Loading...
99-23019 RESO RESOLUTION NO. 99-23019 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE HOLD HARMLESS AGREEMENT REQUIRED IN CONJUNCTION WITH THE CITY OF MIAMI BEACH'S AFFIDAVIT OF OWNERSHIP TO OBTAIN A CLASS I COASTAL CONSTRUCTION PERMIT FROM MIAMI-DADE COUNTY FOR THE FLORIDA DEPARTMENT OF TRANSPORTATION'S PROJECT TO REPLACE THE MERIDIAN AVENUE BRIDGE OVER COLLINS CANAL. WHEREAS, the Meridian Avenue bridge over the Collins Canal is in the process of being replaced by the Florida Department of Transportation (FDOT) as part of their bridge replacement program; and WHEREAS, the bridge replacement work requires a Class I Coastal Construction Permit from Miami-Dade County and, as a prerequisite to obtaining said permit, an Affidavit of Ownership and Hold Harmless Agreement are required to be executed by the City of Miami Beach as a holder of an interest in the area where the work is to be performed. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Clerk are hereby authorized to execute the Hold Harmless Agreement required in conjunction with the City of Miami Beach's Affidavit of Ownership to obtain a Class I Coastal Construction Permit from Miami-Dade County for FDOT's replacement of the Meridian Avenue bridge over Collins Canal. PASSED and ADOPTED this ~ day of, January, 1999. ~/jJ MAYOR ATTEST: APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION ~ ( p CU~ CITY CLERK ~~}L{? C'ty AM I ~? I ofney n /~~ L/'zJ' Date F:IWORKISALLICOMMEMOIMERlDIAN. WPD AFFIDAVIT OF OWNERSHIP AND HOLD HARMLESS AGREEMENT PERSONALL Y APPEARED BEFORE ME, Julio Grave de Peralta, Director of Public Works of the City of Miami Beach, the undersigned authority, and hereby affirms as follows: 1, That the City of Miami Beach holds an interest in those areas designated and more fully described as follows: Meridian Avenue Bridge: Commence at the intersection of the center lines of Meridian A venue and 19th Street, as shown in AMENDED PLAT OF GOLF COURSE SUBDIVISION OF THE ALTON BEACH REALTY COMPANY recorded in Plat Book 6, at Page 26, Public Records of Miami-Dade County, Florida; thence run northerly, along the center line of Meridian Avenue for a distance of 249.16 feet to the POINT OF BEGINNING of the tract ofland herein described; thence deflects to the left 119025' 46" for a distance of 40,19 feet to a point located on the west Right-of-Way of Meridian Avenue; thence northerly, along the west Right-of-Way of Meridian Avenue for a distance of 10.50 feet to a point located on the south Right-of-Way of Collins Canal; thence westerly, along the south Right- of-Way of Collins Canal for a distance of 44.00 feet; thence deflects 900 to the right for a distance of 43.19 feet to a point; thence run easterly, parallel to the center line of Collins Canal for a distance of203.32 feet; thence deflects 900 to the right for a distance of 43.19 feet to a point located on the south Right-of-Way of Collins Canal; thence westerly, along the south Right-of-Way of Collins Canal for a distance of75.50 feet to a point located on the east Right-of-Way of Meridian Avenue, as shown in Florida Department of Transportation project No 87099-3504; thence southerly, along said east Right-of-Way of Meridian Avenue for a distance of 10,50 feet; thence deflects to the right 60034' 14" for a distance of 43.63 feet to the POINT OF BEGINNING, Said lands located, lying and being in Section 34, Township 53 South, Range 42 East, City of Miami Beach, Florida, containing 10,881 square feet more or less, or 0.250 acres more or less. This description was generated from examination ofthe abutting Record Plats and Florida Department of Transportation Project No, 87099-3504, 2. That the above-referenced areas are the subject matter of the Application to be submitted by the Florida Department of Transportation for a Class I Coastal Construction Permit under and pursuant to Section 24-58 of the Code of Metropolitan Dade County to construct or engage in the following activity: Meridian A venue bridge replacement over the Collins Canal. 3, That your affiant hereby affirms the City of Miami Beach's interest in the above-noted areas necessary for the work noted in Paragraph 2 above and, subject to the limitation set forth in Section 768.28, Florida Statutes, the City of Miami Beach hereby agrees to defend same and hold Miami- Dade County harmless for any and all liability , claims and damages of any nature occurring, incurred or arising as a result of the City of Miami Beach not having the above-stated interest in the afore stated areas. 17 ( ~d- e. c \~ ) ~ave de Peralta Director of Public Works City of Miami Beach STATE OF FLORIDA ) ) SS COUNTY OF DADE ) ~The foregoing iQstrument w~s acknowledged -~1-7; ,199$, by JUliO GrClJe ct~. to me 0 who has l-'lUJuced .M before me this LL- day of Pe ra i .k- , \Yh9 is personally as identification. OFACL\LNUrARYSEAL ULLIAN BEAUCHAMP NOTARY PtJBLlC 5T ATE OF rLORrDA COMMISSION NO CC733:372 MY COMMISSION F.XP. APR. 29,2007;... MY COMMISSION EXPIRES: Jf; ftfirf '}3eoUchQ4P PRINT NAME Wfi NEISEN o. KASDIN, MAYOR CITY OF MIAMI BEACH ATTEST: ~4P~ CITY CLERK APPROVED AS TO FORM & lANGUAGE & FOR EXECUTION F:\ WORK\$ALL\DIXC\MERID.AFF ( "\ /-J/ \ct57~~ eu., Atto I 1;; d~J' Date ~ITY OF MIAMI BEACH ITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 COMMISSION MEMORANDUM NO, I L,-<1 'L TO: Mayor Neisen O. Kasdin and Members of the City DATE: January 6, 1999 FROM: Sergio Rodriguez City Manager SUBJECT: A RESOL ON OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE HOLD HARMLESS AGREEMENT REQUIRED IN CONJUNCTION WITH THE CITY'S AFFIDAVIT OF OWNERSHIP TO OBTAIN A CLASS I COASTAL CONSTRUCTION PERMIT FROM MIAMI-DADE COUNTY FOR THE FLORIDA DEP ARTMENT OF TRANSPORTATION'S PROJECT TO REPLACE THE MERIDIAN AVENUE BRIDGE OVER COLLINS CANAL. ADMINISTRATION RECOMMENDATION: Adopt the Resolution. BACKGROUND: The Florida Department of Transportation (FDOT) will be replacing the Meridian Avenue bridge as part oftheir bridge replacement program, All construction over water within the Bay area requires a Class I Coastal Construction Permit issued by Miami-Dade County. As part of the permitting process, Miami-Dade County requires a Hold Harmless Agreement from the City of Miami Beach, as the holder of an interest in the area where the work is to be performed, CONCLUSION: The Mayor and City Commission should approve the Resolution authorizing the Mayor and City Clerk, to execute the attached Affidavit of Ownership and Hold Harmless Agreement, required to obtain a Class I Coastal Construction permit from Miami-Dade County for the construction of the Meridian Avenue bridge over Collins Canal by the FDOT, ~ \ . .~,i/7 SR\Cr&C\JOdP\MS\A V\cdv F.\WORK\SALLCOMM~.\fO\MERIDIA:o.I WPD AGENDA ITEM ~ DATE t -~-C}~