Loading...
HomeMy WebLinkAbout2004-25585 Reso RESOLUTION NO. 2004-25585 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RATIFYING A CONTRACT, IN THE AMOUNT OF $167,749, WITH NUTECH ENGINEERING SYSTEMS, INC., FOR THE SUPPLY AND INSTALLATION OF THEATER CURTAINS, THEATER SEATING, AISLE CARPETING, AISLE LIGHTING, HARD WALL FINISHES, SOUND SYSTEM, AND ALL ASSOCIATED MATERIALS AND EQUIPMENT FOR THE BYRON CARLYLE THEATER. WHEREAS, the Mayor and City Commission, at the November 28, 2001 City Commission meeting, adopted Resolution No. 2001-24677, which authorized the Property Management Director to serve as the Certified General Contractor for the design and renovation of the Byron Carlyle Theater; and WHEREAS, during the programming and design of the interior finishes to be used in the Byron Carlyle Theater, it was determined that, due to the slope of the floor in the theater and the requirement to be in compliance with the Americans with Disabilities Act (ADA), and the applicable building and fire codes, many of the interior finishes would need to be custom built to meet the needs and design criteria of the existing conditions; and WHEREAS, the Property Management Director exercised the authority given to him by the City Manager and City Commission, and prepared specification bid packages for different components of the interior finishes that reflected the exact needs to comply with the existing conditions of the building and the applicable code requirements; and WHEREAS, after a specification bid package was complete, four firms that specialize in theater seating were contacted to provide quotes for the required scope of the work which resulted in four separate bid submittals for the project; and WHEREAS, after a specification bid package was complete, three firms that specialize in theater curtains were contacted to provide quotes for the required scope of the work which resulted in two separate bid submittals for the project; and WHEREAS, after a specification bid package was complete, five firms that specialize in theater sound systems were contacted to provide quotes for the required scope of the work which resulted in five separate bid submittals for the project; and WHEREAS, the Property Management Director, after reviewing the bids, checking references, licensing, and insurance requirements determined that Nutech Engineering Systems, Inc., provided the lowest responsive responsible bids for each portion of the aforestated work; and WHEREAS, additional products and materials were submitted by vendors for other minor interior finishes for the Theater that were required to coordinate in style and color to meet the design criteria and for the review of the product's availability to meet the construction schedule and the project's budget; and WHEREAS, the Property Management Director determined that the finish products and materials for these requirements that were submitted by Nutech Engineering Systems, Inc., were the best products and materials available to be used on the Byron Carlyle Theater Project; and WHEREAS, a contract with Nutech Engineering Systems, Inc., was prepared and form approved by the Legal Department, and executed by the Mayor and City Clerk, as required for the supply and installation of theater curtains, theater seating, aisle carpeting, aisle lighting, hard wall finishes, sound system, and all associated materials and equipment in the Byron Carlyle Theater; and WHEREAS, as required by Resolution No. 2001-24677, the Administration herein requests that the Mayor and City Commission herein ratify the aforestated contract; said contract deemed necessary to continue the prosecution of work on the Byron Carlyle Theater. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein ratify a contract, in the amount of $167,749, with Nutech Engineering Systems, Inc., for the supply and installation of theater curtains, theater seating, aisle carpeting, aisle lighting, hard wall finishes, sound system, and all associated materials and equipment fort the Byron Carlyle Theater. PASSED and ADOPTED this 9th of ,2004. ATTEST: ~S~) t CITY CLERK APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION . >--25'cJ~ omey~ Date CITY OF MIAMI BEACH PROPERTY MANAGEMENT DIVISION AUDITORIUM SEATiNG AND AISLE LIGHTS BYRON CARLYLE THEATRE TABULATiON SHEET DESCRIPTiON NUTECH CONTRACT SERIES TSI SOLUTIONS Auditorium Seating WI $ 55,078.39 $ 56,701.32 $ 58,5'56;{)0'" $ '."59i'220:0~' Aisle Lights no Hghts DESCRiPTION CITY OF MIAMI BEACH PROPERTY MANAGEMENT DIViSION AUDITORIUM SOUND SYSTEM BYRON CARLYLE THEATRE TABULATION SHEET NUTECH ENGiNEERiNG BEACH SOUND SOUTHERN HARRIS AUDIO TECHNiCAL SYSTEMS, INC. Auditorium Sound $ 24,603.29 System 53,282.68 55,058~97 63,378.67 PRO SOUND $ 105,700.00 CITY OF MiAMi BEACH PROPERTY MANAGEMENT DIViSION AUDiTORiUM CURTAINS AND INSTALLATION BYRON CARLYLE THEATRE TABULATION SHEET DESCRIPTiON NUTECH Kenney Drapery Associates, Inc SECOA Wall Cul'1:ains Byron Carlyle Theatre Renovation Project Budget aud Project Status Report As of March 25, 2004 Fundina Date 04/18/2001 OS/29/2002 10/01/2003 Fundina Source Appropriated Expended General Fund Vndesignated $ 500,000.00 $500,000.00 Reallocation of CDBG funds FY 00/01 NBDC Com. Fa<;ade $ 150,000.00 $ 150,000.00 FY 01/02 NBDC Com. Fa<;ade $ 150,000.00 $ 150,000.00 MBCDC Pres. & Rehab Prog. $ 100,000.00 $ 92,456.14 Quality of Life (via NBDC) $ 150,000.00 $ 150,000.00 Quality of Life (via NBDC) $ 150,000.00 $ 148,278.84 Miami-Dade CDBG (via NBDC) $ 50,000.00 $ 49,937.28 Miami-Dade Cultural Affairs Grant $ 16,096.00 $ 15,748.00 State Cultural Facilities Program Grant FY 01/02 $ 460,000.00 $ 459,999.81 Miami-Dade Cultural Affairs Capital Development Grant $ 12,500.00 Total Funding: $ 1,738,596.00 $ 1,716,420.07 $ Balance 03/20/2002 05/16/2001 06/06/2002 06/13/2002 09/18/2002 22,175.93 Phase One: Lobbv area converted into Office Space Total Proiect Expenditures for Phase One. Property Management charge (construction of offices) Laumar Roofing (Roof and HVAC system replacement) Property Management (Maintenance, beginning of project) Sub-total Phase I Budaet Expended Balance 118,072.21 401,501.00 40,000.00 559,573.21 $ 1,179,022.79 $ $ $ $ 1,738,596.00 $ Phase Two: Theater Lobbv and Performance space. Restrooms, and Interior Finishes $ 1,179,022.79 Demolition Lango Equipment ( Demolition) Lango Equipment (Additional Demolition) Total Interior Finishes Lotspeich Company, Inc (acoustical ceilings and installation) Daltile ( materials for restrooms tile) Farrey's Wholesale Hardware (Lobby Light fixtures) Casinos's Carpet (Projector room tile) Mardale (toilets partitions and accessories) Ricky's Doors ( doors and specialty hardware) $ 43,450.00 (ratified) $ 5,800.00 (ratified) $ 49,250.00 $ 785.00 $ 1,800.00 $ 3,500.00 $ 43.61 $ 3,200.00 $ 4,950.00 $ 14,278.61 $ 62,904.64 (ratified) $ 106,418.00 (ratified) $ 169,322.64 $ 34,836.00 (ratified) $ 34,836.00 $ 21,370.00 $ 10,739.51 $ 8,245.00 $ 1,841.00 $ 5,700.00 $ 18,126.00 Byron Carlyle Theater Budget Expenditure Public Works Depl. Property Mgl. Division April 2004 Reports, Desian. Plans review ATC (Asbestos/ Environmental Reports) M.L.Cain & Assoc. (Appraisal report) Accurate Fire Sprinkler (Fire sprinkler system design) Federal Express Tri-City Electric Co. (Fire Alarm System Design) Olga V. Cordero, PE. (plans review, signed and seal) Total Fire Protection Fire Controls Inc.(Fire Alarm Installation) Falcon Fire Protection (Fire Sprinkler Installation) Total Concrete Work Luis E. Roca, Inc (Concrete form and pour services) Total Artistry in Glass (railings stairs, mezzanine, ramp, mirrors, etc) Lobby Floors (Carpet and art design installation) CPL Cons!. Inc (spray knockdown wall texture) ArchiTile, Inc.( decorative bathrooms counters) Total Theater Eauipment and Components Theater Equipment ( stage lighting and microphones material supply Sound Concepts (Stage installation) Miami Stagecraft (Stage Lighting Equipment and Materials) Miami Stagecraft (Stage Lighting, Sound System Installation) Kelly Benson Electric (Theater House Lights materials and installation) NUTECH (seats, Curtains, Carpets, aisle lights..) Sound Equipments (NUTECH) Total Miscellaneous Waste Management (Portable Toilets) IT (phones and computer hook-ups) Plumbing Fixtures (Home Depot materials and fixtures) Marnia Plumbing (Sanitary Sewer Lift Station Repairs) DPC (duct insulation removal of asbestos) Refri-Cool (HVAC materials) Total Internal Charaes Property Management Charges (Internal labor and materials) for HVAC, Electrical, Plumbing, Carpentry, Ceramic Tile Installation, and Painting charged to the project budget Total Sub-total Phase II Phase Two Budget $ 1,179,022.79 Work remainina to complete: Site Clean up and Punch List Items (Estimated Cost) Projected Project Balance: $ 41,455.60 $ 9,000.00 $ 1,260.00 $ 5,552.49 $ 123,289.60 $ 49,937.09 $ 135,430.00 $ 58,300.00 $ 42,875.00 $ 24,340.00 $ 143,145,20 $ 24,603.29 $ 478,630.58 $ 235.56 $ 3,150.00 $ 4,972.52 $ 24,924.00 $ 1 ,000.00 $ 9,024.23 $ 43,306.31 $ $ 243,933.22 243,933.22 Total Project Expenditures $ 1,156,846.86 $ Project Balance 22,175.93 $ 21,575.00 $ 600.93 The scope of work on the Phase II project is substantially complete and the TCO has been received. Although the scope of work on the Phase II project is substantially complete, existing building maintenance, waterproofing, fire issues, and building exterior repairs that are beyond the scope of work of the Phase II pmject have and will require additional funding. Byron Carlyle Theater Budget Expenditure Public Works Dept. Property M9t. Division April 2004 CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY lD - Condensed Title: Ratification of a Contract to Nutech Engineering Systems, Inc., in the amount of $167,749, for the installation of theater curtains, theater seating, aisle carpet and aisle lighting, hard wall finishes, sound s stem, and associated materials and e ui ment for the B ron Carl Ie Theater. Issue: Shall the City Commission ratify a Contract to Nutech Engineering Systems, Inc., in the amount of $167,749? Item Summary/Recommendation: In accordance with Resolution No. 2001-24677 adopted by the City Commission on November 28'", 2001 the Administration, through its Property Management Director, is providing General Contracting services including bidding, the award of contracts for work, and change orders on the Byron Carlyle Theater project. Under the provisions of the Resolution, contracts and purchases exceeding $25,000 must be brought back to the City Commission for Ratification. As part of the design ofthe renovation project, interior finishes were required. During the design of the Theater's interior finishes, multiple vendors were contacted to provide samples and quotes on the components of the different finishes. Based on the results of the quotes and the products availability and in meeting the design criteria in style, comfort, color selection, and quality, the Property Management Director determined that Nutech Engineering Systems, Inc., was the lowest responsive responsible vendor for the Project. A contract was developed with Nutech Engineering Systems, Inc" in the amount of $167,749, and was reviewed by the Legal Department, and executed by the Mayor and City Clerk as required. The Administration recommends that the Mayor and City Commission ratify a Contract to Nutech Engineering Systems, Inc., in the amount of $167,749, for the installation of theater curtains, theater seating, aisle carpet and aisle lighting, hard wall finishes, sound system, and associated materials and equipment for the Byron Carlyle Theater. Advisory Board Recommendation: I N/A Financial Information: Amount to be expended: D Finance Dept. # 301,2316.000676 ( General Fund) Source of Funds: $167,749 City Clerk's Office Legislative Tracking: I AGENDA ITEM DATE c7D G-9-oL/ CITY OF MIAMI BE'ACH CITY HALL 1700 CONVENTION CENTER DRIVE, MIAMI BEACH, FLORIDA 33139 http://ei.miami -beach. fl. us COMMISSION MEMORANDUM DATE: June 9, 2004 SUBJECT: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez C\~ City Manager (J' v A RESOLUTION OF THE MAYOR AND MEMBERS OF THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RATIFYING A CONTRACT IN THE AMOUNT OF $167,749 TO NUTECH ENGINEERING SYSTEMS, INC., FOR THE SUPPLY AND INSTALLATION OF THEATER CURTAINS, THEATER SEATING, AISLE CARPETING, AISLE LIGHTING, HARD WALL FINISHES, SOUND SYSTEM, AND ALL ASSOCIATED MATERIALS AND EQUIPMENT IN THE BYRON CARLYLE THEATER. TO: FROM: ADMINISTRATION RECOMMENDATION Ratify the resolution. ANALYSIS During the programming and design of the interior finishes to be used in the Byron Carlyle Theater, it was determined that all items to be used in the Theater needed to be constructed in conformance with the slope of the floor in the theater, acoustical need requirements, color selection, comfort of seating, sound system requirements, budget limitations, and the requirements of ADA, Building Codes, and Fire Codes. These elements needed to be matched and coordinated to other elements of the Theater to meet the design criteria. The Mayor and City Commission, at the November 28, 2001 Commission meeting, adopted Resolution No. 2001-24677, which authorized the Property Management Director to serve as the Certified General Contractorforthe design and renovations of the Byron Carlyle Theater. The Property Management Director exercised the authority given to him by the City Manager and City Commission, and had vendors provide samples for review of theater seating, developed specifications for a sound system, received samples of theater curtains, aisle carpeting, egress aisle lighting that conformed to the concrete and carpet floor conditions, hard wall coverings, and other 1 required interior finishes for the Theater. Bid specifications for the different components were prepared and sent to specialized vendors to provide quotes forthe purchase and installation requirements to reflect the exact needs of the design and Theater configuration. These specifications also included the existing conditions of the building and the applicable code requirements that the vendors were required to follow. Additionally, vendors were requested to provide samples of products to test and to help determine which would work and fit best in the theater design plan. Four firms that specialize in theater seating were contacted to provide quotes for the supply and installation of approximately 31 0 seats and the required anchoring plus the installation of ADA and Fire Code required aisle lighting. Of the four firms that received bid packages, four submitted quotes for the project. After reviewing the quotes, it was determined the theater seats provided by Nutech Engineering Systems, Inc. was of the best design, met required code compliance, and was the most comfortable to fit the theater needs. In addition, Nutech Engineering Systems, Inc., was the lowest responsive responsible bidder for the scope of work. The sound system specifications developed for the project were reviewed and verified by the Theater Manager and Sound System Manager of the Jackie Gleason Theater and both agreed that the specifications for the sound system met the needs and requirements of the Byron Carlyle Theater. Five firms that specialize in theater sound systems were contacted to provide quotes for the sound system to be used in the project. Of the five firms contacted, all five provided quotes for the Project. Nutech Engineering Systems, Inc., was the lowest responsive responsible bidderforthe scope of work. Three firms that specialize in Theater perimeter wall curtains and curtains that surround the exterior of the stage were contacted to provide quotes for the purchase and installation of the custom made theater curtains. Of the three firms contacted, two provided quotes for the project. Nutech Engineering Systems, Inc., was the lowest responsive responsible bidder for the scope of work. In addition to the bid items, other interior finishes elements, in the amount of $55,884.31, were required for the project including the aisle carpeting inside the Theater and hard wall finishes that were required for the acoustic properties of the Theater and to serve as trim elements for the installed drapes and exit doors. These items were required to match and conform to the design and color selections of the other related Theater finishes. After reviewing product submittals and after verifying the materials to be in compliance with Building and Fire Code requirements and in conformance with the design, color selection and budget of the Byron Carlyle Theater Project, and the availability of the products and installation requirements necessary to comply with the project's construction schedule, the Property Management Director determined that the finish materials for these requirements that were submitted by Nutech Engineering Systems, Inc. were the best products and materials available to be used on the Byron Carlyle Theater Project. 2 After checking background references, plus licensing and insurance requirements, the Property Management Director determined that Nutech Engineering Systems, Inc., was the lowest and best responsive responsible bidder on the project. A contract was then prepared with Nutech Engineering Systems, Inc., in the amount of $167,749 and was reviewed and form approved by the Legal Department on March 29, 2004. The contract was then signed by the contractor and executed by the Mayor and City Clerk as required. The Administration recommends that the Mayor and Members of the City Commission of The City of Miami Beach ratify the Property Management Director's contract to Nutech Engineering Systems, Inc., in the amount of $167,749 for the supply and installation oftheater curtains, theater seating, aisle carpeting, aisle lighting, hard wall finishes, sound system, and all associated materials and equipment in the Byron Carlyle ~ater. JM~FB/BAJ C:\My Files\Commemo\ByronRatifyStageMemo.DOC 3