structure to be unsafe. On October 28, the Building Department posted an "unsafe structure" notice on the Royal Palm, stating that on October 21, 1998 and October 26, 1998, inspections were performed at the Royal Palm which revealed deterioration of the structure and structural parts which are in violation of the South Florida Building Code, and that all measures deemed appropriate or necessary to bring the building into compliance with the South Florida Building Code must be effectuated. All such actions must receive all required permits for each aspect of the contemplated corrective work pursuant to the South Florida Building Code and the City's Land Development Regulations Code. Furthermore, the building must be maintained secure at all times in accordance with Section 202.6 of the South Florida Building Code, and in a manner acceptable to the Building Official. Since the City was officially notified, daily meetings have been held with City staff and the developer to determine the implications of demolition relative to historic preservation and zoning- related matters. On October 26 the developer was asked to obtain additional samples from the facade in order to determine the feasibility of saving it. Preliminary test results indicating elevated chloride levels in the facade were provided on October 29, 1998. Copies of both reports are included with t~.is L. T. C. Dates were set for a joint meeting of the Historic Preservation and Design Review Boards on November 16, the City Commission on November 18 and the Zoning Board of Adjustment on December 7, 1998. In addition, the Administration will engage an independent structural engineer to render an opinion on the issue. ANALYSIS The unexpected demolition of all or a significant portion of the remaining Royal Palm Hotel carries certain ramifications which are expected to impact the Crowne Plaza project. The Administration was asked to prepare the following analysis to determine the extent of the issues at stake: Historic Preservation Board Approval Design and Preservation staff, as well as the Building Official and the project's engineer of record, have all concluded that the remaining portions of the existing Royal Palm Hotel are in an advanced state of structural decline. To this end, staff has determined that the developer must first obtain a Certificate of Appropriateness for Demolition. Under certain circumstances, if a structure constitutes an immediate threat to public health or safety, as determined by the Building Official, the Dade County Unsafe Structures Board, Fire Marshall, or Public Works Director, an exemption to this requirement could be granted. As of the date of this report, the Building Official has not yet concluded that the advanced state of structural deterioration of the remaining portions of the Royal Palm Hotel constitute a threat to "immediate public health or safety". Pursuant to Section 118-535 of the Miami Beach Code, Certificates of Appropriateness for the Loews and Royal Palm Crowne Plaza Hotel sites are granted or denied in accordance with procedures set forth in the former Zoning Ordinance Section 19 (as amended prior to May 5, 1994), as provided for in the Development Agreement. Pursuant to Subsection 19-6 of the former Zoning Ordinance, the procedures for granting or denying a request for a Certificate of Appropriateness for Demolition to demolish a historic structure require the applicant to obtain a Certificate of Appropriateness for Demolition from the City Commission subsequent to a formal recommendation being issued by the Historic Preservation Board after a separate public hearing. To this end, staff has scheduled a special meeting of the Historic Preservation Board on November 16 to consider the request for a Certificate of Appropriateness for Demolition for the complete demolition of the remainder of the existing Royal Palm Hotel. At the same meeting, the Joint Design ReviewIHistoric Preservation Board will consider a request for a modification to the existing Design Review approval for the subject site, in order to fully re-create those portions of the Royal Palm Hotel slated for demolition. Since the City Commission must ultimately approve the Certificate of Appropriateness for Demolition, a public hearing will be fully noticed with a time certain of 5 :00 pm for the November 18 City Commission meeting. Zoning Issues Setbacks The Royal Palm / Shorecrest site received variances on December 13, 1996, in order to retain and renovate portions of the two existing hotel buildings and construct two new hotel tower additions. The nature of the variances were relative to the setbacks of the new construction, as well as loading space requirements and the setback for decks. The existing buildings did not require any setback variances since historic structures may retain their respective existing setbacks regardless of the total value of the rehabilitation and additions, combined. Should the existing Royal Palm building be demolished, any new construction that follows the original building's footprint would require a modification to the variance previously granted along the north side property line and a modification to the conditions included in the Board of Adjustment's final order relative to the rehabilitation of the original building. Parking At the time the building permit was issued for the Royal Palm Crowne Plaza project, the parking requirements were calculated as follows: Royal Palm Shorecrest Total Total Units 257 165 422 U nits in existing building 50 0 50 Net units requiring parking 207 165 372 Parking requirement @ .75/unit 156 124 280 There are no parking requirement for uses within the existing historic structures. The parking requirements for the accessory uses were satisfied using the unit bonus provision in the Ordinance. The 280 required parking spaces were satisfied with 106 spaces on site and 174 provided in the 16 Street Parking Garage in accordance with the development agreement between the RDA and RDP Royal Palm Hotel, Ltd. So.ould the existing Royal Palm building be demolished, and the uses contained therein replaced on site, either a modified agreement to provide additional spaces in the 16 Street Garage or the payment of a parking impact fee shall be required. Asswning fifty units are within the new construction and any accessory uses parking requirement is satisfied through the unit bonus provision, thirty-eight (38) additional parking spaces will have to be dedicated in the 16 Street Garage as meeting the requirement or an impact fee of $190,000 will be required for the issuance of the modified building permit. Building Department As of the date of this L.T.C., the Building Department was checking on the availability and pricing of structural engineering firms to review the test results and provide and independent third party OpinIOn. Legal/Contractual Issues Liability/Exposure There are two primary documents that govern the relationship between the Miami Beach Redevelopment Agency (the "Agency"), and RDP Royal Palm Hotel Limited Partnership (the "Developer"), the developer of the Hotel. These are the Ground Lease and the Hotel Development Agreement. The Agency owns the land underlying the Hotel. Title to the buildings on the land was transferred to RDP by Special Warranty Deed on May 28, 1998. Section 5.1 of the Hotel Development Agreement provides, in part, that: "The Owner has not made and does not make anv representations as to the physical or structural condition. value. adequacy or fitness for use of any equipment or svstems in the Existing Hotels, or the presence on or about the Existing Hotels of any substance or material which is or may hereafter be subject to any Environmental Laws, including, without limitation, Hazardous Materials, or any other matter or thing affecting or related to the Existing Hotels, and Developer herebv expressly acknowledges that no such representations have been made. and Developer further acknowledges that it has inspected the Existing Hotels and agrees to take the same "as is". in such condition as the same may be in on the date of delivery of the deed thereto." [emphasis added] The Section 18.2 of the Ground Lease provides, in part, that: "Tenant accepts the Premises in existini condition and state of repair and Tenant confirms that: except for the representation contained in Section 18.1 (and any other representation expressly set forth in this Lease), (i) no representations. statements. or warranties. express or implied. have been made by. or on behalf of. Owner with respect to the Premises or the transactions contemplated by this Lease, the status of title thereto (except as set forth in Exhibit 2.1 attached hereto and incorporated by reference herein), the physical condition thereof (including but not limited to subsurface conditions),...." [emphasis added] Section 18.1 and Exhibit 2.1 are not relevant to the condition of the property. The City Attorney has advised that these sections of the documents, and other factual and legal matters, indicate that the RDA does not have any legal liability to the Developer for the condition of the Royal Palm Hotel. Modifications and/or Amendments to the Development Agreement With regard to the modifications and/or amendments to the Ground Lease, Hotel Development Agreement and other documents in connection with the development of the Royal Palm Crowne Plaza Hotel, it is apparent that the Plans and Specifications and the Development Cost Budget will have to be modified, however, it is too early to determine whether other amendments to documents will be necessary. As of the date hereof, the City Attorney's staff does not believe that any extensive amendments will be necessary. Any an all amendments will be brought before the City Commission! Redevelopment Agency as necessary in a timely fashion. Royal Palm Crowne Plaza Project - Impact to Timing Pursuant to the outcome of the Historic Preservation and Design Review Board meetings, the developer will prepare a new timeline for the project. In the interim, the architect is preparing plans for the re-design of the hotel and piling work continues on site. SR/CX=:KOB Attachments 80PM,~N 0~ f(('115 Dwttn CONSULTING ENGtNI:ERS, INC. I~on InVM1I~lon 208~D e. Dixie Hwy. . No. MIami aelen. FL 33180 O.de: (305) 932.5g11 · Srowlrd: (30S) 920.2388 Aeporw Pro~rty OYners Royal Palm Botel 0/0 Michael Milber~1 1545 Collin. Avenue Miami Beach, n. 33J.39 RBI 8TJWC'l'URAL aUII.DI.Cil SVA1.UAl'IOR Gentl....n: In accordance with the reQuelt of Mr. Mich..l Milh.r9, this oft ice conducted an in.pection of the above property, (th. Royal Pal. Hotel). The property location i. just we.t of the Atlantic Ocean, and within the Coa.tal Control Zone, (a .pee!.l wind velocity and tidal .urge zone recantly e.tablished). Tbe purpo.. of this report: i. only to aIl8e.. the, current structural Clondition due to exten.iv. spalling which i. cnrrently occurrinq on the concrete etructural fcaminq .y.telll of the exterior and interior building .urface. The buildin9 ha. a 'Ieven story heiqht at the we.t end and reduc.. to a five .tory hei~rht at the e.lt. The .truoture i. ....nti.lly ot reinforced concret., intil19d with malonry unit., and olay tile unit. in 10.. locations. Thi. report is baaed on the findin91 and work paper. of R...t~rch Conlul tant. Ine., and the con.ult-iAC) tina (Gopm&n) writing this report, Usinq previoul in tormat ion , photoqraphl and doc\~.nt&tion provided by R..earch Conaultant., a amall ero.. ..ction check of the previou. in.pection wa. made to verity and under.taneS varioue description. previouely provided. The 8Aterior .urf.o., the roof .tructure and el...nt. abOVe the roof and varioue 'Il.aent. ju.t &beve the qroun<l l.vel were J.nlpeClted by this office. Al.o included in thi. inlpection va. the one-.tory Cabana buJ.ldJ.n; to the East. The following descrJ.ptJ.one were u.ed when referrinq to condition. at .pal.linqJ 1. Primary Itaqe - Slll41l to medium craek., .li9ht .xp&nlion. 2. Secondary stage - Large cracks, enabliD9 penetr.tion of sharp too L. or paper edg... Some hollow .oundinq OD .urfao.. 3, Tertiary fltag. - Large fracture., alr..dy flaked off or r.ady to lI.parate and fall oft, Bollow eound when t.ffec1....y ""'~"""-'~""""', pag_ 2 of 4 Roy.l iala Boe.l The v.riou. room unit. which were previouIly in.pe<:tec1 i. al.o de.cribed her.in in the .ame manner. Included with thi. report ie on .etimate tor repair ..de by the firm known a. "CunH." Con.truction. The 4utimata "'.. preparad by Mr. Ron BrO'llfn, the t:o"owner of the company. The cOJApany i. known .. .peei.li.t, in th!e type ot repair work. Th. company wa. .eleoted br thi. enqine.r to provide a r..li.tic bid, one th.t ie non cOlllpet. ti v., ue1 n9 th.ir knowlBdge ot the type ot work .Xpected by thi. ottic. ba.ed on previous work on .imilar projecte. The Cab.na buildinq located at the Northe..t .id. of the property and adjaoent to th~ pool, ha. indication. ot concrete .p.llinq. The .tructur. i. a .ingle story build!n;, the deck ie u..d far reoreational purpo..., it 1. conatruct.d ol reinforced OODOJ:.t... The top .urtac. i. in rBaaon4bly good condition, th.r. 1. no .palling indicated over the top surtac., lome exi.t. around ~b. perimeter edqe.. S'lme concrete handrail, are al,o .pellinq. The .pallinq in tho.. .::e4. is in the ..condcry .t.i.. Th. underaide of the eoncret. .lab, .tair .lab and store room .lab haa apalled and i. in the tl:-ti.lry stagee. Spallinq i. .xtln.jve throughout the .xterior buildiD9 .urtac.. Thi. wa. noted on t~l. North, Eaat and South facee of the bul1dinc;. The tracture. w.:-. occurrinq vertic411y on the buJ.ldinq lurtac.. of the concrete columT. line., all .id.. of the building. Moat ot th... were in the 'i)rimary and ..condary atage.. Noted w.. one particular colulM i:1 the kitch.n arBa at the north lide a. havini .palled ..ver.ly and require. immediate attention io th8 way of lupportin9 .hor.. tel reinforce it on 4 sido.. Horizontal fr.ct~.. ar. occurring at many window header location. and b... location. and .om. concr.te .;.11 location.. There are vi.ible on the Rorth, !aet and South .ide.. of the building and ita condit.ione r.n9_ frOll prLDAry to tertiary .ta;... The set of exterior .tair. on the- . Ga.t buildin9 tace .how. 'xtenelv. .p&llinq on the .tair uncl.nid.. a. well a. the ,upp)rt beam.. Mo.t of the.. .pall.d are.. are in the tertiary atag... Root top are.. vere also inapected and found to have ..ny .palled ar.a. .10n9 vall parapet., alonq beam. and column. and the under.idee of m.Jch uf the expoeed slab area.. The are.. inepected incl~Qed pent hou.. room., maohine room., water tower roo.., and elevatar maehine and switch room.. The.e ar... were found to be .palled into the ..(:ondary stag.. and eOM ar...into the tertiary stage.. The tra.n room area north aide first floor ha. exten.iYe .pallinq in the t.r1:iary ataql!tB over the II lab. , b.am. and column.. It .hould b. noted that although spalling wa. not vi.ible on tb. ",..t face (entry .ie..) of the building, & atronq po..iOility ~.&J..ta. that there NY al.o be ar... that .are .pa11in9 in the primary ataqo. and p08.ible into the .eeondary .tage.. Page J of 4 Royal 1'_1. Botal Of the interioe ar.'.a, there are a total ot 121 hotel roo.., 6 air conditioning or air ~.ndlinq closeta, And 6 double loaded b.llvay., one per floor. Of the 121 room., 32 roo.. hAve erea. .palled in the terti.~ .ta9'.' 40 rQQ~' are .palled into the .eoondlry .tI9.' .nd 48 room. .how nu .pallinq or pOllibl. IIlight priury .palling which :'.4y or Itl4y nut n.ed be rapaired. Additionally, of the 6 cIo.eta, 4 are .palled in the secondary .tag. and 2 are into the tertiary It_ge. Of the 6 hallway., 5 h.ve ar... that are .palled in the tertiary .tauee, and 1 into the ee<:ondary .tag... In eummation, the c~ndition ot the building .hould b. aonlidered critical. It h.. bu.n m.y experience in p.et inve.ticzation., that _~- it the !nora advanc!ed condi tiona are not addr...ed, localized tailur.e wl11 ev.ntually result. Additional deterioration ot the primary lupport. .uch a, the column de.eric.d in the kitchen, could re.ult in ma..ive f.lilure. Rep.ir. .hould ~ b. mad. on an _a. n.eded- ba.il. All .rea. where .pallinq i. indicated, regardl..e of it. Itag. of de,,'.loplll4lnt, should b. repaired. All fracrtured .eotion. .houlcS be huunered away a.nd removed. All fraoture line. ahould lixe",iee be chipped open. In all c...., tbe coz:rodeci reinforcinq .hould be expo.ed, it Ihould b. cleaned .round ita entire perimeter re.QVinq all the ru.t Beale to the .hiny .urface. If the exiatin9 reinforcing iJ tound to have lo.t gr..ter thau 25' of it. cro.e ..c:t.lon, than additional r.inforeinc; .hould b. introduced to b. '.;tliced alongside the exi.ting. The .urt.e. .hould then he coatad with a corrosion r..i.t1ve chemical or eA epoxy bonding agent to act as a corrosion inhibiter to prevent future epallinq at the same location and a. a ..cur. bonding agent when applying the p:otective coating of concrete. Concrete..y be applied by hand trcrWelinq where .1U11 ar... exi.t up to 1 1/2" thick. Pre'.\1re gro\Jtinq (Gunite l .houlcl be u.ed for larger ar.a.. Any aoncret. u.ed .h;Juld b. eand 4gQI'9gate only. After preparation ot the reinfora!nq. the concrete enQuld be r.-applied to it.. oriqin&l profile. In the event a minim~ of 1 1/2- of coverage cannot b. acbieved en expo.ed .urface., then aD epoxy co.tin, mu.t be appli.d over the reinforcing. All concrete .hould b. a minimum .trenqth of 4,000 p...l. Attached .. an encloeure with thia report i. the repair e.tt.ate a. provided by "Gunit. Con.truotion and Rental.-. The ..tiaate ..de wa. by vilual in.pe(~tion, however lon9.tand.in; experience or both expertl involved will ueu.l1y amount to a 010.. .pproximat on of the t inal co. t . I t:. should be not.ed th. t . co._tio r.pair i. in.uttiei.nt. P~bl.Lc ...!ety dictate. the repair. b. made in the proper mann.r. s1.ply removlnq the 100S8 concrete aurfac.. and patching and fillinQ crack. i. not a pI'oper repair. Paraqraph. two and three provide fIn estimate ot repair. to the _in buildin;, interior and exterior .urtace., of between thr.e hu.nd.r:ed fifty to four hundred fifty thou.and. Other aijICelJ.aaeou. woC'Jl~"'Mwol"""'-' inclUding the Cabana buildinq, to be between 40 to 60 thou.and dollac.. 'ag. 4 of . Key.I 'ala Bot.l Should any further con.ultation over t.hi. matter b. rllCi'lired, ple... f..t free to contact me at any time I may b. available. Re.peotfully eubaitted GO C~lGlnlllUl' :9 ~ nerbert L. G n, 11.1. July 8, 1993 (J93-t48 BLG/ie CCI Paul Gloi. Chief Buildin9 Inapector City of fitiud l...ch BnolOllu.r.. life. ....."~..-......,, ..~1."''''.''l"-!'l,. .. .,,~;.;.t.,.__.. -,...,-i.~~~'7-''''~''''-'''''~.''''''' GOPMliN (/ OMlgn fn.peat'on CONSUL TlNQ ENQI"EEAS. INC. Imut/gallo" 20885 E. OilCle Hwy. . No. MIami Sue"'. FL 33180 Oade: (306) e32-501 f · SrQward: (308) 920'23ea A.po", City of Hi-.1 B.aah Buildin; . Zonin9 Dt'p&.rt.~nt 555 - 17th Street Hiud Beach, rL 33:.39 Attn. Paul Oioin *(6U~1 (' (}-,3 g. ROYAL PAUl 8OTIU. a.ntle_nl .. The followinq in.pection. were mad, in the kitchen are. of the above .ite. The !:\apeatiQnl were made to evaluate and approve repair. required to .p&lled .tructural member.. A ahort .ynop.i. of .ach in.peotion ~&de on the appropriate date i. included in thi. reJ)Ort. 8/10/93 in.pection e.f the kitchen interior column to the ea.t end. All .palled conoretl' ha. been chipped away, expo.in; and oleaning exi.ting c:oluJIlIJ r'Jinforcinq. No addJ.tional reinforcin9 i. required. Approved for concrete placement. 8/12/93 in'peation elf the kitchen interior column at the "e.t .iele. All .pall.d concr.t" ha. been chipped away, .xpo.inq and oleaning exi.tin9 column r4intorainq. No addition.l reinforcin9 i. required. Approved for concrete placement. 8/24/93 in.pection (,f the spalled conccete beam above the ea.t .id. oolumn of the kitchen. Reinforcinq need, additional el..ainll, looe. concrete need. removal. Not approYed. 8/25/93 rein.pectitt" of above b.am. Looe. concrete ha. been r.mov.d, additional cleaning of r.intorcinq accompli.hed. 2 - .5 r.1nforoinq rod. added, tied and lap .plJ.ced to exi.ting re-bar. at bottom of beam. Approved for ooncret. placement. All expo..d reinfo::o!nq va. pre-tr.ated with . ru.t inhibitinq chemical prior to r.pl&cinq the concree. cover. "GUNITB" (pr",u4. grouted concrete) wa. not u..d in this .... bec.ua. of contamination po..Jbiliti.. to kitchen equipment. All eluent. were r..tor~to""tl1!!t_~J...9.~~A~.P~QI..l.l.Jtj,.tb....&M. .DP110&~i_ of ".meo VWM'rcOft-'~. . CeJftentlt1.0U' material whiah meet. the int.nt of Pag. 2 of 2 Royal P.lJa Bot.l the .nqin..rinq .p.c:itication.. Enclo.ed are the .p.cifioation. and direction. for llPplication by the manutacturer. R..peotfully .ubaitt.d ~UL!I 8I1G 1111: 1118 , -~ ~/. ./ . ~.... /, 1 / aerbert L. Gop , )).!. Augu.t 25, 19 093-448 I.C. . CITY OF MIAMI BEACH BUILDING DEPARTMENT 1680 MICHIGAN AVE. SUITE 701 AMI BEACH, FLORIDA 33139 PHOi'<E: (305) 673-7610 FAX: (3()5) 673-7357 February 8, 1996 CITY OF MIAMI BEACH MIAMI BEACH, FLORIDA Re: INSPECTION AT THE ROYAL PALM HOTEL 1545 COLLINS AVENUE MIAMI BEACH, FLORIDA The Royal Palm Hotel is an eight story reinforced concrete structure built in circa 1937. The foundation is made of pre-cast concrete piles with reinforced concrete pile caps and grade beams. The first six floors (+/-) have reinforced concrete slabs, and the remaining floors have steel bar joists for the floor system. The columns appear to be reinforced concrete thru-out. The exterior walls appear to be concrete masonry units. Some of the interior walls were found to have the older terra cotta type blocks. It appears that originally the building was built up to five floors, and then the remaining three floors were added almost immediately. This is based on the micro-film records that are available. In summary, it is the writer's opinion that to make a complete and thorou h evaluation of the condition of the comp e e structure, the pntire inside of the building must be gutted, and then for the writer to complete a more thorough and complete examination of all the structural elements. Based on the areas that were accessible, there is a significant amount of repairs that have to be completed, especially to the concrete slabs (e.g., second, third, and fourth floors). It is difficult, at best, to make a complete evaluation if not all areas are accessible, however, extrapolating on what was visible, and assuming this to be typical thru-out, it is the writer's opinion that the amounts of concrete repairs will be significant. To the extent that lt may be advisable to spend the money-to ~ut the buil~, an? th~n complete~a more thorough examination, and then determlne lf the buildin~ is worth-Th-e-e-x:pendi ture. or if it exceeds the 50% level tha~ would reqttire itto be condemned. INSPECTION AT THE ROYAL PALM HOTEL 1545 COLLINS AVENUE MIAMI BEACH, FLORIDA PAGE 2 Based on the areas that the writer was able to see, the following is a summary of observations: 1. The exterior walls have significant cracks, that based on their locations (near corners), appear to be corrosion of the reinforcing steel inside the concrete columns. This corrosion causes the steel to swell and spall the concrete, or create these cracks. 2. Several columns at the ground floor were found to have the same types of cracks. For the same reasons noted in item no. 1. 3. At the second, third and fourth floor, the slab overhead, was found to be severely spalled, to the extent that complete matrix of reinforcing steel is completely exposed. This is a very severe condition, because the slab will not function as a reinforced concrete slab. Hence, the slab has a very low load capacity. The point is that these areas will have to be fully shored. Please note that the upper floors were not all accessible, and therefore, this latter condition may also exist. Also, at the ground floor, several areas of the slab overhead were found to have spalled concrete and the reinforcing steel exposed. 4. The writer was' not able to inspect the crawl space, however, the writer suspects that there may be access to the crawl space. If there is, this area must also be inspected (by the writer). Based on all other items, it is the writer's opinion that this area may also require work. If there is no crawl space, then skip this item. 5. Some of the higher floors, with steel bar joist, were found to have the steel severely corroded. 6. The stairs thru-out the building also have signs of corrosion of the reinforcing and cracks and spalling. 7. Several slabs were found to have been repaired some time in the past. Note, some of these repairs were very crude, some were made with gunite. INSPECTION AT THE ROYAL PALM HOTEL 1545 COLLINS AVENUE MIAMI BEACH, FLORIDA PAGE 3 8. At the ground floor, at the south side, it appears that a one story addition was completed after the original building was built. The problem is that the ground floor slab appears to have severely settled. There is a major crack in the floor. It is the writer's opinion that the slab, and possibly the entire addition was made on compacted fill (or not so compacted fill), and this has settled over the years. 9. At the front of the building, there is a decorative slab,.near the roof, that cantilevers from the face of the building. The slab soffit has spalled and the reinforcing steel is exposed. This area is visible from the ground. 10. The windows were not closely examined by the writer, however, it appears that they should be replaced. 11. The rear cabanas were not examined by the writer. To avoid any possible misunderstanding, nothing in this observation report is to be construed directly, or indirectly, as a guarantee for any portion of the building, or the building as a whole. To the best of the knowledge of the writer, this report represents an appraisal of the observed areas at the time of this observation visit, and to the extent reasonably possible. Respectfully, ' f} ~Q1~10~ 0uan Fernandez-Barquin, P.E. Structural Reg. No. .......... Special Inspector No. ........ 40114 0947 SUMMARY OF PHOTOGRAPHS: 1-2 FRONT OF BUILDING (WEST ELEVATION). 3-6 NORTH ELEVATION. 7-9 REAR OF BUILDING (EAST ELEVATION). 10 SOUTH ELEVATION. 11 CRACKS IN WALL, NORTH ELEVATION. 12 SOUTH ELEVATION. 13-18 CRACKS IN WALL, NORTH ELEVATION. 19-21 CRACKS IN COLUMNS AT GROUND FLOOR. 22-26 SPALLING OF CONCRETE FROM SECOND FLOOR SLAB SOFFIT, AS SEEN FROM THE GROUND FLOOR. 27-36 EXAMPLES OF CONCRETE SLAB SOFFIT SPALLING AND EXPOSED REINFORCING STEEL. 37-38 STEEL BAR JOIST FOR FLOOR SYSTEM. 39 STEEL BAR JOIST AT HIGH ROOF. NOTE THAT THE BOTTOM CHORD IS COMPLETELY CONSUMED AND SEVERED. 40-41 MORE SLAB SOFFITS. 42 GROUND FLOOR, AT SOUTH SIDE, WITH CRACK AND SETTLEMENT. , \ ! ! j I I f I , I i I i I l i I , I I t , ~"..- ~J1\ ...-i;i. ft~"'.:."".# ",.. ..... ~:. ;<:r: J~:.!Jr~'" i,..>" i I I I / I i 1 '~~ , , ( , ~ , . r f.t; 7 ;,;~.~'~~""'" ~ :~ri :'--'0 ti\ I J 1 ./ '\ 1= -01 . .. -= -= ~- -- .. .. .. ,ft._' \.-: I .. =- .... .;; , I' ,I, \ \ ,,- :~ '_. ',~ ~~.../.'\~ ''i!~~ ~~r:\ ''/'''''''' " . " " ~ . U , I \ Sii.' 0-,,\. \.. ! I / ! I I I I i I I i i ~}"" ~~-,~---.. ",/-,.:i;"'\;~" ;~~~,";:, ............'..-,.1 .' ,-' ~. -/ t~fi ;+;'~ ":":,:"., "'~' ".' , :~~~~J.:~:t2:~=:'t. '<:_ :..;> ~\ ~~;i ~., . \ ,'. \ ..~. '~~,:\ ~".' .\ ~. '::::\\ t t ~. . i " 10 -. 8- .. .~ '.~~.>'J~~.:~.~~~.._. j "'. t.. ,j f~. ' / -~ ,.,~. \' ~~~:n\\i;\ ~ tt '" A -.~I~ ....~..~. '. :~J 12-- r I I t \~ , f f I \'0/ I I ~ , ~f ," )~.~~. ":',' .... -'. r" , ~ '~~ \l I I \1 \~ I , I I I ! I i r ; , J \-<1 w '2..\ '1.-'1- ~. , ! 'L~ ,~.r.~~':':;:~~i0~.~F~.~::.~ ... t .;;.5:.:S~... :". ~c...-~:.:.~~i.~ 'i-:.~'...~ s.., '.'-;:..v- >tt~ft~:~;, ~"'~ ','.~ . ~.' .... ~'. ~' ;--- .:~':-- .,. .',. 24- f I i g I , ~ 2.S 2.& I i! ~ """..i~\~':;""':'7'.-- '2.1 , '2-2> l , t ~ ~ j i ---,'~~"! -.~,- -IIR ~-,;.~. ~~~'. ~t, . ~ .", ~\~'~,t..,: - ., I. ~ r" >"7''LN~. .~ , ... .....r-,:r;.,..,.. " ~ .t" :::~~:)'" '.::H: lo"....., b\ f ._'",.... : :~. ._/ . . ;. :;"'"'" ?~ J..,;l).,_~,. .:i_t~~ .'....i~,;~'r,~,.> .; ~ \f' . r ~~: ~'i'~. . f~~{':'-".~'~. -....*._:?i.. ~ ~.~~~~~... ,~~':;" ,If ,,,>~,~...": ~~ . ,.-' ,.. .",:- -'- ~"':J -~~~""" ,~,~ '~.",~..:.,:,. ~.::~~ l.,~:'...",'>j""'... -. :. ,.,...... I "~"<;" ,!'t.j;.~-... ~- \.:! ','" .:. .... '-..... _'""J..,:, . _ ~ -:~..",-..., r.,-. ~ ~ I ~~~. . -~--- ~"'.'~~~:C'.~ .~. ;';';.It.~~_;:-.~-..., ':J::...-.' .~';. '~,c,""" '.' .,~ . I ..r;;., .r...Q'''.-"..- , F. ~~-=~;:'...'.i' ":' 1 "J i , ;.r -" -:-::g~' '1~:!."~ . ...,'" . /~,::::;~,..~ d~'~ /,.~-~ .~",..,.,. 'J ~; f: ii; ~6 31 ~o;;::-' ~ ~,.: ,~~--~ '.:t. - \ :"";>.;.s. '..._: ":,- . .~":--:.~ . ....--~ -;~ ~ " :.. -J. \ '" '"" .... " ~ "- ......... ....., '",- " , .3,~ , !' i' t ~, '"' f L TII':;ijor.eJOSIJI2 18 r! Ttflf.u ::051Ji1 !!is AROIJliEC, IJIVICA Octocer 18. 1998 Mr. Chns A. BrUCh, Development Director DONOHOE DEVELOPMENT COMPANY 2101 'h'iscansin Avenue. NW Washington, DC 20007 FAX 202 333 5394 and 305 6048266 RE: Existing Royal Palm Hotel Structural Issues Dear Chris. Attached you will find Doug Timmons letter summarizing his final determination on how to proceā‚¬d with the existing Royal Palm Hotel building. Our Historic Preservation architect, is in the process of evaluating the structural situation and preparing to outline the process of historic re-construction. Substantial documentation has afready taken place to date and the additional documentation is being performed at this time in . anticipation of a mass-demorition of the existing building that its 'Historically consistent' re-construction by our team. Shortly the Historic Architect will be submitting his own written statement conceming the process. We have also asked HershelJ Gill our peer review engineer to review all the testing data provided by ATC and to form an independent opinion. As a result of his personal walk- thru at the building he has already grasped the extend of the structural problems with the historic structure, as a result of his walk-thru he had offered an early opinion letter back en September 10, 1998. However he is now providing a more scientifically calibrated opinion based on the results to the A TC testing data. t..ttached you will find his letter. It is evident by the results of the tests performed by A TC 2nd the severely deteriorated structural frame of the building that the best coarse of action would be to re-construct rather than re-store the existing Royal Palm Hotel structure. Tnis is the opinion of our structural engineers and in general the opinion of all the experts that have witnessed the conditions of this structure, now that it is air striped intemally and that we have the concrete test results. Please call me if you need additional information on this matter. Sincere! I ,einali:1o Berges, R.A. Projeer Manager ,'l.u3ched RiP et!er dated Cctober 19. .998. Hershell Gill Letter datec Octebe." 19. 1998 CC 8el"1a!"cc J:crt-B--escia, OCf'\ P~~tles, Rlci"arc Mat!ar, Daniel GrirT1, riie ~(d/recflJre pfinnill!llnr~r;l)r Dwgn ?;;qis,wiall #AA C000455 r-~I' r-\ J. ...... I li'.lr.1LJr~~ PAR TNE::< 385 607 2162 p. 2 RIVA, TIMMONS & PARTNERS CONSULTING STRUcrUR<\L ENGDlEERS 4':114 SW. i2 Avenue Nliami, Florida 33155 October 19, 1998 Dougbs B. Timmons., P.E. (30;) 661~}IOPhone (305) 667-2168 Fax Arquitectonica IntemationaJ 550 Brickell Avenue ~1iami, Florida 33131 ATTN: Mr. Reinaldo Borges RE: The Existing Royal Palm Hotel REINALDO: After reviewing the concrete tests and final report prepared by ATe, T am recommending that the existing strucnrre be condemned and entirely demolished. This opinion is based on a visual waIk-thru in addition try the test results, which indicate that 22 of the 25 tests taken are below 3000 psi which is industry standard on the low end. The average of the three tests taken at the first level is ] 843 psi. Further 20 of 25 chloride ion tests exceed the .2% value allowed by the current ACI cOOe. The low concrete teSts in the fIrst level are a'serious COt:lcern because these columns are th~ most highly stressed.. In addition., due to historical preservation, a large percentage of the first floor is not demolished. in general the columns expoSed to date have a high level of deterioration at this level. There is a possibility that further interior demolition could cause aloealized collapse In my professional opinion,. 100% of the concrete and masonry should be replaced above the foundations. Further inspection of the foundation is required before a final decision is made. The high chloride ion concentrations make a partial repair of this structure impossible. The existing reinforcing and any new reinforcing which is added will continue to deteriorate if the contaminated concrete is not removed and replaced Finally the condition of the first level columns indicate that further interior demolition in this area may be extremely dangerous. Sincerely, RfV A, TIMMONS & PARTNERS CCT.28. lS~8 10:35AM OCI-!~-99 110H 5:('1'\, PM ;: GriL .o\T<::'r 1;'1/"'.. U .u... L it\olL ....~ll..o"'.~~ 1'10. 885 F.2 ~ HERSHELL GJLL CONSULTING ENGINEERS, INC. 4601 ~,..,c. d. LeOl"' 81vd. I S...lee :3~O I CQ""!!' al4bl.. I >=Ior'da ~:3' 46 ( (~C~l 8"?3e~~ / lOe", (:iCEJ 5EieJ.\iC.ii OctabQr 19, 1998 Mr. Reinaldo Borges ARQUrT!CTONICA 550 8rick&1I Avenue, Suite 200 Miami, Florida 33131 Refersnee: ROYAL PAL.M HOTEL HGCE Ffle: 9821 RP Dear Reinaldo: v"'le have reviewed the results of the concrete testing, for the existing ROYAL PALM HOTEL. The results indicate that: 1, A high level of et\lorides is present in the concrete. 2. The avera~e concrete compressi~ strength is less than 2,500 pSI, with a low value of 1 ,520 poi. Our Inspection of the structure on September 5, 1998 revealed very substantial structural deterioration of the $labs, eolumns, and lateral resisting members. The high level of chlorides in the concrete will cause further deterioration of the concrete and reinforcing steel. Therefore, the opinion Of this office remain~ (as prevlOU$ly stated in our September 10, 199a letter) that this structure should be demolished. ~,I4J Michael D. r=ried, P.E. (9621 L TRA) -~,-~~ JV r~1 ~~:~~ r'.l ~rEC ~SS0CIArES 1 3e5882 1 2':..::' p.ez 9955 ,';w 115 V\jay, Su.te , 1\11a."l'1l. ROnda 33178 . 305.882.8200 Fax 305882.1200 ASSOCIATES INC. October 14, 1998 RP Royal Palm Hotel C/o Donohoe Development 2101 Wisconsin Avenue, NW Washington, DC 2fXXf7 Attn.: Mr. Christopher A. Bruch RE: Report on Core and Chloride Testing Royal Palm Crowne Plaza 1535 Collins A venue Miami Beach, Florida ATe Proiect # 03657.0C02 Dear Mr. Bruch, A TC Associates Inc. (A TC) has completed the requcs.ted and authori.zed concrete coring and chloride-ion content testing for the above subject project. This report contains the results of the test results and data obtuncd. SCOPE OF SERVICES The proposed scope of services for this project included obtainirIg four COOCTe(C COI'e3 from each of the seven floors of the subject building for a totil of 28 cores. At each proposed core location a pachometer was used to scan for the presence of embedded reinforcing steel, prior to coring. The data obtained was used to minimize the potential of cutting through the concrete reinforcing steel during concrete coring operations. Due to the lower than expected colllyressive strength test results from the first seven core tests, the structural engineer of record suspended the coring oper.uion. 1\ltenty-five of the planned 28 cores were completed. Each of the extracted concrete cores ~ air~, trimmed, capped, measured, and tested for compressive strength. The concrete core test data and compressive strength test results are included in this zqxxt. Concrete d1J3t was extracted from the concrete cores and an acid soluble chloride-ion content test on hardened concrete was perfonned. The conducted test measures the acid soluble chloride-ion content as a percentage of the concrete sampJe weight An adjustment was made to report the ch1ori~ion content as a percentage of cement weight The chloride-ion content test results are included in this report. r',__ ,......,-.J-''-_...~.___ ~..;l(.)....)oo_.....;.u't.J r.<u..,,:) RDP Royal P31m H~J C/o Dooohoe Developmeot ATC Project No.: 0)657.0002 pa~2 CHLORIDE-ION CONTENT The chloride-ion content tests were cooducted in general accordance with ASThf C- 1 14, Section 19. The acid soluble chloride-ion content listed below (concrete %CL(') is the measured test value reported as a percentage of the concrete dust sample weight, approximately 1.5 grams. This measured value was then adjusted by a factor of eight to arrive at a chloride-ion content as a percaH.age of the estimated cement ~jght. >'id. '" ~'c' ~r.:. ,.. .....~,. >{"" ... .,... '. ....C...':" . ,. ",,' ;... " .~. .,'. :.','.:/Cooeretei'. " . ','.;. .T ,.c...c, '.."" ':":. ... .. ..... ........ 0,. ...c... ., ,:.; dJ:.':L:~:H2I}~~)..' I :<:ement ... .. . ",' . .... ..... .. , c.' <..'%cL~ :' #4- #8 #10 I 12 # 15 /I 1 #3 15 117 #9 #11 113 # 14 #16 2"" Floor, Column RP8fRPE 0.0720 0.576 0.9<<) 0.100 . 0.043 0.736 117 4-:' Roor, Column RPS/RPE S' Roor, Column RPSIRPE 6' Floor, Column RPSIRPE r' Floor, Column RP8IRPE I- Floor, Column RPSIRPE 1- Floor, Column RP'3fRPE 2"" Floor, Column RP8/RPE 3..t Floor, Column RP8/RPE 4~ Floor, Column RP8/RPE S" Floor, Column RP8/RPE 611 Floor, Column RP8/RPE T' Floor, Column RP8/RPE T' Floor, Column RP8/RPE 6' Floor, Column RP8IRPE S" Floor, Column RP8/RPE 4. Floor, Column RP8IRPE 3101 Floor, Column RP8/RPE 3101 Floor, Column RP8IRPE 4" Floor, Column RPS/RPE 4tl Floor, Column RPS/RPE 5* Floor, Column RPSiRPE ..,.. Floor, Column RP8/RPE 0.1200 0.0125 0.0054 0.0920 0.0540 O,UlOO 0.1050 0.()530 0.0710 0.0460 0.0080 0.0180 0.0052 0.0300 0.0270 0.0720 0.0700 0.2050 0.5100 0.2500 0.5200 0.2250 0.432 118 #19 120 127 128 2.08 0.840 0.504 0.568 0.368 0.064 0.144- 0.042 0.24<J 0.216 0.576 O. .5&) 1.640 4.080 2.OCQ 4.160 1.800 # 29 # 30 #34 OCT-16-98 FRI 8..:35 PM ATEC ASSOCrATES 138588::1::88 p.e.. RD? Royal ?31m HO(eJ C/o Docohoe Development ^TC PTojet:t No.: OJ657.lX<J2 p.g" J CONCRETE CORE TEST DATA ,., r ... c...'fTe1:tIDn -c.:re .' ~!1g:h, .. Dia.r:1etir . Uti . Com pre.ssi 'ie AI'e.'l " Ccrnp~ N.::L. : Ai",; "110'0<,) ......' f..c~ .. ";Lca.J' . ,':: : ". .5lTe n.gt.>, ';', WppU1g ',:.",. '" "':..:" . " 1<. ..... (Sq.ln) .. ... ):": ;.:.. : I"..... . (1 h l''''! : .:/f r:.: .... r.,..:(lbs..} . (p.si): > ";;.' .. .... ..... .- . ru: e.s ":' . '....... ." ..,.... . '....... " . . .. .: . "." 2 4.104 I 2.995 1.37 I 0.94 11,963 7.04 I 1600 1 .. 3.439 1.986 1.76 o.n IS ,.3 9-4 3.09 2670 Z 6 2.363 1.969 1.20 0.93 7,062 I 3.04 2160 3 g 3.863 1.990 19.5 N/A 5,705 3.11 I 1830 .. 10 3.116 I 1.983 I 1.57 0.97 4,.350 3.09 , 1520 :3 12 3.987 1.933 2.01 N/A 6,082 3.09 1970 6 15 3.138 1.981 1.58 0.97 6,056 3.08 1910 7 5 4.149 1.991 2.08 N/A 1.140 3. 11 2,490 2 , I i 3.327 1.947 1. i 1 0.98 6,132 3.00 2010 3 9 3.864 1.992 1.94 N/A 6,.36 I 3.12 2.;zOO 4 I I 4.063 1.989 2.03 N/A 1,.3 16 3.1 I Z,.'HO S 13 3.990 1.978 2.02 I N/A 7,339 3.07 2,460 6 14 3.503 1.984 1.77 0.98 6,836 3.09 2, I ISO 7 15 3.916 1.989 I 1.97 N/A 9,424 .5.11 3,030 7 17 3.688 1.986 1.56 0.99 8,947 3.10 2.860 6 18 3,676 1.984 1.85 0.99 12,968 3.09 ",160 I .5 19 3.965 1.964 2.02 N/A 6,.534 3.03 2,160 .. 20 2,312 1.995 1.16 0.91 10,078 3.13 2,930 3 27 3.912 I 1.966 1.99 NlA 8,.H4 I 3.03 2,150 3 28 I 3.313 1.973 1.68 0.96 I 9,301 3.06 3,070 .. 29 2.1G3 1.961 1.1G I 0.91 1,992 ~.OZ 2,410 .. 30 3.6'-4 1.9~ 1.86 0.99 -',1 -'2 3.0-4 I,G70 3 34 3.5Z5 1.963 1.93 N/^ 9,977 I ~.O2 3,.3 00 I 7 ] 6.039 2.993 2.03 N/A 15,657 1 7.03 2,230 I 1 :3 3.455 2.985 1.16 0.91 13,094 i.OO 1,700 I Note: Coru markt-d (") were the first s.=vel1 10 be: le.$:cd. RDP Royal Palm Hotel C/o Donohoe Oevelopmeot A TC Projl:Ct No.: 03657.QC()2 p"ge 4 UNIT WElGHT DATA Seven concrete cores were measured for determining the concrete unit weight. An average concrete unit weight was calculated using five of these values, the high and low value 'Wd.S not used in tltis calculation. The unit weight data is as foUows: CoreNo;." Dry'.WL fddd. Hj H:O TeIhP' .. . ".... ..... . .. + ci'VOlt.l.rne ..:.. SpeclflCGfa vii y ..U nit WtO' .. . ". . . # 3 171.2 ?;7 I 851= 1.968 I 122.4 # 1 583.0 307 I 85~ 1.899 1 18.1. # 17 156.2 75 85~ 2.083 129.5 # 34 204.7 95 85~ 2.155 134. O. # 28 190.0 91 85~ 2.088 129.9 # 16 86.7 41 85~ 2.115 131.5 I # 6 197.7 96 85~ 2.059 128.1 Note: 1. Unit weights marked (.) were not used in unit weight average calculation. 2. The average unit weight of the above concrete cores is 128.3 1bs. per cu. ft. Using the above average unit weight of 128.3, an estimated weight per cubic yard of concrete of 3500 pounds was calculated. It is assumed that the concrete was designed as a standard 3,OCO-psi mix, with approximately 425 pounds of cement per cubic yard. Therefore, the weight of cement is approximately 12 percent of the total concrete weight. A value of 8 was used to adjust the measured concrete chloride--ion content to estimate the chloride-ion content as a percentage of cement weight. Respectfully submitted, A TC Associates Inc. Operations Manager Hdi ~Z{~ Vice President, Engineering UCT-~o-;"";') I I I I I I L I ff ~1 @f p ~! -w ,. FRI 1:)4:3, PM I ::r o -< > ,... '1J > ,... J: f: g ~3 0 ilj ~ ;. z ~i m II ~ ,... > N >>0 ~ I I I I I m >< en :1 i ilia := ~~ ~ q > ,... ,~ > ,... J: :t:. ~ ~ ~ ~ ~ ~ ...... ":' , %. ... . :' ATEC ASSO~I.":lTES 13;)::588::1::1313 --. '--- ------ I ~. t~ ~~@~cr ~@ (ID(V@@ @ f ,~! II 11r r \1 1;, Iii! ,I I ~ t. I: "_ 9 ~_ ~ i I 9~ /1, ,I ,.. I--r,.--, .~.',~:"_Z-;h .. +b 'I; J i ' ! ; ,Ii i ; Ii' : . ' : / i )' : i, t! i! dl:' i i ,I! : /,) II '" .. ' a l-/ .' !'.. '; : /:i . I 1__.1. _ '.;' I. . 1 ~, ; II ~; ,1,.,. .-L L~__ . . .. __.. ~ ' ,!-'-:r-"',~,f:~~"-{;I~~~I,~--i='~~~~4-' -r--KID/: II ~ I! i 'i':' <.) i . 1 ii'l LL ~ i /'.. .. ,., :--;--, - ._~. ~ [ W :~ i . 'I' 'If~~rr~[tr~'. . ._~~~@ j 1llL~ .:...;~-...,-.:' ~I' ..i; r ifll: 'f II' ,Ir . ---, , ~ - - . - . .. .. -' /'; i; : 'I, I i /' ; " .... I "LJ:-"':: t :' I i 1','Trocr~~-!f-=~---'-i1 -,'- 'f--'-,~~~ ~ ~ I : i I .;1 i '-.-. '-. ,10 '!-t' - .1-+ .ere-' _. -.-- . i 'i! i ' , .:!, I' ! -~- "~'-'14'--a'_,_,_,__, , I /: , I I I I i I i I i -l_ iiJ-'i1-J___ ....L,~ ! Ii i! !! i '-'- i 1 -~ - ~,----+. _ .1-... __..n.__, _ -.:.........~\ ! ,i i ! ! -0- i! ij'-[!-' -.or_. 'I'~ ~ '\ .1 /: ,: )' I a~. ,I !I~ :;::11 '~:I "~I' '.. I I .~-:--!--- I :.:: , \ ==: . . j: . --'~ 'f-4 . -+--C!; \ I Ii i 'I I) -.. -- I I :'1 I' ! I -'. i i:: 'i !i; I'~.~~ -r- I: i 'j~'-'II'-<<:I" ::J"::::::'r:: .~ ' ! i . '. I' . ":iiL--" ~~RJ -='~:::::f~O:~ _. hi (!) -1-- I 1" r-- . 1..,.=T _I - . - -r- __ -+-- __ _ P.e6 -l l, I I I I I I I ~ ~ ~ fi~ JI -w ~~ d fJ ~ = l :;:: Ai ~ ~ I ;. ... , x' . - - --..--- . ., . - - ....... - - '-' '-' . ,...... . ..;.-' 4.,:)(;,)":>OO_..-c.JU - -._---~ :::J o -< :. r- ~ > ~ f~g ~~ 0 .2~ ~ i.~ 1-0 II,... > ~ cp CP' CP @cP <?>r@r ' i i 1 i l' ~ i I . I ,I @ I i , i.~ "10 m >< en HI! "s 0 ~ -< q :. ~; :. ,... J: I I ! I ! I I I I ! i : ! i ! i I -I' -LU-~~___I_~~ ~ : ' I I' I I' , : 'I T I,! '. '. '~I/!!IIII . (.;'\ I . I..!_, _ I !. ! iW1l!] J'-~ , IT-lil'l-f0 -'I~'1h'-'i ~. ~~. Ii '-'-. .~ . ; ';: .: -# ~N1 II-~ I II' I' i /i ~~ Ii ! - , ! I r I ' , : I II I - . -I. - - - Lt -. . - -r- - : y,.... ' . J.... , -L~ i Ii.' V. I i If f I I : ~ --i- I I -II - - - -~ ti i, Ii' ---i- -h--f -r-p i ! i !! I ; , I ' ~ I t I -._L_. I .._~. . : _~ I ,I" , I~ ---l-. .u._.! . I.- ""_._. _,l,~ I I I I :1 'I I \;;.) :. :i Iii i ~ ;: :;==1j I,' , . ~ Ii N ---i- r-jFf 'r~ --~-J-i '- ,---l-Lft; ; ,i Ii ,,- II i ~ Ir~ I I It. -rr- - -~-(1) r j~ L I := m CI'I o :::J -oj .- . ~ . - :--l I ! , , I I I I I i I i I ! I ! J I I ! I I I ' ~J r'-'-'"-'_..........,~..:;. I / I :z:J o -< ~ I '1J ~ ,... 3: f~ g ~2 0 AI ~ H; ~ 11 i d z " :::l o -< > ,.. '1J > ,.. i: )::a. ~ ~ f' ~ ~ f ('") ~I ~ !: ~ r. ~ ~!:::::: w H ~ ":' ( :. - I ~' 13d58d":l2t.j1d P.138 ---..:... - --- ' 1 J Siq>$r ~r ~~cr t/: . ,~~" tJ! ~ I.....-\t. , I "', I '.' 4-! I ~ ~ 1'-:' , '-' ,. . q~ 'i d /' : i I i ~~. I: "I I'D" oj , , Y, / ' , .~ v "I -r~i--;7-- -r:'i;H{(-l;r:- .- ~~. I I' i; ii, tl'ii -n 1;11/ 'I: , I:,: ~~i':~,/", 1':'; II:, I ! I ;'! ,~ :1; · i .j., "~!,'_,, -. -.... , i i~-'Y--'r:r _H~~1'i"1~~:;'I~PLL~ - - ~15 I j I j.,~' /,! :._-t-~,.-_-i,;! I ~KID ' -P'-i0 --'1'~"', ::'~I. I. . --..Ii ~I 1 "". ~ I ")2~: ~~((II rL-!'~ /1'1' ' Ti - , . IIi -. T : =--.J 1 "/'';1.1-- -1.-""-/1 '-., . ~t. -. - '1' --,- ;J: -, '. :,.'r-"._.~' III; : I I; . I ' ",,"" J-~+.;:.=:,~--=" . -. - ..-. "'-+--KID I ! ;, I I ~II ;-li! 1- -'- . .0-- i1J,__.__ _~ - 1_-- < i' " i 1 -~-= " i n-h-es-----.---~ I ,! i I I f I I ' \ ' , : : ' I' , -~- ::,~._.;~..~-,_._.--.- '-kID i I,. ::' . i Ii! I ! \ ' ; !' I' ! ' _,1..- . ~ .J/ --ij-~------- --kl , :! i. '! I ~ _ \ r . I It I .. ---.-.-, . .~\ - - -, '-.- "--11--.,-.-. _._ .~ : I -0-' I ;1:: ,I \ ]' Iii, I' ;f~ I ; !i W;! I \ . I' f : c 'I :l :;==:, '\ " '~. ~'~ Iii; Ii ;. ~ ; ~ \ -~1---~",: .- !~I@)'I~ -=ri=l ~-=-=--'I--::'';''-II-' T~ , ! 'i I, ~! I -- '. . , I 1;;'1 II' I -<-... " I . I I ______ -'- ':1'.1 "--1-~~~="=--~---~ ' ,r-'" --- ~-- ------'"'"-=-- I '\.::;) H. 'i!LI_.d_i=======L=~._! ~ '-i- -.-.- I -. J 1 I ~ ' '" I I -1- - :// Ii' 1- -1 ,.! - . - -r- _ . -+- . _ . I I I I I - - .-.---- - "..... ................... ,'. ~...;,..- ,... ~ .;J '-' '"- ... ,.... j c:...:::> ,.. . I(J =- :13 o -< ~ r '1J ~ r- J: 11 g H~ s> z ~~ ~ J:"l r- >>0 N > ::I m <n o ::I ~ ----.. _.. - -- .l..,:)Q.:;lOO...::......<.Jv I f J. -===--===--=j I ;, I ! I ! . I I 1 I : I I I I @ I . I ! ! ) I r-;;'\ -'~0 t -3 " j T <" m )( ~ ~ Z Q ::I 0 -< I > r ~ -._L_ I ~ I I r- ~ -.-...- I I I I ,~, I :t:. -'-r- I : . --t-<ID ~ I I , I ~ I I I ---~- 'n'-( ....~_.-. --r I ~' .' ~ 'I I. f' . , ,..~ Ii :1 ~ I i I I rr:~J ~ " , IS ' , " ..;:::. - r-@- '1=* . II ~l~ fS ~ ---r- H ,'-'=' ,I ~ I I I t~ I I _._~- I' I .1-1-_. ----[J~ . I , , I I I I I; If '-=o.r I~ II ~ I : I If/' I ':' , I. . . %' -...-....-- , . ," , -- ..--.....,-''-''-..........0:::....;) ..~V..,.lOO_J.~'OC,.Ior.J r-. J. l(j: I --- I 1 -.------ '1 I I I I :D I 0 -< >>0 I f I ,... ~ r ~ cp I ,... i ~ l~~ u~ I I : f~ .~ 1'1J ! I f~ r- ~ N > ::J IT'! <n 0 :c -oj m >< en -t S! c := o -< > ,... '1J ~ ,... J: :t:. ~ s:: f' ~ If C") .I ~ f. ~ =l ~ ~i ~ ~ I I, ,. , ,.,' --_L_ I i -'-r- I ===;r~ I , l~ J~ --r . '/'?f\ .- '-,-1 I ~ I I , 'II'+~ Ill~ I I -___ J :b. ~ s:: fi~ II ~ If ~ fl ~ I! ~ I ~ J::;; ~ , :. ... , %' --il I I I I I I I .--.-- I I I I I I / J ::2 o -< >>0 ,... '0 Jlo ,... J: f~g ~~ 0 ~i ~ H; > N Jlo := m en o :ll -1 @ I I m )( in ,-1 2: c;) := o -< Jlo ,.. '1J Jlo ~ , ," I " , ~ ~ 'I I ~ I II ---r-'0 i Iii i : Iii i " ! I! I i ,I I i II ~ i -f" -'f-,L..-~.l~,_,_..._.~@) f . II I i II ~,; I I . . 1.1_. I! r IJI!III .J'-~ '1 ',ll'-'! '-1"/ -, -'r~ -r~ ,-d ;-- 1/--- -~ , ;. i' " ' ; I I '+t. , .-t--@ r Iii ii ~~j .' ___1- WJ-.i. t !.I~.,J I .l,~ r , /, II I \.::,) ! Ii! II : - :-1- I I I ( ::; ;;; . fl', T ~ .~ i Iii' I . ~. , :,' , -LIi\ -'-r- -Tl'-'! '-'---. _.~- I ~ i i i i I : , i" I I -'-r- . --~ I ' ---1- - Ir 11/: Q') -. -r - . jl,--t-<ID , I' I' I ! ! '!' I . --f- -4-1----1-:---f-0 ,___ 'I !? I .I.~ If - - I I I I 't I L if I \6J J:J ~ I ,... ." >>0 ,... ~ fig U~ 5"'" d~ > ~ :::J m CIS o :::J ~ , -- m )( ii) ~ 5: C) := o -< > ,.. ~ > ,.. J: I -'-r- I -.-,...- tl ....= I ~.:.: , -'-r- I -,-~- I ---,-- I I -.,J -'-r-' I _._~- I I(~I :t:. ~ S f~ 5:J ~l ~ .! ~ JI ~ If ~ ~i Q . I :. .. . ~' - - . -- --------- ----.ll I I. I I ! I i I I ff , . .~ J~ o~ I~ .~ 'f0 ~ 'I~ f I cr cp ~ cr crcp ~cr(~)(f ) - i . I, i \ I I I . I I I I r .! I _ I I I. I[ -f<IJ I I i I I .. I I II : -I' ~LU-~t-_. '1 -! I! " ! j Ii' I , I..i_. I.!_ j I . -1(ID 'i 'U!'-') --rro II -'=to -~-I-tH"-- -~ I . I . ...1 I " @ ~~ !-.-t-<IJ I II ~~ : '1-~ - 'rw I I I I OCT-Z~-98 WED e~:e6 PM ATEC ASSOCIATES 13e~88212ea P.e2 ...., 9955 r-NV 116 Way, Suite i Miami. Fionda 33178 305882.8200 Fax 305.882.1200 ASSOCIATES INC. October 28, 1998 RP Royal Palm Hotel C/o Donohoe Development 210 1 Wisconsin Avenue, NW Washington, DC 20C'ff7 Attn.: Mr. Christopher A. Bruch RE: Report on Chloride Testing Royal Palm Crowne Plaza 1535 Collins Avenue Miami Beach, Florida ATe Project # 03657.ocm - Dear Mr. Bruch, ATC Associates Inc. (ATC) has completed the requested and authorized concrete coring and chloride-ion content testing for the above subject project. This report contains the results of the test results and data obtained. SCOPE OF SERVICES The proposed scope of services for this project included obtaining concrete dust samples from two of the five facade support columns on each floor level from the second to the seventh floor. Concrete dust samples were also taken from two locations within the first floor slab and from two locations of a first floor grade beam. A total of 16 concrete dust samples were tested for acid soluble chloride content. CHLORIDE-TON CONTENT The chloride-ion content tests were conducted in general accordance with AST.M C-114, Section 19. The acid soluble chloride-ion content listed below is reported as a percentage of the concrete dust sample weight, approximately 1.5 grams. This measured value wasthen adjusted by a factor of eight to arrive at a chloride-ion content as a percentage of the estimated cement weight. OCT-~o-~8 WED e5:e, PM ATEC ASSOCIATES RDP Royal Palm Hote[ C/o DOQQhoe Development I' .il':~I~f~!1 FIGB,.. FIGB FL, FI 2h 2, 3h 3. 4. 4,. 5. 5" 6 ~ 7, 7" ,'" It First Floor Grade Beam First Floor Grade Beam First Floor. Desk Area First Floor. Northwest Corner Facade Facade Facade Facade Facade Facade Facade Facade Facade Facade Facade Facade 1313588212138 P.a3 ATe Project No,: 03657.0002 pal:e 2 ;t:'~:;;.!.i.~H:; :.~.~:~tr.,;i! .f(;;~1;'~~~;.'."'... 0.0320 0.0088 O. 09CX) O.03m 0.0700 0.0490 0.2050 0.0270 0.1500 0.034D 0.0058 0.0500 0.0046 0.0090 BDL 0, (X)66 0.2560 0.0704 0.7200 0.2880 0.56C() 0.3920 1. 6400 0.2160 1. 20CQ 0.2720 0.0464 0.4aXJ 0.0368 0.0720 BDL 0.0528 Please call us should you have any questions or desire additional information. Thank you for this opportunity. Respectfully submitted, A Te Associates Inc. / , / / /IJ/l () /1/ / ~~/;/~/7" Laughn Drouillard OJX'rations ~7 /C~E Vice President, Engineering