LTC 158-2004 Bridge Rehabilitation, Removal of Flyover, and Improvements to 63rd Street and Indian Creek Drive CITY OF MIAMI BEACH Office of the City Manager Letter to Commission No. 58-200 To: From: Subject: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez ~ ~ City Manager ~/ BRIDGE REHABILYrATION, REMOVAL OF FLYOVER, AND IMPROVEMENTS TO 63RD STREET AND INDIAN CREEK DRIVE Date: Ju .n~28,~004 For your information, the Florida Department of Transportation (FDOT) has scheduled a public information workshop for subject project to take place at Nautilus Middle School Auditorium on Wednesday, July 21,2004, from 7:30 p.m. to 10:00 p.m. After the demolition of the existing flyover, subject project will resurface and reconstruct Indian Creek Drive from a point 350 feet south of W 63~d Street to just north of Abbott Avenue. The total length of the project along Indian Creek Drive is 0.6 miles. The project also includes milling and resurfacing of W 63rd Street, beginning just east of Allison Road and ending at the west end of the drawbridge crossing Indian Creek. The project includes complete renovation of the W 63rd Street Drawbridge. The reconstruction of W 63rd Street continues from east of the drawbridge to a point just west of Collins Avenue. The distance from Allison Road to Collins Avenue is approximately 0.16 miles. The most notable feature of this reconstruction is the removal of the left turn flyover (Eastbound to Northbound) and a total revamping of the signalized intersection ofW 63~d Street and Indian Creek Drive. The project includes new roadway lighting, new drainage structures, new signing and pavement markings, landscaping, and an updating of all signalized intersections. The renovation of the bddge will include new handrail, restoration and concrete repairs, new structural steel for the bascule leaf, and more reliable electrical systems, control systems, and machinery systems. In order to avoid impacting two consecutive toudst seasons and boat shows, the project is currently planned to start construction in April 2006. Once construction begins, it is estimated that it will take approximately 580 days to complete the work; however, the contractor will be given substantial incentives to complete the work early and penalties for completing the work late. Maintenance of traffic concepts are set up so as to maintain traffic on both W 634 Street and Indian Creek Drive at all times. Marine traffic will not be affected except for short pedods of time, for which ample notice and Coast Guard compliance will be required. In response to the City Commission's suggestion, FDOT is looking for ways to provide a protected left tum from Collin~ Avenue and 63r~ Street to south bound Indian Creek Drive. c: Robert C. Middaugh, Assistant City Manager Fred H. Beckmann, Director of Public Works F:\WORK~$ALL\0LUCY LLOPIS\LTC\63rd Flyover Bridge Rehabilitation.doc