CITY OF MIAMI BEACH, FLORIDA
PROCUREMENT DIVISION
1700 CONVENTION CENTER DRIVE
MIAMI BEACH, FLORIDA 33139
JOB ORDER CONTRACT
CONSTRUCTION CONTRACT DOCUMENTS
VOLUME I
PROJECT MANUAL FOR THE FOLLOWING PROJECT(S):
JOB ORDER CONTRACT 14-03/04-CAPIT AL IMPROVEMENT PROJECTS
H.A. Contracting Corp.
CITY CLERK
CITY OF MIAMI BEACH
COMMISSION ITEM SUMMARY
~..
""liiiii5"
Condensed Title:
Request for Award of Job Order Contracts (JOC) to seven (7) Contractors for Public Works, City Wide, and
Ca itallrn rovements Pro ects.
Issue:
Shall the City Commission Award Contracts to Contractors for Public Works, Citywide, and Capital
Improvement Projects?
Item Summa 1Recommendatlon:
JOC has delivered a fast, cost-effective procurement system that gives each department an option in the
procurement of construction services. In the first 12 months of the JOC program, job orders were issued on 58
projects totaling $10,523,581.69.
The number of construction projects Initiated and awarded via JOC In one year (58), Is greater than the tolal
number of construction projects awarded via traditional bidding (53) in the past three yearsl
The average time from the Joint ScopemeetlngOnltlal meeting of the City and Contractor to discuss scope of
work) to a Notice to Proceed (document directing contractor to corrvnence work) has averaged 26.3 days. With
traditional bidding, the time It has laken to Issue a Notice to Proceed to a contractor following the execution of
the contract books has averaged in excess of t80 days. Thus a timesaving of at least 154 days on average.
Based on the results of the City's JOC program coupled with the high volume of constructlon....e1ated projects,
the city issued three separate bid solicitations In order to increase the pool of responsive and responsible
contractors that would be ready, willing and able to accomplish timely and cost effective construction work.
Based on the analysis of the adjustment factors bid and the volume of construction projects the Administration is
recommending the following awards:
Public Works: City Wide:
CW Construction, Inc. Alpine Construction, Inc.
CIP:
F.H. Paschen SN Nielsen
H.A. Contracting, Inc.
Carivon Construction, Inc.
F & L Construction, Inc.
Pass Intematlonal, Inc.
APPROVE THE CONTRACT AWARDS.
Advisory Board Recommendation:
I I
Financial Information: Funds are available from the capital Improvements budget accounts allocated to
City Departments and/or Divisions, subject to Office of Management and Budget review. Each contract has a
maximum estimated annual value of $2 Million dollars for the Public Works and City-Wide and $5 Million for
CIP ro eets.
Source of
Funds:
D
Finance De t.
C Clerk's Office Le
Gus Lopez, ext. 6641
GL T .... F8 ... . . ReM .. ....... .. .JMGnn .. ..
T:\I\GEN _IlO4\Rogulll\lllCSlmmlly.dOC
AGENDA ITEM. R~
DATE S-'J/p-<J..{
148
CITY OF M lAM I BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139
htlp:\\mlamlblladlll.gov
SUBJECT:
COMMISSION MEMORANDUM
Mayor David Denner and DATE: May 26,2004
Members of the City Commission
Jorge M. GOnZaluj . ~
City Manager . rr- U
REQUEST FOR .. ROVAL TO AWARD JOB ORDER CONTRACTS TO THE
FOLLOWING CONTRACTORS PURSUANT TO INVITATION FOR BIDS ("BID") NO.
12-03/04 FOR PUBLIC WORKS PROJECTS; BID NO. 13.()3/04 FOR CITYWIDE
CONSTRUCTION PROJECTS; AND BID NO. .14-03104. FOR CAPITAL
IMPROVEMENTS PROJECTS: 1) ALPINE CONSTRUCTION, INC.; 2) CARlVON
CONSTRUCTION, INC.; 3) CW CONSTRUCTION, INC.; 4) F & L CONSTRUCTION,
INC.; 5) F.H. PASCHENSN NIELSEN; 6) H.A. CONTRACTING, INC.; 7) PASS
INTERNATIONAL, INC. AT AN ESTIMATED ANNUAL AMOUNT OF $2 MILLION PER
CONTRACT FOR PUBLIC WORKS AND CITYWIDE CONSTRUCTION PROJECTS,
AND $5 MILLION PER CONTRACT FOR CAPITAL IMPROVEMENT PROJECTS; AND
FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE ALL
CONTRACTUAL AGREEMENTS THERETO.
TO:
FROM:
ADMINISTRATION RECOI\IIP.llENOATION
Approve the Award of Contracts and authorize the Mayor and City Clerk to execute all
contractual agreements thereto.
FUNDING AND AMOUNT
Funds are available from the capital improvements budget accounts allocated to City
Departments and/or Divisions, subject to Office of Management and Budget review. The
following are the maximum value of each contract:
12-03/04 - Public Works....$2 million annually, maximum vallie $10 millic:m in five years.
13-03/04 - City Wide.........$2 million annually, maximum value $10 million in five years.
14-03/04 - CIP............ ... $5 million annually, maximum value $25 million in five years.
TERM OF CONTRACTS
The initial tem of each contract is .12 months and may be renewed for four (4)
additional one-year periods at the City's sole discretion. The renewal opti6ns.may be
exercised when the annual maximum value is reached ($2 million for Public Works and
Citywide, and $5 million for CIP projects), or when the one-year has expired, whichever
occurs first. For example, should a Public Works contractor reach $2 million in
construction work within the first six (6) months of their contract, the City at its sole
discretion, may renew the contract, and the contractor will be in year two of their
contract.
149
Commission Memo
Bids No. 12-03/04, 13-03/04, and 14-03/04
May 26, 2004
ANALYSIS
The City fully implemented a Job Order Contracting (JOC) program on. May 2, 2003.
The City's JOC program was implemented after thorough research and presentations
that included the following:
. The Mayor and City Commission at Its December 20, 2000 meeting, referred to
the Finance and Citywide Projects Committee for discussion, the JOC program.
. The Finance and Citywide Projects Committee at its February 12, 2001
meeting, listened to a presentation from the Procurement Director relative to
the JOC system and its benefits, and recommended that the Administration
pursue the implementation of the JOC program for timely completion of
construction projects.
. On February 21, 2001, COmmissioner Simon Cruz provided the City
COmmission with a verbal report relative to the Finance and Citywide Projects
Committee's recommendation as stated above.
. On. July 18, 2001, the Mayor and City Commission adopted Resolution No.
2001-24524, which authorized the issuance of a Request for Proposals (RFP)
for the establishment of JOC program.
. On April 10, 2002, the Mayor and City Commission adopted Resolution No.
2002-24818, Which authorized the administration to enter into negotiations with
The Gordian ~roup.
. On July 10, 2002, the Mayor and City Commission adopted Resolution No.
2002-24914, which authorized the Mayor and City Clerk to execute an
agreement with The Gordian Group for the establishment of theJOC program.
. On March 19, 2003, the Mayor and City Commission adopted ReSolution No.
2003-25157, which awarded contracts to the following contractors: 1) HA
Contracting; 2} F & I Construction; 3} Carivon Construction; 4) TRAN
Construction; 5) Grace & Naeem Uddin, Inc.; and 6) TROPEX Construction.
The first year results of the City's JOC program are as follows:
· . JOC has delivered a fast, cost-effective procurement system that gives each
department an option in the procurement of construction services. In the first 12
months of the JOC program, job orders Were issued on 58 projects totaling
$10,523,581.69.
· The number of construction projects initiatec:l and awarded via JOC in one year
(58), Is greater than the total number of construction projects awarded via
traditional bidding (53) in the past three yearsl
150
Commission Memo
Bids No. 12-03/04, 13-03/04, and 14-03/04
May 26, 2004
. The average time from the Joint Scope meeting (initial meeting. of the City and
Contractor to discuss scope of work) to a Notice to Proceed (docum$nt directing
contractor to commence work) has averaged 26.3 days. With traditional bidding,
the time it has taken to issue a Notic$to Proceed to a contractor following the
execution of the contract books has averaged in excess of 180 days. Thus a.
timesaving of at least 154 days on average.
. There have been no contractor-initiated change orders on any project. Under
JOC the contractor jointly scopes the work with the City and any
misunderstanding or confusion is openly discussed and resolved. If a question
arises during the proposal development the contractor is free to contact the City's
representative and get the appropriate anSW$t5. This non-adversarial relationship
eliminates the underlying cause of most claims and changes.
. There has been no c1elim or any litigation relative to any JOe project.
Based on the results of the eity's JOe program coupled with the high volume of
construction-related projects, the city issued three separate bid solicitations in order to
Increaseth$pool of responsive and responsible contractors that would be ready,willing
and able to.accomplish timely and cost effective construction work.
BID PROCESS
A mandatory pre-bid conference was held on April 8, 2004. The pre-bid conference
was held for the purpose of discussing the JOe concept and the contract documents,
the City's construction program, and bid considerations. . Bidders had to be represented
by a person that would be directly involved in preparing the JOe bid and responsible for
executing the construction work. A total of 21 bidders attended the pre-bid conference.
Prospective bidders were required to subrriita"bidu on all work contained in the unit
price book by quoting a single adjustment factor that would be applied for work
accomplished during normal working hours and a single adjustment factor for work to be
accomplished during other than nonnal working hours. These two adjustment factors
represent the contractor's only adjustment to the prices published In the unit price book
and must include all indirect cost such as overhead, profit, bonds, insurance, design
and contingency costs.
For example, an adjustment factor of 15% would be bid as 1.15. During the execution of
the contract the unit price of a specific construction task is multiplied by the appropriate
adjustmenffactor to obtain the final price to be paid for a specific construction task. JOC
represents a competitively bid, finn fIXed price contract since all the prices and the
adjustment factors are established before the contract is awarded.
All interested bidders were provided a copy of the project Manual and provided with a
Compact Disk containing the following:
. The Unit Price Book containing over 140,000 construction tasks. EaCh task
contains a task description, unit of measurement, and a unit price. EaCh unit
151
Commission Memo
Bids No. 12-03/04, 13-03/04, and 14-03/04
May 26, 2004
price contains locally developed direct costs for material, equipment, and labor.
The construction tasks encompass all aspects of construction work.
. A set of detailed technical specifications for each of the 140,000 construction
tasks. The specification set incorporates the City's own specifications.
. The legal terms and conditions that contain the specific contract language
concerning the execution of the contract, which is standard with all our
construction contract awards.
BID ~ESULTSIDETERMrNATION OF AwAAD
On April 20, 2004, the City received five (5) bids for the Public Works Contract (#12-
03/04). And on April 21 2004, the City received six (6) bids for City Wide Contract (#13-
03/04), and on April 22, 2004, the City received seven (7) bids for the CI P JOC Contract
(#14-03/04). The tabulated results are attached.
The recommended contractors were selected based on the following evaluatloncriteria
which was incorporated into all three invitation for bids:
a. Factor Weights for Determining the LoW Bid Only:
-Type of Work Non Davis Bacon -90%.
-Type of Work Davis Bacon - 10%
-Normal Working Hours - 90%
-Other Than Normal Hours - 10%
-Architectural and Engineering Services - 30%
b. The ability, capacity and skill of the bidder to perform the contract.
c. Whether the bidder performed satisfactory on contracts within the time specified,
without delay or interference.
d. Thecharacter,integrity, reputation, judgment, experience and effiCiency of the
bidder.
e. The quality of performance of previous contracts.
f. The previous and existing compliance by the bidder with lawS and ordinances
relating to the contract.
g. The Management Plan submitted and experience of the contractor astisted in
the questionnaire.
Included within the Project Manual was the City's position in awarding projects under
this contract. All contractors were instructed that it was the City's intention to award at
least one (1) Job Order Contract for each contract number on the basis of the lowest
and best bid. However, the City of Miami Beach reserves the right to award multiple
contracts, if determined to be in the City's best interest. The City will award only one
JOC contract to a single Contractor under this advertisement (i.e., no Contractor will be
awarded more than one (1) JOC contract).
152
Commission Memo
Bids No. 12M03/04, 13-03/04, and 14-03/04
May 26, 2004
In determining a bidder's responsibility and ability to perform the contract, the City
investigated and requested information concerning the financial condition, experience
record, personnel, equipment, facilities, principal business location and organization of
the bidder, the bidder's record with environmental regulations, and the claims/litigation
history of the bidder.
The following are references seClJred by the procurement staff in references to past
project experience:
Aloine Construction. Inc.
Daniel Perez
Perez and Perez Architects
"I have personally known Mr. Alfred Querofor over 20 years, and during this time I have
known him to be a dedicated construction professional always striving for excellence in
his field. Without reservation I recommend him and his company. .
Joe Herrera
SMG/Miami Beach Convention Center
"Vel}' reliable contractor, friendly and on-tJm9. "
Carivon Col'lstruction. Inc.
Roy Martinez
. Miami International Airport
"Carivon construction has provided construction services for Miami International Airport
for the last 2 years. Value and quality are of the up most imporlance to Carlvon
Construction. They are a great asset for any organizf;ltion that may need their services"
Steve Clark
SMG/Miami Beach. Convention center
"Carlvon isa great contractor, reliable and always ready to provide the services needed
on time and budget. "
CW Construction. Inc.
. John Harrison
Harrison Construction Company
"Contractor is vel}' conscientious, high integrity. Would be happy to worle with CW
again. Excellent performance. ".
Buddy Meazaros
Miami-Dade College
"Vel}' good service and workmanShip. Responds well to owners requests and demands.
Would not hesitate to use them again. n
153
Commission Memo
Bids No. 12-03/04, 13-03/04, and 14-03/04
May 26, 2004
F & L Construction. Inc.
Nury Menicucci
City of Miami Beach/CIP
-F&L has a pro-active approach in management and takes pride in their work
(performing good quality work). n
Bruce Lamberto
City of Miami Beach/Property Management . . . .
"F & L has been very responsive to the four projects that I requested they quote on for
us. The immediately came out and met with me to go over proposed work and they did
provide timely estimates when we needed it. n
F .H. Paschen SN Nielsen
Eric Mitchell
San Diego Department of General SerVices
-F.H. Paschen has provided excellent work products on over 8 million dollars of new
and old construction projects. "
Jack Farnan
Metropolitan Water Reclamation District
"F.H. Paschen has worked on the District's JOC program for several years. Theirprices
at'9 competitive and their work is done well. n
H.A.Contractlna. Inc.
HA Contracting, Inc. is an existingJOC Cbntractor With the City. The Procurement staff
has contacted CIP, Public Works,. Property Management and the Convention Center for
I8ferences. All departments have commented that HA Contracting is a good
contractor that has performed well under the existing JOe contract for the City.
Pass International. Inc.
Roberto Smith
Koger Equities
"Pass International has been our preferred general contractor for over 10 yearS and will
continue to do work for us. Their professionalism and dedication to the job at hand is
unsurpassed. I wholeheartedly endorse Pass International as a quality general
contractor. "
Ronald Langlois
Franklin Templeton Companies. LLC
-I have used Pass Constroction for over nine . years and I am very. pleased with the
quality of their work. Pass construction has. gone out of their way to provide the lowest
cost to us without sacrificing quality. They have worked closely with our architect over
the past nine years and have identified a number of design problems that would have
delayed the project. I have been impressed with the honesty of their ownership. It is
nice to do business with an organization that you~ can trust. ..
154
Commission Memo
Bids No. 12-03/04, 13-03/04, and 14-03/04
May 26, 2004
Scope of Work:
Individual Job Orders issued will determine the scope of work under for each project.
Upon receipt of a notice to proceed, .the contractors will furnish all architectural and
engineering services (less than $25K) to support individual job orders,shop drawings,
samples, management, documentation, materials, . supplies, parts (to included system
components), transportation, plant, supervision, labor and equipment needed to perform
the work at designated City properties. .
The contracts will include but not be limited tothefoll()wing construction repair,
renovation, .or new construction projects: Public Works, Capital Improvements Projects,
Facilities and Parks, Parking, the Miami Beach Convention Center, and the Jackie
Gleason Theater of the Performing Arts.
The Public Works Department and the.Capitallmprovements Program (CIP) office will
administer the contracts.
Evaluation:
The contractor will be evaluated on each J()bOrder. Results of the evaluation will
impact the issuance of future job orders.
Contract Price:
The contract price is to include thefumishingof all Jabor, materials, equipment including
tools, services, . obtaining permits, applicable taxes, overhead,architectural and
engineering services, overhead and profit for the completion of each Job Order. The
cost of any item(s) of work not covered by a specific contract unit price shall be treated
as a non pre-priced item.
Each contract will have an initial term of 12 months. . Eaehcontract will include an option
for four (4) additional one-year renewals. Rehewals shall be subject to prior approval of
the City Manager. The Contract duration shall not exceed five (5) years. An option term
may be exercised when the maximum value of $2 million on the Public Works and
Citywide contracts, and $5 million on theCIP contracts is achieved or the eXpiration of
the 12 month term, whIchever is first.
Based on the analysis of the adjustment factors bid and the volume of construction
projects the Administration is recommending the following awards:
Public Works:
CW Construction, Inc.
Citv Wide:
Alpine Construction, Inc.
CIP:
H.A. Contracting, Inc.
Carivon Construction, Inc.
F & L Construction, Inc.
Pass International, Inc.
F.H. Paschen SN Nielsen
155
ColIlmission Memo
Bids No. 12-03/04, 13-03/04, and 14-03/04
May 26, 2004
CONCLUSION
In summary, the JOC system will enable the City to achieve its primary objective of
being able to "more rapidly engage contractors" While lowering costs and strengthening
internal controls. JOC does not replace anyof the existing contracting systems including
program management services. JOC is just an efficient and effective tool for the City to
use in accomplishing its facilities maintenance and construction . program. JOC has
proven to be a system that can offer immediate as well as long-tenn benefits.
The Administration recommends that the .Mayor.and City Commission award contracts
to the following contractors pursuant to Invitation for Bids No. 12-03/04, 13-03/04, and
14-03/04: 1) Alpine Construction,lnc.;2) Carlvon Construction, Inc.; 3) CW
Construction, Inc.; 4) F & L Construction, Inc.; 5) F .H. Paschen SN Nielsen; 6) H.A.
Contracting, Inc.; 7) Pass International, Inc., for capital improvements projects, public
works projects, and other citywide projects whereby funds have been appropriated by
the City Commission; and further authorizing the Mayor and City Clerk to execute all
contractual agreements thereto.
JMG:RCM:FB:TM:GL
T:\AGENDA\2004\May2604\Regular\JOCCommlsslonMemo.doc
156
~
...,
:1
...
l'
'i
~
...,
0'"
~'i
~;:;:;
.~~8
fa .N
.~~~
8iXi~
1:1
157
CD
:2
a.~
()~
~~
,-~
,-
:9-0
CD .-
~CD
CD ~
"0 CD
c:"O
::::J c:
1:)::::J
~1:)
c~
88
alal
"g"O
E~
~al
(lI ~
C:c
.CD (I)
~(I)
CD.Q
> ~
~al
.r:.
I! I!
~o
~a1'
c-E
88
$(1)
~~
I-~
~ t
~
~
..j.
-
1
~.
.....
M
o
,
M
0-
5 ~.
~M
d9~
..s~o
fI) N
.~~~
8~ ~
iiS~
158
. *
*
t
e-
o.
...
5i
!
2
Q.
E
j!
ft
(.)
2;
~
~
g
...
c
o
(.)
...
CI)
'E
o
~
CI)
:2~
-~ 0
~~~
t~
.....::J
_ (V) a.
!~t
-(\;
:29
CON
......~
-CI)"'C
::; "'C .-
-CCO
::J '-
tsCl)
~-g
_... ::J
~Cts
p8g
tV c
~8
;:"E tV
e~-g
tV"E
15~
~tV
IIlC
~m
.r=.Q
. ~ (Q
.llO.r=
ts'-
gfj
~8.g
5l 8
CI) en .
,.....c: :2
1-1-
.. 1:
~
::iE
LL
o
~
u
159
'C I T Y 0 F M I AM I BE A C H
1700 CONVENTION CENTER DRIVE. MIAMI BEACH. FLORIDA 33139
hUp:\\cl. m lami-beach.fl.us
PROCUREMENT DIVISION
Telephone (305} 673-7490
Facslmlls (305) 673-7851
INVITATION TO BID
ADDENDUM NO.3
April 19, 2004
JOB ORDER CONTRACT: ITB 12-03/04 PUBLIC WORKS DEPARTMENT; JOB ORDER
CONTRACT: ITB 13-03/04 CITY WIDE; JOB ORDER CONTRACT: ITB 14-03/04 CAPITAL
IMPROVEMENTS PROJECTS is amended as follows:
I. Questiollsand Answers :
Q: On the bid questionnaire it asks, how many years the organization has been in business while
possessing ore of the licenses (General Contractor). Our company has been operating since
1997 doing business as General Contractors but our current license is dated from 2000 (with a
different qualifier). Do we meet the minimUn1 requirement as stated in the bid documents which
read?
"Only General Contractors with a minimum of five (5) years of General Contracting
construction experience are eligible to submit bids".
A: As long as your company has been in business and licensed as a General Contractor for
five (5) years, your company meets the above stated minimum requirements.
Q: The invitation to bid, for the mentioned projects, states that the bidder must hold a Florida
Certified General Contractor's License. If the work being performed inITB 12-03104 is primarily
for sitelciviVutility type projects, why is it necessary for the bidder to hold a valid Florida Certified
General Contractor's License? Will a contractor holding an engineering license be allowed to bid
on the project?
A: A Florida Certified General Contractor's License is necessary because of the complexity
and diversity of the projects that will be performed under this contract. A contractor
holding an engineering license will not be allowed to perform under this contract; only
contractors who have a State of Florida Certified General Contractor's License will be
allowed to perform under this contract.
Page 2
Addend1lltl 3
II. The attached page 136 of the Project MimuaI has been amended, please discard original page
in the Project Manual and replace with attached page.
Bidders are required to acknowledf!e receipt ofthis Addendum or the bid mav
be considered non~responsive.
CITY OF MIAMI BEACH
r~'
Gus Lopez, CPPO
Procurement Director
rm
PROJECT MANUAL
ARTICLE6 ECONOMIC PRICE AOJUSiMENT. (APPLlCAaLE TO THE
OPTION PERIODS ONLY)
6.1. This Article . provides a mealls to adjust the Contractor's Adjustment Factors on
an allnual basis bv mutual aareement of the contractina parties from the date
of the Contract award. The actual neaotiated escalation/de-escalation will not
exceed as measured by the Construction Cost Index (CCI) published in the ENR
(formally known as Engineering News Record) calculated for the U.S. Twenty
(20) City Index.
6.2. The "original Adjustment Factors" are those Adjustment Factors submitted with
the Contractor's Bid that remain in effect for a one year period beginlling with the
date of Contract award. Providing the Contract is still in effect, the Contractor's
Adjustment Factors shall be neaotiated at each allnual anniversary date of the
Contract award (Le. in beginning of month 13. 25, 37 and 49 of the Contract).
m
.....
6i CCI iRdioOG Ol~pld~IiSAgdRH~RtAl~i TAe "~OlSOyeiar" fer tRO ,H;ltpglieS gf tRis
p~,'isieR is tAli 12 meRtR per-igd pRer tli tR9 C9RtRilGt a"Ja~ 1'RO "baGo yoar
iRdex" is detolmiRli'il ~~. sldmmiJ;1ij tRO. mORtRI)' CCI iRsi'iloS eeijiRRiRg "'itR tAe
meRt!;JfiFier te t!;Jo ^"'a~ IiIatefer eas!;J9f tRe 12 R:leRtRs .9f t!;Jo "~ase )'oar" aRd
ai"iaiR9 by 12 TRli ~sldlt is theQ"orage eel fer the "sase year."
i 1 TAO"eeJ;1tFaGt ~'liar" is tRe 12 meAtR peRes fell9>"iRij t!;Je iRitial CORttQGtQ!'Ja~.
1'RO "eoRtraGt :/elilr iRaox" is aster.miRoa ~y swmmiAij tRo meAthl)' CCI iRaiso& fer
tRO iRitial 12 meRtR SORvaGt poriea aAda"i"jaiRij S)' 12 1'Ro ~swlt is tRO a"OFa~e
CCI fer tAO "seRtraGt year"
i Ii 1'AO lieeAemis PFiee^ ajldstmoAt fer mORt!;Js .1121 ef the C'eRtmetisaoter.miReil
br iliviaiRij tRe "eeRtFaGt yoar iRilex" ~). tRO "saso yoar iAlilell" ne CeRtFaGter's
^sjustmoRt paGlsr;s fer meRt!;Js 13 21eftho C'oRtralilt aFeaotelmiROa b)'
m\;lltifil:;iRg tAe IiseAemis PRse ^Qj\;lstmeRt S)' the "eFigiRal AajldstmQAt pastors"
ne iseRemis PRse .~Qj\;lstmeRt fer meRths 25 3G, 37 48, rmlil 4Q Gg "'ill so
ealliwlatelil iR OlR ilileRtieal maRAeF. slililiR9 tAli ":lear iRlileH" aRd tRe "seJ;1tRilst ~'ear
iRdex" 12 mOJ;1tRli fe~"a~.
6.6 ^ II. tRe. ase"e sompl;/tati9Rs. sAall be earrielil. tgfi"e (5). deeimar filiaeos aAQ t!;JeR
feldRa9a te feldr (1) aeGimOlllilases . ReldJ;11i1iRij 9f RwmserG sAall be aesomfililiRea
~y iRsreasiRg tRe feWRA aeeimal plass if the fiftR aeGimal is e'llolal to fh~ sr
greater If tRS fiftR aesiR:lal filase is 9'1.lldal tgfelolr erlesll,tAe fSt.lRR aesimalliRall
l'emaiR WRsROlRsea.
ARTICLE 7 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
7.1. The CITY is not required to furnish drawings or additional specifications for
Job Orders issued under this contract. The CITY may, however, choose to
Page 136
City of Miami Beach
CopyIlghl02004 Tho Gadl.. Group
March 2004
CITY 0 F M I AM I B E AC H
1700 CONVENTION CENTER DRIVE, MIAMI BEACH, FLORIDA 33139
http:\\cl.mlaml-beach.fl.us
P~OCUREMENT DIVISION
Telephone (305) 673-7490
Facsimile (305) 673-7851
INVITATION TO BID
ADDENDUM NO.2
April 12,2004
JOB ORDER CONTRACf: ITB 12-03/04 PlJBLIC WORKS J)EP ARTMENT;JOBORDER
CONTRACf: ITB 13-03/04 CITY WIDE; JOB ORDER CONTRACf: ITB 14-03/04
CAPITAL JM1lROVEMENTS PROJECfS is amended as follows:
I. Clarifications:
1. A bid guaranty is REOUlRED to be submitted with your bid response, and the amounts are
as follows:
- ITB 12-03/04 Public Works Departmefit . $25,000
- ITB 13-03/04 - City Wide - $25,000
- ITB 14-03/04 - Capital Improvement Projects- $50,000
2. Correct line 4, of Bid Fonn 2, to read as follows:
- 4. Multiply Line 3 by :2160 (.90x.80 x.30).............................
Attached are amended Bid Form 2, for all three projects, discard originals in the
Project Manual and replace with attached amended pages.
3. Deadline for receipt of questions for all three projects have been changed to 5:00PM
on Thursday, April 15, 2004.
. Bidders are required .to acknowledee receiut of this Addendum or the bid may
be considered non-responsive.
CITY OF MIAMI BEACH
/) A'"
~_/./"
(. t:::'--
Gus Lopez, CPPO
Procurement Director
rm
BID FORM 2
COMBINE:D ADJUSTMENT FACTOR WORKSHEET
FOR CONTRACT NUMBER ITB 12-03/04 CITYWIDE
For the purposes of determining the low bid the Contractor shall complete the
following worksheet.
(Specify to four (4) decimal places).
1. Normal Working Hours Construction Adjustment Factor ........................
2. Multiply Line 1 by .5040 (.90 x.ao x.70) .....................................................
3. Normal Working Hours Construction Adjustment Factor with
Architectural and Engineering Services......................................................
4. Multiply Line 3 by .2160 (.90 x.SO x.30)......................................................
5. Other Than Normal Working Hours Construction Adjustment Factor....
6. Multiply Line 5 by .1260 (.90 x.20 x.70). .....................................................
7. other Than Normal Working Hours Construction Adjustment Factor
with Architectural and Engineering Services ..........;..................................
8. Multiply line 7 by .0540 (.90 x.20 x.30) .......................................................
9. Normal Working Hours Construction using Davis Bacon Wages...........
10 Multiply Line 9 by .0560 (.10 x ,80 x.70) ....................................................
11. Normal Working Hours Con~truction using Davis Bacon Wages with
Architectural and Engineering Services .....................................................
12 Multiply Une 11 by .0240 (.10 x .80 x.30) .................................................
13 Other Than Normal Working Hours Construction using Davis Bacon...
14. Multiply line 13 by .0140 (.10 x .20 x.70)....................................................
15 other Than Normal Working Hours Construction using Davis Bacon with
Architectural and Engineering .Services......................................................
16. Multiply line 15 by .0060 (.10 x .20 x.30) ....................................................
17. Add lines 2+4+6+8+10+12+14+16 ....................................................~.........
(Combined Adjustment Factor)
BID FORM 2
COMBINED ADJUSTMENT FACTOR WORKSHEET
FOR CONTRACT NUMBER ITB 13-03/04 PUBLIC WORKS DEPARTMENT
For the purposes of determining the low bid the Contractor shall complete the
following worksheet.
(Specify to four (4) decimal places).
1. Normal Working Hours Construction Adjustment Factor ........................
2. Multiply Une 1 by .5040 (.90 x.80x.70) .....................................................
3. Normal Working Hours Construction Adjustment Factor with
Architectural.and Engineering Services ......................................................
4. Multiply Une 3 by .2160 (.90 x.80 x.30)......................................................
5. Other Than Normal Working Hours Construction Adjustment Factor....
6. . Multiply Une 5 by .1260 (.90 x.20 x.70). .....................................................
7. Other Than Normal Working Hours Construction Adjustment Factor
with Architectural and Engineering Services ............................................. __~
8. Multiply line 7 by .0540 (.90 x.20 x.30) .......................................................
9. Normal Working Hours Construction uSing DaVis Bacon Wages...........
10 MUltiply Une 9 by .0560 (.10 x .80 x.70) ....................................................
11. Normal Working Hours Construction using DaVis Bacon Wages with
Architectural and Engineering Services ..................................................... __
12 Multiply Une 11 by .0240 (.10 x .80 x.30) .................................................__
13 Other Than Normal Working Hours Construction using Davis Bacon...
14. Multiply line 13 bY .0140 (.10 x .20 x.70) ....................................................
15 Other Than Normal Working Hours Construction using Davis Bacon with
Architectural and Engineering Services......................................................
16. Multiply line 15 by .0060 (.10 x .20 x.30) ....................................................
17. Add lines 2+4+6+8+1 0+12+14+16........~.....................................................
(Combined Adjustment Factor)
BID FORM 2
COMBINED ADJUStMENT FACTORWORKSHEET
FOR CONTRACT NUMBER ITB 14.03/04 CAPITAL IMPROVEMENT
PROJECTS
. .
For the purposes of determining the low bid the Contractor shall complete the
following worksheet.
(Specify to four (4) decimal places).
1. Normal Working Hours Construction Adjustment Factor ........................ __
2. Multiply Line 1 by .5040 (.90 x;80 x.70) .....................................................
3. Normal Working Hours Construction Adjustment Factor with
Architectural and Engineering Services..,...................................................
4. Multiply Line 3 by .2160 (.90 x.ao x.30) ......................................................
5. Other Than Normal Working Hours Construction Adjustment Factor....__
6. Multiply Line 5 by .1260 (.90 x.20 x.70). .....................................................
7. Other Than Normal Working Hours Construction Adjustment Factor
with Architectural and Engineering Services .............................................
8. Multiply line 7 by .0540 (.90 x.20 x.30) .......................................................
9. Normal Workirg Hours Construction USing Davis Bacon Wages...........
10 Multiply Line 9 by .0560 (.10 x ,ao x.70) ....................................................__
11. Normal Working Hours Construction using Davis Bacon Wages with
Architectural and Engineering Services .....................................................
12 Multiply Line 11 by .0240 (.10 x .80 x.30) .................................................
13 Other Than Normal Working Hours Construction using Davis Bacon...
14. Multiply line 13 by .0140 (.10 x .20 x.70) ...................................................,
15 Other Than Normal Working Hours Construction using Davis Bacon with
Architectural and Engineering Services......................................................
16. Multiply line 15 by .0060 (.10 x .20 x.30) ....................................................
17. Add lines 2+4+6+8+10+12+14+16.....,..;......................................................
(Combined Adjustment Factor)
CITY OF MIAMI BEACH
1700 CONVENTION CENTER DRIVE. MIAMI BEACH. FLORIDA 33139
http:\\cl.mlaml-beach.fl.us
PROCUREMENT DIVISION
Telephone (305) '673-7490
Facsimile (305) 673-7851
INVITATION TO BID
ADDENDUM NO.1
March 31, 2004
JOB ORDER CONTRACT: ITB 12-03/04 PUBLIC WORKS DEPAllTMENT;JOBORDER
CONTRACf: ITB 13-03/04 CITY WIDE; JOB ORDER CONTRACT: ITB 14-03/04
CAPITAL IMPROVEMENTS PROJECTS is amended as follows:
I. The Mandatory Pre-Bid Conference that was advertised in Volume 1 - Project Manulll of the
CD has been amended as fonows:
A Mandatory Pre-Bid Conference has been schedllIed for 9:30 A.M., April 8th, 2004, at the
City of Miami Beach Convention Center, 4th Floor Executive Offices ConfereJice Room
located at, 1900 Convention Center Drive, Miami Beach, FL 33139. Intending Bidders must
attend the Mandatory Pre -Bid Conference. The Mandatory Pre -Bid Conference is held for the
purpose of discussing the JOC concept and the Contract Documents, the City's construction
program, and bid considerations. Bidders must be represented by a person that will be directly
involved preparing the JOC bid and responsible for executing the construction work. Any
Bidder submitting a bid and who was not represented and signed in at the Mandatory Pre -Bid
Conference may be deemed non-responsive.
Bidders are 'required .to acknowledlZe' receipt of this Addendum or the bid may
be considered non-responsive.
CITY OF MIAMI BEACH
~~ '"
,~/,/
. .::>-
Gus Lopez, CPPO
Procurement Director
rm
~:. THE GOROIA~ GROlJPilll
.
.~'
Pr'ojel::t Manual
INVITATION TO BID ..................................................................................................1
00200 DEFIN ITIONS ........ ..... ...... ..... ........... .......... ..... ......... ............. ...... ...6
00300 INSTRUCTIONS TO BIDDERS....................................................14
1. General: ........ ......... ........... ............. ............... ...,.. .............. ............14
2. Examination of Contract Documents: ...........................................14
3. Submission of a Bid:......................................................................14
4. Scope of Work: .............................................................................14
5. Job Order Contract Overview: ......................................................15
6. Contract Documents:....................................................................16
7. Location of Work: .........................................................................17
8. Abbreviations and Symbols: .........................................................17
9. Pre-Bid Interpretations: ................................................................18
10. Submitting Bids: ............................................................................18
11. Printed Form of Bid: ......................................................................18
12. Bid Guaranty: ................................................................................18
13. Acceptance or Rejection of Bids:..................................................19
14. Determination of Award: ...............................................................19
15. Evaluation: .....;........ ........ .............. ......... ........ ....... ..;.............. .........20
16. Contract Price:.... ...... ..... .... ............. .......... ...... ....... ....... ........ ...... ...20
17. Postponement of Date for Presenting and Opening of
Bids: ... ..... ..... ........ ........... ... ...... ....... ..... ..... ...... ................ ...... .......20
Qualifications of Bidders: ..... ...... ... .............. ...... ................ ..... ...... ..20
Addenda and Modifications: .........................................................20
Prevailing Wage Rates: ..;.....;.......................................................21
BIDfTENDER FORM .......... ........... ...... ........ ........ ...... ..... ... ....... ....22
CITY OF MIAMI BEACH LICENSES' PERMITS AND FEES .......25
FORM OF BID.......... ..... ................................ .................... ....... ....26
SUPPLEMENT TO BIDfTENDER FORM - QUESTIONNAIRE ....41
SUPPLEMENT TO BIDITENDER FORM - NON-COLLUSION
CERTIFiCATE...... ...... ....... ..... ........ ...... ........... ........... ......... ..... ....47
SUPPLEMENT TO BIDITENDER FORM - DRUG FREE
WORKPLACE CERTIFICATION ..................................................48
SUPPLEMENT TO BIDITENDER FORM-TRENCH SAFETY ACT
.....................................................................................................50
RECYCLED CONTENT INFORMATION .....................................51
CONTRACT .................................................................................52
FORM CERTIFICATE OF INSURANCE ......................................64
FORM OF PERFORMANCE BOND.............................................65
FORM OF PAYMENT BOND .......................................................68
CERTIFICATE AS TO CORPORATE PRINCIPAL.......................70
00400
00405
00407
00500
00520
00530
00540
00500
00600
00708
00710
00720
00721
18.
19.
20.
. -
TABLE OF CONTENTS
City of Miami Beach
copyright 0 2004 The Gordian Group
Page i
...~/............................../.
~
Project Manual
.",~.
00735
00800
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
PERFORMANCE AND PAYMENT GUARANTY FORM.............. 71
GENERAL CONDITIONS ............................................................ 73
Project Manual: ... ... ....... ...... .., ..... ..... ......... .......... ....... .......... ........ 73
Intention of City: ...........................................................................74
Preliminary Matters: ..................................................................... 74
Performance Bond and Payment Bond: ...................................... 74
Qualification of Surety:................................................................. 75
Indemnification:............................................................................ 76
Insurance Requirements:.. .................. .......... ......... ................ ...... 77
Labor and Materials: .................................................................... 79
Royalties and Patents: ................................................................. 80
Weather: ... ..... ...... ............. ......... .... .................... ..... ......... ............80
Permits, Licenses and Impact Fees: ............................................ 80
Resolution of Disputes: ................................................................81
Inspection of Work: ..............,....................................................... 82
Superintendence and Supervision: ........;~.................................... 83
CITY's Right to Terminate Contract: ............................................ 84
CONTRACTOR's Right to Stop Work or Terminate
Contract: ........ .... .... ... ............................ ............... ........ ........ ........ 86
Assignment: ... .... ......... ...... ....... ............. ........... .... .... ....... ............. 86
Rights of Various Interests:.......................................................... 86
Differing Site Conditions: ............................................................. 86
Plans and Working Drawings: ......................................................87
CONTRACTOR to Check Plans, Specifications and Data:.......... 88
CONTRACTOR's Responsibility for Damages and Accidents: ....88
Warranty: ... .......... ....... .............. ..... ......... ...... ... ................ ......... ... 88
Supplementary Drawings:........................................,................... 89
Defective Work: ...... .... .............. ....... ....... ......... ................. ........... 89
Taxes: ........ ............ .....,............. ..... ........ .......... ............... ............. 90
Subcontracts:............................................................................... 90
Separate Contracts:.. ..... ...... ......... ........ ............... .................. ...... 94
Use of Completed Portions: ......................;..................................94
Lands for Work: ...........................................................................95
Legal Restrictions and Traffic Provisions: ....................................96
Location and Damage to Existing Facilities, Equipment or Utilities:
.....................................................................................................96
Value Engineering: . .................. ....... ................. ................. ....... ....97
Continuing the Work: ................................................................... 97
Changes in the Work or Terms of Contract Documents: .............97
Field Orders and Supplemental Instructions: ............................... 98
Change Orders: ........ ....... ........ ...... ........... ........ ........... ................ 98
Value of Change Order Work: ,.................................................... 99
Notification and Claim for Change of Contract Time: ................... 99
City of Miami Beach
copyright <<> 2004 The Gordian Group
March 2004
.
~
-:~";
Project Manual
00900
00923
00925
00926
00930
01000
02000
40.
42.
43.
43.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
No Damages for Delay: ...;..........................................................100
Substantial Completion: .............................................................102
No Interest.................................................................................103
Shop Drawings and Samples: ....................................................103
Field Layout of the Work and Record Drawings: ........................104
As-Built Drawings: ...........;..........................................................105
Safety and Protection: ............... .................................................1 06
Payment by CITY for Tests: .......................................................107
Project Sign: ...............................................................................107
Hurricane Precautions: ...............................................................107
Cleaning Up; CITY'S Right to Clean Up: ....................................107
Removal of Equipment ..............................................................108
Nondiscrimination, Equal Employment Opportunity, and Americans
with Disabilities Act:....................................................................108
. Project Records: .;............;..........................................................1 09
Occupational Health and Safety: ................................................109
Environmental Regulations: .......................................................111
SUPPLEMENTARY CONDITIONS ............................................112
STATEMENT OF COMPLIANCE ...............................................113
CERTIFICATE OF SUBSTANTIAL COMPLETION ....................124
FINAL CERTIFICATE OF PAYMENT ........................................126
FORM OF FINAL RECEIPT .......................................................127
ADDENDA AND MODIFICATIONS............................................129
JOC SUPPLEMENTAL CONDITIONS .......................................133
March 2004
City of Miami Beach
copyright C 2004 Tho Gordian Group
Page III
Project Manual
This Page Intentionally Left Blank
g
~
-:-:;.-
Page Iv
March 2004
City of Miami Beach
copyright C 2004 The Gordian Group
.
Project Manual
C I TYOF M IAMI BEACH
1700 CONVENTION CENTER DRIVE, MIAMI BEACH, FLORIDA 33139
www.miamibeachfl.gov
PROCUREMENT DIVISION
Telephone (305) 613-7490
Facsimile (305) 673-7851
INVITATION TO BID
JOB ORDER CONTRACT; ITS 12..()3/04PUSUCWORKS DEPARTMENT
JOB ORDER CONTRACT;ITB 13-03/04 CITY WIDE
JOB ORDER CONTRACT; ITB 14-03/04 CAPITAL IMPROVEMENTS PROJECTS
NOTICE TO CONTRACTORS
Sealed bids Will be received by the City of Mia.mi Bea.ch Procurement Director, 3rd
Floor, 1700 Convention Center Drive, Miami Beach, Florida 33139, until 3:00 p.m.
local time for Job Order Contracts (hereinafter called JOC) according to the Bid
Table below: Ohly General Contractors with a minimum of five (5) years of General
Contracting construction experience are eligible to submit bids.
The bid dates and contract values for the referenced Job Order Contracts are as
follows:
BID TABLE
. . .
Bid Number Bid Due Maximum Maximum Contract
Date Contract Total Value
ValuefTerm
ITB12-03/04 4/20/04 $2,000,000 $10,000,000
ITB 13-03/04 4/21/04 . $2,000,000 $10,000,000
ITB 14-03/04 4/22/04 . $5,000,000 $25,000,000
March 2004
Page 1
City of Miami Beach
copyright 0 2004 The GordiBll Group
Project Manual
g
.-
-=--
A JOC is a cornpetitive bid resulting in a firm fixed priced indefinite quantity
construction contract pursuant to which the Bidder/Contractor will perform a variety
of work at different project locations. The Scope of Work includes a collection of
detailed repair, construction and demolition tasks with related performance
specifications and pre-established unit prices. The contracts are for the
accomplishment of repair, alteration, modernization, maintenance, rehabilitation,
demolition and construction of infrastructure, buildings, structures, or other real
property. Work is accomplished by means of issuance of a Job Order against the
contract. Under the JOC concept, the Contractor is required to furnish all
management, documentation, labor, materials and equipment needed to perform the
work including architectural and engineering services to support individual Job
Orders.
Each contract will have an initial term of 12 months. At the City's sole discretion,
each contract will include an option for four (4) additional terms. The contract
duration shall not exceed five (5) years. An option term may be exercised when the
maximum value of $2,000,000 for 12-03/04 and 13-03/04 and $5,000,000 for 14-
03/04 is achieved or the expiration of the 12 month term for as listed in the bid table
for each contract number.
The Bidder's for JOB ORDER CONTRACT ITB 12-03/04 PUBLIC WORKS
DEPARTMENT must hold at the time of submitting the Bids, a valid Florida Certified
General Contracting License. The work for this contract will be used primarily for
site/civil/utility type projects.
The Bidder's for JOB ORDER CONTRACT ITB 13-03/04 CITYWIDE must hold, at
the time of submitting the Bid, a valid Florida Certified General Contractor License.
The work for these contacts will be used primarily for renovation and or repair and
minor new construction type projects.
The Bidder's for JOB ORDER CONTRACT ITB 14~03/04 CAPITAL IMPROVEMENT
PROJECTS must hold, at the time of submitting the Bid, a valid Florida Certified
General Contractor License. The work for these contacts will be used primarily for
City's Right Away Projects, renovation and or repair and minor new construction
type projects.
If the Bidder is a joint venture, the joint venture itself will be considered a separate
and distinct organization and must be in compliance with all requirements of the
State statutes and the Florida Contracting licensing regulations.
At time, date, and place referenced herein, bids will be publicly opened. Any bids
received after time and date specified will be retumed to the Bidder unopened. The
Page 2
City of Miami Beach
copyright C 2004 The Gordial Group
March 2004
.~
u...
:'~
~
Project Manual
responsibility for submitting a bid before the stated time and date is solely and
strictly the responsibility of the Bidder. The City is not responsible for delays caused
by mail, courier service, including U.S. Mail, or any other occurrence.
Page 3
.
....~'..:.
Project Manual
A Mandatory Pre-Bid Conference has been scheduled for 9:30 A.M., April 8th,
2004, at the Miami Beach Convention Center, 4th Floor Conference
Room, 1900 Convention Center Drive, Miami Beach, FL 33139. Intending Bidders
rnust attend the Mandatory Pre-Bid Conference. The Mandatory Pre-Bid
Conference is held for the purpose of discussing the JOC concept and the
Contract Documents, the City's construction program, and bid considerations.
Bidders must be represented bya person that will be directly involved
preparing the JOC bid and responsible for executing the construction work.
Any Bidder submitting a bid and who was not represented and signed in at the
Mandatory Pre-Bid Conference may be deemed non-responsive.
A Bid Bond will not be required for this contract. The successful bidder will be
required to fumish an initial Performance and Payment Bonds, each in the amount of
$2,000,000.
The bid package will be available March 30th ,2004, and can be ordered or picked up
at the City of Miami Beach, City Hall, Procurement Division, 1700 Convention Center
Drive, Miami Beach Florida 33139. The cost for these bid documents is $100.00.
Checks or money orders should be made payable to City of Miami Beach. The
Bidder may also purchase the Bid Documents the day of the Pre-bid Conference.
Bid Documents will be available on CD-ROM. Volume I the Project Manual and
Volume II the Construction Task Catalog will also be included as a paper copy.
The contact person for this Bid is the Procurement Director. The Procurement
Director may be contacted by phone: 305-673-7495; fax: 305-673-7851; or e-mail:
guslopez@miamibeachfl.gov. Oral cOmmunication between a bidder, lobbyist or
consultant and the Procurement Director is limited to matters of process or
procedures. Request for additional information or clarifications must be made in
writing ,to the Procurement Director, with a copy to the City Clerk, no later than 10
calendar days prior to the Bid Opening.
The City will issue replies to inquiries and any other corrections or amendments it
deems necessary in written addenda issued prior to the deadline for responding to
the Bid. Bidders should not rely on representations, statements, or explanations
other than those made in this Bid or in any written addendum to this Bid. Bidders
should verify with the Procurement Division prior to submitting a Bid that all addenda '
have been received.
The City of Miami Beach reserves the right to accept any proposal or bid deemed to
be in the best interest of the City of Miami Beach, or waive any informality in any
proposal or bid. The City of Miami Beach may reject any and all proposals or bids.
City of Miami Beach
copyrlghtO 2004 The Gordian Group
March 2004
Page 4
tb
-..
Project Manual
It is the current intention of the City of Miami Beach to award at least one (1) Job
Order Contract for each contract number under this solicitation on the basis of the
lowest and best bid. However the City of Miami Beach reserves the right to award
multiple contracts, if determined to be in the City's best interest. Such multiple
awards shall not affect the Maximum Contract Total Value, as stated above, for each
contract awarded. The City of Miami Beach will award only one JOC contract to a
single Contractor under this advertisement (I.e., no Contractor will be awarded more
than one (1) JOC contract).
YOU ARE HEREBY ADVISED THAT THIS INVITATION TO BID IS SUBJECT To
THE .CONE OF SILENCE, "IN ACCORDANCE WITH ORDINANCE 99 -3164 AS
AMENDED. A COPY OF ALL WRITTEN COMMUNICATION(S) REGARDING THIS
BID MUST BE FILED WITH THE CITY CLERK.
YOU ARE HEREBY ADVISED THAT THIS INVITATION TO BID IS SUBJECT TO
THE "CODE OF BUSINESS ETHICS", ("CODE") IN ACCORDANCE WITH
RESOLUTION NO. 2000-23879.
YOU ARE HEREBY ADVISED THAT THIS INVITATION TO BID IS SUBJECT TO
THE CITY OF MIAMI BEACH DEBARMENT ORDINANCE NO. 2000-3234.
YOU ARE HEREBY ADVISED THAT THIS INVITATION TO BID IS SUBJECT BID
SOLICITATION PROTEST ORDINANCE NO. 2002-3344.
Detailed representation of all these ordinances can be found on the City of Miami
Beach Website at http://www.miamibeachfl.gov/newcity/depts/purchase/bidintro.asp
City of Miami Beach
copyright 0 2004 The Gordiwl Group
CITY OF MIAMI BEACH
Gus Lopez, CPPO, CPPB
Procurement Director
Page 5
..~..............................<.
EW
Project Manual
-=-
00200 DEFINITIONS
1. Definitions: When ever the following terms or pronouns in place of them
appear in the Project Manual, the intent and meaning shall be interpreted as
follows:
1.1. ACCEPTANCE: Shall mean that construction on an individual Job
Order is Substantially Completed in accordance with the Contract
Documents including all punch lists items. At the time of acceptance,
a Certificate of Completion will be issued and the Final Certificate of
Payment will be processed. All warranties and guarantees for
completed work shall commence at Final Completion. The date of
acceptance will be selby the CITY.
1.2. ADDENDUM or ADDENDA: Shall mean the additional Contract .
provisions issued in writing by the Contract Administrator prior to the
receipt of bids.
1.3. ADJUSTMENT FACTORS: The Contractor's competitively bid price
adjustment to the unit prices as published in the Construction Task
Catalog. Contractors must bid 2 sets of adjustment factors; one set
for work accomplished during normal working hours and for work
accomplished during other than normal working hours with and
without architectural and engineering services. The second set of
adjustment factors for work accomplished during normal working
hours using Davis Bacon Wages and for work accomplished during
other than normal working hours using Davis Bacon Wages with and
without architectural and engineering services. The adjustment
factors must be expressed as an increase or decrease from the
published prices.
1.4. ADVERTISEMENT: Shall mean the publicly placed Advertisement
For Bid inviting Bidders to submit a Bid. The term "Solicitation" may
be interchangeably used with the term Advertisement.
1.5. AGREEMENT: Shall mean the document duly signed by the
. Contractor and the City, binding both parties to the terms of the
Contract Documents.
1.6. BIDDER: Any individual, firrtl, or corporation submitting a bid for this
Project, acting directly or through a duly authorized representative.
1.7. CHANGE ORDER: A written document ordering a change in the
Contract Price or Contract Time or a material change in the Work.
1.8. CITY: The City (or Owner) shall mean the City of Miami Beach, a
Florida municipal corporation, having its principal offices at 1700
Convention Center Drive, Miami Beach, Florida 33139, which is a
Page 6
City of Miami Beach
copyright 0 2004 The Gordian Group
March 2004
. .......~.................................................
~
~-
~
Project Manual
1.9.
1.10.
1.11.
1.12.
1.13.
1.14.
1.15.
U6.
party hereto and/orwhichthis Contract is to be performed. In all
respects hereunder, for performance is pursuant to City's position as
the owner of a construction project. In the event City exercises its
regulatory authority as a governmental body, the exercise of such
regulatory authority and the enforcement of any rules, regulations,
laws and ordinances shall be deemed to have occurred pursuant to
City's regulatory authority as a governmental body and shall not be
attributable in any manner to City as a party to this Contract.
CITY COMMISSION: City Commission shall mean the goveming
and legislative body of the City.
CITY MANAGER: City Manager shall mean the Chief Administrative
Officer of the City.
CLAIM: Shall mean a right existing on behalf of any person that
might develop into a lien in favor of the claimant if such right existed
against any person or entity other than a public body.
CONSTRUCTION TASK GAT ALOG: Shall mean the comprehensive
listing of specific construction or construction related tasks together
with a specific unit of measurement and a unit price. (Also referred to
as the "CTC").
CONSULTANT: Architect or Engineer who has contracted with City
or who is an employee of City, to provide professional services for
various Projects. Whenever the term .Consultant" is used in these
documents, it shall be construed to mean the Consultant, through the
Program Manager. The Program Manager may on a project by
project determination act as the City's representative.
CONTRACT: The part or section of the Contract Documents
addressing some of the rights and duties of the parties hereto,
including but not limited to contract time and liquidated damages.
CONTRACT ADMINISTRATOR: The City's Contract Administrator
shall mean the individual appointed by the City Manager who shall be
the City's authorized representative to coordinate, direct, and review
on behalf of the City, all matters related to Job Order Contracts.
CONTRACT DOCUMENTS: The Project Manual including, the
Notice for Bids, Addenda,if any, to the Project Manual, the Bid
Tender Form, the record of the award by the City Commission, the
Performance Bond and Payment Bond, the Notice of Award, the
Notice(s) to Proceed, Change Orders, Field Orders, Supplemental
Instructions, JOC Supplemental Conditions, Job Orders and any
additional documents the submission of which is required by this
City of Miami Beach
copyright 0 2004 lhe GordlErl Group
Page 7
Project Manual
.
1.17.
1.18.
1.19.
1.20.
1.21.
1.22.
1.23.
1.24.
Project Manual, are the documents which are collectively refetred to
as the Contract Documents. The Contact Documents consist of the
follow Volumes:
Volume I, Project Manual.
Volume lIa, Book 1 of 3, Construction Task Catalog.
Volume lib, Book 2 of 3, Construction Task Catalog.
Volume ilia, aook 1 of 3, Technical Specifications.
Volume IIIb, Book 2 of 3, Technical Specifications.
Volume IIIc, Book 3 of 3, Technical Specifications.
CONTRACT PRICE: The original adjUstment factors established in
the bid submittal and awarded by the City.
CONTRACT TIME: Unless otherwise ptovided, the Contract Time is
the period of time, measured in calendar days, allotted in the RFP for
the Substantial Completion of the individual Job Order.
CONTRACTOR: The person, firm, or Corporation with whom the City
has contracted and who is responsible for the acceptable
performance of the Work and for the payment of all legal debts
pertaining to the Wotk. All references in the Contract Documents to
third parties under contract or control of Contractor shall also be
deemed to be a reference to Contractor.
DAYS: Shall mean calendar days.
DETAILED SCOPE OF WORK: Shall be determined by individual
Job Orders issued hereunder. The Detailed Scope of Work is the
complete description of services to be provided by the Contractor
under an individual Job Order. The Detailed Scope of Work will
include sufficient documentation for a given project as determined by
City. Documentation may include a narrative description of the work,
partial architectural documents or full architectural documents
depending on the complexity of the specific project.
EMERGENCY: Shall mean such situations as shall require
immediate action preventing Contractor from contacting City prior to
execution.
FIELD ORDER: A written order which ordel'S minor changes in the
Work but which does not involve a change in the Contract Price or
Contract Time.
FINAL COMPLETION: The date certified by the City or progtam
Manager in the Final Certificate of Payment upon which all conditions
Page 8
City of Miami Beach
copyright 0 2004 The Gordian Group
March 2004
---=-
.
Project Manual
and requirements of any permits and regulatory agencies have been
satisfied; any documents required by the Contract Documents have
been received by the City or Program Manager; any other documents
required to be provided by Contractor have been received by the City
or Program Manager; and to the best of the City's or Program
Manager's knowledge, information and belief the Work defined herein
has been fully completed in accordance with the terms and
conditions of the Contract Docurnents.
1.25. INSPECtOR: An authOrized representative of the City or Prograrn
Manager assigned. to make necessary inspections of materials
furnished by Contractor and of the work performed by Contractor.
1.26. . JOB ORDER: The portion of the Contract Docurnents that sets forth .
the Detailed Scope of Work, the schedule, and a firm fixed lump sum
price to be paid to the Contractor. It also consists of any special
conditions that might apply to a specific Job Order such as Liquidated
Damages and technical submittals, plans and drawings, the Notice to
Proceed, and other documents required by the City.
1.27. JOB ORDER COMPLETION TIME: Shall mean the period of time
allotted for the Contractor to achieve Final Completion of a Job
Order.
1.28. JOB ORDER CONTRACT: Shall mean a cornpetitivelyawarded,
indefinite quantity contract for accomplishing construction and
construction related services. Work is accomplished through the
issuance of individual Job Orders against the Contract. Each Job
Order issued under the JOC will be a firm fixed priced order for
accomplishing a specific Detailed Scope of Work.
1.29. JOB ORDER PRICE PROPOSAL: Shall mean the Contractor
prepared documents quoting a firm fixed price and schedule for the
competition of a specific Detailed Scope of Work as requested by
City. The Proposal might also contain approved drawings, permits or
other such documentation as the City might require for a specific Job
Order.
1.30. JOINT SCOPE or JOINT SCOPING: Shall mean the joint activity
that takes place at the Site with the City and or Program Manager
and the Contractor wherein a proposed Job is discussed and
examined, and the framework of the Detailed Scope of Work is
developed.
1.31. LAW or LAWS: Shall mean the Constitution of the State of Florida, a
statute of the United States or of the State of Florida, a local law of
March 2004 City of Miami Beach
copyright C 2004 The Gordian Group
.
~
-=-
.. Project Manual
the City of Miami Beach or County of Miami-Dade, and any other
ordinance, rule or regulation having the force of Law.
1.32. MATERIALS: Materials incorporated in this Project, or used or
consumed in the performance of the Work.
1.33. MATERIALMEN: Shall mean any person, firm or corporation, other
than employees of the Contractor, who or which contracts with the
Contractor, or any. Subcontractor to fabricate or deliver, or who
actually fabricates or delivers, plant materials or equipment to be
incorporated in the Work.
1.34. MAXIMUM CONTRACT TERM VALUE: Shall mean the maximum
dollar value of Work that can be ordered under this Contract during
any single term of the Contract.
1.35. MAXIMUM CONTRACT TOTAL VALUE: Shall mean the maximum
dollar value of Work that can be ordered under this Contract during
the entire duration of the Contract.
1.36. MEANS AND METHODS OF CONSTRUCTION: Shall mean the
labor, materials in temporary structures, tools, plant, and,
construction equipment, and the manner and time of their use,
necessary to accomplish the result intended by a Job Order.
1.37. MINIMUM CONTRACT VALUE: Shall mean the minimum dollar
value of Work that can be ordered during the duration of the
Contract.
1.38. NON PRE-PRICED TASKS: Shall refer to work tasks required to
perform individual Job Orders that are not included in the
Construction Task Catalog but within the general scope and intent of
this Contract. Such work requirements shall be incorporated into
and made a part of this Contract for the Job Order to which they
pertain, and may be incorporated into the Construction Task Catalog,
if determined appropriate by the City. Non pre-priced work
requirements shall be separately identified and submitted in the Job
Order Price Proposal.
1.39. NORMAL WORKING HOURS: Shall mean the hours of 8:00 AM to
5:00 PM Monday through Friday except Holidays.
1.40. NOTICE(S) TO PROCEED: Written notice to Contractor authbrizing
the commencement of Job Orders.
1.41. OTHER CONTRACTORS: Shall mean any person, firm or
corporation with whom a Contract has been made by City for the
Page 10 March 2004
..i.lfiii\.. .................... . ..................
~
.-,~---
project Manual
performance of any work Which is not a portion of work covered
under this Contract.
1.42. OtHER THAN NORMAL WORKING HOURS: Shall mean the hours
of 5:01 PM to 7:59 AM Monday through Friday and any time
Saturday, Sunday, and Holidays. City holidays are as follows: New
Years Day, Martin Luther King Day, the designated Spring Holiday,
Memorial Day, Independence Day, Labor Day, Veterans Day,
Thanksgiving Day, .the designated Christmas Holiday, Christmas
Day. The Contractor will not normally be permitted to work on City
holidays. Work required other than during the aforementioned
working period will be at the City direction and/or and require City's .
approval prior to commencement of work activities.
1.43. PLANS AND/OR DRAWINGS: The official graphic representations
as needed on each Job Order to represent or supplement the
Detailed Scope of Work.
1.44. PRE-PRICED TASK: Shall mean a task included in the Construction
Task Catalog for Which a Unit Price has been established.
1.45. PROGRAM MANAGER: An authorized representative contracted by
the City who may be assigned individual JOC projects. This
individual designated by the City as being responsible for managing,
supervision and acceptance of Job Orders.
1.46. PROGRESS SCHEDULE: Shall mean a bar chart submitted by the
Contractor and subject to approval by the City showing the overall
Job Completion Time and subdivided for each critical operation
therein.
1.47. PROJECT: The construction project as described in the Job Order.
1.48. PROJECT INITIATION DATE: The date as specified in the Job
Order Notice to Proceed upon which time commences for completion
of the Job Order.
1.49. PROJECT MANUAL: The official documents setting forth bidding
information and requirements; contract form, bonds, and certificates;
General and Supplementary Conditions of the Contract Documents.
1.50. PROJECT COORDINATOR: Shall -mean the individual assigned by
the City as being responsible for managing, supervision and
acceptance of Job Orders
1.51. PROVIDE or FURNISH: Uniess specifically noted otherwise, shall
mean supply and install complete and ready for operation and use.
City of Miami Beach
copVright 0 2004 The Gordian Group
Page 11
March 2004
Project Manual
.
~
1.52.
1.53.
1.54.
1.55.
1.56.
1.57.
1.58.
1.59.
1.60.
1.61.
PUNCH LIST: Shall mean a compilation of items that have not been
completed in accordance with an individual Job Order.
REQUEST FOR PROPOSAL (RFP): Shall mean the Document
issued by the City that formally requests the Contractor to prepare a
Job Order Price Proposal for a Detailed Scope of Work.
RESIDENT PROJECT REPRESENTATIVE: An authorized
representative of Consultant or Program Manager assigned to
represent Consultant or Program Manager on the Project.
SAMPLES: Shall mean the physical examples submitted by the
Contractor of materials, equipment or Workmanship to establish a
standard that the Contractor is required to meet.
SHOP DRAWINGS: Shall mean drawings, diagrams, illustrations,
schedules, test data, calculations, performance charts, cuts,
brochures, al"ld other data which are prepared by the Contractor and
which illustrate a portion of the Work.
SITE: Shall mean the area UPOl"l or in which the Contractor's
operations are carried on; and such other areas adjacent thereto as
may be designated as such by the Project Coordinator and or
Program Manager.
SPECIFICATIONS: Shall mean all of the definitions, instructions,
descriptions, directions, requirements, provisions and standards (and
all written supplements thereto) pertaining to the methods, (or
manner) of performing and actual performance of the Work, or
quantities and quality (as shown by test records) of accepted
materials to be furnished under this Contract, as hereinafter detailed
and designated in the Contract Documents. Specifications for this
contract include Volume Ilia, IIIb, IIIc, South Florida Building Code
and standard City of Miami Beach Specifications.
STATE: Shall mean the State of Florida.
SUBCONTRACTOR: A person, firm or corporation having a direct
contract with Contractor including one who furnishes material worked
to a special design according to the Contract Documents, but does
not include one who merely furnishes Materials not so worked.
SUBSTANTIAL COMPLETION: The date certified by the City and or
Program Manager when all conditions and requirements of permits
and regulatory agencies have been satisfied and the Work is
sufficiently complete in accordance with the Contract Documents so
the Project is available for beneficial occupancy by City. A Certificate
of Occupancy or Certificate of Completion must be issued for
Page 12
March 2004
...~..........................
~
>,'~.-
Project Manual
1.62.
1.63.
1.64.
1.65.
1.66.
Substantial Completion to be achieved, however, the issuance of a
Certificate of Occupancy 01' Certificate of Completion or the date
thereof are not to be detel'minative of the achievement or date of
Substantial Completion.
SUPERINTENDENT: Shall mean the supervising representative of
the Contractor who is present on the work site at all times during
progress, authorized to receive and fulfill instructions from and
communicate with City, ahd capable of superintending the work
efficiently. The Superintendent shall not actually perform the physical
tasks involved unless otherwise waived in writing by City.
SURETY: The surety company or individual which is bound by the
performance bond and payment bond with and for CONTRACTOR
who is primarily liable, and which surety company or individual is
responsible for Contractor's satisfactory performance of the work
under the contract and for the payment of all debts pertaining thereto
in accordance with Section 255.05, Florida Statutes.
UNIT PRICE: Shall mean the price published in the Construction
Task Catalog for a specific construction or construction related task.
The unit prices are fixed for the duration of the Contract. Each unit
price is comprised of the Labor, Equipment and Materials costs to
accomplish that specific task.
WAGE DECISION: Shall mean the applicable federal wage
determination provided by the City as issued by the U.S. Department
of Labor.
WORK: The construction and services required by the Contract
Documents, whether completed or partially completed, and includes
all other labor, materials, equipment and services provided or to be
provided by Contractor to fulfill Contractor's obligations. The Work
may constitute the whole or a part of the Project.
March 2004
City of Miami Beach
copyright 0 2004 The Gordian Group
Page 13
.
Project Manual
~....
00300 INSTRUCTIONS 1'0 BIDDERS
1. General:
1.1 The following instructiohS and those set forth herein are given for the
purpose of guiding Bidders in properly preparing their bids. Such
instructions have equal force and weight with other portions of the
Contract Documents and strict compliance is required with all the
provisions contained in the instructions
2. Examination of Contract Documents:
It is the responsibility of each Bidder before submitting a Bid, to:
2.1. Examine the Contract Documents thoroughly.
2.2. Take into account Federal, State and local (City and Miami-Dade
County) laws, regulations, ordinances that may affect costs,
progress, performance, furnishing of the Work, or award.
2.3. Carefully review the Contract Documents and notify the City of all
conflicts, errors or discrepancies in the Contract Documents, of which
Bidder knows or reasonably should have known.
3. Submission of a Bid:
3.1. The submissiOn of a Bid shall constitute an incontrovertible
representation by Bidder that Bidder has complied with the above
requirements and that without exception, the Bid is premised upon
performing and furnishing the Work required by the Contract
Documents and that the Contract Documents are sufficient in scope
and detail to indicate and convey understanding of all terms and
conditions for performance and furnishing of the Work.
4. scope of Work:
4.1. The Scope of work under this Contract shall be determined by
individual Job Orders issued hereunder. Upon receipt of a Notice to
Proceed, the Contractor shall furnishes all architectural and
engineering services to support individual Job Orders, shop
drawings, samples, management, documentation, materials,
supplies, parts (to included system components), transportation,
plant, supervision, labor and equipment needed to perform the work
. at designated City properties.
4.2. The Contracts will be for the following:
Page 14
City of Miami Beach
copyright 4) 2004 The Gordian Group
March 2004
.
"-"
Project Manual
JOB ORDER CONTRACT ITB 12-03/04 PUBLIC WORKS
DEPARTMENT
The Contract may be used to perform any work on facilities
under the jurisdiction of the City but is to be used primarily
for site/civil/utility type projects under the jurisdiction of the
Public Works Department.
JOB ORDER CONTRACT ITB 13-03/04 CITYWIDE
The Contract may be used to perform any work on facilities
under the jurisdiction of the City but is to be used primarily
for work for renovation and or repair and minor new
Construction and can be used City wide.
JOB ORDER CONTRACT ITB 14-03/04 CAPITAL
IMPROVEMENT PROJECTS
The Contract may be used toperforrn any work on facilities
under the jurisdiction of the City but is to be used primarily
for work for renovation, right away projects, streetscapes,
and or repair and minor new construction under the
jurisdiction of Capital Improvement Projects.
4.2.4 The City reserves the right to award multiple JOC
Contracts for .. the same Department. The City also
reserves the right to assign individual Job Orders to other
JOC Contractors for that Department.
5. Job Order Contract Overview:
5.1. A Job Order Contact (JOC) is a competitively bid, firm-fixed-price
indefinite-quantity contract. It includes a collection of detailed repair
and construction tasks and specifications that have established unit
prices. It is placed with a Contractor for the accomplishment of
repair, alteration, modernization, rehabilitation, construction, etc., of
buildings, structures, or other real property. Ordering is accomplished
by means of issuance of a Job Order against the Contract.
5.2. Under the JOC concept, the Contractor furnishes management,
labor, materials, equipment and architectural and engineering
services required to document the scope of work to support individual
Job Orders.
5.3. The JOC contract includes a Construction Task Catalog (CTC). The
CTC was developed by the City and is based on the use of
experienced .Iabor .and high quality materials. The CTC also
incorporates local activity, climate and geographic features.
4.2.1.
4.2.2.
4.2.3.
City of Miami Beach
copyright C 2004 The Gordian Group
Page 15
PrC)ject Manual
g
.-
...---:=-
5.4. Bidder will offer two (:2) sets of adjustment factors that will be applied
against the prices set forth in the Construction Task Catalog (CTC).
One set will be for work when Davis Bacon Wage decisions will not
apply for construction performed during normal or other than normal
working hours with and without Architectural and Engineering
Services. The second set will be for work when Davis Bacon Wage
Decisions do apply for construction performed during normal or other
than normal hours with and without Architectural and Engineering
Services. These adjustment factors will be used to price individual
scopes of work by multiplying the adjustment factor by the unit prices
and quantities. These sets of adjustment factors will be proposed
separately. The CTC and the Contractor's adjustment factors will be
incorporated in the award of the contract.
5.5. As work requirements are identified, the scope of work will be
explained to the Contractor at a Joint Scope Meeting. The
Contractor will be given a Request For Proposal and a Detailed
Scope of Work. The Contractor will be required to review the
Detailed Scope of Work and develop a Price Proposal using the
appropriate tasks, quantities and the applicable adjustment factor. If
the Contractor's Proposal is found reasonable and acceptable, a Job
Order may be issued. The resulting price shall be a lump sum, fixed
price for the completion of the Detailed Scope of Work.
5.6. The JOCconcept also includes a provision for the establishment of
prices for work requirements that are within the general scope of
work but were not included in the CTC at the time of Contract award.
These tasks are referred to as "Non Pre-priced Items.. Non Pre-
priced (NPP) items may require the establishment of specifications
and drawings and may subsequently be incorporated into the CTC.
6. Contract Documents:
6.1. The Contract Documents constituting component parts of this
Contract are the following:
Volume I,ProjectManual.
Volume lIa, Book 1 of 3, Constrl.lction Task Catalog.
Volume lib, Book 2 of 3, Construction Task Catalog.
Volume ilia, Book 1 of 3, Technical Specifications.
Volumelllb, Book 2 of 3, TeChnical Specifications.
Volume IIIc,BoOk 3 of 3, Technical Specifications.
Page 16
City of Miami Beach
copyright 0 20041he Gordian Group
March 2004
.
project Manual
."-
~
6.2. Volume I JOC project Manual: The JOC Project Manual contains
bidding information. and requirements, contract forms, bonds and
certificates, General Conditions and JOC Supplemental Conditions of
the Contract Documents.
6.3. Construction Task Catalog (CTC), (Volume lIa, and lib): The CTC
contains pricing information for the work to be accomplished and for
the unit of measure specified. It consists of CSI divisions 1 through
16.
6.4. The Technical Specifications (Volume ilia, IIIb and IIIc): The
Technical Specifications are numbered and organized in the
Construction Specification. Institute's (CSI) master format. All
specifications are filed in divisions 1 through 16 per CSI guidelines.
The intent of these specifications is to furnish concise industry and
commercial standards for maintenance or repair of City facilities.
6.5. Other documentS and standards referenced in the Contract
Documents. Whenever standards or specifications of other agencies
or departments, authorities, etc. are referred to, they shall be the
version in effect at the time of receiving price proposals, unless the
date of a specific version is contained in the reference.
6.6. Design and Specification References:
6.6.1. Florida Department of Transportation Standards (Latest
Edition)
6.6.2. Metro-Dade Design and Construction Standard
Specification & Details
6.6.3. Standard Plans for Pubic Works (American Work
Association)
6.6.4. GreenbookStandard Specification (American Work
Association)
6.6.5. City of Miami Beach General ROW Program Design
Policies February 2004 as amended.
6.6.6. Master Specifications Outlines
7. Location of Work:
7.1. All Work will be within the City limits of Miami Beach and individual
projects will assigned as determined by the City.
8. Abbreviations and Symbols:
City of Miami Beach
copyright 0 2004 The Gordian Group
Page 17
Pr()jecf Manual
........~.........................................................
.fL.U
:,--,~
8.1. The abbreviations used throughout the Contract Documents are
defined hereinafter in the Technical Specifications.
9. Pre-Bid Interpretations:
9.1. Only questions answered by written Addenda will be binding. Oral
and other interpretations or clarifications will be without legal effect.
All questions about the meaning or intent of the Contract Documents
are to be directed to the City's Procurement Director in writing.
Interpretatiohs or clarifications considered necessary by the City's
Procurement Director in response to such questions will be issued by
City by means of Addenda mailed or delivered to all parties recorded
by the City's Procurement Director as having received the Bidding
Documents. Written questions. should be received no less than ten
(10) calendar days prior to the date of the opening of Bids. There
shall be no obligation on the part of City or the City's Procurement
Director to respond to questions received less than ten (10) calendar
days prior to bid opening.
10. Submitting Bids:
10.1. All Bids must be received in the Procurement Division, City of Miami
Beach, 1700 Convention Center Drive, Third Floor, Miami Beach,
Florida 33139, before the time and date specified for Bid opening,
enclosed in a sealed envelope, legibly marked on the outside. A
complete and separate. Bid package must be submitted for each
contract that the Contractor wished to bid:
JOC BID FOR:
BID/ JOC CONTRACT NO:
11. Printed Form of Bid:
11.1. All Bids must be made upon the blank BidlTender Form and Form of
Bid, Form 1 and Form 2 in Article 00407. The Bid must be signed
and acknowledged by the Bidder in accordance with the directions on
the Bid Form.
12. Bid Guaranty:
12.1. A bid bond for contracts 12-03/04 and 13-03(04 is $25,000 and
$50,000 for contract 14-03/04. Each bid must be accompanied by a
certified check of the Bidder, or by a bid bond prepared on the form
of bid bond annexed hereto, duly executed by the Bidder as principal,
Page 18
City of Miami Beach
copyright 0 2004 The Gordian Group
March 2004
.
.':~,
Project Manual
and having as surety thereon a surety company authorized to do
business in the State of Florida and approved by the City. SuCh
checks or bid bonds shall be returned to all bidders not receiving the
award after the City and the accepted Bidder have executed the
Contract. Or, if no Contract has been executed, within one hundred
eighty days (180) days after the opening of bids, upon demand of the
Bidder at any time thereafter so long as such Bidder has not been
notified of the acceptance of suCh bid.
13. Acceptance or Rejection of Bids:
13.1 . The City reserves the rightto reject any or all bids prior to award.
Reasonable efforts will be made to either award the Contract or reject
all bids within one hundred eighty (180) calendar days after bid
opening date. A Bidder may not withdraw its bid unilaterally nor
change the Contract Price before the expiration of One hundred
eighty (180) calendar days from the date of Bid opening. A Bidder
may withdraw its Bid after the expiration of one hundred eight (180)
calendar days from the date of Bid opening by delivering written
notice of withdrawal to the Purchasing Division prior to award of the
Contract by the City Commission. The City reserves the right to
award additional contracts under this solicitation if it is determined to
be in the City's best interest for a period of one hundred and eighty
(180) calendar days following the opening of Bids.
14. Determination of Award:
: ..
14.1. The City Commission shall award the contract to the lowest and best
Bidder. A lowest Bid is determined by line 17 on Bid Form 2
contained herein. In determining best, most responsive and
responsible Bid, the following shall be considered:
a. Adjustment Factors to be considered are based on the following.
percentages. For purposes of determining the low bid from Bid
Form 2; 90% of the worn is to be accomplished using non Davis
Bacon wages and 10% of the worn using Davis Bacon Wages.
80% of the work will be accomplished during Normal Working
Hours and 20% will be accomplished during Other Than Normal
Worning Hours. 30% of the work will require Architectural and
Engineering Services.
b. The ability, capacity and skill of the Bidder to perform the
contract.
c. Whether the Bidder performed satisfactory on contracts within
the time specified, without delay or interference.
City of Miami Beach
copyrlgi't <<) 2004 The Gordian Group
Project Manual
'.;#fiiS...,',...............,.,.... "..,....".........,
~
~
~
d. The character, integrity, reputation, judgment, experience and
efficiency of the Bidder.
e. The quality of performance of previous contracts.
f. The previous and existing compliance by the Bidder with laws
and ordinances relating to the contract.
g. The Management Plan submitted and experience of the
contractor as listed in the questionnaire.
15. Evaluation:
15.1. The contractor will be evaluated on each Job Order. Results of the
evaluation will impact the issuaflceof future Job Orders.
16. Contract Price:
16.1. The Contract Price is to include the furnishing of all labor, materials,
equipment including tools, services, obtaining permits, applicable
taxes, overhead, architectural and engineering services, overhead
and profit for the completion of each Job Order. The cost of any
item(s) of Work not covered by a specific Contract unit price shall be
treated as a Non Pre-priced item and the procedure for ordering
these tasks are outlined in Article 12 of the JOC Supplemental
. Conditions.
17. Postponement of Date for Presenting and Opening of Bids:
17.1. The City reserves the right to postpone the date for receipt and
opening of bids and will make a reasonable effort to give at least
seven (7) calendar day's written notice of any such postponement to
each prospective Bidder.
18. Qualifications of Bidders:
18.1. Bids shall be considered only from firms normally engaged in
performing the type of work specified within the Contract Documents.
. Bidder must have adequate organization, facilities, equipment, and
personnel to ensure prompt and efficient service to City.
18.2. In determining a Bidder's responsibility and ability to perform the
Contract, City has the right to investigate and request information
concerning the financial condition, experience record, personnel,
equipment, facilities, principal business location and organization of
the Bidder, the Bidder's record with environmental regulations, and
the claims/litigation history of the Bidder.
19. Addenda and Modifications:
Page 20
City of Miami Beach
copyright 0 2004 The Gordian Group
March 2004
m
~
~
Project Manual
19.1. The City shall make reasonable efforts to issue addenda within seven
(7) calendar days prior to bid opening. All addenda and other
modifications made prior to the time and date of bid opening shall be
issued as separate documents identified as changes to the Project
Manual.
20. PrevailiilgWage Rates:
20.1. This project, either in whole or in part, may be federally assisted,
through the City of Miami Beach Community Development Block
Grant Funds, and as such Bidders must comply with Section 109 of
Title I of the Housing and Community Development Act of 1974, as
amended; the President's Executive Order 11246, as amended by
Executive 11375, which prohibits discrimination in employment
regarding race, color, religion, sex or national origin; Title V1 of the
Civil Rights Act of 1964; the Davis Bacon Act, as amended; the
Copeland (Anti-Kickback) Act; the Contract Work Hours and Safety
Standards Act; and all other applicable Federal, State and local laws
and ordinances.
20.2. Enclosed is the wage decision applicable to. the subject project. It
must be incOrporated into the Contract Documents and displayed at
the Job Site. Davis Bacon wages will only apply for work which is
federally funded and the wage decision will be decided on a project
by project basis.
. 20.3. Weekly payroll reports (WH347or equivalent) are required to be
submitted by the. contractor and subcontractors through the
contractor certifying that all laborers and mechanics engaged in the
construction of the project, including those employed by
subcontractors, have been paid no less than the minimum wage
rates as listed on the enclosed wage decision.
March 2004 Page 21
Project Manusl
..~...................................
~
~
-
-
00400 BIDITENDER FORM
Job Order Contract #: I ~ - ..0 2J /0 f
Submitted:
tf/r4"y
Date
City of Mianii Beach,Florida
1700 Convention Center Drive
Miami Beach, Florida 33139
The undersigned, as Bidder, hereby declares that the only persons interested in this
bid as principal are named herein and that no person other than herein mentioned
has any interest in this bid or in the Contract to be entered into; that this bid is made
without connection with any other person, firm, or parties making a bid; and that it is,
in all respects, made fairly and in good faith without collusion or fraud.
The Bidder further declares that it has examined the Contract Documents and all
addenda thereto furnished before the opening of the bids, as acknowledged below;
and that it has satisfied itself about the Work to be performed; and all other required
information with the bid; and that this bid is submitted voluntarily and willingly.
The Bidder agrees, if this bid is accepted, to contract With the City, a political
subdivision of the State of Florida, pursuant to the terms and conditions of the
Contract Documents and to furnish all necessary materials, equipment, machinery,
tools, apparatus, means of transportation, and all labor necessary to construct and
complete within the time limits specified the Work covered by the Contract
Documents for the Project entitled:
Job Order Contract No:
· }lflo;0
The Bidder also agrees to furnish the required Performance Bond and Payment
Bond or alternative form of security, if permitted by the City, each for not less than
the total bid price, and to furnish the required Certificate(s) of Insurance. The
undersigned further agrees that the bid guaranty accompanying the bid shall be
forfeited if Bidder fails to execute said Contract, or fails to furnish the required
Performance Bond and Payment Bond, or fails to furnish the required Certificate(s)
of Insurance within seven (7) calendar days after being notified of the award of the
Contract.
Page 22
City of Miami Beach
copyright C 2004 The Gordian Group
March 2004
ro
".
-
-
I, ·
Project Manual
In the event of arithmetical errors, the Bidder agrees that these errors are errors
which may be corrected by the City. Acknowledgment is hereby made of the
following addenda (identified by number) received since issuance of the Project
Manual:
Addendum Number
/
~
The Bidder shall acknowledge this bid by signing and completing the spaces
provided below.
Name of Bidder: /../A .&AJJAA I1Nb .. t!.-<)1Lf
CitylStatelZip:
q .s-c.1 0 IV vJ
/nJAm/ .
.
If< ~r hAY i
PJ "?,?) 72-
Telephone No.:
:a O~- 6'CJ J - q:LJ R...
Social Security No.
or Federal Dun and Bradstreet No.: 6'9 - fl. f2 f ;3. J tj. 7
(if applicable) ,
. Bradstreet No.: J J- L// '-1-&:3 5"1)
I. D. No.:
(if applicable)
If a partnership, names and addresses of partners:
City of Miami Beach
c:opyrtgN. 0 2004 The OoIdIan Group
Page 23
Project Manual
"~
..".
, ."
(Sign below if not incorpc>rated)
WITNESSES:
(Signature)
~~
'"
(Sign below if incorporated)
ATTES::r: "
ft'"
/:' ,',/ ,/1 "
.'111.' : ~'., j/ _J ." .,' , "
, it ( it t,"C4U-trlu
(Secretary)
j
CORPORATE: SEAL)
Incorporated under the laws of the State of:
(Type or Print Name of Bidr'.en'
(Type or Print Name Signed Above)
City of Miami Beach
_ 02004 The 000dI0n 0.....,
m
.-
~
Project Manual
00405
CITY OFMIAMt BEACH LICENSES' PERMITS AND FEES
Pursuant to the PUblic Bid Disclosure Act, each license, permit or fee a Contract a
will have to pay the City before or during construction by unit method of all licenses,
permits and fees REQUIRED BY THE CITY AND PAYABLE TO THE CITY by
virtue of this construction as part of the Contract is as follows:
The General Contractor's City of Miami Beach Building Permits. Public Works
Permits and Zoning Permits will be reimbursed by the City for the cost of the Permit
only as a Non Pre-priced task with no marked-ups. The cost for obtaining these
Permits is to be included in the Contractor's Adjustment Factor.
LICENSES, PERMITS AND FEES WHICH MAY BE REQUIRED BY
MIAMI DADE COUNTY THE STATE OF FLORIDA, STATE OR
OTHER ARE NOT INCLUDED IN THE ABOVE LIST. OBTAINING
THESE PERMITS IS THE RESPONSIBILITY OF THE
CONTRACTOR AND WILL BE REIMBURSED BY THE CITY AS A
NON-PREPRICED TASK WITH NO MARK-UPS.
1 Occupational licenses from City of Miami Beach firms will be reqUired
to be submitted within fifteen (15) days of notification of intent to
award.
2 Occupational licenses will be required pursuant to Chapter 205.065
Florida Statutes.
March 2004
~
-
Project Manual
Pages 26 through 35 are blank pages, therefore they are discarded.
Pages 26-35
City of Miami Beach
:::('p~'1 ~Il. {:; :::0::;4 -!1>; GrYI1I.;!r: Crr:'0r::
March 2004
Project Manual
ro..-
......
."
BID FORM 1
SCHEDULE OF PRICES
FOR CONTRACT NUMBERITB 14-03/04 CAPITAL IMPROVEMENT PROJECTS
The .Bidderhereby proposes to furnish all labor, materials,equipment,
transportation, supervision, arChitectural and engineering services, as
.. required, and facilities necessary to complete in a workmanlike manner and in
acco~ance with the Contract Documents, all Job Order Work ordered for the
compensation in accordance with the following sChedule of prices: The
Contractor bids two (2) sets of adjustment factors that will be applied against
the prices set forth in the Construction Task Catalog (CTC). One set will be
for work when Davis Bacon Wage decisions will not apply for construction
performed during normal or other than normal working hours with and without
ArChitectural and Engineering Services. The second set will be for work when
Davis Bacon Wage Decisions do apply for construction performed during
normal or other than normal hours with and without ArChitectural and
Engineering Services. These adjustment factors will be used to price
indi9'idual scopes of work by multiplying the adjustment factor by U-Id unit
prices and quantities. These adjustment factors will be considered for the
Term Period (12 months from date of contract award)
Une 1 Normal Working Hours Construction: Contractor shall perform any or all
functions called for in the Contract Documents and the individual project
Detailed Scope of Work, scheduled during normal working hours in the
quantities specified in individual Job Orders against this contract for the
unit price sum specified in the Construction Task Catalog (CTC) multiplied
times the adjustment factor of:
/rtJV~t?
. (Specify to four (4) decimal places)
Line 2 Normal Working Hours Construction with Architectural and Engineering
Services: Contractor shall perform any or all functions called for in the
Contract Documents and the individual project Detailed Scope of Work,
scheduled during normal working hours in the quantities specified in
individual Job Orders against this contract for the unit price sum specified
City of Miami Beach
copynghI c 2CX)4 The Gofdian Oroup
-
-
..
t.. '.
..lD
"
Project Manual
in the Construction Task Catalog (CTC) multiplied times the adjustment
factor of:
/1 /Mu
. . (Specify to four (4) decimal places)
Line 3 Other Than NormalWorking Hours Construction: Contractor shall perform
any or all functions called for in the Contract Documents and the individual
project Detailed Scope of Work, scheduled during other than normal
~ working hours in the quantities specified in individual Job Orders against
this contract for the unit price sum specified in the Construction Task
Catalog (CTC) multiplied times the adjustment factor of:
J, I fL/J d
(Specify to four (4) decimal places)
line 4 Other Than Normal Working Hours Construction with Architectural and
Engineering Services: Contractor shall perfonn any or all functions called
for in the Contract Documents and the individual project Detailed Scope of
Work, scheduled during other than normal working hours in the quantities
specified in individual Job Ordets against this contract for the unit price
sum specified in the Construction Task Catalog (CTC) multiplied times the
adjustment factor of:
If /%tJO
(Specify to four (4) decimal places)
line 5 Normal Working Hours Construction using Davis Bacon Wages:
Contractor shall perform any or all functions called for in the Contract
Documents and the individual project Detailed Scope of Work, scheduled
during normal working hours in the quantities specified in individual Job
Orders against this contract for the unit price sum specified in the
Construction Task Catalog (CTC) multiplied times the adjustment factor of:
J i IJQt:O.
(Specify to four (4) decimal places)
March 2004
City of Miami Beach
oopynghl 02004 Tho Gotdlan GrOuP
Page 37
ltl,
-
-
."'.. '
#,.
project Manual
Line 6 Normal Working Hours Construction using Davis Bacon Wages with
ArChitectural and Engineering Services: Contractor shall perform any or all
functions called for in the Contract Documents and the individual project
Detailed Scope of Work, scheduled during normal working hours in the
quantities specified in individual Job Orders against this contract for the
unit price sum specified in the Construction Task Catalog (CTC) multiplied
times the adjustment factor of:
.,.
1,//;(.5
(Specify to four (4) decimal places)
Line 7 Other Than Normal Working Hours Construction using Davis Bacon
Wages: Contractor shall. perform any or all functions called for in the
Contract Documents and the individual project Detailed Scope of Work,
scheduled during other than normal working hours in the quantities
specified in individual Job Orders against this contract for the unit price
sum specified in the Construction Task Catalog (CTC) multiplied times the
adjustment factor of:
1,.I.t.)olJ
(Specify to four (4) decimal places)
Line 8 Other Than Normal Working Hours Construction using Davis Bacon
Wages with Architectural and Engineering Service$: Contractor shall
perform any or all functions called for in the Contract Documents and the
individual project Detailed Scope of Work. scheduled during other than
normal working hours in the quantities specified in individual Job Orders
against this contract for the unit price sum specified in the Construction
Task Catalog (CTC) multiplied times the adjustment factor of:
!
/, l/PtJO
(Specify to four (4) decimal places)
Une 9 Combined Adjustment Factor (From Bid Form 2)
jIOg/~
(Specify to four (4) decimal places)
City of Miami Beach
~ 0 2004 The Gordian Q<oup
BID FORM 2
COMBINED ADJUSTMENT FACTOR WORKSHEET
FOR CONTRACT NUMBER ITB 14-03/04 CAPITAL IMPROVEMENT
PROJECTS
For the purposes of determining the low bid the Contractor shall complete the
following worksheet.
(Specify to four (4) decimal places).
Normal Working Hours Construction Adjustment Factor ........................ /; 07j00
Multiply Line 1 by .5040 (.90 x.80 x.70) ..................................................... _ t S-:;' Y 2-
Normal Working Hours Construction Adjustment Factor with
Architectural and Engineering Services ...................................................... .;....L!.l. ~) 0
Multiply Line 3 by .2160 (.90 x.eo x.30) ...................................................... t;;ly /1
Other Than Normal Working Hours Construction Adjustment Factor.... -1, / ::ltJ iJ
Multiply Line 5 by .1260 (.90 x.20 x.70). ..................................................... t 1'1-/1
Other Than Normal Working Hours Construction Adjustment Factor
with Architectural and Engineering Services .............................................
8. Multiply line 7 by .0540 (.90 x.~O x.30) .......................................................
9. Normal Workirg Hours ConstrLJction using Davis Bacon Wages...........
10 Multiply Line 9 by.0560 (.10 x .80 x.70) ....................................................
11. Normal Working Hours Construction using Davis Bacon Wages with
Architectural and Engineering Services ..................................................... J ( /1:<..5
12 Multiply Line 11 by .0240 (.10 x .80 x.30) ................................................. 2-f!.2bJ 7
13 Other Than Normal Working Hours Construction using Davis Bacon... I , /y(JtJ
14. Multiply line 13 by .0140 (.10 x.20 x.70) ..................................................t.lJ/ '" ()
15
1.
2.
3.
4.
5.
6.
7.
If /~()o
, O(?~7
If tJ9.<::' 0
, Oh/~
16.
17.
Other Than Normal Working Hours Construction. using Davis Bacon with
Architectural and Engineering Services...................................................... /, I t,O 0
Multiply line 15 by .0060 (.10 x .20 x.30)........~...........................................1 tJO~ 1
Add lines 2+4+6+8+10+12+14+16.............................................................. J, () flh
(Combined Adjustment Factor)
ltd,
-
-
Project Manual
The Bidder shall complete this Combined Adjustment Factor Worksheet and transfer
the Bid Adjustment Factors. (Line 1. 3. 5, 7. 9, 11, 13. 15) and Final Combined
Adjustment Factor (Line 17) to the space provided on the Bid Form 1 of this
. proposal. The lowest Combined Adjustment Factor will be deemed the lowest bid.
The Owner reserves the right to revise all arithmetic calculations for correctness.
Contractor Name:
~
Authorized Signatur :
Printed Name:
Date: /1- ~? - D Y
Page 40
City of Miami Beach
~ 0 200< the Gooi8n Gwup
March 2004
~.. .
#'.
,lD
-
-
I, · .
Project Manual
00500
SUPPLEMENT TOBIDrrENDER FORM. QUESTIONNAIRE
THIS COMPLETED FORM SHOULD BE SUBMITTED WITH THE BID,
HOWEVER, ANY ADDITIONAL INFORMAnON NOT INCLUDED IN THE
SUBMITTED FORM AS DETERMINED IN THE SOLE DISCRETION OF
...--THE CIlY, SHALL BE SUBMITTED WITHIN SEVEN (7) CALENDAR DAYS
OF THE CITY'S REQUEST.
, QUESTIONNAIRE
The ui'fdersigned authorized representative of the Bidder certifies the truth and
accuracy of all statements and the answers contained herein.
1. How many years has your organization been in business while possessing
one of the licenses, certifications, or registrations specified in the Invitation to
Bid.
License/Certification/Registration
_ ~&e.., 010703
# Years
;2/
1.1 What business are you in? C,eneftA...!' ~.A.f'}12-I}671AJ~)
2.
What is the last project of thiS nature that you have Completed?
[;} tF Arr-ALH/Y> t-AIV
3.
Have you ever failed to complete any work awarded to you? If so, where and
why?
No
3.1. Give owner names, addresses and telephone numbers, and surely
and project names, for all projects for which you have performed
March 2004 City of Miami Beach
<:oPVdghl Cl 2004 The ~n Gtoup
~.~
Project Manual
ll'o.
work, Where your surety has intervened to assist in completion of the
project. . Whether o..r not a d. aim was m.ad. eo.. J~ .
" Ivo
4.
Give names, addresses and telephone . numbers of three individuals,
corp5f8tions, agendes, or institutions for which you have performed work:
4.1 .
(name)
n~ A-rn ..... AJ~
c.~cE . 7:U~~ /YI~ ;J
(address)
(phone #)
4.2.
(name)
(address)
(phone #)
4.3.
(name) (address) (phone #)
5. List the following information concerning all contracts in progress as of the
date of submission of this bid. (In case of ccrventure, list the information for
all co-Venturors.)
NAME OF
PROJECT
OWNER &
PHONE #
TOTAL DATE OF
CONTRACT COMPLETION
VALUE PER CONTRACT
%OF
COMPLETION
TO DATE
:::;Ee-' A-rr /h' -4 /}1rA/Y
(Continue list on insert sheet, if necessary.)
6. Has a representative of the Bidder completely inspected the proposed project
and does the Bidder have a complete plan for its performance?
.,' .'. . ties
Page 42
City of Miami Beach
_02004__0."""
ro
"..-
-
, .'
II,
Project Manual
7.
8.
9.
10.
Will you subcontract any part of this work? If so, give details indudinga list of
the subcontractor(s) that your cornpany anticipates usinQon this contract.
Llec:, -- ~€ e.., A-n-A r_-HfYlF ..A Jtr"
What equipment do you own that is availableJor the work?
fl(1 ~?vin),.} D":,)..}ep ~)(' J
~~ I
" ....
~, at equiPme, nt Wi!:; purchase for the proposed work?
" lVee-cle d
~at equipment will you rent for the proposed work? '
~-Atf'P A..:.4
11.
State the name of your proposed project 'manager and superintendent' and
give details of his or her qualifications and experience in managing similar
work.
Ven'1/S-~
~'It.e. 51!-1L~dl
II J1..o!1fs . II:;)
L' Am
c~e e.- , ' i4 ( J.-J rYIf- A' r<:..
March 2004
City of Miami Beach
""""..... C 200< Tho (lordan Gooup
Page 43
~.~.
I.. '
Project Manual
12. State the true, exact, correct and complete name of the partnership,
corporation or trade name under which. you do business and the address of
the place of business. (If a corporation, state the name of the president and
secretary. If a partnership, state the names of all partners. If a trade name,
state the names of the individuals who do business under the trade name).
12.1. The correct name of the Bidder is
j.j. A _ &AJrEA 6Y7AJr_ &f'-{J
.~
12.2. The business is a (SOle Proprietorship) (Partnership) (Corporation).
(!.~p~l't'r "- h" J"-.->
.
12.3. The address of principal place of business is:
Cf5'fJ 0 I.JL,u If< 1;> ~ I3Ayl
//)/A--rn r Fi "h3i 7 L
12.4. The names of the corporate officers, or partners, or individuals doing
business under a trade name, are as follows:
. . . /V)A-
I
12.5. List all organizations which were predecessors to Bidder or in which
the principals or officers of the Bidde;;7:t prinCipals or officers.
/
12.6. list and describe all bankruptcy petitions (voluntary or involuntary)
which have been filed by or against the Bidder, its parent or
subsidiaries or predeces$ororganizationsduring the past five (5)
years. Indude in the description the disposition of each such petition_
Page 44
City of Miami Beach
copyrM;1tl CI 2004 Tho Go<<San Group
March 2004
.tD
-=-
,..
','.
Project Manual.
12.7.
h
12.8.
12.9.
lVo^,,[ .
List and describe all successful Performance or Payment Bond
claims made to your surety(ies) during the last five (5) years. The list
and descriptions should include claims against the bond of the Bidder
and its predecessor organization(s).
. .AJtJAlf~
List all claims, arbitrations, administrative hearings and lawsuits
brought by or against the Bidder or its predecessor organization(s)
during the last five (5) years. The list shall include all case names;
case, arbitration or hearing identification numbers; the name of the
project over which the dispute arose; a description of the subject
matter of the dispute; and the final outcome of the claim.
NnAlf' _
List and describe all criminal proceedings or hearings concerning
business related offenses in which the Bidder, its principals or
officers or predecessor organizfti9n(s) were defendants.
N!JN[._
March 2004
City of Miami Beach
"""",i!1Il 0 2004 Tho O.<<joo. Group
Page 45
ro.~
-
-
6. '..
#..\
Project Manual
.'
12.10. Has the Bidder, its principals, officers or predecessor organization(s)
been debarred or suspended from bidding by any government during
the last five (5) years? If yes, provide details. /1./0
12.1,!. Under wha conditions does the Bidder request Change Orders?
It-.L A-J'l1!" FiJi!-- C-n"h1.' /- tv/V07noN~
r"l1\)7;e4cr of-. lA..JoAk.... OLpf-~
12.12. What is the Bidders Job Order Contracting or indefinite quantity
contracting experience? If the Bidder has eXperience, provide all
details and the agency you preformed these services for, contact
names and phone numbers and details of what type of work you
performed. If you need additional space please provide it on a
separate page.
~p;.ArrAWYnf)Jr
12.13. Explain your understanding of the Job Order Contrad Program and
how your firm plans on providing the Management to execute the
process from project initiation. throughout close-out. Your
Management Plan should include individuals assigned to this project
. and their responsibility. Provide your Management Plan in a separate
. document with the.. details reques~.
S ~ r:; IlrrltUflYl GAll
Page 46
City of Miami Beach
_ 0 2<J()4 Tho aorn;... """'"
March 2004
ro
I.. '.
Project Manual
00520
SUPPLEMENT TOBIDITENDER FORM - NON-COLLUSION
CERTIFICATE
PRIOR TO AWARD OF THE CONTRACT THIS FORM MUST BE
SUBMITTED FOR BIDDER TO BE DEEMED RESPONSIBLE.
Submi~d this fJJ., day of /Jpn" /
,2004.
The undersigned, as Bidder, dec:lares that the only . persons interested in this
proposal are named herein; that no other person has any interest in this proposal or
in the contract to which this proposal pertains; that this proposal is made without
connection or arrangement with any other person; and that this proposal is in every
respect fair and made in good faith, without collusion or fraud.
The Bidder agrees if this proposal is accepted, to execute an appropriate City of
Miami Beach document for the purpose of establishing afonnal contractual
relationship between the Bidder and the City of Miami Beach, Florida, for the
perfonnance of all requirements to which the Bid pertains.
The Bidder states that this proP9sa.liS basedflponthe documents identified by the
following number: Bid No..-rre pi - 03/0. tJ
. .
IJeNP-'k, /fr!1e}o 1/
PRINTED N E
/j)
t '/2-.[.--'3./ b ~-Il} t
TITLE (IF CORPORATION)
City of Miami Beach
COP'ingtd 0 2004 The Gofdan Group
It}
Project Manual
.-
~
00530
'SUPPLEMEN''' "0 BID/TENDER FORM - DRUG FREE
WORKPLACE CERTIFICATION
f'RIOR to AWARD OF tHE CONTRACT THIS FORM MUSt SE SUBMITTED
FOR BIDDER TO BE DEEMED RESPONSIBLE.
The undersigned Bidder hereby certified that it will provide a drug-free workplace
program by:
(1) Publishing a statement notifying its employees that the unlawful manufacture,
distribution, dispensing, possession, or use of a controlled substance is
prohibited in the offeror's workplace, and specifying the actions that will be
taken against employees for violations of such prohibition;
(2) Establishing a continuing drug-free awarehess program to inform its
employees about:
(i) The danger$ of drug abuse in the workplace;
(Ii) The Bidder's policy of maintaining a drug-free workplace;
(iii) Any available drug counseling, rehabilitation, and employee
assistance programs; arid
(iv) The penalties that may be imposed upon employees for drug abuse
violations occurring in the workplace.
(3) Giving all employees engaged in performance of the Contract a copy of the
statement required by subparagraph (1).
(4) Notifying all employees, in Writing, of the statement required by subparagraph
(1), that as a condition of employment on a covered Contract, the employee
shall:
(i) Abide by the terms of the statement; and
(ii) Notify the employer in writing of the employee's convictiOn under a
criminal drlig statute fora violation occurring in the workplace no later
than five (5) calendar days after such conviction;
(5) Notifying City government in writing within ten (10) calendar days after
receiving notice under subdivision (4) (ii) above, from an employee or
otherwise receiving actual notice of such conviction. The notice shall include
the position title of the employee.
City of Miami Beach
copyrlght C 2004 The Gordian Group
March 2004
~
-
,. '.
Project Manual
(6) Within thirty (30) calendar days after receiving notice under subparagraph (4)
of a conviction, taking one of the following actions with respect to an
employee who is convicted of a drug abuse violation occurring in the
workplace:
(i) Taking appropriate personnel action against such employee, up to
and including tennination; or
(ii) " Requiring such employee to participate satisfactorily in a drug abl:se
-assistance or rehabilitation program approved for such purposes by a
"" federal, state, or local health, law enforcement, or other appropriate
agency; and
,..
(7) Making a good faith effort to maintain a drug-free workplace program through
implementation of subparagraphs (1) tough (6
("
t!-v&f
STATE OF
COUNTY OF
Aor/bft
~. .
!:::::::>-frD~
(Print Vendor Name)
BPJoiegohn~ instrument as acknowte ged betor!, me this .jl. {). day of, - '
20 . by - N I!- . e.1 (; III as -
P/2.-t. $ J ~v (title) of . " t!.~AfT~.c...:r7AU., U)~
(name of person whose signature is being notarized) (name of corporation/company), known to
me to be the person described herein, or who produced
as identification, and who did/did not take an oath.
I""h "".........
: ~ MARY.....".'..."......."
: 1li.~ "'__ CEAVERS .
: =. 1It.~ .......m1ssJon "000187985 :
i \:-tOFl\'~ ExpQW 3/512007 i
: 11'11111\\'1: Bonded through :
i!~.~32-4254) Florfcla N.....~ . - :
......................... --, I"\IIsn.. Inc. :
.......................
(Print Name)
. My commission expires:
-
City of Miami Beach
OOCJ'{rq.t C 2004 The Gordan Group
Project Manual
~-
-=-
~.I. .'
~l' .
.\
00540
SUPPLEMENT TO BIDITf::NbER. FORM-TRENCH SAFETY
ACT
PRIOR TO AWARD OF THE CONtRACT THIS FO~M MUSTSE SUBMITTED
WITH BID FOR SID TO SE DEEMED RESPONSIVE.
BIDDER ACKNOWLEDGES THAT INCLUDED IN THE ADJUStMENT FACTORS
OF THE PROPOSAL ARE COSTS FOR COMPLYING WITH THE FLORIDA
TRENCH SAFETY ACT.
IN .. O~DE~ TO. BE . CONSIDERED RESPONSIVE. . THE . BIDDER MUST
COMPLETE THIS FORM. SIGN AND SUBMIT IT WITH THEIR BID DOCUMENT.
City of Miami Beach
copy_ 0200< The Golda. Qroup
..~............................
~
~
Project Manual
00500
RECYCLED CON,.EN" INFORMATION
In support ofthe Florida Waste Management LaW, Bidders a.re encouraged to supply
with their bid, any information available regarding recycled material content in the
products bid. The City is particularly interested in the type of recycled material used
(such as paper, plastic, glass, metal, etc.); and the percentage of recycled material
contained in the product. The City also requests information regarding any known or
potential material content in the product that may be extracted and recycled after the
product has served its intended purpose.
March 2004
City of Miami Beach
copyright C 2004 The Gordian Group
Page 51
.tn
~
00600
CONTRACT
CONTRACT
THIS IS A CONTRACT, by and between the City of Miami Beach, a
political subdivision of the State of Florida, hereinafter referred to as CITY,
and M.A... COlltractilllCotP.
hereinafter referred to as CONTRACTOR.
WIT N E SSE TH,that CONTRACTOR and CITY, for the
considerations hereinafter named, agree as follows:
ARTICLE 1
SCOPE OF WORK
1.1. The Scope of work under this Contract shall be determined by individual Job
Orders issued hereunder. Upon receipt of a Notice to Proceed, the
CONTRACTOR shall fumishesall architectural and engineering services to
support individual Job Orders, shop drawings, samples, management,
documentation, materials, supplies, parts (to included system components),
transportation, plant, supervision, labor and equipment needed to perform the
work at designated CITY properties.
ARTICLE 2
CONTRACT TIME
2.1. CONTRACTOR shall be instructed to commence the Work by written
instructions in the form of a Standing Order issued by the CITY'S
Procurement Director and a Notice to Proceed issued by the Contract
Administrator. The term of the 12 month contract shall commence on the
date of the Contract, The maximum contract time is no more than 5 years or
when the maximum value of the contract is reached.
2.1.1. Once the Contract is in place, JobOtders will be issued for the
individual Job Orders through Notice to Proceeds. The time for
completion of individual Job Orders will be contained in the Job Order
Notice to Proceed.
Page 52
City of Miami Beach
-copyright e 20C.a1he Gordian Group
March 2004
lb
Project Manual
::"',~-
2.2.
Time is of the essence throughout this Contract. Job Orders shall be
sUbstantially completed within the specified calendar days listed on eaCh
individual Notice to Proceed, and completed and ready for final payment in
accordance with Article 5 within the time specified on each individual Notice
to Proceed.
2.3.
Liquidated Damages (LDs) may be applied to individual Job Orders at the
discretion of the City. The dollaramount(s) relative to LDs are not intended
to be applied as penalties, but rather to be applied as damages to the City for
its inability to obtain full beneficial occupancy and/or use of the Project. LDs
on construction projects other than streets cape or utility proiects are
hereby fixed at $1,000 per day and agreed upon between the parties,
recognizing the impossibility of precisely ascertaining the amount of damages
that will be sustained by the City as a consequence of such delay, and both
parties desiring to obviate any question of dispute concerning the amount of
said damages and the cost and effect of the failure of the Contractor to
complete the project on time.
City of Miami Beach
copyright 0.2004 The GordiEll1 Group
Page 53
Project Manual
.
~
It is estimated that the Construction Management component of City incurred
expense would be based on the recognized rate of 4% of total project cost.
Hence, a $5,000,000 project that has construction duration of 300 working
days would result in a CM cost component of $800 per day. This value would
vary by project and can be established by the Program Team and provided to
the Consultants accordingly.
Loss of Parking Revenue: Ifa))plic~ble. will be incorporated in the Job
Order/Notice to Proceed.
2.4. CITY is authorized to deduct liquidated damages from monies due to
CONTRACTOR for the Work under this Contract or as much thereof as CITY
m~y,in its sole discretion, deem just and reasonable.
2.5. CONTRACTOR shall be responsible for reimbursing CITY, in addition to
liquidated damages, for all costs incurred by the CITY and or Program
Manager in administering the construction of the Project beyond the
completion date specified in each Job Order RFP, plus approved time
extensions. The CITY'S and or Program construction administration costs
shall be pursuant to the contr~ct between CITY and Program Manager, a
copy of which is available upon request of the Contract Administrator. All
such costs shall be deducted from the monies due CONTRACTOR for
performance of Work under this Contract by means of unilateral credit change
orders issued by CITY as costs are incurred by Program Manager and agreed
to by CITY.
ARTICLE 3
THE CONTRACT SUM AND ADJUSTMENT FACTORS
3.1. CITY shall pay to CONTRACTOR for the performance of the Work described
in the Contract Documents. The contract is an indefinite-quantity contract
with no minimum values. The maximum amount that may be ordered under
contract 12-03/04 and contract 13-03/04 is two million dollars ($2,000,000)
per term. The maximum value. of that may be ordered under contract 12-
03/04 and contract 13-03/04 is ten million dollars ($10,000,000). The
maximum amount that may be ordered under contract 14-03/04 is
($5,000,000) per term. The maximum value that may be ordered under this
contract 14-03/04 is twenty five million ($25,000,000).
3.2. Payment shall beat the lum)) sum price stated in the Notice to Proceed for
each Job Order. This price shall be full compensation for all costs, including
overhead and profit, associated with completion of all the work in full
City of Miami Beach
copyright C 2004 The Gordlan Group
March 2004
Page 54
~
Project Manual
conformity with the requirements as stated or shown, or both, in the Contract
Documents using the following adjustment factors:
3.2.1. Normal Working Hours Construction: Contractor shall perforITI any or
all functions called for in the Contract Documents and the individual
project Detailed Scope of Work, scheduled during normal working
hours in the quantities specified in individual Job Orders against this
contract for the unit price sum specified in the Construction Task
Catalog (CTC) multiplied times the adjustment factor of:
1.0400
3.2.2. Normal Working Hours Construction with Architectural and
Engineering Services: Contractor shall perform any or all functions
. called for in the Contract Documents and the individual project
Detailed Scope of Work, scheduled during normal Working hOurs in
the quantities specified in individual Job Orders against this contract
for the unit price sum specified in the Construction Task Catalog
(CTC) multiplied times the adjustment factor of:
1.1200
3.2.3. Other Than Normal Working Hours Construction: Contractor shall
perform any or all functions called for in the Contract Documents and
the individual project Detailed Scope of Work, scheduled during other
than normal working hours in the quantities specified in individual Job
Orders against this contract for the unit price sum speCified in the
Construction Task Catalog (CTC) multiplied times the adjustment
factor of:
1.1200
3.2.4. Other Than Normal Working Hours Construction with Architectural
and Engineering Services: Contractor shall perform any or all
functions called for in the Contract Documents and the individual
project Detailed Scope of Work, scheduled during other than normal
WOrking hours in the quantities. specified in individual Job Orders
against this contract for the unit price sum specified in the
Construction Task Catalog (CTC) multiplied times the adjustment
factor of:
3.2.5. Normal Working Hours Construction using Davis Bacon Wages:
Contractor shall perform any or all functions called for in the Contract
Documents and the individual project Detailed Scope of Work,
scheduled during normal working hours in the quantities specified in
individual Job Orders against this contract for the unit price sum
March 2004
City of Miami Beach
Copyright Q 2004 The Go-dlan GfouP
Page 55
.~
00:;;;;;;:::-
Project Manual
specified in the Construction Task Catalog (CTC) multiplied times the
adjustment factor of:
1.0950
3.2.6. Normal Working Hours Construction using Davis Bacon Wages with
Architectural and Engineering Services: Contractor shall perform any
or all functions called for in the Contract Documents and the
individual project Detailed Scope of Work. scheduled during normal
working hours in the quantities specified in individual Job Orders
against this contract for the unit price sum specified in the
Construction Task Catalog (CTC) multiplied times the adjUstment
factor of:
1.1125
3.2.7. Other Than NorrnalWorking Hours Construction using Davis Babon
Wages: Contractor shall perform any or all functions called for in the
Contract Documents and the individual project Detailed Scope of
Work, scheduled during other than normal working hours in the
quantities specified in individual Job Orders against this contract for
the unit price sum specified in the Construction Task Catalog (CTC)
multiplied times the adjustment factor of:
1.1400
3.2.8. Other Than Normal Working Hours Construction using Davis Bacon
Wages with Architectural and Engineering Services: Contractor shall
perform any or all functions called for in the Contract Documents and
the individual project Detailed Scope of Work, scheduled during other
than normal working hours in the quantities spebified in individual Job
Orders against this contract for the unit price sum specified in the
Construction Task Catalog (CTC) multiplied times the adjustment
factor of:
1.1600
ARTICLE 4
PROGRESS PA YMEN'TS
4.1. For Job Orders of duration of 45 days or less, the City will make only onefirtal
payment. For Job Orders of duration of more than 45 days the contractor
may make Application for Payment for work completed during the Project at
intervals of not more than once a month. Contractor's application shall show
a complete breakdown of the Project components, the quantities completed
City of Miami Beach
copyrlght ~ 2004 The Goldian Group
March 2004
.....~......................................
.u.
-:~'.
Project Manual
and the amount due, together with such supp6rtingevidence as may be
required by CITY. Contractor shall include,. but same shall be limited to, at
City's discretion, with each Application for Payment, an updated progress
schedule acceptable to CITY as required by the Contract Documents and a
release of liens and consent of surety relative to the work which is the subject
of the Application. Each Application for Payment shall be submitted in
triplicate to CITY for approval. CITY shall make payment to contractor within
thirty (30) days after approval by CITY of contractor's Application for Payment
and submission of an acceptable updated progress schedule.
4.2. Ten percent (10%) of all monies earned by contractor shall be retained by
CITY until Final Completion and acceptance by CITY in accordance with
Article 5 hereof, except that after ninety percent (90%) of the Work has been
completed, the Contract Administrator may reduce the retainage to five
percent (5%) of all monies previously earned and all monies eamed
thereafter. . Any reduction in retainage shall be in the sole discretion of the
Contract Adrninistrator, shall be recommended by CITY and CONTRACTOR
shall have no entitlement to a reduction. Any interest earned on retainage
shall accrue to the benefit of CITY. All requests for retainage reduction shall
be in writing in a separate stand alone document.
4.3. CITY may withhold, in whole or in part. payrnent to such extent as rnaybe
necessary to protect itself from loss on account of:
4.3.1. Defective work not remedied.
4.3.2. Claims filed or reasonable evidence indicating probable filing of
claims by other parties against CONTRACTOR or CITY because of
Contractor's performance. .
4.3.3. Failure of CONTRACTOR. to make payments property to
Subcontractors or for material or labor.
4.3.4. Darnagetoanother contractor not remedied.
4.3.5. Liquidated damages and costs incurred by CITY for extended
construction administration .
4.3.6 Failure of CONTRACTOR to provide any and all documents required
by the Contract Documents.
March 2004
Page 57
City of Miami Beach
copyright 0 2004 The Gordian Group
.
~'.
.~.."
project ManuSI
ARTICLE 5
ACCEPTANCE AND FINAL PAYMENT
5.1. Upon receipt of written notice from contractor that the Job Order is ready for
final inspection and acceptance, CITY and or Program Manager shall, within
ten (10) calendar days, make an inspection thereof, If Contract Administrator
find the Work acceptable, the requisite documents have been submitted and
the requirements of the Contract Documents fully satisfied, and all conditions
of the permits and regulatory agencies have been met, a Final Certificate of
Payment (Form 00926) shall be issued by CITY and or Program Manager,
over its signature, stating that the requirements of the Contract Documents
have been performed and the Work is ready for acceptance under the terms
and conditions thereof.
5.2. Before issuance of the Final Certificate for Payment, Contractor shall deliver
to the CITY a complete release of all liens arising out of this Contract, receipts
in full in lieu thereof; an affidavit certifying that all suppliers and
subcontractors have been paid in full and that all other .indebtedness
Connected with the Work has been paid, and a consent of the surety to final
payment; the final corrected as-built drawings: and invoice.
5.3. If, after the Work has been subStantially Completed, full completion thereof is
materially delayed through no fault of contractor, and the CITY so certifies,
CITY shall, upon certificate of the CITY, and without terminating the Contract,
make payment of the balance due for that portion of the Work fully completed
and accepted. Such payment shall be made under the terms and conditions
governing final payment, except that it shall not constitute a waiver of claims.
5.4. Final payrnentshall be made only after the CITY Manager or his designee
has reviewed a written evaluation of the performance of contractor prepared
by the Contract Administrator, and approved the final payment. The
. acceptance of final payment shall constitute a waiver of all claims by
contractor, except those previously made in strict accordance with the
provisions of the General Conditions and identified by contractor as unsettled
at the time of the application for final payment.
Page 58
City of Miami Beach
copyright C 2<XM The Gordlen Group
March 2004
.
----.'.
'--~:.
Project Mallual
AR.TICLE 6
MISCELLANEOUS
6.1. This Contract is part of,and incorporated in, the Contract Documents as
defined herein. Accordingly, all of the documents incorporated by the Contract
Documents shall govern this Project.
6.2. Where there is a cOnflict between any provision set forth within the Contract
Documents and a more stringent state or federal provision which is applicable
to this Project, the more stringent state or federal provision shall prevail.
6.3. Public Entity Grimes:
8.3.1. In accordance with the Public Crimes Act, Section 287.133, Florida
Statutes, a person or affiliate who is a contractor, consultant or other
provider, who has been placed on the convicted vendor list following
a conviction for a public entity crime may not submit a bid on a
contract to provide any goods or services to the CITY, may not
submit a bid on a contract with the CITY for the construction or repair
of a public building or public work, may not submit bids on leases of
real property to the CITY, may not be awarded or perform work as a
contractor, supplier, subcontractor, or consultant under a contract
with the CITY, and may not transact any business with the CITY in
excess of the threshold amount provided in Section 287.017, Florida
Statutes, for category two purchases for a period of 38 months from
the date of being placed on the convicted vendor list. Violation of this
section by Contractor shall result in cancellation of the CITY
purchase and may result in Contractor debarment.
.8.4. Independent Contractor:
6.4.1. Contractor is an independent . contractor under this Contract.
Services provided by Contractor pursuant to this Contract shall be
subject to the supervision of Contractor. In providing such services,
neither Contractor nor its agents shall act as officers, employees, or
agents of the CITY. This Contract shall not constitute or make the
parties a partnership6r joint venture.
8:5. Third Party Beneficiaries:
6.5.1. Neither Contractor nor CITY intend to directly or substantially benefit
a third party by this Contract. Therefore, the parties agree that there
are no third party beneficiaries to this Contract and that no third party
shall be entitled to assert a claim against either of them based upon
this Contract. The parties expressly acknowledge that it is not their
March 2004
City of Miami Beach
copyright 0 2004 Tho Gordian Group
Page 59
.tb
-
-
ProjectNlanual
intent to create any rights or obligations in any third person or entity
underthis Contract.
6.6. Notices:
6.6.1. Whenever either party desires to give notice to the other, such notice
must be in writing,sent by certified United States Mail, postage
prepaid, return receipt requested, or by hand-delivery with a request
for a written receipt of acknowledgment of delivery, addressed to the
party for whom it is intehdedat the place last specified. The place for
giving notice shall remain the same as set forth herein until changed
in writing in the mannerprovided in this section. For the present, the
parties designate the foRewing:
For City:
City of Miami BeachProcorelllent Division
1700 Convention Center Drive
Miami Beaeh, Florida 33139
Artn: Gus Lopez
With copies to:
City Attorney ,
City of Miami Beach
1700 Convention Center Drive
Miami Beach, Florida 33139
For Contractor.
B.A. Contractio2Corp.
9500 NW 12th Street, Bay 1
Miami. Fl. 33172
AUn: Henn Anf!elo In
6.7. Assignment and Performance:
6.7.1. Neither this Contract nor any interest herein shall be assigned;
transferred, or encumbered by either party. In addition, Contractor
shall not subcontract any portion of the work required by this Contract
except as authorized by Section 27 of the General Conditions.
Contractor represents. that .all persons delivering the services
required by this Contract have the knowledge and skills, either by
training, experience,education, or ac6mbination thereof, to
adequately and competently perform the duties, obligations, and
services set forth in the Scope of Work and to provide and perform
such services to City's satisfaction for the agreed compensation.
Page 60 City of Miami Beach March 2004
copyright@ 2004 The- Gordian GrvuP
lb
~
-
Project Manual
6.1.2. Contractor shall perform its duties, obligations, and seNices under
this Contract in a skillful and respectable manner. The quality of
Contractor's performance and all interim and final product(s) provided
to or on behalf of City shall be comparable to the best local and
national standards.
Materiality and Waiver of Breach:
6.8.1. City and Contractor agree that each requirement, duty, and obligation
set forth in these Contract Documents is substantial and important to
the formation of this Contract and, therefore, is a material term
hereof.
6.8.2. City'S failure to enforce any provision of this Contract shall not be
deemed a waiver of such provision or mOdification of this Contract. A
waiver of any breach of a provision of this Contract shall not be
deemed a waiver of any subsequent breach and shall not be
construed to be a modification of the terms of this Contract.
Severance:
6.9.1. In the event a portion of this Contract is found by a court of
competent jurisdiction to be invalid, the rernaining provisions shall
continue to be effective unless City or Contractor elects to tenninate
this Contract. An election to tenninate this Contract based upon this
provision shall be made within seven (7) days after the finding by the
court becomes final.
6.10. Applicable Law and Venue:
6.10.1. This Contract shall be enforceable in Miami-Dade County, Florida,
and if legal action is necessary by either party with respect to the
enforcement of any or all of the tenns or conditions herein exclusive
venue for the enforcement of sarne shall lie in Miami-Dade County,
Florida. By entering into this Contract, CONTRACTOR and CITY
hereby expressly waive any rights either party may have to a
trial by jury of any civil litigation related to, or arising out of the
Project. CONTRACTOR shall specifically bind all sub-
contractors to the provisiol1sof this Contract.
6.1 1 Amendrnents:
6.11.1. No modification, amendment, or alteration in the tenns or conditions
contained herein shall be effective unless contained in a written
document prepared with the same or similar formality as this Contract
and executed by the Board and Contractor.
6.12 Prior Agreernents:
6.8
6.9.
March 2004
City of Miami Beach
copyright 0 2004 The Gordian Group
Page 61
..
...:,~
Project Manual
.6.12.1. This document incorporates and Includes all prior negotiations,
correspondence, conversations, agreements, and understandings
applicable to the matters contained herein and the parties agree that
there are no commitments, agreements or understandings
concerning the subject matter of this Contract that are not contained
in this document. Accordingly, the parties agree that no deviation
from the tern1s hereof shall be predicated upon any prior
representations or agreements, whether oral or written. It is further
agreed that no modification, amendment or alteration in the terms or
conditions contained herein shall be effective unless set forth in
Writing in accordance with Section 6.11 above.
IN WITNESS WHEREOF, the parties have set their hands and seals the day
and year first above written.
nlL1YMJw--
Robert Parcher, City Clerk
APPROVED.AS TO
FORM & LANGUAGE
& FOR EXECUTION
;(~Ufl{/~
Attome~
b- '}.....~- 0''-(
Date
Page 62
City of Miami Beach
copyright C 2004 The Gordian Group
March 2004
ProjeefManual
CONTRACTOR MUST EXECUTE THIS CONTRACT AS INOICATEOBeLOW.
USE CORPORATION OR NON-CORPORATION FORMAT, AS APPLICABLE.
[If incorporated sign below.]
ATTEST:
Corporate Seal)
[If not incorporated sigh below.]
('DIlP.
~'7.a--)
It
CONTRACTOR
(Type Name Signed Above)
day of , 20
CITY REQUIRES FOUR (4) FULL-EXECUTEDCONiAACTS, FOR DISTRIBUTION.
WITNESSES:
(Name)
By
(Signature)
March 2004
Page 63
City of Miami Beach
copyr'.gl'l! e 2004 The Gordian Group
KNOW ALL MEN BY THESE PRESENTS. that we, B.A. Contracting Corp.,
as Principal,herelDafter called the PrlDclpal, aDd Fidelity and Deposit Company of
Maryland
a corporation duly orgaDized DDder the laWS of the State of Maryla:nd,
as Surety, herelDafter called theS;"'ety, are held and firmly bound uto City of Miami Beach
as Obligee, hereinafter caBed the Obligee, in the sum of' Fifty Thousand and Nolllundred
Dollars ($50,000.00)
for the paymeDt ofwhieh sum well aDd truly to be made, the said PrIncipal aDd the said Surety,biad
ourselves, our heirs, executors, administrators, successors aDd asslgus, joiatly aDd severally, firmly
by these preseDts.
WHEREAS, the said Principal has submitted a bid for Job Order Contract: ITB 14-03/04
Capital Improvement Projects
NOW, THEREFORE, if the Obligee shall aceept the bid of the principal aad the Priacipal shall
enter into aCoDtract with the Obligee in aecordance with the terms of such bid, and give sueh boDd
or bonds 85 may be specified iD the biddiDg or CODtract Doeumeats with good aDd safficieat surety
for the faithful performance of such Contract and for the prompt paymeDt of labor and material
furDished ia the prosecution thereof, or iD the event of the failure of the Principal to enter such
Contract aDd give such bond or bonds, if the Principal shall pay to the Obligee the difference Dot to
exceed the penalty hereof between the amoot specified iD said bid aad such larger amOODt for
which the Obligee may in good faith coDtract with another party to perform the Work covered by
said bid, theD this obligation shall be null aDd void, otherwise to remain in full force aad effect.
Signed aad staled this 14111 day of April, 2004
Witnesses:
(-.
t f/. . (l,J
\~0~U-,--l9~" .
By:
R.B. B 'nson, Attorney-In-Fact and
Florida Resident Agent
. . Power Of Attorney
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
KNOW ALL MEN BY THESE PRESENTS: That the FtDEL1TY AND DEPOSIT COMPANY OF MARYLAND, a
corporation of the State of Maryland, by PAUL C. ROGERS, Vice President, and T. E. SMITH, Assistant Secretary, in
pursuance of authority granted by Article VI, Section 2, of the By-Laws of said compii!y, w . set forth on the reverse
side hereof and are hereby certified to be in full force and effect on the date hereof. d s if . nate, constitute and
appoint R. H. BENSON, of Miami Shores, Florida, its true and lawfu -1 - 0 make, execute, seal
and deliver, for, and on its behalf as surety, and as its act and 0 ngs and the execution
of such bonds or undertakings in pursuance of these " ompany, as fully and amply, to
all intents and purposes, as if they had b",~~y ~ n regularly elected officers of the
Company at its office in Baltim~~\HcIr ~~ power of attorney revokes that issued on behalf of
R. H. Benson, date4-!!i! ,i())J '.:::/ U )\jSU".::./
The said Assistant ~ t the extract set forth on the reverse side hereof is a true copy of Article VI,
Section 2, of the By- y, and is now in fOrce.
IN WITNESS OF, the said Vice-President and Assistant Secretary have hereunto subscribed their names and
affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 13th day of August,
A.D. 2003.
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
o:y V~
~
T. E. Smith
By:
Assistant Secretary Paul C. Rogers
Vice President
State of Maryland } SS'
City of Baltimore .
On this 13th day of August, A.D. 2003, before the subscn'ber, a Notary Public of the Stateof Maryland, duly
commissioned and qualified, came PAUL C. ROGERS, Vice President, and T. E. SMITH, Assistant Secretary of the
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers
described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being
by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Company aforesaid,
and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal
and their signatures as such officers were duly affIxed and subscribed to the said instrument by the authority and direction of
the said Corporation.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above
written.
fV/U~J-
DennisR. Hayden Notary Public
My Commission Expires: February 1,2005
B.A. CONTRACTING CORP.
9500 N.\v. 12th Street' Miami, Florida 33172 Mailing Address' P. O. Box 226408' Miami, Florida 33122-6408
Telephone (305) 591-9212 . Fax Line: (305) 591-9630
REFERENCES
AGENCY FIRMINAME
. MIAMI DADE COUNTY PUBLIC SCHOOLS
12525 N.W. 28TH AVE.
MIAMI, FL. 33167
.305-995-4038
CONTACT: FRANCIS HOAR
. AGENCY FIRM/ NAME
W ACKENHUT CORP.
4200 W ACKKENHUT DR
PALM BEACH GARDENS, FL
561-691-6668
CONTACT: CARLOS VALDEZ FAULl
AGENCY FIRM/NAME
SCHOOL BOARD OF BROW ARD COUNTY
600 S.E. 3RD AVE.
FT. LAUDERDALE, FL
954-765-6060
CONTACT: JOE DELILLO
AGENCY FIRM/NAME
MIAMI DADE WATER & SEWER
4200 SALZEDO
CORAL GABLES, FL
305-669-5735
CONTACT: GARY CLARKE
<
AGENCY FIRM/NAME.
SCHOOL DISTRICT OF PALM BEACH
3300 SUMMIT BLVD.
WEST PALM BEACH, FL
561-687-7085
CONTACT: STEVE DAVIS
AGENCY FIRM/NAME
MIAMI DADE COLLEGE
1101 SW 104 STREET
MIAMI, FL
305-237-0586
CONTACT: BUDDY MEAZZROS
AGENCY FIRM/NAME
PALM BEACH COUNTY
3323 BELVEDERE ROAD
WEST PLAM BEACH, FL
561-233-2055
CONTACT:ALLAN DUPEE
AGENCY FIRM/NAME
CITY OF MIAMI BEACH
1700 CONVENTION CENTER DRIVE
MIAMI BEACH, FL
305-673-7490
CONTACT: JOE HERERA
.
i s .~ .!I ~ ! ~ I! ~ I!
I! ! ...
m III III ~ 0 ~
l 0 c 0 " Iii .i
. <'il I <'il ~ ~ 00 .!! ~ ~
'E '2 ~ 'E
5 ~ J ~ .! G G ~ ii
0 3 ~ ;: 0
,11 ,11
.
;F. ;F. ;g ;F. .,. ;F. .,. .,. .,. ;F. .,.
~~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~
~ ~
. . .
.. .. ..
~ H .. .. ~ H ~il ~
J 8 ,g ,g 8 Ii 8
~ = il ~ II =
~ i~ ..~ H .. ~ ..~ U i~
0 I Ii H I
~ IG
ZO: ZO: ZO: 0:0: Z 0:0: ZO:
8 8 0 8 0 ~ ~ 8 0 8 8
0 0 q
~ .. ~ .; '" '" N .. 8 d cO
;;;. 0 ~ ~ 0 l'l 10 lil
oo '" q
. ..: 0 ~ ~ '" ~ N .,; ~ ~ ~
oo (; .. '" ~
" "l " ..
'e: '" <Ii N .. .. .. .; .; N
0
U .. .. .. .. .. ... .. .. ... .. ..
if .. ~ .. .. .. l ~ .. h .. ~
.~ .~ ~ ~ ~ ~ .~ ~~ ,2 ~
> ~ ~ ~ ~ ~ ~ ~ I"' ~ ~
. . z
. J! '" '" N ~ ~ ~ '" N N ~ ~
~ ~ ~ i1: ~ !2
~
..
I "' ~ "' Ji "' ;: ~1R if ;i ~ '" ;: ~'"'"
z~-.:.: ::q!!!: Zti~ z..... Z"'oo _ ""g ~ft~
"'""~ ..""~ l!3""~ "' ,'" oo""~
h ~.~o =",~ ~r i1j... N '~ =;: ~!U ~...:c N '0
toO...l ~ :b ","", iH.. l!3~~ ~"C:i..J l'l~~ ~~:b l!3i!~
::~~ ......~ ~mOO
""- - 8" .J '''';t 8~i -:11" "3""_ ....i!::l .:::E81 8~~
8 ..~ ~ a. -N !~~ 8 -i {!rr. .~ 0.-'"
>...'6q U~ij ~G.it. ~ I~~ 3 .~ GOO
r "'~'" ~ih '" ~g '" ~ "'~ iH~ :J: ~ '" ~ g
.~ ~ Ii .. ~ - ,,1/ .." .!! ' 8 loON .. Ii - -~ i..:
5>E~ I<~ eiil~ .0 ~ ti ~~t; J~h 1:i>&;
E<- ~~~fR ~~Hi ~<~ BUm i!<.... I!<~
"'... ~~~ ~ ~..
u..~R u..~~ ""N'" 00.... u.~~ u..~~
il! ::E ::E ::E ::E ::E ::E ::E ::E ::E ::E ~
g g 9 Q ~ 3 9 ~ ~ Q
8 8 l..>
" C)
1 .
~ ~Q ~ ~ " ~
J 0 I 0 * i 0
i! ~I .., i! i! i!
H 0 -
~ ~ ~ ~
~" t .. ~ ~ j j
.. " "88 "8
j ii~ " "ff. h ! ~ j
.. 0 ;lj" ~\!: '"
is u.. is i *~ ~
~,s ~ ~.t i~t ~J!: u ~ ~ 1
'0 a. ~ ~s ~s
f boO "'" ","0 0.0 ~I "'" j t..
~~ " 3l!-B _a." 8~ "
li nt li i ~~ lill:
"g i S~g "g ,,8 i i~ .8
.. i~ ~![j ~i ~~ " -a li~
oE G .il- l! '" oE oE
~ "']!l J~ ~E eJ!: ~ ~
h sli 18~ i!" h h
" ~8 ~8 ~~ ;; Ii
z ::El..> If.,, l..>81 o.u '" l:l
I
a.
..
"
...
j
g
~
;;
i!
'l!
~
i
a
~
I
.
l
~I
.
J
1:
!
l!:
"
o
U
~t
I~
j
N
..I~
~
!
'~I=
ii:1-
1
i
"
Ii'
~
f
'0
i
..
~
N
Z
".
l'l
. .
I!
8
,~
Ii
o
j
'"
I
.,.
:&
..
jl!
~t
~~
.. 3 3
is !!- 0
8 j,~
. H...
I~!~~~
~ ~..-c
,g
~
o
Ii
'"
J
!:
.,
!2
.....
.,.
'"
N
.
;g
'"
.. . ...
.
~
'"
o.
;::
~
B
J
l;
'S
,11
~
"
o
..l
U
~
~
..
;;;
'"
.~
'C
~
.,
!2
....
;:
z.....
lQu._
~i~
~3 ~
3..,},
",,,g
-!l~..:
,,< ..
l!coC;;
.."'..,
.
~I ~il!l H~
~... =~~ II.!!::!
~~~hii~H~o
!~f~iU~,~~~
<;1/<'>/!l..::!:::!licli....
1:::20"':::1 Er:'.>~:b
2..;;;2 "1Dll':S~o
(f):J:;l/)OCDtLa),()..:l")
::E
g
~
~
11'l
h
,g ~
.gs
a. 8
2;-",
!s
~8
eB
e :s
:io
$R
81
00.
'liu.
I;:
'18
-i~i
0.0
~~i
:&;8
6)
h~
",ou
::E
B
::E
g
"'
..
I
8
l;
o
~
.~
B
'Ii
..
~
'"
e
~
~
.
'Ii
j
..
,f:!
~
.
[!;
'"
.
.
..
" ..
.!iH
H.H
'"
~
8
!i
~
'C
~
..
s
. .
:!:u:: ..... Ie
hiilq~
gi~ ga::ii
~ ~ "'~ If.-, '"
..rea";' :i:3
C:..J:t rJJ.- N
:fit a;,,,,,::t.~
iiit:.N.OO~
.t .....c.....<D..,\
ijj~aH;:;g
::E
g
1'l
g
8
~
~
~
!
2;-
~
Ul-
l:!~
H
'a~
l!8
.,h
~~
-08
..,
o
.,
'Ii
!
'!!
..
~'"
'Os
2;-C!
o~
~
.
S
o
~
.
'if.
g
3
g-
h
U
~
'Ii
>
~
::E
g
~
.
~
"
~
Ii
o
~
j
H
z'"
j
..g
U
.,.
l'l
j
~
~
'if.
Ii:
..
"l!
,38
U
'"
~
::E
g
Cl
'"
l;
>
o
8
q
H
..,
~
8
!i
~
~
~
."
~
~
;: .
z.......: :1;
~ Uo.'-3 ~o
l\I'!!o ~~
~.g :bl~ iiI~
.:::; gl'-, ... ..
3 'Jis~'"
l:~~=-Q.~2
.. ~ .~"l! 3 ~
'0 > fDo ra 'C ~
i!<.....:iZsli>
lL~~~c3tJ):e
:::!
g
~
s
Is
.!!....
3;1;
i1::
G iI
j'~
8",
H
eg
H
E~
8~
g;z
~8
~8
J-.
u~
H
a. 8
~o
~i
~~.
~
.,.
l'l
.
,~
~
m
'"
l;
~
i
j
..,
o
;F.
o
..
~
.
j
J!I
i
a.
.
o
o
~
~
..,
,S
gg
.3
lill!:
".oo
.. .
3~
..~
:::>..
...
..
.
.
.
~
'C
..
>
8
'"
~
!
~
i!l..;
U
'"
t:ii
g .
..e'"
~~ ::t
1.;~
W~'"
in
,,<....
..
.
::E
g
::E
g
.!!
"
J!I
i
"'I-
~~
8'
ul'l
cell:
Ii
'S;ll
l!~
H
'Ii.!!
u><.,
,;,
j
Ii
o
j
"
i1l
I
00
..
U
!:!'I'
E<
"s
~....
. .
D. A.CONTRACTING CORP.
9500 N.\v. 12th Street . Miami. Florida 33172 Mailing Address' P. O. Box 226408 . Miami, Florida 33122-6408
Telephone (305) 591-9212' Fax Line: (305) 591-9630
President
Education
Bachelors in Building Construction
University of Florida 1976
Associates in Arts
Miami Dade Community College 1974
Years of Exnerience
Total 27 years
HACC 20 years
Licenses
Certified General Contractor
State ofFL CGC 010703
Certified Underground Utilities & Excavation
State of Florida cue 056875
Vice President
Education
Miami Dade Community College
Building Construction 1975
Years of Experience
Total 32 years
HACC 19 years
Licenses
CertifiedGenemlContracror
State ofFL (Inactive) CGC 020522
Certified Real Estate
#0435780
Certified Mortgage Broker
#169578
Henry Angelo III
As the founder ofH.A. Contracting
Corp., Mr. Angelo is the driving force
behind the success of the firm. With over.
.27 years of experience in the
construction industry, his experience
ranges from governmental agency work
such as U.S. Army Corp of Engineers &
U.S. Air Force, water treatment
rehabilitation with Miami Dade Water &
Sewer Authority to local municipalities
and public school district. His proven
leadership abilities have lead to a
successful firm.
. Nicholas Angelo
Nicholas is highlydiversified in his
experience in the construction industry.
With numerous years of on hands
experience and a vast range of licenses,
his knowledge ofland development and
construction lends to the firms backbone
of successful completions of
construction management, design build
& restorative/rehabilitation projects. His
primary focus currently is school district
contracts.
B. A.CONTRACTINGCORP.
9500 N.\v. 12th Street. Miami, Florida 33172 Mailing Addr~ss . P. O. Box 226408' Miami, Florida 33122-6408
Telephone (305) 591~9212' Fax Line: (305) 591~9630
Architect
Education
Master of Arts in Architecture
University of Florida 1978
Bachelor if Art In Architecture
University ofFlorida 1976
Years of Exnerience
Total 31 years
. HACC 13 years
Licenses
Certified Building Contractor
State ofFL CBe 028081
Licensed Architect
State ofFL AR 0009309
Architect/Projeet Manager
Education
Master of Science in Building Construction
University of Florida 200 I
Bachelor of Arts in Architecture
University of Zulia 1992
Years ofExnerience
Total 12 years
HACC I year
Licenses
Licensed Architect Venezuela
Affiliations
Associated Builders & Contractors, Inc Member
Venezuelan Civil Engineer Association
Professional Membet
Venezuelan Architect Association
Professional Member
LouisC. Kallinosis
As the on site lead staff architect, Lou is
responsible for overseeing all design
related projects. His experience both
commercial and residential projects
throughout the years gives H.A.
Contracting Corp. a strong foundation
for design related tasks. Supervising a
staff of on site as well as independent
design professionals, combined with his
culmination of experience~, allows Lou
to lead the design efforts to the achieved
goals.
Zorina Montiel
A dedicated and ethical professional in
the field of construction and
architectural design, Zorina brings with
her experience organization, time
effectiveness and the ability to multi task
projects. As a current project manager
for H.A. Contracting Corp., she has a
reputation for building teams to insure
timely, accurate and quality completion
of projects with an architect's insight on
construction & design projects.
. .
D. A. CONTRACTING CORP.
9500 N.\v. 12th Street. Miami, Florida 33172 Mailing Address . P. O. Box 226408' Miami, Florida 33122-6408
Telephone (305) 591-9212 . Fax Line: (305) 591-9630
Contract Manager
Education
Master of Science
University of Miami 1990
Bachelor of Science
University of Miami 1989
Years of Exoerience
Total 6 years
HACC 6 years
Licenses .
Certified General Contractor
State ofFL CGCI504793
Affiliations
Qualifier MAC. Construction, Inc.
State Certified MlWBE flt1D
Contract Coordinator/Comptroller
Education
Master of Administration & Supervision
Florida International University 1984
Bachelor of Education
University of Miami 1975
Years of Exoerience
Total 22 years
HACC 18 years
Affiliations
President M,A.C. Construction, Inc.
State Certified MlWBE firm
Kelli Erbs
As the contract manager for H.A.
. Contracting Corp., Kelli in involved
. with the project administration,
estimating, budgeting & cost control as
well as proposals, contracts, MlWBE
development, subcontractor & crew
management. As a certified general
contractor, Kelli possess the skills to
proficiently manage all projects from
inception to occupancy.
Mary A.Ceavers
Combining her construction experience
. with a business and educational
background, Mary lends over 20 years of
industry knowledge to the company. Her
leadership abilities in the business &
construction profession has been proven
with her involvement in governmental
and educational contracts.
D. A.CONTRACTING CORP.
9500 N.\v. 12th Street. Miami, Florida 33172 Mailing Address · P. O. Box 226408' Miami, Florida 33122-6408
Telephone (305) 591-9212. Fax Line: (305) 591-9630
Plumbing Supervisor
Education
U.S, Air Force
Security Specialist Technical Training 1971
Plumber Joint Apprenticeship
Plumber Local 519
Years ofExoerience .
Total 31 years
HACC 8 years
Licenses
Certified Plumbing Contractor
State of FL CFC057166
Paint Supervisor
Education
. West Virginia State College
2 years
Years of Experience
Total 31 years
HACC 2 years
Chester Webb
With over 30 years of experience from
apprenticeship to licensed plumbing
contractor, Chester adds the plumbing
and mechanical experience to the tam at
H.A. Contracting Corp. Currently the
project manager handling the Miami
Dade Water & Sewer Authority blanket
contract for HACC, Chester's direct
supervision, management and
coordination with owners blends
together the office and on site duties.
Thomas Trimble
Tom's 24 years of experience as a
salesman for Glidden Paint Company
followed by his estimating years in the
field collaborates his ability to estimate,
manage, budget and cost contain projects
of all sizes. Currently his dual role of
estimator and On site supervisor for all
stucco, waterproofmg, paint & finish
projects, provides HACC with an
excellent handle on the construction
projects.
B. A.~ONtRActt~G CORP.
9500 N.\v. 12th Street' Miami, Florida 33172 Mailing Address . P. O. Box 226408' Miami, Florida 33122-6408
Tdephone (305) 591-9212' Fax Line: (305) 591-9630
Construction Supervisor
Education
Associate in Arts
Miami bade Community College
Years Exnerience
Total 22 years
HACC 15 years
Construction SuperVisor
Education
Miami Dade Community College
Building Construction Courses
Years Exneri.ence
TomI18 years
HACC 15 years
Dennis Dara
As a career construction supervisor,
Dennis's vast experience and knowledge
has been in a multitude of project
scopes. From construction of multi level
housing projects renovations, to lift
stations to new construction of bank &
institutional facilities, Dennis has
managed most facets of the industry.
With strong experience in the Job Order
Contracting & educational facility arena, .
Dennis is working with Miami Dade
College and Miami Dade County Public
Schools currently.
Xavier Sansaricq..
Xavier's starts as a painter & project
foreman has lead him through many
years of exposure in the construction
industry. As a construction supervisor
with HACC over the last 5 years,
Xavier's strengths have been his ability
to balance the field and office
supervision & duties. Currently running
. the School District of Palm Beach
County Portable relocations contract, the
School District ofBroward County's
Relocatable Buildings contract and the
Palm Beach County JOC Contract,
Xavier manages subcontractors, crew,
architects and engineers directly.
Bilingual, he is able to provide effective
communication to those associated with
projects at all levels.
. H.A.CONTRACTINGCORP.
9500 N.\v. 12th Street' Miami, Florida 33172 . Mailing Address . P. O. Box 226408' Miami, Florida 33122-6408
Telephone (305) 591-9212' Fax Line: (305) 591-9630
Field Supervisor
Larry Smith
Years Experience
Tota132 yeatS
HACC 16 yeatS
An experience supervisor with on site
management, Larry has supervised entire
operations for major construction
projects. He has trained crews and
coordinated operations with
subcontractors in all major disciplines.
He provides effective conimunication on
a daily basis with the project manager,
architect, engineers, owners & crew.
Field Supervisor
Dave Lutes
Years Exoerience
Total24 yeatS
HACC 4 years
. Dave joined HACC with experience in
residential & commercial project
supervision as wen as hands off
craftsmanship and service work.
Joe Dara
Field Supervisor
Joe has been in the construction industry
from an early age with familial ties to
the industry. He hands on as well as
supervisory skills lends to schedules
being met and completion of projects.
Years Experience
Tota119 yeatS
HACC 4 yeatS
B. A.CONT8ACTINGC08P.
9500 N.\v. 12th Street. Miami, Florida 33172 Mailing Address. P. O. Box 226408 . Miami, Florida 33122-6408
Telephone (305) 591-9212. Fax Line: (305) 591-9630
. .
H.A.Contracting Corp. is constantly updating its list of subcontractors.
Below is a list of subcontractors that HACC utiltizies for bidding and
awarded work.
Alarm Electronics Inc.
B&S Casework
B.K. Electric
Breig Electric
Coltec Engineering
EC Stokes Mechanical
First General Drywall
Franklin Flooring
Gray Plumbing & Mechanical
George R. Colbrooth Electrical
Gauranteed Fence
Imperial Commercial Carpet
KMllnternational
LACE Foodservice
MAC. Constructionlnc
McPoyles Painting
Metro Engineering Contractors
MJ Roofing
Modern Venetian Blinds
Monarch Fire Protection
Pyke Mechanical
Renaissance Builders & Constructors
Sol-A- Trol
TCOE Corporation
D. .A. CONTllAtTlNG.~ORP.
9500 N,W, 12th Street" Miami, Florida 33172 Mailing Address" P. 0, Box ]45240' Coral Gables, Florida 331 14-5240
Telephone (305) 591-9212 . Fax Line (305) 591-9630 .
Section 12.13 METHODOLOGY OF PROJECT MANAGE:MENT FOR JOC
The necessary staff will be assigned to projects as per the following breakdown (See H.A.
CONTRACTING CORP. JOC Management Plan ORGANIZATIONAL CHART"):
Projects ranging from $100.000.00 to $500.000.00
Project Manager Level II
Field Supervisor In House
Projects ranging from $500.000.01 to $ .000.000.00
Vice President
Project Manager Level I
Project Manager Level II
Field Supervisor In House
Field Manager In House
Projects szreaterthan $1.000.000.00
President
Vice President
Project Manager Level I
Project Manager Level II
Field Supervisor In House
Field Manager In House
Job Order Contracts are indefinite qUantity, :firm. fixed price contracts. The contractor
is responsible for evaluating the scope of work as defined by the owner and
developing a quantitative estimate to be used in conjunction with the Job Order
Contract Unit Price Catalog. Each Project will be assigned Contract Administrator.
Contract Administrator will develop bid price for work being solicited. Progen
Proposals will be submitted in compliance with the JOC contract documents. Upon
receipt the Notice of award project administration begins including subcontractor
agreements, design, permitting & submittals. Material Submittal log will be
developed, and all submittals effecting the critical path of the project will be
forwarded to the owner' representative as soon as possible (2-3 weeks). Balance of all
remaining submittals will be made at the end of 4 weeks. Theproject schedule will be
submitted for approval upon completion of design drawings (if applicable). Once a
pre-construction meeting is held, mobilization will commence & work will begin
according to schedule. Upon substantial completion of the project, in house forces
affirm punch list completion by all involved. At final acceptance inspection approval,
project administrators will generate close out packages, including but not limited to
required contract forms, As Built drawings and copies of permits or other pertinent
documents, submitted to the owner for approval.
(
. . ~..
.~ U
.Qcd
cd .(1) .
~~
0.. ..~
uS
.cd
~ .~.
~~
~C+-I
o 0
.J:J ~.
O.~
~u
lb
::.:.~.
Project Manual
00708
xxx 2.
xxx 6.
xxx 7.
XXX8..
xxx 9.
FORMcERtn=ICATE OF INSURANCE
INSlJAANCECHECK LIST
Workers' Compensation and Employer's Liability per the. statutory limits. of
the State of Florida.
Comprehensive General Liability (occl.lrrence form), limits of liability
$1,000.000.00 pel' occurrence for bodily injury property damage to include
Premises/Operations; Products, Completed Operations and Contractual
. Liability. Contractual Liability and Contractual Indemnity (Hold harmless
endorsernent exactly as written in "insurance requirements. of
specifications ).
Autornobile Liability - $1,bOO,000 each oCcurrence - owned/non-
owned/hired automobiles included.
Excess Liability ~$ .00 per ()ccurrence to follow the primary
coverages.
The City must be named as and additibnal insured on the liability p()IiCies;
and it must be stated on the certificate.
Other Insuranee as indicated:
Builders Risk completed value $ .00
Liquor Liability $ .00
Fire Legal Liability $ .00
Protection and Indemnity $ .00
Employee Dishonesty Bond $ .00
. XXX Professibnal Liability $ 250.000.00
Thirty (30) days Written cancellation noticerequired.
Best's guide rating B+:Vlor better, latest edition.
Thecertificaternust state the Quote nurnber and title
VENDORAND INSURANCE AGENT STAtEMENT:
We understand the Insurance ReqUirements of these specifications and that
evidence of this insurance may be required within five (5) days after Bid opening.
. kkNI-'1 !hv~EUJ 11L
Contractor
March 2004
- I
' ~C08.Q" CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DDIYYYY)
06/10/2004
PRCOUCER (305)822-7800 FAX THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Cr.llinsworth, Alter, Fowler, Dowling & French ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
P. O. Box 9315 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COYERAGE AFFORDED BY THE POLICIES BELOW.
Miami Lakes, FL 33014-9315
INSURERS AFFORDING COYERAGE NAIC#
INSURED INSURER A: Amerisure Mutual Ins Co
H.A. Contracting Corp. INSURER B.
P.O. Box 226408 INSURER c:
Miami, FL 33122-6408 INSURER D.
INSURER E:
cny""'."""
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDIN
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
II~M :.rm;~ TYPE OF INSURANCE POLICY NUMBER P~H~Y EFFECTIVE PR~'f,)' EXPIRATION LIMITS
GENERAL LIABILITY GL20062590002 01/01/2004 01/01/2005 EACH OCCURRENCE $ 1,000,00~
X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $ 50,00~
I CLAIMS MADE 0 OCCUR MED EXP (Anyone person) $ 5,00~
A X CONTRACTUAL PERSONAL & ADV INJURY $ 1,000,00Cl
~ HOLD HARMLESS GENERAL AGGREGATE $ I,OOO,OOCl
I--
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 1,000,00Cl
h POLICY [Xl ~r8i n LOC
AUTOMOBILE LIABILITY CA1198095 01/01/2004 01/01/2005 COMBINED SINGLE LIMIT
"x $
ANY AUTO 7 (Ea accident) 1,000,00(
I---
ALL OWNED AUTOS
I--- t7 BODILY INJURY $
SCHEDULED AUTOS ~~ (Per person)
A X
HIRED AUTOS BODILY INJURY
X $
NON-QWNED AUTOS I- to/V 'i (Per accident)
-
- PROPERTY DAMAGE $
(Per accident)
GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $
=i ANY AUTO OTHER THAN EAACC $
AUTO ONLY: AGG $
EXCESS/UMBRELLA LIABILITY EACH OCCURRENCE $
tJ OCCUR D CLAIMS MADE AGGREGATE $
$
R DEDUCTIBLE $
RETENTION $ $
WORKERS COMPENSATION AND WC1382622 10/10/2003 10/10/2004 X I T"Xg~i~~.1 10J,II-
EMPLOYERS' LIABILITY 500,00(
A ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $
OFFICERlMEMBER EXCLUDED? EL DISEASE - EA EMPLOYEE $ 500,00(
If ~es, describe under E.L. DISEASE. POLICY LIMIT 500,00(
S ECIAL PROVISIONS below $
OTHER
~ESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS the
~ity of Miami Beach is named as additional insured on the general liability in regards to
~ollowing project: Notification of Contract Award - Job Oder Contract (Joe) No. 14-03/04,
Public Works Department
City of Miami Beach
City Hall
1700 Convention Center Drive
Miami Beach, FL 33139
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF. THE ISSUING INSURER WILL ENDEAVOR TO MAIL
-1!L. DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT.
BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON THE INSURER. ITS AGENTS OR REPRESENTATIVES,
AUTHORIZED REPRESENTATIVE
Lee Fowler AU
ACORD 25 (2001/08)
@ACORD CORPORATION 1988
lb
-
~
Project Manual
. .
Bond No.PRF08667448
00710
FORM OF PERFORMANCE BOND
BY THIS BOND, We H.A. Contracting Corp.
. '. Fidelity & Depo~it
as Principal, hereinafter called CONTRACTOR, and Company of Maryland
as Surety, are bound to the CITY of Miami Beach, Florida, as Obligee, hereinafter
called CITY, in the initial amount of Two Million Dollars ($2,000,000), for the
payment whereof CONTRACTOR and Surety bind themselves, their heirs,
executors. administrators, successors and assigns, jointly and severally.
WHEREAS, CONTRACTOR has by written agreement entered into a Contract,
Bid/Contract No.: 14.:..03/04 ,awarded the 26 day of May, 200.l-..
with CITY which Contract Documents are by reference incorporated herein and
made a part hereof, and specifically include provision for liquidated damages, and
other damages identified, and for the purposes of this Bond are hereafter referred to
as the "Contract";
THE CONDITION OF THIS BOND is that if CONTRACTOR:
$.
Performs the Contract between CONTRACTOR and CITY for construction of
Job Order Contract 14-03/04 the Contract being
made a part of this Bond by reference, at the times and in the manner
prescribed in the Contract: and
Pays CITY all losses, liquidated damages. expenses, costs and attorneys
fees inclUding appellate proceedings, that CITY sustains as a result of default
by CONTRACTOR under the Contract: and
Performs the guarantee of all work and materials furnished under the
Contract for the time specified in the Contract; then THIS BOND IS VOID,
OTHERWISE IT REMAINS IN FULL FORCE AND EFFECT.
Whenever CONTRACTOR shall be, and declared by CITY to be, in default
under the Contract, CITY having performed CITY obligations thereunder, the
Surety may promptly remedy the default, or shall promptly:
3.1. Complete the Project in accordance with the terms and conditions of
the Contract Documents: or
1.
2.
,~
/~
"..~
~
~; l
j'"
~,
March 2004
City of Miami Beach
c;DpYTight e 2004 Tha Gon:lbsn GroIJP
Page 65
I',
,;i
~
--
project Manual
3.2. Obtain a bid or bids for completing the Project in accordance with the
terms and conditions of the Contract Documents. and upon
determination by Surety of the lowest responsible Bidder, or, if CITY
elects, upon determination by CITY and Surety jointly of the lowest
responsible Bidder, arrange for a contract between such Bidder and
CITY, and make available as work progresses (even though there
should be a default or a succession of defaults under the Contract or
Contracts of completion arranged under this paragraph) sufficient
funds to pay the cost of completion less the balance of the Contract
Price; but not exceeding, including other costs and damages for
which the Surety may be liable hereunder, the amount set forth in the
first paragraph hereof. The term "balance of the ConVact Price," as
used in this paragraph, shall mean the total amount payable by CITY
to CONTRACTOR under the Contract and any amendments thereto,
less the amount properly paid by CITY to CONTRACTOR.
4. No right of action shall accrue on this bond to or for the use of any person or
corporation other than CITY named herein,
5. The Surety hereby waives notice of and agrees that any changes in or under
the Contract Documents and compliance or noncompliance with any
formalities connected with the Contract or the changes does not affect
Surety's obligation under this Bond.
Signed and sealed this
16th
day of June
2004
,
~,
[;1,-
~~
,
I
~,~"
Page 66
City of Miami Beach
(;OOyl'i~ht <t'I2004 Tho GiorOIm1 GrOlJp
March 2004
If,j
lb
-
Project Manual
WITNESSES:
-t{~
(Secretary)
By
)1)
e V>.e.t>1 DiYV 0-
(CORPORATE SEAL)
Henry Angelo, Ill, President
(Type NamefTitle Signed Above).
16th day of June ,20 04
IN THE PRESENCE OF:
By
A ent and Attorney-in-Fact
9130 S. Dadeland Blvd., Suite 1700
(Address: street)
Miami, FL 33156
(City/State/Zip)
Telephone No.:305-670-6309
,
.!
:!~
~.~
;';
March 2004
City of Miami Beach
<':Upylio,)ht C 2004 The oorcliM Group
. Page 67
,....
' "
,
~
",
-
-=--
Project Manual
Bond No.PRF08667448
00720
FORM OF PAYMENT SaND
BY THIS BOND, We B.A. Contracting Corp. ' as
Fidelity & Deposit
Principal. hereinafter called CONTRACTOR. and Comoany of Maryland as
Surety, are bound to the CITY of Miami Beach, Florida, as Obligee, hereinafter
called Crry, in the amount of initial Two Million Dollars ($2.000.000) for the payment
whereof CONTRACTOR and Surety bind themselves, their heirs, executors.
administrators. successors and assigns, jointly and severally.
WHEREAS. CONTRACTOR has by written agreement entered into a Contract.
Bid/Contract No.:14-03/04 . awarded the 26th day of May ,20~.
with CITY which Contract Documents are by reference incorporated herein and
made a part hereof, and specifically include provision for liquidated damages, and
other damages identified, and for the purposes of this Bond are hereafter referred to
as the "Contract";
THE CONDITION OF THIS BOND is that if CONTRACTOR:
1 . Pays CITY all losses, liquidated damages, expenses, costs and attorneys
fees including appellate proceedings, that CITY sustains because of default
by CONTRACTOR under the Contract; and
2. Promptly makes payments to all claimants as defined by Florida Statute
255.05(1) for all labor, materials and supplies used directly or indirectly by
CONTRACTOR in the performance of the Contract;
<
l
~
r~
,
')
THEN CONTRACTOR'S OBLIGATION SHALL BE VOID; OTHERWISE. IT SHALL
REMAIN IN FULL FORCE AND EFFECT SUBJECT, HOWEVER, TO THE
FOLLOW1NG CONDITIONS:
2.1 . A claimant, except a laborer. who is not in privity with
CONTRACTOR and who has not received payment for its labOr,
materials. or supplies shall, within forty-five (45) days after beginning
to furnish labor. materials, or supplies for the prosecution of the work,
furnish to CONTRACTOR a notice that he intends to look to the bond
for protection.
2.2. A claimant who is not in privity with CONTRACTOR and who has not
received payment for its labor, materials. or supplies shall, within
ninety (90) days after performance of the labor or after complete
page 68
City of Miami Beach
ccpvrlOht €I :W04 The Gordii\n (~rot.IP
March 2004
:; I'
tb
-
~
Project Manual
delivery of the materials or supplies. deliver to CONrRACTOR and to
the Surety. written notice of the performance of the labor or delivery
of the materials or supplies and of the nonpayment.
2.3. No action for the labor. materials, or supplies may be instituted
against CONTRACTOR or the Surety unless the notices stated under
the preceding conditions (2.1) and (2,2) have been given.
2.4. Any action under this Bond must be instituted in accordance with the
Notice and Time Limitations provisions prescribed in Section
255,05(2). Florida Statutes.
The Surety hereby waives notice of and agrees that any changes in or under the
Contract Documents and compliance or noncompliance with any formalities
connected with the Contract or the changes does not affect the Surety's obligation
under this Bond.
Signed and sealed this
16th
day of
June
,2004
WITNESSES:
(CORPORATE SEAL)
By
Henry Angelo. III. President
(Type NamefTitle Signed Above)
IN THE PRESENCE OF:
By
i
I
I
~;;
9130 S. Dadeland Blvd.. Suite 1700
(Address: Street)
Miami, FL 33156
(City/state/Zip)
Telephone No.: 305-670-6309
March 2004
City of Miami Beach
cop\''l'ight <0 2004 Th~ Gotdjlll~ Gl'OI..IP
Page 69
I
I.
-.-- ." !-,..
~
-::;;;;;:::-
Project Manual
00721 CERTIFICATE AS TO CORPORATE PRINCIPAL
I. Nicholas Angelo , certify that I am the
Secretary of the corporation named as Principal in the foregoing Performance and
Payment Bond (Performance Bond and payment Bond); that Henry Angelo, II~
who signed the Bond(s) on behalf of the Principal, was then President of
said corporation; that I know his/her signature; and his/her signature thereto is
genuine: and that said Bond(s) was (were) duly signed, sealed and attested to on
behalf of said corporation by authority .ts erning body.
V\.-
(Seal) as Secretary of
H.A. Contracting Corp.
(Name of Corporation)
(SEAL)
STATE OF FLORIDA )
) SS
COUNTY OF MIAMI-DADE )
Before me, a Notary Public duly commissioned, qualified and acting personally,
appeared R. H. Benson to me well known, who
being by me first duly sworn upon oath says that he/she has been authorized to
execute the foregoing Performance and Payment Bond (Performance Bond and
Payment Bond) on behalf of CONTRACTOR named therein in favor of CITY.
Subscribp.d and Sworn to before me this 16th
da of June
U-~
Nota Public. state of
Florida at Large
2004
, -
My commission expires:
Bonded
by
Page 70
City of Miami Beach
lXIPynghl C 2004 Tha GOldiSl'\ G(OUP
March 2004
\.
lIli
. .
Power of Attorney
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a
corporation of the State of Maryland, by PAUL C. ROGERS, Vice President, and T, E, SMITH, Assistant Secretary, in
pursuance of authority granted by Article VI, Section 2, of the By-Laws of said compii5Y' w . set forth on the reverse
side hereof and ate hereby certified to be in full force and effect on the date hereof d s "&} . ate, constitute and
appoint R. H. BENSON, of Miami Shores, Florida, its true and la -' - , 0 make, execute, seal
and deliver, for, and on its behalf as surety, and as its act and 0 ngs and the execution
of such bonds or undertakings in pursuance of these 0 ompany, as fully and amply, to
all intents and purposes, as if they had b.sicr\~y~ e regularly elected officers of the
Company at its office in Baltim~~\Jil:iIr ~~@ s power of attorney revokes that issued on behalf of
R. H. Benson, date~ ,101.1 \:::-I @~
The said Assistant ~ t the extract set forth on the reverse side hereof is a true copy of Article VI,
Section 2, of the By- y, and is now in force.
IN WITNESS OF, the said Vice-President and Assistant Secretary have hereunto subscribed theit names and
affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 13th day of August,
A,D, 2003.
ArrEST:
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
~v~
By:
Assistant Secretary Paul C. Rogers
~
T. E. Smith
Vice President
State of Maryland }ss.
City of Baltimore .
On this 13th day of August, A.D. 2003, before the subscriber, a Notary Public of the State of Maryland, duly
commissioned and qualified, came PAUL C. ROGERS, Vice President, and T, E, SMITH, Assistant Secretary of the
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers
described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being
by me duly sworn, severally and each for himself deposeth and saith, that they ate the said officers of the Company aforesaid,
and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal
and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and ditection of
the said Corporation.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and yeat first above
written.
fYpJ-
Dennis R. Hayden Notary Public
My Commission Expites: February 1, 2005
POA-F 031-0061
EXTRACT FROM BY-LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND
"Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice-President, or any of the Senior
Vice-Presidents or Vice-Presidents specially authorized so to do by the Board of Directors or by the Executive Committee,
shall have power, by and with the concurrence of the Secretary or anyone of the Assistant Secretaries, to appoint Resident
Vice-Presidents, Assistant Vice-Presidents and Attorneys-in-Fact as the business of the Company may require, or to
authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations,
policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in
the nature ofmortgages,...and to affix the seal of the Company thereto."
CERTIFICATE
I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify
that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that
the Vice-President who executed the said Power of Attorney was one of the additional Vice-Presidents specially authorized
by the Board of Directors to appoint any Attorney-in-Fact as provided in Article VI, Section 2, of the By-Laws of the
FIDELITY AND DEPOSIT COMPANY OF MARYLAND.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the
Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on
the 10th day of May, 1990.
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically
reproduced signature of any Vice-President, Secretary, or Assistant Secretary of the Company, whether made heretofore or
hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and
binding upon the Company with the same force and effect as though manually affixed."
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said Company,
this
I( ~
I a
day of
\J::n~
CXXJY .
ofc1~
Assistant Secretary
00800 GENERAL CONDITIO....S
1. Project Manual:
1.1. Order of Precedence of the Component Parts of the Contract
Documents:
1.2. In the event ofa Conflict between different parts of the Contract
Documents, the order of precedence of the component parts of the
Contract Documents shall be as follows:
A. Project Manual, Volume I
8. Addenda, if any
C. Plans and Drawings, if any d
D. Construction Task Catalog, Volume II
E. Standard Specification of the City, State or Federal
Government, if any
F. The Job Order
G, Technical SpecifiCation, VolUme III
H... Proposal and Acceptance Forrns
I. Invitation to Bid
J. Bonds
K. Insurance
1.3. The Project Manual includeS any general and JOC Supplemental
Contract conditions or specifications attached hereto.
1.4. The Project Manual, along With all documents that make up and
constitute the Contract Documents, shall be followed in strict
accordance as to work, performance, material,and dimensions
except when City and or Program Manager may authorize, in Writing,
an exception.
1.5. Dimensions given in figures are to hOld preference over scaled
measurements from the drawings; however, all discrepancies shall
be resolved by the City and or Program Manager. Contractor shall
not proceed when in doubt as to any dimension or measurement, but
shall seek clarification from the City and or Program Manager.
1.6. Contractor shallbefumished, free of charge, one paper (1) copy of
the Project Manual, and (1) copy of the CTC. All documents including
the Technical Specifications will be provided on CD-ROM, which
Shall be preserved and always kept accessible to City and or
.
------
-:----
. ProJect Manual
ProJect Mal1ual
lD
-=-"
Program Managl:lr authorizM reprl:lsentatives. Additional copies of
the Project Manual may be obtained from City at the cost of
reprod uction.
2. Intelltion of City:
2.1. It is the intent of City to describe in the Contract Documents a
functionally complete Project (or part thereof) to be constructed in
accordance with the Contract Documents and in accordance with all
codes and regulationsgoverhing construction ofthe Project. Any
work, materials or equipment that may reasonably be inferred from
the Contract Documents as being requirl:ld to produce the intended
result shall be supplied by Contractor whether or not specifically
called for. When words Which have a well-known technical or trade
meaning are used to describl:l work, materials or equipment, such
words shall be interpreted in accordance with that meaning.
Reference to standard specifications, manuals,. or codes of any
technical soCiety,' organization or association, or to the laws or
regulations of any governmental authority, whether such reference be
specific or by implication, shall mean the latest standard
specification, manual, cOde or laws or regulationsinl:lffect at the time
of opening of bids and Contractor shall comply therewith. City shall
have no duties other than those duties and obligations expressly set
forth within the Contract Documents.
. Preliminary Mattl:lrs:
3.1. Ala time specified by the City and or Program Mahagl:lr but before
Contractor starts the work at the Job Order site, a conference
attended by Contractor, City and or program Manager and others as
deemed appropriate by Contract Administrator, will be held to discuss
the schedule, Shop Drawings other submittals, safety, site access
and other issues as rl:lquired to establish a clear understanding of the
construction operations.
Perforrnancel3ond and Payment Bond:
Within fifteen (15) calendar days of being notified of thl:laward, Contractor
shall furnish a Performance Bond and a Payment Bond containillg all the
provisions of the Performance Bond and Payment Bond attached hereto as
forms 00710 and 00720.
Each Bond shall be. ill the amount of two million ($2,000,000) dollars
guaranteeing to CITY the completion and performance of the work
covered in such Contract as well as full payment of all suppliers,
laborers, or subcontractors employed pursuant to this Project. Each
Project Manual
Bond shall be With a surety company which is qualified pursuant to
Article 5.
4.2. Each Bond shall cOntinue in effectfor one year after Final Completion
and acceptance of the work With liability equal to one hundred
percent (100%) of the Contract sum, or an additional bond shall be
conditioned that Contractor will, upon notification by City, correct any
defective or faulty work or materials which appear within one year
after Final Completion of the Contract. . If the option terms are
exercised the Contractor shall furnish additional performance and
payment bonds in the amount of $2,000,000 each. If an individual
Job Order is issued over the maximum amount of initial value of the
contract bonds, the City will request from the contractor a payment
and performance bond equal to the amount of the Job Order. The
City will pay for the extra bonds as a Non-prepriced task with no mark
ups from the contractor.
4.3. Pursuant to the requirements of Section .255.05(1)(a),Florida
Statutes, as may be amended from time to time, Contractor shall
ensure that the bond(S) referenced above shall be recorded in the
public records of Miami-Dade County and prOVide City with evidence
of such recording.
4.4. Alternate .. Form of Security: In . lieu of a Performance. Bondahd a
Payment Bond, CONTRACTOR may furnish alternate forms of
security which may be in thefomi of cash, money order,certified
check, cashier's check or unconditional letter of credit in the form
attached hereto as Form 00735. Such alternate forms of security
shall be subject to the prior approval of CITY and for same purpose
and shall be subject to the same conditions as those. applicable
above and shall be held by CITY for one year after completion and
acceptance of theWork.
Qualification of Surety:
5.1. Bid Bonds,PerfomianceBonds and Payment Bonds over Five
Hundred Thousand Dollars ($500,000.00):
5.1.1.. Each bond must be executed bya surety company of
recognized standing, authorized to do business in the State
(if Florida as surety, having a resident agent in the State of
Florida and having been in business with a record of
. successful continuOus operation for at least five (5) years.
5.1.2. The surety company shall hold a current certificate of
authority as acceptable surety on federal bonds in
accordance with United States Department of Treasury
.~
~
~
Circular 570, Current Revisions. If the amoohtof the Bond
exceeds the underwriting limitation set forth in the circular,
in order to qualify, the net retention of the surety company
shall not exceed the underwriting limitation in the circular,
and the excess risks most be protected by coinsurance,
reinsurance, or other methods in accordance with Treasury
Circular 297, revised September 1, 1978 (31 DFR Section
223.10, Section 223,111). Further, the surety company
shall provide CITY with evidence satisfactory to CITY, that
such excess risk has been protected in an acceptable
manner.
5.1.3. The CITY willacc::ept a surety bond froth a company with a
rating of B+ or better for bonds up to $2 million, provided,
however, that if any surety company appears on the watch
list that is published quarterly by Intercom of the Office of
the Florida Insurance Commissioner, the CITY shall review
and either accept or reject the surety company based on
the financial information available to the CITY. A surety
company that is rejected by the CITY may be substituted
by the Bidder or proposer with a surety company
acceptable to the CITY, only if the bid amount does not
increase. The following sets forth, in general, the
acceptable parameters for bonds:
Policy-
holder's
Ratinos
. 500,001 to 1,000,000
1,000,001 to 2,000,000
2,000,001 to 5,000,000
5,000,001 to 10,000,000
10,000,001 to 25,000,000
25,000,001 to 50,000,000
50,000,001 or more
B+
B+
A
A
A
A
A
Class I
Class II
Class III
Class IV
Class V
Class VI
Class VII
Indernnification:
6.1. CONTRACTOR shall indemnify and hold harmless CITY, its officers,
agents, directors, and employees, from liabilities,damages,losses,
and costs, including, but not limited to reasonable attorneys fees, to
the extent caused by the negligence, recklessness or intentional
Wrongful misconduct of CONTRACTOR and persons employed or
utilized by CONTRACTOR in the performance of this Agreement.
. Project Manual
Except as specifically provided herein, this Agreement does not
require CONTRACTOR to indemnify CITY, its employees, officers,
directors, or agents from any liability, damage, loss, claim,action, or
proceeding. These indemnifications shall survive the term of this
Agreement. In the event that any action or proceeding is brought
against CITY by reason of any such claim or demand,
CONTRACTOR shall, upon written notice from CITY, resist and
defend such action or proceeding by counsel satisfactory to CITY.
6.2: The indemnification provided above shall obligate CONTRACTOR to
defend at its own expense to and through appellate, supplemental or
bankruptcy proceeding, or to provide for such defense, at CITY's
. option, any and all claims of liability and all suits and actions of every
name and description covered by Section 6.1 above which may be
brought against CITY whether performed by CONTRACTOR, or
persons employed or utilized by CONTRACTOR.
Insurance Requirements:
7.1. Without limiting any. ofttle other obligations .. or liabilities of
CONTRACTOR, CONTRACTOR shall provide, pay for, and maintain
. in force until all of its work to be performed under this Contract has
been completed and accepted by CITY (or for such duration as is
otherwise specified hereinafter), the insurance coverages set forth
herein.
7,1.1. Workers'. Compensation insurance to apply for all
employees in compliance with the "Workers' Compensation
Law" of the State of Florida and all applicable federal laws.
In addition, the policy(ies) must include:
7.1.U. Employers' Liability with a limit of $500.000 each
accident.
7.1.1.2. Ifany operations are to be undertaken oh or about
navigable waters, coverage must be included for
the U.S. Longshoremen & Harbor Workers Act
and Jones Act.
7.1.2. Comprehensive General Liability with minimum limits of
$1,000,000 ($1,000,000) per occurrence combined single
limit for Bodily Injury Liability and Property Damage
Liability. Coverage must be afforded on a form no more
restrictive. than the .Iatest edition of. the Comprehensive
General Liability poliCy, without restrictive endorsements,
as filed by the Insurance Services Office, and must include:
F'roject Marillal
L.........~..............'.................'.........................
u.I
~.
~-..
Premises and/orOperations.
Independent Contractors.
Products and/or Completed Operations for
contracts over . Fifty Thousand Dollars
($50,000.00) CONTRACTOR shall maintain in
force until at least three years after completion of
all work required under the Contract, coverage for
Products and Completed Operations, including
Broad Form Property Damage.
Explosion, Collapse and Underground Coverages.
. Broad Form l'roperty Damage.
Broad Foiti1' Contractual Coverage applicable to
this specific Contract, including any hold harmless
. and/or indemnification agreement.
7.1.2.7. Personal Injury Coverage with Employee and
Contractual Exclusions removed, with minimum
limits of coverage equal to those required for
Bodily Injury Liability and Property Damage
Liability. .
7.1.2.8. CITY is to be expresslyinclucled as an Additional
Insured with respect to liability arising out of
operations performed for CITY by or on behalf of
CONTRACTOR or acts or omissions of
CONTRACTOR in connection With general
supervision of such operation.
Business Automobile Liability with minimum limits of One
Million ($1,000,000) per occurrence, combined single limit
for Bodily Injury Liability and Property Damage Liability.
Coverage must be afforded on a form no more restrictive
than the latest edition of the Business Automobile Liability
policy, without restrictive endorsements, as filed by the
Insurance Services Office and must include:
7.1.3.1. Owned Vehicles.
7.1.3.2. Hired and Non-OWried Vehicles.
7.1.3.3. Employers' Non-Ownership.
. If the initial insurance expires prior to the completion of the work,
renewal copies of policies shall be furnished at least thirty (30) days
prior to the date of their expiration.
7.1.2.1.
7.1.2.2,
7.1.2.3.
7.1.2.4.
7.1.2.5.
7:1.2.6.
7.1.3.
.:~
.~
7.3. Notice of Cancellation and/or Restriction~-The policy(ies) must be
endorsed to provide CITY with at least thirty (30) days notice of
cancellation and/or restriction.
. 7.4. CONTRACTOR shaH furnish to the CITY's Risk Manager Certificates
of Insurance or endorsements evidencing the insurance coverage
specified above within fifteen (15) calendar days after notification of
award of the Contract. The required Certificates of Insurance shall
name the types of policies provided, refer specifically to this Contract,
and state that such insurance is as required by this Contract. The
Certificate of Insurance shall be in form similar to and contain the
information set forth in Foim 00708.
The official title of the Owner is the CITY of Miami Beach, Florida.
This official title shall be used in all insurance documentation.
7.6. Additional or Replacernent Bond: It is further rnutually agreed
between the parties hereto that if, at anytime, the CITY shall deem
the surety or sureties upon any bond to be unsatisfactory, or if, for
. any reason, such bond (because of increases in the work or
otherwise) ceases to be adequate, the Contractor shall, at its
expense within five (5) days after the receipt of notice frorn the CITY
to do so, furnish an additional or replacement bond or bonds in such
forrn, amount, and with such surety or sureties as shall be
satisfactory to the CITY. There shall be no lapse in surety coverage
and failure to do so shall bea material breach of this Contract. In
such event, no further payments tothe Contractor shall be deemed to
be due under this Contract until such new or additional security for
the faithful performance of the work shall be furnished in manner and
form satisfactory to the Board.
7.7. Professional Liability Insurance: If the. scope. of work of this contract,
.. as determined by individual Work Orders, includes professional
services which require signed and sealed documents, then the
Contractor at that point shall provide evidence of Professional
Liability Insurance from the Architect/Engineer of record with policy
limits no (ess than $250,000 per claim. Evidence of said Professional
Liability Insurance shall be submitted to the CITY prior to the
commencement of the professional service. .
Labor and Materials:
8.1. Unless otherwise provided herein,CONTRACTOR shall provide and
pay for all materials, labor, water, tools, equipment, light, power,
transportation and other facilities and services necessary for the
proper execution and completion of the Work, whether temporary or
City of Miami Beach
oopyrlghtO 2004 The Gordian Group
Page 79
.
permanent and whether or notinc6tporated or to be incorporated in
the Work.
CONTRACtOR shall at all times enforce strict discipline and good
order among its employees and subcontractors at the Project site
and shall not employ on the Project any unfit person or anyone not
skilled inthe work to which they are assigned.
~oyalties and Patents:
9.1. All fees, royalties, arid claims for any inVention, or pretended
inventions, or patent of any article, material,arrangement, appliance,
or method that may be used upon or in any manner be connected
with the construction of the Work Or appurtenances, are hereby
. included in the prices stipulated in this Contract for said work.
Weather:
10.1. Extensions to the Contract Time for delays caused by the effects of
inclement weather shall be submitted as a request for a change in
the Contract Time pursuant to Article 39. These timeextellsions are
justified only when rains or other inclement weather conditions or
related adverse soil conditions prevent CONTRACTOR from
productively performing controlling items of work identified on the
accepted schedule or updates resulting in:
10.1.1. CONTRACTOR being unable to work at least fifty percent
(50%) of the normal work day on controlling items of work
identified on the accepted schedule or updates due to
adverse weather conditions; Or
10.1.2. CONtRACTb~ must make major repairs lothe Work
damaged by weather. Providing the damage waS not
attributable to a . failure to perform .or neglect by
CONTRACTOR, and providing that CONTRACTOR was
unable to work at least fifty percent (50%) of the normal
workday on controlling items of work identified on the
. accepted schedule or updates.
Permits, Licenses and Impact Fees:
11.1. Except as otherwise provided within theJOCSUpplemental
Conditions, all permits and licenses required by federal,state or local
laws, rules and regulations necessary for the prosecution of the Work
undertaken. by CONTRACTOR pursuant to this Contract shall be
secured and paid for by CONTRACTOR. The General Contractor's
Building Permits, Public Works Permits and Zoning Permits will be
reimbursed by the CITY for the cost of the Permit only as a non pre-
.......~..............................................
.
. -=-
Project Manual
priced task with no marked-ups. The cost for obtaining the Permits is
to be included in the Contractor's Adjustment Factor. It is
Contractor's responsibility to have and maintain appropriate
Certificate(s) of Competency, valid for the Work to be performed and
valid for the jurisdiction in which the Work is to be performed for all
persons working on the Project for whom a Certificate of Competency
is required.
11.2. Impact fees levied by the CITY and/or Miami-Dade COUhty shall be
paid by CONTRACTOR. CONTRACTOR shall be reimbursed only
for the actual amount of the impact fee levied by the municipality as
evidenced by an invoice or other acceptable documentation issued
by the municipality and submitted to CITY as a non pre-priced task.
Reimbursement to CONTRACTOR in no event shall include profit or
overhead of CONTRACTOR.
12. Resolution of Disputes:
12.1. To prevent aU disputes and litigation, it is agreed by the parties
hereto that the CITY shall decide all questions, claims, difficulties and
disputes of whatever nature which may arise relative to the technical
interpretation of the Contract Documents and fulfillment of this
Contract as to the character, quality, amount and value of any work
done and materials furnished, or proposed to be done or furnished
under or, by reason of, the Contract Documents and CITY's
estimates and decisions upon all claims, questions, difficulties and
disputes shall be final and binding to the extent provided in Section
12.2. Any claim, question, difficulty or dispute which cannot be
resolved by mutual agreement of CITY and CONTRACTOR shall be
submitted to Contract Administrator in writing within twenty-one (21)
calendar days. Unless a different period of time is ~et forth herein,
Contract Administrator shall notify CITY and CONTRACTOR in
writing of his decision within twenty-one (21) calendar days from the
date of the submission of the claim, question, difficulty or dispute,
unless Contract Administrator requires additional time to gather
information or allow the parties to provide additional information, All
hon-technical administrative disputes shall be determined by the
Contract Administrator pursuant to the time periods provided herein.
During the pendency of any dispute and after a determination
thereof, CONTRACTOR, Contract Administrator and CITY shall act in
good faith to mitigate any potential damages including utilization of
construction schedule changes and alternate means of construction.
12.2. In the. event the determination of a dispute under this Article is
unacceptable to either party hereto, the party objecting to the
March 2004
City of Miami Beach
copyrlght 0 2004 The GO<d1an Group
Page 81
m
'~
~
Project Manual
deterrnination rnust notify the other party in writing within ten (10)
days of receipt of the written determination. The notice must state
the basis of the objection and must be accompanied by a statement
that any Contract Price adjustment claimed is the entire adjustment
to which the objecting party has reason to believe it is entitled to as a
result of the determination. Within sixty (60) days after Final
Completion of the Work, the parties shall participate in mediation to
address all objections to any determinations hereunder and to
attempt to prevent litigation. The mediator shall be mutually agreed
upon by the parties. Should any objection not be resolved in
mediation, the parties retain all their legal rights and remedies
provided under State law. A party objecting to a determination
specifically Waives all of its rights provided hereunder, including its
rights and remedies under State law, if said party fails to comply in
strict accordance with the requirements of this Article.
13. Inspection of Work:
13.1. CITY and 01' Program Manager shall at all times have access to the
Work, and CONTRACTOR shall provide proper facilities for such
access and for inspecting, measuring and testing.
13.1.1. Should the Contract Documents, CITY and or Program
Manager instructions, any laws, ordinances, or any public
authority require any of the Work to be specially tested or
approved, CONTRACTOR shall give CITY and or Program
Manager timely notice of readiness of the Work for testing.
If the testing or approval is to be made by an authority
other than CITY, timely notice shall be given of the date
fixed for such testing. Testing shall be made promptly,
and, where practicable, at the source of supply. If any of
the Work should be covered up without approval or
consent of CITY and or Program Manager, it must, if
required by CITY and or Program Manager, be uncovered
for examination and properly restored at Contractor's
expense.
13.1.2. Re~examination of any of the Work may be ordered by the
CITY and or Program Manager with prior written approval
by the Contract Administrator, and if so ordered, the Work
must be uncovered by CONTRACTOR. If such Work is
found to be in accordance with the Contract Documents,
CITY shall pay the cost of reexamination and replacement
by means of a Change Order. If such Work is not in
Page 82
City of Miami Beach
copyright 10 2004 The Gordian Group
March 2004
/
&
~
accordance with the Contract Documents, CONTRACTOR
shall pay such cost.
. 13.2, Inspectors shaH have no alithority to permit deviations from, nor to
relax any of the provisions of, the Contract Documents nor to delay
the Contract by failure to inspect the materials and work with
reasonable promptness without the written permission or instruction
of the CITY and or Program Manager.
13.3. The payment of any compensation, whatever may be its character or
form, or the giving of any gratuity or the granting of any favor by
CONTRACTOR to any inspector, directly or indirectly, is strictly
prohibited, and any such act on the part of CONTRACTOR will
constitute a breach of this Contract.
14. Superintendence and Supervision:
14.1. The orders of CITY maybe given through Program Manager, which
instructions are to be strictly and promptly followed in every case.
CONTRACTOR shall keep on the Project during its progress, a full-
time competent English speaking superintendent and any necessary
assistants, all satisfactory to the CITY and or Program Manager for
each Job Order issued. The superintendent shall not be changed
except with the written consent of the CITY and or Program Manager,
unless the superintendent proves to be unsatisfactory to
CONTRACTOR and ceases to be in its employ. The superintendent
shall represent CONTRACTOR and all directions given to the
superintendent shall be as binding as if given to CONTRACTOR and
will be confirmed in writing by the CITY and or Program Manager
upon the written request of CONTRACTOR. CONTRACTOR shall
give efficient supervision to the Work, using its best skill and
attention. The CONTRACTOR shall keep on the Work the
Superintendent at all times during the working hours. The
Superintendent shall be reachable 24 hours a day, seven days a
week. If the Superintendent is not available because of illness or
vacation or the like, the CONTRACTOR shall notify the CITY of the
substitute Superintendent.
14.2. Daily, CONTRACTOR's superintendent shall record, at a minirnum,
the following information in a bound log: the day; date; weather
conditions and how any weather condition affected progress of the
Work; time of commencement of work for the day; the work being
performed; materials, labor, personnel, equipment and
subcontractors at the Project site; visitors to the Project site, including
representatives of, CITY and or Program Manager, regulatory
representatives; any special or unusual conditions or occurrences
March 2004
City of Miami Beach
copyright 10 2004 The Gordian Group
Page 83
Pr6Ject Manual
.
;".,~
encountered; and the time of termination of work for the day. All
information shall be recorded in the daily log in ink. The daily log
shall be kept on the Project site and shall be available at all times for
inspection and copying by CITY and Program Manager.
14.3. The Contract Administrator,. CONTRACTOR and Program Manager
shall meet at least weekly or as determined by the Contract
Administrator, during the courSe of the Work to review and agree
upon the work performed to date and to establish the controlling
items of work for the next two weeks. The CITY and or Program
Manager shall publish, keep, and distribute minutes and any
comments thereto of each such meeting.
14.4. If CONTRACTOR, in the course of prosecuting the Work, finds any
discrepancy between the Contract Documents and the physical
conditions of the locality, or any errors, omissions, or discrepancies in
the Project Manual, it shall be CONTRACTOR's duty to immediately
inform the CITY and or Program Manager, in writing, and the CITY
and or Program Manager will promptly review the same. Any work
done after such discovery, until authorized, will be done at
CONTRACTOR's sole risk.
14.5. CONTRACTOR shall supervlseand direct the Work competently and
efficiently, devoting such attention thereto and applying such skills
and expertise as may be necessary to perform the Work in
accordance with the Contract Documents. CONTRACTOR shall be
solely responsible for the means, methods, techniques, sequences
and procedures of construction.
15. CITY's Right to Terminate Contract:
15.1. If CONTRACTOR fails to begin the Workwithill fifteen (15) calendar
days after the Project Initiation Date, or fails to perform the Work with
sufficient workers and equipment or with sufficient materials to insure
the prompt completion of the Work, or shall perform the Work
unsuitably, or cause it to be rejected as defective and unsuitable, or
shall discontinue the prosecution of the Work pursuant to the
accepted schedule or if CONTRACTOR shall fail to perform any
material term set forth in the Contract Documents or if
CONTRACTOR shall become insolvent or be declared bankrupt, or
commit any act of bankruptcy or insolvency, or shall make an
assignment for the benefit of creditors, or from any other cause
whatsoever shall not carry on the Work in an acceptable manner,
Contract Administrator may give notice in writing to CONTRACTOR
and its Surety of such delay, neglect or default, specifying the same.
If CONTRACTOR, within a period of five (5) calendar days after such
Page 84
City of Miami Beach
copyright 0 2004 The Goo::Iian Group
March 2004
~
..~
Project Manual
notice, shall not proceed in accordance therewith, then CITY may
upon written certificate from Program Manager of the fact of such
delay, neglect or default and CONTRACTOR's failure to comply with
such notice, terminate the services of CONTRACTOR, exclude
CONTRACTOR from the Project site and take the prosecution of the
Work out of the hands of CONTRACTOR, and appropriate or use any
or all materials and equipment on the Project site as may be suitable
and acceptable. In such case, CONTRACTOR shall not be entitled
to receive any further payment until the Project is completed. In
addition CITY may enter into an agreement for the completion of the
Project according to the terms and provisions of the Contract
Documents, or use such other methods as in CITY's sole opinion
shall be required for the completion of the Project according to the
terms and provisions of the Contract Documents, or use such other
methods as in CITY's sole opinion shall be required for the
completion of the Project in an acceptable manner. All damages,
costs and charges incurred by CITY, together with the costs of
completing the Project, shall be deducted from any monies due or
Which may become due to CONTRACTOR. In case the damages
and expenses so incurred by CITY shall exceed the unpaid balance,
then CONTRACTOR shall be liable and shall pay to CITY the amount
of said excess.
15.2. If after notice of termination of CONTRACTOR's right to proceed, it is
determined for any reason that CONTRACTOR was not in default,
the rights and obligations of CITY and CONTRACTOR shall be the
same as if the notice of termination had been issued pursuant to the
Termination for Convenience clause as set forth in Section 15.3
below.
15.3. This Contract may be terminated for convenience in writing by CITY
upon ten (10) days written notice to CONTRACTOR (delivered by
certified mail, return receipt requested) of intent to terminate and the
date on which such termination becomes effective. In such case,
CONTRACTOR shall be paid for all work executed and expenses
incurred prior to termination in addition to termination settlement
costs reasonably incurred by CONTRACTOR relating to
commitments which had become firm prior to the termination.
Payment shall include reasonable profit for work/services
satisfactorily performed. No payment shall be made for profit for
work/services which have not been performed,
15.4. Upon receipt of Notice of Termination pursuant to Sections 15.1 or
15.3 above, CONTRACTOR shall promptly discontinue all affected
work unless the Notice of Termination directs otherwise and deliver
March 2004
City of Miami Beach
copyright C 2004 The Gordian Group
Page 85
.
.-...--
-
. Project Manual
or otherwise make available to CITY all data, drawings,
specifications, reports, estimates, summaries and such other
information as may have been required by the Contract Documents
whether completed or in process.
16. CONTRACTOR's Right to Stop Work or Terminate Contract:
16.1. Should CITY and or Program Managerfail to review and approve or
state in writing reasons for non-approval of any Application for
Payment within twenty (20) days after it is presented, or if CITY fails
either to pay CONTRACTOR within thirty (30) days after presentation
by Program Manager of any sum certified by the CITY, or to notify
CONTRACTOR and or Program Manager in writing of any objection
to the Application for Payment, then CONTRACTOR may, give
written notice to CITY and/or Program Manager of such delay,
neglect or default, specifying the same. If CITY and or Program
Manager (where applicable), within a period of ten (10) calendar days
after such notice shall not remedy the delay, neglect, or default upon
which the notice is based, then CONTRACTOR may stop work or
terminate this Contract and recover from CITY payment for all work
executed and reasonable expenses sustained therein plus
reasonable termination expenses. Any objection made by CITY to an
Application for Payment shall be submitted to Contract Administrator
in accordance with the provisions of Article 12 hereof.
17. Assignment:
17.1. Neither party hereto shall assign the Contract or any subcontract in
whole or in part without the written consent of the other, nor shall
CONTRACTOR assign any monies due or to become due to it
hereunder, without the previous written consent of the Mayor and
CITY Commission.
18. Rights of Various Interests:
18.1. Whenever work being done. by CITY's forces or by other contractors
is contiguous to or within the limits of work covered by this Contract,
the respective rights of the various interests involved shall be
established by the Contract Administrator to secure the completion of
the various portions of the work in general harmony.
19. . Differing Site Conditions:
19.1. In the event that during the course of the Work CONTRACTOR
encounters subsurface orcbncealed conditions at the Project site
which differ materially from those shown on the Contract Documents
and or the Detailed Scope of Work and from those ordinarily
City of Miami Beach
copyright <<> 2004 The Gordian Group
March 2004
........~.................................................
~
-
:""-C--
Project Manual
encountered and generally recognized as inherent in work of the
character called for in the Contract Documents; or unknown physical
conditions of the Project site, of an unusual nature, which differ
materially from that ordinarily encountered and generally recognized
as inherent in work of the character called for in the Contract
Documents, CONTRACTOR, without disturbing the conditions and
before performing any work affected by such conditions, shall, within
twenty-four (24) hours of their discovery, notify CITY and or Program
Manager in writing of the existence of the aforesaid conditions. CITY
and or Program Manager shall, within two (2) business days after
receipt of Contractor's written notice, investigate the site conditions
identified by CONTRACTOR. If, in the sole opinion of CITY and or
Program Manager, the conditions do materially so differ and cause
an increase or decrease in Contractor's cost of the original Detailed
Scope of Work, or the time required for, the performance of any part
of the Work, whether or not charged as a result of the conditions,
CITY and or Project Manual. Program Manager shall recommend an
equitable adjustment to the Contract Price by initiating another Job
Order based on the new Detailed Scope of Work, or the Contract
Time, or both. If CITY and or Program Manager and CONTRACTOR
cannot agree on an adjustment in the Contract Price or Contract
Time, the adjustment shall be referred to the Contract Administrator
. for determination in accordance with the provisions of Article 12.
Should the Contract Administrator determine that the conditions of
the Project site are not so materially different to justify a change in
the terms of the Contract, the Contract Administrator shall so notify
CITY and or Program Manager and CONTRACTOR in writing, stating
the reasons, and such determination shall be final and binding upon
the parties hereto.
19.2. No request by CONTRACTOR for an equitable adjustment to the
Contract under this provision shall be allowed unless CONTRACTOR
has given written notice in strict accordance with the provisions of
this Article. 19.3. No request for an equitable adjustment or change
to the Contract Price or Contract Time for differing site conditions
shall be allowed if made after the date certified by CITY and Program
Manager as the date of substantial completion.
20. Plans and Working Drawings:
20.1. CITY and or Program Manager shall have the right to modify the
details of the plans and specifications, to supplement the plans and
specifications with additional plans, drawings or additional
information as the Work proceeds, all of which shall be considered as
part of the Detailed Scope of Work. In case of disagreement
March 2004
City of Miami Beach
copyright C 2004 The Gordian Group
Page 87
~
~
--=-
Project Manual
between the written and graphic portions of the Detailed Scope of
Work, the written portion shall govern.
21. CONTRACtOR to Check Plans, Specifications and Data:
21.1. CONTRACTOR shall verify all dimensibris, quantities and details
shown on the plans, specifications or other data received from CITY
and or Program Manager, and shall notify CITY and or Program
Manager of all errors, omissions and discrepancies found therein
within three (3) calendar days of discovery. CONTRACTOR will not
be allowed to take advantage of any error, omission or discrepancy,
as full instructions will be furnished by the CITY and or Program
Manager. CONTRACTOR shall not be liable for damages resulting
from errors, omissions or discrepancies in the Contract Documents
unless CONTRACTOR recognized such error, omission or
discrepancy and knowingly failed to report it to the CITY and or
Program Manager.
22. CONTRACTOR's Responsibility for Damages and Accidents:
22.1. CONTRACTOR shall accept full responsibility forthe Work against all
loss or damage of whatsoever nature sustained until final acceptance
by CITY, and shall promptly repair any damage done from any cause
whatsoever, except as provided in Article 29.
22.2. CONtRACtOR shall be responsible for all materials, equipment and
supplies pertaining to the Project, In the event any such materials,
equipment and supplies are lost, stolen, damaged or destroyed prior
to final acceptance by CITY, CONTRACTOR shall replace same
without cost to CITY, except as provided in Article 29.
23. Warranty:
23.1. CONTRACTOR warrants to CITY that all materials and equipment
furnished under this Contract will be new unless otherwise specified
and that all of the Work will be of good quality, free from faults and
defects and in conformance with the Contract Documents. All work
not conforming to these requirements, including substitutions not
properly approved and authorized, may be considered defective. If
required by CITY and or Program Manager, CONTRACTOR shall
furnish satisfactory evidence as to the kind and quality of materials
and equipment.
23.2. All work furnished under this Cbntract shall be guaranteed against
defective materials and workmanship, improper performance and
noncompliance with the Contract Documents for a period of one year
after final completion and acceptance of the Job Order, except as
City of Miami Beach
copyright C 2004 The Gordian Group
March 2004
Project Manual
.
otherwise specifically specified in other parts. of the Contract
Documents, or within such longer period of time as may be
prescribed by law or provided by the manufacturer.
23.3. The Guarantee shall include the name of the project as designated in
the Job Order, be signed by an officer of the company having
authority to provide the warranty, and state: ''This document serves
as a one (1) year written guarantee for the work performed, and
material and equipment inStalled on the above referenced Work
Order. This guarantee incorporates all provisions of the Contract
Documents that refer or relate to the guarantee. This guarantee is
commenced on the final acceptance date."
23.4. During the guarantee period, the Contractor shall repair ahd replace
. at his own expense, when so ordered by the CITY, all work that may
develop defects whether these defects may be inherent in the
equipment or materials, in the functioning of the piece of equipment,
or in the functioning and. operation of pieces of equipment operating
together as a functional unit. Any equipment or material which is
repaired or replaced shall have the guarantee period extended for a
period of one year from the date of the last repair or replacement.
24. Supplementary Drawings:
24.1. When, in the opinion of the CITY aM Or Program Mahager, it
becomes necesSary to explain the Work to be done more fully, or to
illustrate the Work further, or to show any changes which may be
required, supplementary drawings, with specifications pertaining
thereto, will be prepared by the CITY and or Program Manager or the
Contractor may be requested to prepare Architectural Services to
document the Detailed Scope Of Work.
24.2. The sUPlllementary drawings shall be binding upon CONTRACTOR
with the same force as the Project Manual. Where such
supplementary drawings require either less or more than the original
. Detailed Scope of Work, appropriate adjustments shall be made by
issuance of an a Job Order along with the required documentation.
25. . Defective Work:
. 25.1. The CITY and or Program Manager shall have the authority to reject
or disapprove work which CITY and or Program Manager finds to be
defective. If required by the CITY and or Program Manager,
CONTRACTOR shall promptly either correct all defective work or
remove such defective work and replace it with non-defective work.
CONTRACTOR shall bear all direct, indirect and consequential costs
March 2004
City of Miami Beach
copyright 0 2004 1he Gordian Group
Page 89
&
Project ManUal
~
of such removal or corrections including cost of testing laboratories
and personnel.
25.2. Should CONTRACTOR fail or refuse to remove or correct any
defective work or to make any necessary repairs in acCordance with
the requirements of the Contract Documents within the time indicated
in writing by the CITY and or Program Manager shall have the
authority to cause the defective work to be removed or corrected, or
make such repairs as maybe necessary at CONTRACTOR's
expense. Any expense incurred by CITY in making such removals,
corrections or repairs, shall be paid for out of any monies due or
Which may become due to CONTRACTOR, or may be charged
against the Performance Bond. In the event of failure of
CONTRACTOR to make all necessary repairs promptly and fully,
CITY may declare CONTRACTOR in default.
25.3. If, within one (1) year after the date of substantial completion or such
longer period of time as may be prescribed by the terms of any
applicable special warranty required by the Contract Documents, or
by any specific provision of the Contract Documents, any of the Work
is found to be defective or not in accordance with the Contract
Documents, CONTRACTOR, after receipt of written notice from
CITY, shall promptly correct such defective or nonconforming Work
within the time specified by CITY without cost to CITY, to do so.
Nothing contained herein shall be construed to establish a period of
limitation with respect to any other obligation which CONTRACTOR
might have under the Contract Documents including but not limited
to, Article 23 hereof and any claim regarding latent defects.
25.4. Failure to reject any defective work or material shall not in any way
prevent later rejection When such defect is discovered, or obligate
CITY to final acceptance.
26. Taxes:
26.1. CONTAACTOR shall pay aU applicable sales, consumer, use and
other taxes required by law. CONTRACTOR is responsible for
reviewing the pertinent state statutes involving state taxes and
complying with all requirements. Sales Tax has been included in the
material and equipment cost of the unit prices.
27. Subcontracts:
27.1. CONTRACTOR shall not employ any subcontractor or Architectural
and Engineering firm against whom CITY and or Program Manager
may have a reasonable objection. CONTRACTOR shall not be
Page 90
City of Miami Beach
copyright 0 2004 The Gordian Group
March 2004
....1t'I'S. .................... .. ............
~
.
Project Manual
27.2.
27.3.
27.4.
27.5
required to employ any subcontractor against Whom CONTRACTOR
has a reasonable objection.
CONTRACTOR shall be fully responsible for all acts and omissions
of its subcontractors and of persons directly or indirectly employed by
its subcontractors and of persons for whose acts any of them may be
liable to the same extent that CONTRACTOR is responsible for the
acts and omissions of persons directly employed by it. Nothing in the
Contract Documents shall create any contractual relationship
between any subcontractor and CITY or any obligation on the part of
CITY to payor to see the payment of any monies due any
subcontractor. CITY and or Program Manager may furnish to any
subcontractor evidence of amounts paid to CONTRACTOR on
account of specific work perforrned.
CONTRACTOR agrees to bind specifically every subcontractor to the
applicable terms and conditions of the Contract Documents for the
benefit of CITY.
For Contract 12-03/04 Public Works Contract CONTRACTOR Shall
perform the Work with its own organization, amounting to not less
30% of the Contract. Price. For Contracts 14-03/04 Capital
Improvements Projects arid 13-03/04 City Wide,CONTRACTOR
shall perform the Work with its own organization, amounting to not
less than 10% of the Contract Price. The participation will be an
accumulative participation over the contract.
Execution of Subcontracts:
27.5.1. The Contractor shall provide with each Job Order Price
Proposal a list of proposed subcontractors and type of
work being performed. This list shall be provided on a form
provided by CITY.
27.5.2. The Contractor shall not commit to or finalize subcontracts
with any subcontractors until receipt of approval of each
subcontractor and receipt of a Job Order by the CITY. No
subcontractor shall be used that is excluded from Federal,
State or CITY of Miami Beach procurement programs nor
those who have been debarred or otherwise excluded from
the CITY procurement system.
27.5.3. Upon receipt of a Job Order, the Contractor shall
immediately enter into each approved subcontract, and
thereafter shall neither terminate any such subcontract nor
reduce the scope of the work to be performed by, or
March 2004
Page 91
m
~.
-
project Manual
decrease the price to be paid to the subcontractor
thereunderwithout prior notification to CITY.
27.5.4. If the CITY rejects any sub contractor or architectural and
engineering firm proposed, it is hereby agreed that the
rejection will not be the basis for an increase in the Job
Order Price Proposal.
27.6. Procedure for Changing Listed Subcontractors:
A subcontractor may be changed only subsequent to notification to
and approval from the CITY. The notification of change shall state
reasons for the change with a release from the listed subcontractor
attached thereto.
27.7. The Contractor shall give his/her personal attention constantly to the
faithful performance of the works shall keep the same under his/her
own control, and shall not assign the contract by power of attorney or
otherwise, nor sublet the work or any part thereof, without the
previous written consent of the CITY.
27.8. If an approved SUbcontractor elects to subcontract any portion of its
subcontract, the proposed sub-subcontract shall be submitted in the
same manner as directed above.
27.9. Wherever the wordSubcontr'actor appears, it also means sub-
Subcontractor.
27.10. No Subcontractor shall be permitted on the Site unless such
subcontractor is approved. Before entering into any subcontract
hereunder, the Contractor shall inform the Subcontractor fully and
completely of all provisions and requirements of this Contract relating
either directly or indirectly to the Work to be performed and the
. materials to be furnished under such subcontract, and every such
Contractor shall expressly stipulate that all labor performed and
materials furnished thereunder shall strictly comply with the
requirements of the Contract.
27.11. The agreement between the Contractor and its Subcontractors shall
contain the same terms and conditions as to method of payment for
Work, labor and materials, and as to retained percentages as are
contained in this Contract.
27.12. The Contractor shall pay all Subcontractors for and on account of
Work performed by such Subcontractors in accordance with the
terms of their respective subcontracts. If and when required by the
CITY, the Contractor shall submit satisfactory evidence that it has
made such payment.
Page 92
City of Miami Beach
copyright 0 2004 The Gordian Group
March 2004
Bra
-=-
Project Nlanual
27,13. The CITY's approval of a Subcontractor shall not relieve the
Contractor of any of its. responsibilities, duties and liabilities
hereunder. The Contractor shall be solely responsible tothe CITY for
the acts, omissions or defaults of its Subcontractor and of such
Subcontractor's officers, agents and employees, each of whom shall,
for this purpose, be deemed to be the agent or employee of the
Contractor to the extent of its subcontract.
27.14. The Contractor shall cause appropriate provision to be inserted in all
subcontracts relative to the work to require compliance by each
subcontractor with the applicable provisions contained in the
Contract.
27.15, Nothing contained in the contract documents shall create any
contractual relation between any subcontractor and the CITY.
27.16. No Subcontractor shall be permitted to perform Work at the Site until
it has fumished satisfactory evidence of insurance as required by the
CITY.
27.17. The Contractor shall promptly, upon request, file with the CITY a
conformed copy of any subcontract.
27.18. Contractor Liable and Responsible To CITY:
27.18.1. The Contractor shall be held liable by CITY for the
performance of all the . work provided for under this
Contract. These specifications make no attempt to fix the
scope of the work of the subcontractors or the
responsibility . of any such subcontractors, it being
understood that the Contractor shall fix the scope of all
work and responsibilities of the subcontractors.
27.18.2. The Contractor's use of Subcontractors shall not diminish
the Contractor's. obligations to complete the Work in
accordance with the Contract. The contractor shall not be
released from any part of his/her liabilities or obligations
under his/her contract should any subcontractor fail to
perform in a satisfactory manner the work undertaken by
him. The Contractor shall control and coordinate the Work
of its Subcontractors.
27.18.3. Any disputes which may arise in this connection between
the Contractor and any subcontractor must be settled
between the parties concerned. CITY will not undertake or
be in any way responsible for the settlement of such
disputes.
March 2004 Page 93
.
~'
F'roJect Manual
28. Separate Contracts:
28.1. CITY reserves the right to let other contracts in connection with this
Project. CONTRACTOR shall afford other persons reasonable
opportunity for the introduction and storage of their materials and the
execution of their work and shall properly connect and coordinate this
Work with theirs.
28.2. If any part of CONTRACTOR's Work depends for proper execution or
tesults upon the work of any other persons, CONTRACTOR shall
inspect and promptly report to the CITY and or Program Manager
any defects in such work that render it unsuitable for such proper
execution and results. CONTRACTOR's failure to so inspect and
teport shall constitute an acceptance of the other person's work as fit
and proper for the reception of CONTRACTOR's Work, except as to
defects which may develop in other contractor's work after the
execution of CONTRACTOR's.
28.3. CONTRACTOR shall conduct its operations and take all reasonable
steps to coordinate the prosecution of the Work so as to create no
interference or impact on any other contractor on the site. Should
such interference or impact occur, CONTRACTOR shall be liable to
the affected contractor for the cost of such interference or impact.
28.4. To insure the proper execution of subsequent work, CONTRACTOR
shall inspect the work already in place and shall at onCe report to the
CITY and or Program Manager any discrepancy between the
executed work and the requirements of the Contract Documents.
29. Use of Completed Portions:
29.1. CITY shall have the right at .its sole option to take. possession of and
use any completed or partially completed portions of the Project.
Such possession and use shall not be deemed an acceptance of any
of the Work not completed in accordance with the Contract
Documents. If such possession and use increases the cost of or
delays the Work, CONTRACTOR shall be entitled to reasonable
extra compensation, or reasonable extension of time or both, as
recommended by Program Manager and or CITY.
29.2. In the event CITY takes possession of any completed or partially
completed portions of the Project, the following shall occur:
29.2.1. CITY shall give notice to CONTRACTOR in writing at least
thirty (30) calendar days prior to CITY's intended
occupancy of a designated area.
Page 94
City of Miami Beach
copyright 0 2004 The Gordian Group
March 2004
.
.-
.-.,~
Project Manual
29.2.2.
29.2.3.
29.2.4.
29.2.5.
. .
CONTRACTOR shall complete to the point of Substantial
Completion the designated area and request inspection
and issuance of a Certificate of Substantial Completion in
the form attached hereto as 00925 from the CITY and or
Program Manager.
Upon CITY's issuance of a Certificate of Substahtial
Completion, CITY will assume full responsibility for
maintenance, utilities, subsequent damages of CITY and
public, adjustment of insurance coverages and start of
warranty for the occupied area.
CONTRACTOR shall complete all items noted on the
Certificate of Substantial Completion. within the time
specified by the CITY and or Program Manager on the
Certificate of Substantial Completion, as soon as possible
aM request final inspection and final acceptance of the
portion of the Work occupied. Upon completion of final
inspection and receipt of an application for final payment,
the CITY and or Program Manager shall issue a Final
Certificate of Payment relative to the occupied area.
If CITY finds it necessary to occupy or use a portion or
portions of the Work prior to Substantial Completion
thereof, such occupancy or use shall not commence prior
to a time mutually agreed upon by CITY and
CONTRACTOR and to which the insurance company or
companies providing the property insurance have
consented by endorsement to the policy or policies.
Insurance on the unoccupied or unused portion or portions
shall not be canceled or lapsed on account of such partial
occupancy or use. Consent of CONTRACTOR and of the
insurance company or companies to such occupancy or
use shall not be unreasonably withheld.
30. Lands fot Work:
30.1. CITY shall provide, as may be indicated in the Contract Documents,
the lands upon which the Work is to be performed, rights-of-way and
easements for access thereto and such other lands as are
designated by CITY or the use of CONTRACTOR.
30.2. CONTRACTOR shall provide, at CONTRACTOR'S own expense and
without liability to CITY, any additional land and access thereto that
may be required for temporary construction facilities, or for storage of
March 2004
Page 95
City of Miami Beach
copyright C 20041he Gordian Group
.""'-
~
-=-
Project Manual
materials. CONTRACTOR shall furnish to CITY copies of written
permission obtained by CONTRACTOR from the owners of such
facilities.
31. Legal Restrictions and Traffic Provisions:
31.1. CONTRACTOR shall conform to and obey all applicable laws,
regulations, or ordinances with regard to labor employed, hours of
work and CONTRACTOR's general operations. CONTRACTOR
shall conduct its operations so as not to close any thoroughfare, nor
interfere in any way with traffic on railway, highways, or water,
without the prior written consent of the proper authorities.
32. LOCation and Damage to Existing Facilities, Equipment or Utilities:
32.1. As far as possible, all existing utility lines in the Project area have
been shown on the plans. However, CITY does not guarantee that
all lines are shown, or that the ones indicated are in their true
location. It shall be the CONTRACTOR'S responsibility to identify
and locate all underground and overhead utility lines or equipment
affecting or affected by the Project. No additional payment will be
made to the CONTRACTOR because of discrepancies in actual and
plan location of utilities, and damages suffered as a result thereof.
32.2. The CONTRACTOR shall notify each utility company involved at
least ten (10) days prior to the start of construction to arrange for
~ositive underground location,relocation or support of its utility where
that utility may be in conflict With or endangered by the proposed
construction. Relocation of water mains or other utilities for the
convenience of the CONTRACTOR shall be paid by the
CONTRACTOR. All charges by utility companies for temporary
support of its utilities shall be paid for by the CONTRACTOR. All
costs of permanent utility relocation to avoid conflict shall be the
responsibility of the utility company involved. No additional payment
will be made to the CONTRACTOR for utility relocations, whether or
not said relocation is necessary to avoid conflict with other lines.
32.3. The CONTRACTOR shall schedule the work in such a mannerthat
the work is not delayed by the utility providers relocating or
supporting their utilities. The CONTRACTOR shall coordinate its
activities with any and all public and private utility providers
occupying the right-of-way. No compensation will be paid to the
CONTRACTOR for any loss of time or delay.
32.4. All overhead, surface or underground structures and utilities
encountered are to be carefully protected from injury or
displacement. All damage to such structures is to be completely
Page 96
City of Miami Beach
copyright C 2004 The GordlM Group
March 2004
..,I'M.
~
-:::.:-
Project Manual
34.
repaired within a reasonable time; needless delay will not be
tolerated. The CITY reserves the right to remedy such damage by
ordering outside parties to make such repairs at the expense of the
CONTRACTOR. All such repairs made by the CONTRACTOR are to
be made to the satisfaction of the utility owner. All damaged utilities
must be replaced or fully repaired. All repairs are to be inspected by
the utility owner prior to backfilling.
Value Engineering:
33.1. CONTRACTOR may request substitution of materials, articles,
pieces of equipment or any changes that reduce the Contract Price
by making such request to the CITY and or Program Manager in
Writing. The CITY and or Program Manager will be the sole judge of
acceptability, and no substitute will be ordered, installed, used or
initiated without the CITY's and or Program Manager's prior written
acceptance which will be evidenced by either a Change Order or an
approved Shop Drawing. However, any substitution accepted by the
CITY and or Program Manager shall not result in any increase in the
Contract Price or Contract Time. Any substitution submitted by
CONTRACTOR must meet the form, fit, function and life cycle criteria
of the item proposed to be replaced and there must be a net dollar
savings including the CITY and or Program Manager's review fees
and charges. If a substitution is approved, the net dollar savings
shall be processed as a deductive Change Order. CITY may require
CONTRACTOR to fumishat CONTRACTOR's expense a special
performance guarantee or other surety with respect to any substitute
approved after award of the Contract.
Continuing the Work:
34.1. CONTRACtOR shall carry on the Work and adhere to the progress
schedule during all disputes or disagreements with CITY, including
disputes or disagreernents concerning a request for a Change Order,
are quest for a change in the Contract Price or Contract Time. The
Work shall not be delayed or postponed pending resolution of any
disputes or disagreements. .
Changes in the Work or Terms of Contract Documents:
35.1. Without invalidating the Contract and without notice to any surety
CITY reserves and shall have the right, from time to time to make
such increases, decreases or other changes in the character or
quantity of the Work as may be considered necessary or desirable to
complete fully and acceptably the proposed construction in a
satisfactory manner, Any extra or additional work within the scope of
33.
35.
City of Miami Beach
copyright C 2004 The Gordian Group
Page 97
Project Manual
lb
~
this Project must be accomplished by means of appropriate Field
Orders and Supplemental Instructions or Change Orders issued
through a Job Order with the required Documentation.
35.2. Any changes to the terms of the Contract Documents must be
contained in a written document, executed by the parties hereto, with
the same formality and of equal dignity prior to the initiation of any
work reflecting such change. This section shall not prohibit the
issuance of Change Orders through a Job Order with the required
Documentation executed only by CITY as hereinafterprovided.
36. Field.Orders and Supplemental Instructions:
36.1. The Contract Administrator, through the CITY and . or Program
Manager, shall have the right to approve and issue Field Orders
setting forth written interpretations of the intent of the Contract
Documents and ordering minor changes in Work execution, providing
the Field Order involves no change in the Contract Price or the
Contract Time.
36.2. The CITY and or Program Manager shall have the right to approve
and issue Supplemental Instructions setting forth written orders,
instructions, or interpretations concerning the Contract Documents or
its performance, provided such Supplemental Instructions involve no
change in the Contract Price or the Contract Time.
37. Change Orders:
37.1. The CITY without invalidating the Contract, may order changes in the
Work by altering, adding to or deducting from the Job Order, by
issuing an additional Job Order. . All changes are to be Owner
initiated as aresult of: 1) change inthe original scope of work or 2) a
hidden condition requiring the use of work tasks or non pre-priced
tasks not in the Contractor's original Price Proposal. All such Work
shall be executed under the conditions of the original contact.
37.2. No changes shall be made without a written Job Order from the
CITY. No claim for an additional Job Order amount shall be valid
unless so ordered and authorized by issuance a Job Order.
37.3. Changes will be considered as a new Job Order and such will follow
the procedures outlined in Article 12 of the Ordering Procedures in
the JOC Supplemental Conditions.
37.4. Changes in the quantity or character of the Work within the scope of
work of the Project which are not properly the subject of Field Orders
or Supplemental Instructions, including all changes resulting in
changes in the Contract Price, or the Contract Time, shall be
Page 98
City of Miami Beach
copyrighl 02004 The Gordian Group
March 2004
.
~
.~
Project Manual
authorized only by Change Orders, issued with a Job Order with the
required documentation and approved in advance and issued in
accordance with the provisions of the CITY.
37.5. All changes to construction contl<lcts must be approved in adVance in
accordance with the value of the Change Order or the calculated
value of the time extension.
37.6. In the event satisfactoryadjustinent cannot be reached for any item
requiring a change .in the Contract Price or Contract Time,and a
Change Order has not been issued, CITY reserves the right at its
sole option to either terminate the Contl<lct as it applies to the items
in question and make such arrangements as may be deemed
necessary to complete the disputed work; or submit the matter in
dispute to Contract Administrator as set forth in Article 12 hereof.
During the pendency of the dispute, and upon receipt of a Change
Order approved by CITY, CONTRACTOR shall promptly proceed
with the change in the Work involved and advise the Contract
Administrator in writing within seven (7) calendar days of
CONTRACTOR's agreement or disagreement with the method, if
any, provided in the Change Order for determining the proposed
adjustment in the Contract Price or Contract Time.
37.7. Under circumstances determined necessary by CITY, Change
Orders may be issued unilaterally by CITY.
38. Value of Change Order Work:
38.1. The value of any work covered by a Change Order or of any claim for
an increase or decrease in the Contract Price shall be determined as
followings:
38.2. All changes, or order of extra Work shall be paid for at the Unit Prices
set forth in the Construction Task Catalog or as Non Pre-priced
Tasks. Credits for the omission or reduction of Work shall be paid in
the same manner.
38.3. For each change, omission or extra Work ordered by the CITY, the
contractor shall submit a Job Order Price Proposal in writing to the
CITY stating a lump sum amount and shall state the extent to which
the contract time shall thereby be increased or decreased.
38.4. All Job Order Price Proposals shall be submitted promptly.
39. Notification ahd Claim for Change of COhtract Time:
39.1. Any claim for a chahge in the Contract Time shall be made by written
notice by CONTRACTOR to the Contract Administrator and or
City of Miami Beach
copyright 10 2004 The GotcHan Group
Page 99
ProJ&ctMallual
Pro!;jram Manager within one (1) calendar day of the commencement
of the event giving rise to the claim and stating the general nature
and cause of the claim. The CITY will. consider the request for
additional time to complete the Job Order and render its judgement
within five (5) days. If the CITY and CONTRACTOR cannot agree, a
determination shall be determined by Contract Administrator in
accordance with Article 12 hereof. IT IS EXPRESSLY AND
SPECIFICALLY AGREED THAT ANY AND ALL CLAIMS FOR
CHANGES TO THE CONTRACT TIME OR CONTRACT PRICE
SHALL BE WAIVED IF NOT SUBMITTED IN STRICT
ACCORDANCE WITH THE REQUIREMENTS OF THIS SECTION.
39.2. The Contract Time will be extended in an amount equal to time lost
on critical Work items due to delays beyond the control of and
through no fault or negligence of CONTRACTOR if a claim is made
therefor as provided in Section 39.1. Such delays shall include, but
not be limited to, acts or neglect by any separate contractor
employed by CITY, fires, floods, labor disputes, epidemics, abnormal
weather conditions or acts of God.
. 40. No Damages for Delay:
40.1. No claim for damages or any claim, othEirthan for an extension of
time, shall be made or asserted against CITY by reason of any
delays except as provided herein. CONTRACTOR shall not be
entitled to an increase in the Contract Price or payment or
compensation of any kind from CITY for direct, indirect,
consequential, impact or other costs, expenses or damages,
including but nbtlimited to costs of acceleration or inefficiency,
arising because of delay, disruption, interference or hindrance from
any cause whatsoever, whether such delay, disruption, interference
or hindrance be reasonable or unreasonable, foreseeable or
unforeseeable, or avoidable or unavoidable; provided, however, that
this . provision shall not preclude recovery of damages by
CONTRACTOR for actual delays due solely to fraud, bad faith or
active interference on the part of CITY and or Program Manager.
Otherwise, CONTRACTOR shall be entitled only to extensions of the
Contract Time as the sole and exclusive remedy for such resulting
delay, in accordance with and to the extent specifically provided
above.
41. Excusable Delay; Compensable; Non-Compensable:
41.1. Excusable Delay: Delay which extends the completion of the Work
and which is caused by circumstances beyond the control of
i......IJiti<..........................................................
u.I
~
Page 100
March 2004
Project Manual
CONTRACTOR or its subcontractors, suppliers or vendors is
Excusable Delay.
41.2, CONTRACTOR is entitled to a time extension of the Contract Time
for each day the Work is delayed due to Excusable Delay.
CONTRACTOR shall document its claim for any time extension as
provided in Article 39 hereof.
41.3. Failure of CONTRACTOR to comply with Article 39 hereof as to any
particular event of delay shall be deemed conclusively to constitute a
waiver, abandonment or relinquishment of any and all claims
resulting from that particular event of delay.
41.3. Excusable Delay may be. compensable or non-compensable:
41.4.1. Compensable Excusable Delay:
41.4.1.1. EXCusable Delay is compensable when {i) the
delay extends the Contract Time, (Ii) is caused by
circumstances beyond the control of the
CONTRACTOR Or its subcontractors, suppliers or
vendors, and (Iii) is caused solely by fraud, bad
faith or active interference on the part of CITY or
its agents, In no event shall CONTRACTOR be
compensated for interim delays which do not
extend the Contract Time.
41.4.1.2. CONTRACTOR shall be entitled to direct and
indirect costs for Compensable Excusable Delay.
Direct costs recoverable by CONTRACTOR shall
be limited to the actual additional costs allowed
pursuant to Article 38 hereof.
41.4.1.3. CITY and CONTRACTOR recognize and agree
that the amount of CONTRACTOR's precise
actual indirect costs for delay in the performance
and completion of the Work is impossible to
determine as of the date of execution of the
Contract Documents, and that proof of the precise
amount will be difficult. Therefore, indirect costs
recoverable by the CONTRACTOR shall be
liquidated on a daily basis for each day the
Contract Time is delayed due to a Compensable
Excusable Delay. These liqUidated indirect costs
shall be paid to compensate CONTRACTOR for
all indirect costs caused by a Compensable
Excusable Delay and shall include but not be
City of Miami Beach
copyright 0 2004 The Gordian Group
Page 101
Project Manual
.
.....~:
41.4.2.
limited to, all profit on indirect costs, home office
overhead, acceleration, loss of earnings, loss of
productivity, .Ioss of bonding capacity, loss of
opportunity and all otMr indirect costs incurred by
CONTRACTOR. The amount of liquidated indirect
costs recoverable shall be as listed in Article 19 of
the JOC Supplemental Conditions per day for
each calendar day the Contract is delayed due to
a compensable Excusable Delay.
Non-Compensable Excusable Delay:
41.4.2.1. When Excusable Delay is (i) caused by
circumstances beyond the control of
CONTRACTOR, its subcontractors, suppliers and
vendors,and is also caused by circumstances
beyond the control of the CITY or Program
Manager, or (ii) is caused jointly or concurrently by
CONTRACTOR or its subcontractors, suppliers or
vendors and by the CITY. or Program Manager,
then CONTRACTOR shall be entitled only to a
time extension and no further compensation for
the delay.
Substantial Completion:
42.1. When CONTRACTOR considers that the Work, or a portion thereof
. designated by CITY pursuant to Article 29 hereof, has reached
Substantial Completion, CONTRACTOR shall so notify CITY and or
Program Manager in writing. Program Manager and or CITY shall
then promptly inspect the. Work. When CITY and or Program
Manager, on the basis of such an inspection, determines that the
Work or designated portion thereof is substantially complete, it will
then prepare a Certificate of Substantial Completion in the form
attached hereto as Form 00925 which shall establish the Date of
Substantial Completion; shall state the responsibilities of CITY and
CONTRACTOR for security, maintenance, heat, utilities, damage to
the Work, and insurance; and shall list all Work yet to be completed
to satisfy the requirements of the Contract Documents for Final
Completion. The failure to include any items of corrective work on
such list does not alter the responsibility of CONTRACTOR to
complete ail of the Work in accordance with the Contract Documents.
Warranties required by the Contract Documents shall commence on
the date of Substantial Completion of the Work or designated portion
thereof unless otherwise provided in the Certificate of Substantial
. Page 102
City of Mlaml.Beach
copyright 10 2004lhe Gordian Group
March 2004
~
Pr()ject Manual
completion. The Certificate of Substantial Completion shall be
submitted to CITY through the Contract Administrator and
CONTRACTOR for their written acceptance of the responsibilities
assigned to them in such Certificate.
43. No Interest:
43.1. Any monies not paid by CITY when claimed to be due to
CONTRACTOR under this Agreement, including, but not limited to,
any and all claims for contract damages of any type, shall not be
subject to interest including, but not limited to prejudgment interest.
However, the provisions of CITY's prompt payment ordinance, as
such relates to timeliness of payment, and the provisions of Section
218.74(4), Florida Statutes (1989) as such relates to the payment of
interest, shall apply to valid and proper invoices.
43. Shop Drawings and Samples:
44.1. CONTRACTOR shallsubrrlit Shop Drawings and or Samples as
required and or as listed in the RFP for individual Job Orders. The
purpose of the Shop Drawings is to show the suitability, efficiency,
technique of manufacture,installation requirements, details of the
item and evidence of its compliance or noncompliance with the
Contract Documents.
44:2. Within the time specified on the RFP in calendar days after the
Project Initiation Date specified . in the Notice to Proceed,
CONTRACTOR shall submit to CITY and or Program Manager a
complete list of preliminary data on items for which Shop Drawings
are to be submitted and shall identify the critical items. Approval of
this list by CITY and or Program Manager shall in no way relieve
CONTRACTOR from submitting complete Shop Drawings and
providing materials, equipment, etc., fully in accordance with the
Contract Documents. This procedure is required in order to expedite
final approval of Shop Drawings.
44.3. After the approval of the list of items required in Section 44.2 above,
CONTRACTOR shall promptly request Shop Drawings from the
various manufacturers, fabricators, and suppliers. CONTRACTOR
shall include all shop draiNingsand other submittals in its certification.
44.4. CONTRACTOR shall thoroughly review . and check the Shop
Drawings and each and every copy shall show this approval thereon.
44.5. If the Shop Drawings.show.or indicate departures from the Contract
requirements, CONTRACTOR shall make specific mention thereof in
its letter of transmittal. Failure to point out such departures shall not
Project Man ual
.
. ."-----:..
---r-
relieve CbNTRACTOR from its responsibility to comply with the
Contract Documents.
44.6. CITY and or Program Manager sh~1I review and approve Shop
Drawings within fifteen (15) calendar days from the date received,
unless said Drawings are rejected by CITY and or Program Manager
for material reasons. CITY'S and or Program Manager's approval of
Shop Drawings will be general and shall not relieve CONTRACTOR
of responsibility for the accuracy of such Drawings, nor for the proper
fitting and construction of the work, nor for the furnishing of materials
or work required by the Contract Documents and not indicated on the
Drawings. No work called for by Shop Drawings shall be performed
until the said Drawings have been approved by CITY and or Program
Manager. Approval shall not relieve CONTRACTOR from
responsibility for errors or omissions of any sort on the Shop
Drawings.
44.7. No approval will be given to p~rtial submittals of Shop Drawings for
items which interconnect and/or are interdependent where necessary
to properly evaluate the design. It is CONTRACTOR's responsibility
to assemble the Shop Drawings for all such interconnecting and/or
interdependent items, check them and then make one submittal to
CITY and or Program Manager along with its comments as to
compliance, noncompliance, or features requiring special attention.
44.8. If catalog sheets or prints of manufacturers' standard drawings are
submitted as Shop Drawings, any additional information or changes
on such drawings shall be typewritten or lettered in ink.
44.9. CbNTRACTOR sh~1I submit the number of copies required by CITY
~nd or Program Manager. Re-submissions of Shop Drawings shall
. be made in the same quantity until final approval is obtained.
44.10. CbNTRACTOR shall keep one set of Shop Dr~wings marked with
CITY's approval at the job site at all times.
45. Field Layoutof the Work and Record Drawings:
45.1. During the construction of a JOC Job Order, the entire responsibility
for establishing and maintaining line and grade in the field lies with
CONTRACTOR. Furthermore the CONTRACTOR shall maintain an
accurate and precise record of the location and elevation of all
constructed items such .as: pipe Iines,conduits, structures,
maintenance access structures, hand holes, fittings and the like.
CONTRACTOR shall deliver these. records in good order to CITY and
or Program Manager as the Work is completed. The cost of all such
field layout and recording work is included in the bid adjustment
Page 104
City of Miami Beach
copyright II> 2004 The Gordian Group
g
~
." ~..
Project Manual
46.
factor'S. All record drawings shall be made on reproduCible paper
and shall be delivered to CITY and or Program Manager prior to, and
as a condition of, final payment.
45.2. CONTRACTOR shall maintain in a.safe place at the Project site One
record copy of all Drawings; Plans, Specifications, Addenda, written
amendments, Change Orders, Field Orders and written
interpretations and clarifications in good orderand annotated to show
all changes made during construction. These record documents
together with all approved samples and a counterpart of all approved
Shop Drawings shall be available at all times to CITY and or Program
Manager for reference.
45.3. Prior to, and as a condition precedent to Final Payment,
CONTRACTOR Shall submit to CITY, CONTRACTOR's record
drawings or as-built drawings acceptable to CITY and or Program
. Manager as listed in Article 46. If no drawings were provided by the
CITY or developed by the Contractor, the City may require the
Contractor, at no expense to the CITY, to provide "as-builts. to
properly document the Work. The CITY will specify the form of As-
Built drawings that will be required, based on what is practicable to
both parties to the Contract.
As-Built Drawings:
46.1. As the Work progresses, the Contractor and the Subcontractor for
each trade or division of Work, under the direction of the Contractor,
shall keep a complete and accurate record of the following:
46.2. Changes and deviations between the Work as shown on the Contract
Documents (if drawings provided by the CITY or developed by the
Contractor) and shop drawings indicating the Work as actually
installed.
46.3. The specific locations of piping, valves duct Work, equipment, and
Other such Work which were not located or changed location on the
Drawings and shop drawings.
46.4. Equipment schedules indicating manufacturer's names and model
numbers.
46.5. The As-Built Documents shall be arranged in a Idgicalorder, and in
accordance with the various provisions of the Specifications (if any).
and properly indexed. The Contractor shall review them for
completeness prior to submittal to the CITY. At the completion of the
Work. the Contractor and each Subcontractor shall certify by
endorsement thereof that each of the revised sepia mylar of the
March 2004 City of Miami Beach
copyright C 2ClO4 The Gordian Group
m
.-=;;;;;;;::-
Project Manual
Drawings and copy of Specifications and shop drawings is complete
and accurate.
47. Safety and Protection:
47.1. CONTRACTOR shall be solely responsible for initiating,maintaining
and supervising all safety precautions and programs in connection
With the Project. CONTRACTOR shall take all necessary precautions
for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
47.1.1. All employees on the work site and other persons who may
be affected thereby;
47.1.2. All the work and all materials or equipment to be
incorporated therein, whether in storage on or off the
Project site; and
47.1.3. Other property at the Prbjectsite or adjacent thereto,
including trees,. shrubs, lawns, walks, pavements,
roadways. structures and utilities not designated for
removal, relocation or replacement in the course of
construction.
47.2. CONTRACTOR shall comply with all applicable laws, ordinances,
rules, regulations and orders of any public body having jurisdiction for
the safety of persons or property or to protect them from damage,
injury or loss; and shall erect and maintain all necessary safeguards
for such safety and protection. CONTRACTOR shall notify owners of
adjacent property and utilities . when prosecution of the work. may
affect them, All damage, injury or loss to any propElrty referred to in
Article 32 above, caused directly or indirectly, in whole or in part, by
CONTRACTOR, any Subcontractor or anyone directly or indirectly
employed by any of them or anyone for whose acts any of them may
be liable, shall be rElmedied by CONTRACTOR. CONTRACTOR's
. dutiEls and responsibilities for the safety and protection of the work.
shall continue until such time as all the Work is completed and
Program Manager has iSSUEld a notice to CITY and CONTRACTOR
that the Work is acceptable except as otherwise provided in Article
29 hereof.
47.3. CONTRACTOR shall designate a responsible member of its
organization at the Work site whose duty shall be the prevention of
accidents. This person shall be CONTRACTOR's superintendent
unless otherwise designated in Writing by CONTRACTOR to CITY.
Page 106 City of Miami Beach
copyright 10 2004 The Gordian Group
tb
.-
.'~
Project Manual
48.
49.
50.
51.
Payment by CITY for Tests:
48.1. Except when otherWise specified in the Contract Documents and or
RFP, the expense of all tests requested by CITY and or Program
Manager shall be borne by CITY and performed by a testing firm
chosen by CITY and or Program Manager. For road construction
projects the procedure for making tests required by CITY and or
Program Manager will be in conformance with the most recent edition
of the State of Florida, Department of Transportation Standard
Specifications for Road and Bridge Construction. The cost of any
required test which CONTRACTOR fails shall be paid for by
CONTRACTOR. Any testing the CITY and or Program Manager
request the Contractor to perform will be identified in the Detailed
Scope of Work and the cost submitted in the Contractor's Price
proposal.
PrOject Sign:
49.1. Any requirements for a project sign shall be as set forth in the
Detailed Scope of Work and or Technical Specifications.
Hurricane Precautions:
50.1. During such periods of time as are designated by the United States
Weather Bureau as being a hurricane warning or alert, the
CONTRACTOR, at no cost to the CITY, shall take all precautions
necessary to secure the Project site in response to all threatened
storm events, regardless of whether the CITY and or Program
Manager has given notice of same.
50.2. Compliance with any specific hurricane warning or alert precautions
will not constitute additional work.
50.3. Additional work relating to hurricane warning. or alert at the Project
site will be addressed by a Change Order in accordance with Section
37, General Conditions.
50.4. Suspension of the Work caused by a threatened or actual storm
event, regardless of whether the CITY has directed such suspension,
will entitle the CONTRACTOR to additional Contract Time as non-
compensable, excusable delay, and shall not give rise to a claim for
compensable delay.
Cleaning Up; CITY'S Rightto Clean Up:
51.1. CONTRACTOR shall at all times keep the premises free from
accumulation of waste materials or rubbish caused by its operations.
At the completion of the Project, CONTRACTOR shall remove all its
March 2004
Page 107
City of Miami Beach
oopyrlght C 2004 The Gordian Group
i.~i.................d.....
~
~
-::::-
Project Manual
waste materials and rubbish from and about the Project as well as its
tools, construction equipment, machinery and surplus materials. If
CONTRACTOR fails to clean up during the prosecution of the Work
or at the completion of the Work, CITY may do so and the cost
thereof shall I be charged to CONtRACTOR. If a dispute arises
between CONTRACTOR and separate contractors.. as to their
responsibility for cleaning up, CITY may clean up and charge the cost
thereof to the contractors responsible therefor as CITY and or
Program Manager shall determine to be just.
52. Removal of Equipment:
52.1. In case of termination of this Contract before completion for any
cause whatever, CONTRACTOR, if notified to do so by CITY, shall
promptly remove any part or all of CONTRACTOR's equipment and
supplies from the property of CITY, failing which CITY shall have the
right to remove such equipment and supplies at the expense of
CONTRACTOR.
53. Nondiscrimination, Equal EmployrrientOpportuhity, and Americans with
Disabilities Act:
53.1. CONTRACTOR shall. not unlaWfully discriminate against any person
in its operations and activities or in its use or expenditure of funds in
fulfilling its obligations under this Agreement. CONTRACTOR shall
affirmatively comply with all applicable provisions of the Americans
with Disabilities Act (ADA) in the course of providing any services
funded by CITY, including Titles I and 11 of the ADA (regarding
nondiscrimination on the basis of disability), and all applicable
regulations, guidelines, and standards. In addition, CONTRACTOR
shall take affirmative steps to ensure nondiscrimination in
employment against disabled persons.
53.2. CONTRACTOR's decisions · regarding the delivery of services under
this Agreement shall be made without regard to or consideration of
race, age, religion, color, gender, sexual orientation, national origin,
marital status, physical or mental disability, political affiliation, or any
other factor which cannot be laWfully used as a basis for service
delivery.
53.3. CONTRACTOR shall not engage in or commit any discriminatory
practice in violation of CITY of Miami Beach Ordinance No, 92-2824
in performing any services pursuant to this Agreement.
March 2004
Page 108
.
:'.:"-~',:'
Project Manual
project Records:
54.1. CITY shall have the rightto inspect and copy, at City's expense, the
books and records and accounts of CONTRACTOR which relate in
any way to the Project, and to any claim for additional compensation
made by CONTRACTOR, and to conduct an audit of the financial
and accounting records of CONTRACTOR which relate to the Project
and to any claim for additional compensation made by
CONTRACTOR. CONTRACTOR shall retain and make available to
CITY all such . books and records and accounts, financial or
otherwise, which relate to the Project and to any claim for a period of
three (3) years following Final Completion of the Project. During the
Project and the three (3) year period following Final Completion of
the Project, CONTRACTOR shall provide CITY access to its books
and records upon seventy-two (72) hours written notice.
OCcupational Health and Safety:
55.1. In compliance with Chapter 442, Florida Statutes, any toxic
substance listed in Section 38F-41.03 of the Florida Administrative
Code delivered as a result of this bid must be accompanied by a
Material Safety Data Sheet (MSDS) which may be obtained from the
manufacturer. The MSDS must include the following information:
55.2. The chemical name and the common named the toxic substance.
55.3. The hazards or other risks in the use of the toxic substance,
including:
55.3.1. The potential for fire, eXplosion, corrosion, and reaction;
55.3.2. The known acute and chronic health effects of risks from
exposure, including the medical conditions which are
generally recognized as being aggravated by exposure to
the toxic substance; and
55.3.3. The primary routes of entry and symptoms of
overexposure.
55.4. The proper precautions, handling practices, necessary personal
protective equipment, and other safety precautions in the use of or
exposure to the toxic substances, including appropriate emergency
treatment in case of overexposure.
55.5. The emergency prdcedure for spills,fire, disposal, and first aid.
55.6. A description in lay terms of the known specific potential health risks
posed by the toxic substance intended to alert any person reading
this information.
54.
55.
Project Manual
&
~.
55.7. The year arid rnonth, if available, that the information was compiled
and the name, address, and emergency telephone number of the
manufacturer responsible for preparing the information.
55.8. Asbestos:
55.8.1. THE CONTAACTOR.IS WARNED THAT EXPOSURE TO
AIRBORNE ASBESTOS HAS BEEN ASSOCIATED WITH
FOUR DISEASES: LUNG CANCER, CERTAIN
GASTROINTESTINAL CANCERS, PLEURAL OR
PERITONEAL MESOTHELlOMAAND ASBESTOSIS.
Studies indicate there are significantly increased health
dangers to persons exposed to asbestos who smoke, and
further, to family members and otMr persons who become
indirectly exposed as a result of the exposed worker
bringing asbestos-laden work clothing home to be
laundered.
55.8.2. The COhtractoris advised that friable and/or nonfriable
asbestos-containhigmaterial may be encountered in
area(s) where coritract work is to be performed. Friable
asbestos containing material means any material that
contains more than one percent asbestos by weight that
hand pressure can crumble, pulverize or reduce to powder
when dry. Nonfriable asbestos-containing materials are
materials in which asbestos fibers are bound by a matrix
material, saturant, impregnant or coating. Nonfriable
asbestos-containing materials do not normally release
airborne asbestos fiber during routine handling and end-
use. However, excessive fiber concentrations may be
produced during uncontrolled abrading, sanding, drilling,
cutting, machining, removal, demolition or other similar
activities.
55.8.3. Care must be taken to avoid teleasing or causing to be
released, asbestos fibers into the atmosphere where they
may be inhaled or ingested. The Occupational Safety and
Health Administration (OSHA) has set standards at 29
CFR 1910.1001 for exposure to airborne concentrations of
asbestos, fibers, methods of compliance, medical
surveillance, housekeeping procedures, and other
measures that must be taken when working with or around
asbestos-containing materials. 29 CFR 1910.1001 has
been identified as applicable to construction (29 CFR
1926.55 gases, vapors, fumes, dusts and mists). The
Page 110
City of MiamI Beach
copyright C 2004 1he Gordian G-oup
March 2004
.tb
.~.
.~,.
Project Manual
Environmental Protection Agency (EPA) has established
standards at 40 CFR 61.140-156 for the control of
asbestos emissions. to the environment and the handlirig
and disposal of asbestos wastes. Additionally the Florida
Occupational Safety and Health Administration standards
are applicable to this contract.
55.8.4. Friable asbestos contairiingmaterials are not permitted by
current criteria and shall not be used in new construction or
modification projects (ETL 1110-1-118, 27 May 1983).
Plans and specifications for all new construction and
modification projects will be reviewed to ensure that the
use of friable asbestos-containing materials is not called
for.
55.8.5. Maintenance, modification, or demolition activities where
exposure to asbestos dust may occur from previously
installed friable or nonfriable asbestos-containing material
will be identified. All precautions, to include proper work
practices, medical surveillance, I'espiratory protection,
industrial.. hygiene, . and environmental . protection
requirements of OSHA (29 CFR 1910.1001), EPA (40 CFR
.61.140-156) and DA Circular 40-834, as applicable, shall
be strictly followed.
56. Environmental Regulations:
56.1. The CITY reserves the right to consider a Bidder's history of citations
and/or violations of environmental regulations in investigating a
Bidder's responsibility, and further reserves the right to declare a
Bidder not responsible if the history of violations warrant such
determination in the opinion of the CITY. Bidder shall submit with its
Bid, a complete history of all citations and/or violations, notices and
dispositions thereof. The non-submission of any such documentation
Shall be deemed to be an affirmation by the Bidder that there are no
citations or violations. Bidder shall notify the CITY immediately of
notice of any citation or violation which Bidder may receive after the
Bid opening date and during the time of performance of any contract
awarded to it.
March 2004
City of Miami Beach
copyright 0 2004 The Gordian Group
Proj~ct Manual
00900
. .
$UPPLEMENTARY CONDITION$
PAGE INTENTIONALLY LEFT BLANK
Page 112
City of Miami Beach
copyright 10 2004 The Gordian Group
:.,~
~
PrOject Manual
00&23
ST A YEMEN'" OFCOI\llPLlANCE
(DAVIS BACON ACT)
No.
Contract No.
Project Title
The undersigned CONTRACTOR hereby swearS under penalty of pe~ury that,
during the period covered by the application for payrnent to which this statement is
attached, all mechanics, laborers, and apprentices, employed or working on the site
of the Project, have been paid at wage rates, and that the wage rates of payments,
contributions, or costs for fringe benefits have not been less than those required by
the Davis Bacon Act and the applicable conditions of the Contract.
Dated
,20
Contractor
By
(Signature)
STATE OF )
)SS
COUNTY OF )
The foregoing instrument was acknowledged before me this
of, 20~, by
perSonally known to rne or who has produced
identification and who did/did nottake an oath.
day
who is
as
WITNESS my hand and official seal, this
,20
day of
(NOTARY SEAL)
(Signature of person taking acknowledgment)
My commisSion expireS:
(Serial nurnber, if any)
Project Manual
.
~
;:......;.;....
DAVIS BACON WAS!: DECISIONS AND ASSOCIATED INF=ORMATION
The prevailing wage rates, GENERAL DECISION: &=L2()030001 FL 1, Superseded
General Decision No. FL020001. January 23, 2004 by the Secretary of Labor State
of Florida, with respect to the Job Order Contract(s) follow this page. Wage decision
changes, such as modifications and superseding decisions, shall be effective, if
published before contract award, unless prior to their issuance by the Secretary of
Labor, construction has started, the mortgage has been initially endorsed, or bids
have been opened.
. .
Please note that the Contractor will be required to certify that all laborers and
mechanics engaged in the construction of the project. including those employed by
the subcontractors, have been paid at least the wage rate required by the effective
wage decision, including all changes and additions on projects which are identified
by the CITY as federally funded.
ThEneference wage decisions will be in effect for twelve (12) lTIonths from the date
the Contract is executed. Thereafter, if CITY executes an option to extend the
Contract for an additional term(s) new wage decisions or modifications thereto will
be issued and effective for the next twelve months. The Contractor's adjustment
factOrs will be modified according to Article 6 of the JOC Supplemental General
Conditions.
Page 114
March 2004
..~.............
!:iliW
Project Manual
GENERAL DECISION: FL20()30()()1 01/23/2004 F'L 1
Date: January 23, 2004 .... ... . . .
General Decision Number: FL2D03000101/23/2004
Superseded General Decision Nurnber: FL020001
State: Florida
Construction Type:
BUILDING
County:
Miami-Dade County in Florida.
BUILDING CONSTRUCTION. PROJECTS (does not include single family
homes and apartments up to and including four (4) stories)
o
1
06/13/2003
01/23/2004
Frin~es
ASBE0060-001 09/01/2002
ASBESTOSWORKERIHEAT AND
FROST INSULATOR
.$26.13
6.86
---------------------------------~------------------------------
ELEC0349-001.......06/01/2002
Rates
Fringes
ELECTRICIAN (h1cluding Fire Alarm
Installation ):
Electrical contracts including
materials that are less than
$2,000,000
$20.50
4.30 + 8%
Electrical contracts including
materials that are over $2,000,000 $22.96
4.30 + 8%
---------------------------------------------------~--~------
ELEV0071-001 .......11/01/2001
Rates Fringes
. ELEVAiOR MECHANIC $25.285 7.455+A
FOOTNOTE FOR ELEVATOR CONSTRUCTORS:
A: Employer contributes 8% basic hourly rate for 5 years or
more of service or 6% basic hourly rate for 6 months to 5
City of Miami Beach
copyright C 2004 The Gordian Group
Page 115
PtbjectManual
~
.~
.--"~"
years of service as Vacation Pay Credit; Paid Holidays:
New Year's Day; Memorial Day; Independence Day;
Thanksgiving Day; Christmas Day, plus the Friday after
Thanksgiving.
--~---------------------------~---------------------------------
ENGI0487-001.......,7/0112002
Rates
POWER EQUIPMENT OPERATORS:
Boom Truck Operator $22.40
Crane (Including Truck Crane) $22.40
Crane Oiler (Including Truck Crane) $16.15
Piledrivers $22.40
-----------------.------...;.,.------.........-------..----.----
Fringes
4.50
4.50
4.50
4.50
Rates Fringes
IR.ONWOR.KER.S:
Ornamental
R.einforcing
Structural
$19.75
$19.75
$19.75
4.70
4.70
4.70
Fringes
5.68
Fringes
6.50
Frin!;les
6.27
Fringes
8.97
. March 2004
----------------------------------------------------------------
PLUM0519-001.......03/16/2003
PLUMBER.
Rates
$22.27
..._------------~----------....-----...----------------------------
.PLUMon5-001....,..07/16/2002
. .
PIPEFITTER. (Including HVAC)
Rates
$25.05
----------------------------------------------------------------
SFFL0821 ~001........01/01/2003
SPRINKLER FITTER
Rates
$22.40
---------------------------------------------------------.......-----
SHEE0032~001.......08/12/2003
SHEET METAL WORKE:R
(Including HVAC duct work)
/
Rates
$24.24
---------------------------------------------------------------
.l:D
.-
....;..;....
Project Manual
SUFL 1999~001.......03/04/1999
Rates
$10.00
$15.36
ACOUSTICAL TILE INSTALLER
BRICKLA YERS/BLOCKLA YER
CARPENTER (Including Drywall
Hanging and Batt Installation)
CARPET LAYER
CEMENT MASONS/CONCRETE
FINISHER
. DRYWALL FINISHER
GLAZIER
LABORERS:
Pipelayers $13.81
Plasterer Tenders $10.09
Unskilled (Including Mason Tending) $8.70
PAINTER, BRUSH $9.61
PLASTERER $15,05
POWER EQUIPMENT OPERATORS:
Backhoe
Bulldozer
Concrete Pump Operator
Grader
Loader
Roller
ROOFER
TILE SETTER.
TRUCK DRIVER
$12.90
. $14.25
$14.50
$12.50
$13.05
$15.71
$14.58
$14.78
$15.93
$15.04
$12.84
$9.99
$12.50
$10.95
-------~----~------------~--~_._---------------------------
Fringes
0.62
.2.40
3.15
2.42
2.85
2.85
2.85
2.85
2.85
0.87
1.83
WELDERS ~ Receive rate prescribed for craft performing
operation to which welding is incidental.
--~-------------------------------~------------------~-~~~-----
----------------------------------------------------------------
Unlisted. classifications needed for work not included Within the
. scope of the classifications listed may be added after award only as
provided in the labor standards contract clauses (29CFR 5.5(a)
. (1 )(ii)).
-----------------------------------------------------------------
In the listing above, the "SU" designation means that rates listed
under that identifier do not reflect collectively bargained wage and
fringe benefit rates. Other designations indicate unions whose
rates have been determined to be prevailing.
City of Miami Beach
copyright to 2004 The Gordian Group
Project l\IIanual
.
.:.~
WAGEDETERMINATION APPEALS PROCESS
1.) Has there been an initial decisiOn in the matter?
This Can be:
* an existing published wage determination
* a survey underlying a wage determination
*a Wage and Hour Division letter setting forth a
. position on a wage determination illatter
*a donformanCe (additional classification and rate)
ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and
Hour Regional Office for the area in which the survey was
conducted because those Regional Offices have
responsibility for the Davis-Bacon survey program. ..If the
response from this initial contact is not satisfactory, then the
process described in 2.) and 3.) should be followed.
With regard. to any other illatter hot yet ripe for the. formal. prOc::ess
described here, initial contact should be with the Branch of
Construction Wage Determinations. Write to:
Branch of Construction Wage Determinatidns
Wage and Hour Division
U. S. Department of labor
200 Constitution Avenue, N. W.
Washington, D. C. 20210
2.) If the answer to the question in 1.) is yes, then an interested
party (those affected by the action) can request review and
reconsideration from the Wage and Hour Administrator (See
29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of labor
200 Constitution Avenue, N. W.
Washington, D. C. 20210
The request should be accompanied bya full statement of the
interested party's position and by any information (wage payment
-!
. Project Manual
.
-=-.'-.
GE:NERAL DECISldN: FL20030044FL44
Date: June 13, 2003
General Decision Number. FL20030()44
CCll'lstruction Type:
HIGHWAY
Superseded General Decision No. FL020044
Couhty(ies ):
DADE
. .
HIGHWAY CONSTRUCTldN PROJECTS(excluding tunnels, building structiohS in
rest areas projects, and railroad construction; bascule, suspension & spandrel arch
bridges designed for commercial navigation; bridges invCllving marine construction;
Clther major bridges).
MCldificl3tion Number
o
. COUNTY(ies):
. DADE
SUFL3009A ............08/01/1993
Publication Date
06/13/2003
BRICKLAYE:RlMASON
CARPENTERS
CONCRETE FINISHER
ELECTRICIAN
FENCE ERECTOR
FORM SETTER
GUARDRAIL ERECTOR
LABORERS:
Asphalt Raker
Pipelayers
Unskilled
. IRONWORKERS:
Reinforcing
Structural
PAINTERS
Rates
11.00
11.72
12.22
14.42
12.00
10.52
7.55
Fringes
8.23
9.14
7.55
13,52
14.65
11.62
Page 120
City of Miami Beach
copyright C 2004 The Gordian Group
.
~
TRAFFIC SIGNALIZATION:
Installer
Mechanic
TRUCK DRIVERS:
. Low-Boy
Single & Multi-Rear AXle
8.61
11.47
8.63
8.05
--------------------------------------~----------._-------------
WELDERS ~ Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Unlisted classificatibns needed for work not included within the
scope of the classifications listed may be added after award only as
provided in the labor standards contract clauses (29 CFR 5.5(a)
(1 )(ii)).
--------------~---------,--~-~--------------~------------
In the listing above, the .SUn designation means that rates listed .
under that identifier do not reflect collectively bargained wage and
fringe benefit rates. Other designations .indicate unions whose
rates have been determined to be prevailing,
WAGE DETERMINATION APPEALS PROCESS
'1.) Has there been an initial decision in the matter?
This can be:
* an existing publiShed wage deterl'nination
*a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a
position on a wage determination matter
* a conformance (additional classification and rate)
ruling
Ohsurveyrelated matters, initial contact, inCluding requests
for summaries of surveys, . should be with the Wage and
Hour Regional Office for the area ih which the survey was
conducted because those Regional Offices have
responsibility for the Davis-Bacon survey program. If the
response from this initial contact is not satisfactory, then the
process described in 2.) and 3.) should be followed.
~.
--:'<~,'
. Project Manual
Witl1tegard to any bther matter not yet ripe for the formal process
described here, initial contact should be with the Branch of
Construction Wage DetelTl1inations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U. S. Department of Labor
200 Constitution Avenue, N. W.
Washington, D. C. 20210
2.) If the. answer to the. question in 1.) is yes, then an interested
party (those affected by the action) can request review and
reconsideration from the Wage and Hour Administrator (See
29 CFR Part 1,8 and 29 CFR Part 7). Write to:
Wage and HoUr Administrator
U.S. Department of Labor
200 Constitution Avenue, N. W.
Washington, D. C. 20210
The request should beaccompariied bya full statement of the
interested party's position and by any information (wage payment
data, project description, area practice material, etc.) that the
requestor considers relevant to the issue.
3.) If the deCision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U. S. Department of Labor
200 Constitution Avenue, N. W.
Washington, D. C. 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERALDECISION
March 2004
Project Manu/II
~
00925
CERTIFICATE OF $UBSTANTIALCOMPLETION
PROJECT:
CITY AND OR
PROGRAM MANAGER:
. BID/CONTRACT NUMBER:
CONTRACTOR:
PROJECT NUMBER:
(name, address)
. TO (CITY):
. .
. NOTICE TO PROCEED DATE:
DATE OF ISSUANCE:
PROJECT OR DESIGNATED PORTION SHALL INCLUDE:
The WorK performed under this Contract has been reviewed and found to be
substantially complete and .all documents required to be submitted by
CONTRACTOR under the Contract Documents have been received and accepted.
The Date of Substantial Completion of the Project or portion thereof designated
above is hereby established as (date), which is also the date of
commencement of applicable warranties required by the Contract Documents,
except as stated below.
DEFINITION OF DATE OF SUBSTANTIALCOMPLETION
The Date of Substantial Completion of the Woi'kOrportion thereof designated
by CITY is the date certified by CITY and or Program Manager when all
conditions and requirements of permits and regulatory agencies have been
satisfied and the Work is sufficiently complete in accordance with the Contract
Documents, so the Project is available for beneficial occupancy by CITY. A
Certificate of Occupancy must be issued for Substantial Completion to be
achieved, however, the issuance of a Certificate of Occupancy or the date
thereof is not to be determinative of the achievement or date of Substantial
Completion.
.
~
Project Manual
List ofiterns to be cornpleted or corrected, prepared by CITY and or Program
Manager, is attached hereto. The failure to include any items on such list does not
alter the responsibility of CONTRACTOR to complete all work in accordance with the
Contract Documents. The date of commencement of warranties for items on the
attached list will be the date of final payment unless otherwise agreed in writing.
City and/or Program Manager
By
Date
In accordance with Section 2.2 of the Contract, CONTRACTOR will complete or
correct the work on the list of items attached hereto within from
the above Date of Substantial Completion.
Date
CITY and/or Program Manager
By
CITY, through the Contract Admiriistrator, accepts the Work or portion thereof
designated by CITY as substantially complete and will assume full possession
thereof at (time) on (date).
City of Miami BeaCh, Florida
By Contract Administrator
Date
The responsibiiitiesof CITY and CONTRACTOR for security, maintenance, heat,
utilities, damage to the work and insurance shall be as follows:
Page 125
.
~
-;:-
Project Manual
PROJECT:
FINALCERTIFICA1"EOF PAYMENT
CITY AND OR
PROGRAM MANAGER:
(name, address)
OC)926
BID/CONTRACT NUMBER:
CONTRACTOR:
PROJECT NUMBER:
NOTICE TO PROCEED DATE:
TO (CITY):
DATE OF ISSUANCE:
All conditions or requirements of any permits or regulatory agencies have been
satisfied. The documents required by Section 5.2 of the Contract, have been
received and accepted. The Work required by the Contract Documents has been.
reviewed and the undersigned certifies that the Work, including minor corrective
work, has been completed in accordance with the provision of the Contract
Documents and is accepted under the terms and conditions thereof.
CITY and/or Program Manager
Date
: i
CITY and/or Program Manager By Date CITY, through the Contract Administrator,
accepts the work as fully complete and will assume full possession thereof at
(time) (date).
CITY of Miami Beach,Florida
By Contract Administrator Date
Page 126
City of Miami Beach
copyrIght 02004 The Gordian Groop
March 2004
.
~
Project Manual
00930
FORlliloF FINAL RECEIPT
The following foimwill be used to show receiptoffihal payment for this Job Order.
FINAL RECEIPT FOR CONTRACT NO.
Received this day of , 20 , from
City of Miami Beach, Florida, the sum of
Dollars ($ ) as full ahd final payment to CONTRACTOR for
all work and materials for the Project described as:
This sum includes full and final payment for all extra work and material and all
incidentals.
CONTRACTOR hereby indemnifies and releases CITY from all liens and
claims whatsoever arising out of the Contract and Project.
CONTRACTOR hereby certifies that ail persons doing work upon or
furnishing materials or supplies for the Project have been paid in full. In lieu of this
certification regarding payment for work, materials and supplies, CONTRACTOR
may submit a consent of surety to final payment in a form satisfactory to CITY.
CONTRACTOR further certifies that all taxes imposed by Chapter 212,
Florida Statutes (Sales and Use Tax Act), as amended, have been paid and
discharged.
[If incorporated sign below.]
CONTRACTOR
ATTEST:
Secretary
By
Title
(CORPORATE SEAL)
Date:
Page 127
March 2004
Project Manual
.-
.~
:,.'~
[If not incorporated sign below.]
CONTRACTOR
WITNESSES:
Name
By
Date:
Page 128
March 2004
City of Miami Beach
copyright 0 2004 The Gordian Group
.......~..............................................
~
Project ManOal
01000
ADDENDA AND MODIFICATIONS
All addenda ahd bther modifications made prior to the time and date of bid
opening shall be issued as separate documents identified as changes to the
Contract Documents.
City of Miami Beach
copyright 13) 2004 The Gordian Group
Page 129
/
m
.-
.~
Project Manual
. ARTICLE 1
ARTICLE 2
ARTICLE 3
ARTICLE 4
. ARTICLE 5
ARTICLE 6
ARTICLE 7
ARTICLE 8
ARTICLE 9
ARTICLE 10
ARTICLE 11
ARTICLE 12
ARTICLE 13
ARTICLE 14
ARTICLE 15
ARTICLE 16
ARTICLE 17
ARTICLE 18
ARTICLE 19
ARTICLE 20
ARTICLE 21
ARTICLE 22
ARTICLE 23
ARTICLE 24
ARTICLE 25
ARTICLE 26
ARTICLE 27
ARTICLE 28
ARTICLE 29
ARTICLE 30
ARTICLE 31
TABLE OF CONTENTS
FOR THE
Joe SlJPPLEMENT AL GENERALeoNOITIONS
. THE CONTRACT..... ................. .............. ............. ......... ........... ..133
INTERPRETATION OF THE CONTRACT DOCUMENTS.........134
CONTRACT PERFORMANCE PERIOD ....................................135
OPTION TO EXTEND CONTRACT PERFORMANCE ..............135
OPTION TO UNILATERALLY EXTEND CONTRACT................135
ECONOMIC PRICE ADJUSTMENT - (APPLICABLE TO THE
OPTION PERIODS ONLY) ........................................................136
SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION..136
CHARACTER OF THE WORK...................................................137
MEANS AND METHODS OF CONSTRUCTION .......................137
CONTRACTOR'S STAFF...........................................................138
COMPETENCE OF WORKMEN ................................................138
ORDERING WORK .............................. ......... ........... ........ ..........139
CONTRACTORS RESPONSIBILITY TO BECOME FAMILIAR
WITH THE WORK......................................................................144
MEASUREMENTS TO BE VERIFIED........................................144
FINAL INSPECTION, ACCEPTANCE AND JOB ORDER
COMPLETION....... ...... ..... ....... ... ........ ... ........ ..... ............. ...... ... ...144
CITY FURNISHED EQUIPMENT/MATERIALS..........................146
SALVAGE AND SALVAGE DISPOSAL .....................................146
WORK BY OTHERS HIRED OR EMPLOYED BY THE CITY....146
LIQUIDATED DAMAGES...........................................................146
REQUESTS FOR INFORMATION OR APPROVAL ..................147
CONTRACT ADMINISTRATOR................................................. 147
THE PROJECT COORDINATOR/PROGRAM MANAGER........148
THE INSPECTOR ......................................................................149
SITE PREPARATION AND CLEANUP ......................................149
ON-SITE STORAGE ..................................................................149
DISRUPTION OF COMMUNITY ACTIVITIES............................150
TRUCKING... ...... .......... ......... ........ ........... ............ ... .... ...............150
EXISTING ELEVATORS .................,..........................................150
CONSTRUCTION ELEVATORS, ETC. ......................................150
ACCESS TO BUILDINGS AND SECURITY...............................151
EQUIPMENT AND FURNITURE ................................................151
January 2004
City of Miami Beach
copyright 0 2004 "" GO<d1an <Soup
Page i
Project Manual
...~..................<.................
LM
::--- .
ARtiCLE 32
ARTICLE 33
ARTICLE 34
ARTICLE 35
. ARTICLE 36
ARTICLE 37
ARTICLE 38
ARTICLE 39
ARTICLE 40
ARTICLE 41
ARTICLE 42
ARTICLE 43
ARTICLE 44
ARTICLE 45
ARTICLE 46
ARTICLE 47
ARTICLE 48
ARTICLE 49
ARTICLE 50
ARTICLE 51
ARTICLE 52
ARTICLE 53
APPLICABLE REGULATIONS ..................................................151
ENVIRONMENTAL PROTECTION ....................................,......153
PROTECTION OF WORK AND PROPERTY............................ 153
FLOOR LOADING ..........;..........................................................155
PROJECT SITE MAINTENANCE ..............................................155
MATERIAL AND EQUIPMENT PROTECTION AND SECURITY
....... no........... .......... .................. ....... ...... ..... ................... ....... ...... 155
EXPLOSIVES AND BLASTING................................................. 156
CUTTING AND PATCHING....................................................... 157
BARRIERS ..... .................... ..................... .................................. 157
POLLUTION CONTROL............................................................ 157
TEMPORARY SERVICES AND UTILITIES............................... 158
HOURS OF WORK AND ACCESS ........................................... 161
ALL LEGAL PROVISIONS DEEMED INCLUDED..................... 161
ARCHITECTURAL AND ENGINEERING SERVICES............... 161
WORK INVOLVING HAZARDOUS MATERIALS ......................162
PRE-CONSTRUCTION CONFERENCE ...................................162
JOB MEETINGS ........................................................................ 162
ENERGY CONSERVATION ...................................................... 163
INTERGOVERNMENTAL PURCHASING AGREEMENT .........163
COMPUTER REQUIREMENTS ................................................163
CITY FURNISHED SOFTWARE ...............................................164
COMMUNICATIONS ................................................................. 164
Page ii
City of Miami Beach
oopyrigt1t C 2004 The Gordian Group
January 2004
.
-.
'.-'. ..
Project Manual
02000 ,Joe SUPPLlr:Mt:N1"AL CONDITIONS
ARTICLE 1 THE CONTRACT
1 .1. The Contract Documents for the. Contract. The Contract represents the entire
integrated agreement between the parties and supersedes all prior
negotiations, representations and agreements, either written or oral including
the bidding documents.
1.2. The Contract Documents shall include:
VOLUME I: Project Manual
VOLUME lIa: Construction Task Catalog
VOLUME lib: Construction Task Catalog
VOLUME ilia: Technical Specifications
VOLUME IIIb: Technical Specifications
VOLUME IIIc: Technical Specifications
1.3. Overview of the Contract
1.3.1. Job Order Contact (JOC) is a competitively bid, firm-fixed-price
indefinite quantity contract. It includes a collection of detailed repair
and construction tasks and specifications that have established unit
prices. It is placed with a Contractor for the accomplishment of
repair, alteration, modernization, rehabilitation,construction, etc., of
buildings, structures, or other real property. Ordering is accomplished
by means of issuance of a Job Order against the Contract.
1.3.2. Under the JOC cOhcept, the Contractor furnishes management,
labor, materials, equipment and architectural and engineering
services required to support individual Job Orders.
1.3.3. The JOC contract includes a Construction Task Catalog (CTC), The
CTC was developed by the CITY and is based on the use of
experienced labor and high quality materials. The CTC also
incorporates local activity, climate and geographic features.
1.3.4.. Bidders will offer (2) sets of adjustment factors that will be applied
against the prices set forth in the Construction Task Catalog (CTC).
One set will be for work when Davis Bacon Wage decisions will not
apply for construction performed during normal or other than normal
working hours with and without Architectural and Engineering
Services. The second set will be for work when Davis Bacon Wage
Decisions do apply for construction performed during normal or other
than normal working hours with and without Architectural and
City of Miami Beach
copyright 0 2004 The Gordian Group
March 2004
.
Project ManuSlI
:':-=---;
EngiMering Services. These adjustment factors will be used to price
individual scopes of work by multiplying the adjustment factor by the
unit prices and quantities.
1.3.5. As Job Order Contract requirements are identified by the CITY, the
Contractor will be issued a Request for Proposal and will be required
to develop a detailed price proposal. The Contractor will submit their
price proposal to the CITY. If the Contractor's proposal is found
acceptable, a Job Order may be issued at the agreed upon units,
which when multiplied by the unit price and Contract adjustment
factor, will establish the firm fixed Lump Sum price for the Job Order.
1.3.6. The JOC concept also includes a provision for the establishment of
prices for work requirements that are within the general scope of
work but were not included in the CTC at the time of Contract award.
These tasks are referred to as "Non Pre-priced Items.. Non Pre-
priced (NPP) items may require the establishment of specifications
and drawings and may subsequently be incorporated into the CTC.
ARTICLI: 2 INTERPRETATION OF THE CONTRACT DOCUMENTS
2.1. upon its own initiative or the Contractor's written request, the CITY may issue
written interpretation of Drawings (if any) and Specifications necessary for the
proper execution or progress of the Work which interpretations shall be
consistent with and reasonably inferable from the Contract Documents.
2.2. The imperative language of the Contract Documents is directed at the
Contractor unless otherwise stated.
2.3. The organit.ation of the Contract Documents into Construction Specifications
Institute rCSI") divisions, sections, and articles, and the arrangement of
Drawings if any, shall not restrict the Contractor in dividing the Work among
Subcontractors or in establishing the extent of Work to be performed by any
trade.
2.4. The JOC Project Manual including the JOC SupplemehtalConditions shall
apply to all contracts or subcontracts for the work covered by these
specifications.
2.5. The work under this contract shall includeeverythihg described, indicated or
shown in the Contract Documents as defined in Article 1.
. 2.6. In ahyaction or proceeding to enforce rights under this Agreement, and any
appeals arising there from, the prevailing party shall be entitled to recover
from the other party its reasonable attorneys' fees, costs and expenses,
Page 134
City of Miami Beach
copyright 0 2004 The Gordian Group
..
..,~
Project Manual
ARTICLE 3 CONTRACTPERFOR.MANCE PE:R.IOD
3.1. The Contract performance period is twelve (12) months from the date of .
award of the Contract or the achievement of the Maximum Contract Term
Value of $2,000,000 for 12-03/04 and 13-03/04 and $5,000,000 for 14-03/04.
The CITY shall have the option to extend the term of each Contract for four
additional Contract Terms of twelve (12) months each. The total Contract
Performance period shall not exceed twelve (12) months each, The total
Contract Performance period shall not extend beyond sixty (60) months. Job
Orders placed prior to, but not completed by the expiration of this Contract,
will be completed with all provisions of this Contract still in force.
3,2. AJob Order Completion Time for each Job Order issued under this Contract
will be determined in accordance with Article 12-0rdering Procedures.
3.3, CITY is entitled to and expects full contract performancefrorn the Contract
aWard date. Contractor should commence any mobilization activities as soon
as practical after contract award, but before work on individual Job Orders
begins.
ARTICLE 4 OPTION TO ExtE:ND CONTRACT PERFOR.MANCE:
4.1. CITY may notexterld any individual JOC contract term beyond one (1) year.
Therefore, if during the one (1) year contract term, the Contractor fails to
reach the Maximum Contract Term Value, the Contract will still terminate,
unless an option term is exercised. If there is unused contract value left on
an individual Contract term when it expires after one (1) year, CITY shall carry
any unused value over to any additional Contract terms.
ARTICLE 5 OPTION TO UNILATERALLY EXTE:ND CONTRACT
5.1. The Contract Contains an Option to Extend Provision, for four (4) additional
one (1) year contract terms. The CITY has the unilateral option to extend.
Procedure for exercising option:
5.1.1. Three (3) months prior to the Contract expiration date, the Contract
Administrator, if he desires, shall issue the Contract or a preliminary
written notice of its intent to extend for an additional Contract term
before the Contract expires.
5.1.2 The extension shall be accomplished prior to current expiration date.
Actual extension to contract shall be accomplished by written
notification.
5.1.3 The total duration of this Gontract, including the exercising of the
option terms, shall not exceed five (5) years.
March 2004 City of Miami Beach
copyright 0 2004 The Gordian Group
(...:..~.........................................:..........
~
"--=-
FlroJeclllllanual
ARtJCLE6 ECONOMICPRICEADJUS1MENT - (APPLICABLE TO THE
OPTION PERIODS ONLY)
6.1. This Article provides a means to adjust the Contractor's Adjustment Factors
on an annual basis from the date of the Contract award using actual
escalation/de-escalation as measured by the Construction Cost Index (CCI)
published in the ENR (formally known as Engineering News Record)
calculated for the U.S. Twenty (20) City Index.
6.2. The "original Adjustment Factors" are those Adjustment Factors submitted
with the Contractor's Bid that remain in effect for a one year period beginning
with the date of Contract award. Providing the Contract is still in effect, the
Contractor's Adjustment Factors shall be recalculated at each annual
anniversary date of the Contract award (Le. in beginning of month 13, 25, 37
and 49 of the Contract).
6.3. CCI indices are published monthly. The "base year" for the purposes of this
provision is the 12-month period prior to the Contract award. The "base year
index" is determined by summing the monthly CCI indices beginning with the
month prior to the Award date for each of the 12 months of the "base year"
and dividing by 12. The result is the average CCI for the "base year."
6.4, The "contract year" is the 12 month period follOwing the initial Contract award.
The "contract year index" is determined by summing the monthly CCI indices
for the initial 12-month contract period and dividing by 12. The result is the
average CCI for the "contract year."
6.5. The Economic Price Adjustment for months 13-24 of the Contract is
determined by dividing the "contract year index" by the "base year index." The
Contractor's Adjustment Factors for months 13-24 of the Contract are
determined by multiplying the Economic Price Adjustment by the "original
Adjustment Factors". The Economic Price Adjustment for months 25-36, 37-
48, and 49-60 will be calculated in an identical manner, sliding the "year
index" and the "contract year index" 12 months forward.
6.6. All the above computations shall be carried to five (5) decimal places and
then rounded to four (4) decimal places. Rounding of numbers shall be
accomplished by increasing the fourth decimal place if the fifth decimal is
equal to five or greater. If the fifth decimal place is equal to four or less, the
fourth decimal shall remain unchanged.
ARTICLE 7 SPE:CIFICATIONS AND DRAWINGS FOR CONSTRUCTION
7.1. The CITY is not required to furnish drawings or additional specifications for
Job Orders issued under this contract. The CITY may, however, choose to
City of MIami Beach
copyrlght <<> 2004 The Gordian Group
.
-z-
Project Manual
do so. If CITY provides such drawings and additional specifications the
provision listed below shall apply.
7.2. In case of conflict between requirements, the requirement which meets all the
codes and, which in the opinion of the CITY is more advantageous to the
CITY, shall govern.
ARTICLE 8 CHARACTER OF THE WORK
8.1. The. Work to be performed by the Contractor in connection with each Job
Order will be described in the Detailed Scope of Work issued with each
Request for Proposal.
8.2. Unless otherwise expressly proVided in a Job Order, the Work must be.
performed in accordance with the best, modern practice, with materials and
Workmanship of the highest quality, to the satisfaction of the CITY.
8.3. In addition to the standards that are prescribed herein, all Work shall conform
to fire and safety regulations prescribed in the CITY of Miami Beach Building
Code, and all codes and standards referenced therein, inclusive of the Florida
Building Code, and any drawings or specifications provided.
8.4. Any material or operation required under this contract Shall comply, as they
pertain, with the specifications and instructions of a manufacturer, the
established standards of The American Society for Testing Materials (ASTM).
The American Institute of Steel Construction (AISC), The American Standards
Association (ASA), The American Welding Society (AWS), or other industry
recognized standards. In the case of conflict between recognized standard
Specifications and those specifications contained in the Contract Documents,
the most stringent shall govern. In case standards for materials and
operations are not listed, the CITY reserves the right to cite those accepted
by the profession involved and require that such standards be adhered to in
the performance of the Work.
ARTICLE 9 MEANS AND METHODS OF CONSTRUCTION
9.1. The Means and Methods of Construction shall be such as the Contractor may
choose; subject, however, to the City's right to reject means and methods
proposed by the Contractor that:
9.1.1. Will constitute or create a hazard to the Work, or to persons or
property; or
9.1.2. Will not prOduce finished Work in accordance with the terms of the
Contract; or
City of Miami Beach
oopyright C 2004 "The Gordian Group
Page 137
m
.:~
-
Project Marlual
9.1.3. Unnecessarily increase the price of the Job Ordenvhen alternative
means and methods are available.
9.2. The City's approval of the Contractor's Means and Methods of Construction,
or its failure to exercise its right to reject such means or methods, shall not
relieve the Contractor of its obligation to accomplish the result intended by a
Job Order; nor shall the exercise of such right to reject create a cause of
action for damages,
ARTICLE 10 CONtRACTOR'S StAFF
10.1. General: The Contractor shall, immediately upon receiving a fully executed
copy of this Contract, assign and maintain during the term of this Contract
and any extension of it, an adequate staff of competent personnel who are
fully equipped, licensed as appropriate, qualified and assigned exclusively to
perform the Work The Contractor shall provide the CITY with the
qualifications of the individuals who will serve in those positions listed below.
The minimum experience of each individual below shall be at least five (5)
years.
10.2. At a minimum, the Contractor shall have at all times a ~roject Manager,
Estimator and Superintendent assigned to this Contract. Additional staff shall
be assigned depending on the volume of Work. The Contractor shall be
responsible for managing, supervising and directing its Subcontractors.
10,3. Should the CITY deem the performance of any employees of the Contractor
unsatisfactory, the Contractor shall terminate the involvement of such
employees in all areas of Contract performance.
ARtiCLE 11 COMPETENCE OF WORKMEN
11.1. Every worker on My part of this Contract shall be competent to perform the
task to which he/she is assigned. For both direct and subcontract work
performance, the Contractor shall be responsible for and shall insure that no
critical facility or utility equipment (plant type equipment) construction or repair
work is performed by personnel with an experience level less than
journeyperson. However, personnel with lesser experience may serve as a
helper. In all instances, for any work performed under contract, personnel
who have an experience level below joumeyperson shall be under the
immediate supervision of a person with experience level at or above
journeyperson as appropriate to the occasion. The Contractor shall assure
that a journeyperson, foreperson, master, etc., as appropriate, performs or
supervises all required work or services.
Page 138
March 2004
City of Miami Beach
copyright <<> 2004 The Gordian Group
.
Project Manual
11.2. The Contractor shall assure that a joumeyperson, fore person , master,etc.,
as appropriate, who is capable of directing the Work, performs or supervises
all required Work or services.
11.3. Conditions which reqUire the constant presence of a CITY Inspector to assure
the quality of the work will not be tolerated. Any worker who does not
produce quality workmanship through lack of cooperation or incompetence
shall be promptly removed from the job upon written order by the CITY. The
judge of quality of workmanship shall be solely determined by the CITY.
11.4. Oh any Federally Funded projects the Davis-Bacon Act standard rules apply
to this contract.
ARTICLE 12 ()~bE~ING WORK
12.1. Initiation of a Job Order
12.1.1. As the need exists for performance by the Contractor under the terms
of this Contract, the CITY will notify the Contractor of a Joint Scope
Meeting.
12.2. Upon this notice, the Contractor shall respond to the needs of CITY within two
(2) working days by:
12.2.1. Establishing verbal contact with CITY to further define the scope of
the requirement, and
12.2.2. Visiting the proposed work site in the company of a CITY
representative, and participating in a Joint Scope meeting which will
include discussion and establishment of the following:
project number and title
the detailed scope of the Work
existing site conditions
methods and alternatives for accomplishing the Work
access to the Site and protocol for admission
hours of operation
staging area
reqUirements for catalog cuts, technical data, Samples and Shop
Drawings
requirements for engineering and architectural services including
sketches, DraWings, Specifications, and as-builts
March 2004
City of Miami Beach
copyright 0 2004 The Gordian Group
Page 139
.
~
~
Preliminary quantity estimates
the applicable Wage Decision for FederallyFunded projects
cOnstruction duration
liquidated damages
specific quality requirements for equipment and material
the presence of hazardous materials
date on which Job Order Price Proposal isdue
12.3. After the Joint Scoping. process, the Contractor and the CITY will agree on a
Detailed Scope of Work, together with a tentative schedule, any sketches,
Drawings and Specifications required to adequately document the Work to be
accomplished, The Detailed Scope of Work, unless modified by both the
Contractor and the CITY, will be the basis on which the Contractor will
develop its Job Order Price Proposal and the CITY will evaluate the Job
Order Price Proposal.
12.4. Upon completion of the jOint scope meeting and the Detailed Scope of Work
the CITY will issue a Request For Proposal (RFP) which requires the
Contractor prepare a price proposal for the work under consideration by the
date indicated on the RFP.
12.5. The Contractor will prepare the Job Order Price Proposal in accordance with
the following:
12.5.1. Pre-priced work requirements. Pre-priced work requirements will
identify the type and number of work units required from the Volume
II Construction Task Catalog. The price per unit set forth in the
Construction Task Catalog shall serve as the base price for the
purpose of the operation of this provision. The Contractors Job
Order Price Proposal shall include support documentation to indicate
that adequate engineering and planning for the requirement has been
done, and that the work units proposed are reasonable for the tasks
to be performed. Documentation to be submitted with the Job Order
Price Proposal shall include, but not be limited to, drawings,
calculations, catalog cuts, specifications, and architectural
renderings.
12.5.2. Non Pre-priced Work Requirements: Units of work not included in the
Construction Task Catalog but within the general scope and intent of
this Contract may be incorporated into this Contract as needs arise.
Such work requirements shall be incorporated into and made a part
of this Contract for the Job Order to which they pertain, and may be
incorporated into the Construction Task Catalog if determined
. Project Manual
appropriate by CITY at the base price determined in this provision.
Non Pre-priced work requirements shall be separately identified and
submitted in the Job Order Price Proposal. Information submitted in
support of non pre-priced work shall include, but not be limited to, the
following:
12.5.2.1. Complete specifications and technical data, including work
unit content, support drawings, work task cost data, quality
control and inspection requirements.
12.5.2.2. Work schedule.
, .
12.5.2.3. Costing data, submitted in support of Non Pre-priced Tasks
shall include a cost analysis report, establishing the basis
for selecting the approach proposed for accomplishment of
the requirements. Unless otherwise directed by the CITY,
costing data will be submitted demonstrating that the
Contractor sought and received three quotes, The
Contractor shall prOvide an installed unit price (or
demolition price if appropriate) which shall include all costs
required to accomplish the Non Pre-priced Task.
12.5.2.4. The final price submitted for Non Pre-priced Tasks shall be
according to the following formula:
A = Direct Labor Cost (up through the foreman level and
including fringe benefits)
B = Direct Material Costs (supported by quoteS)
C = Direct Equipment Costs (supported by equipment
amortization data)
D::: Subcontractor Costs (supported by quotes)
E == Allowable Over Head Costs = A x 55% .
F = Allowable Profit = (A +8 + C) x 10%
G = Subcontractor Allowance == D x1 0%
Total Cost of Non Pre-Priced Task = A + B + C +D + E + F +
G
*A, B. C, Fand F only apply to work self-performed by the
Contractor.
*D and G only apply to work self-performed by
Su bcontractor's.
City of Miami Beach
copyright 0 2004 The GOfdlan Group
.,...,.,
EIiI
:--:~-
-
Project Manual
12.5.2.5. Following apprOval by the CITY of a Non Pre-priced Task
and unit price, the Non Pre-priced Task unit price will be
loaded into the computer data base.
12.5.2.6. The total extended price for the Non Pre-priced Task will
be determined by multiplying the unit price by the quantity
required. The price offered in the Job Order Price
Proposal will be determined by multiplying the total
. extended price by an adjustment factor of 1.0000.
12.5.2.7. After using a non pre-priced item on three separate Job
Orders, the CITY reserves the right to include the unit price
for the work item as a pre-priced item into the CTC which
would become a permanent item and no longer require
price justification.
12.5.3. The Coritractor's Job Order Price Proposal shall include, at a
minimum:
12.5.3.1. Cost Proposal:
12.5.3.2. Architectural or Engineering Drawings or sketches as
required.
12.5.3.4. Catalog cuts, technical data Or samples required
12.5.3.5. List of anticipated Subcontractors and Materialmen
12.5.3.6. Construction schedule;
12.5.3.7. Certificates foranyspecial inSurance required;
12.5.3.8. Sample warranties or guarantees for materials, equipment
or systems proposed;
12.5.3.9 Schedule of Values if required.
12.5.4, The Contractor's Job Order Price proposal shall be submitted in
accordance with the date indicated on the RFP. Unless otherwise
stated on the RFP, the Price Proposal will be due no longer than five
(5) working days after the issuance of the RFP. The CITY may allow
additional time for preparation of the Contractor's Job Order Price
Proposal for complex Job Orders requiring engineering/architectural
drawings and approvals and permits, Allowance will be made to
provide adequate time for preparation and submittal of the necessary
documents and the Job Order Price Proposal and so reflected in the
Job Order Price Proposal due date entered on the RFP. In
emergency work situations and mirior maintenance and repair Job
Orders requiring immediate completion, the Contractor's Job Order
,.....
~
~
Project Manual
Price Proposal rnaybe required quickly and the due date will be so
indicated on the RFP:
Review of the Job Order Price Proposal and Issuance of Job Order
12,6.1. The CITY shall evaluate the entire Job Order Price Proposal and
proposed tasks and compare these with the CITY'S cost estimate of
the Detailed Scope of Work to determine the reasonableness of
approach, including the nature and quantity of tasks proposed.
12.6.2. CITY reserves the right to reject a Contractor Job Order Price
Proposal based on unjustifiable quantities, performance periods,
inadequate documentation, or other inconsistencies on the
Contractor's part, or for any other reason. CITY also reserves the
right to not award an order if City's requirement is no longer valid or
the proposed cost exceeds CITY estimate. In these instances, the
Contractor has no right of claim to recoup Job Order Price Proposal
expenses. The CITY may pursue the performance of such Work by
other means.
12.6.3 By submitting a signed Job Order Price Proposal to the CITY, the
Contractor agrees to accomplish the Work set forth in the Detailed
Scope of Work in accordance with the Request for Proposal at the
. price submitted. It is the Contractor's responsibility to include the
necessary tasks and quantities in the Job Order Price Proposal prior
to delivering it to the CITY.
12.6.4 Each Job Order provided to the Contractor shall reference the
Detailed Scope of Work and set forth the fixed price to be paid and
the Job Order Completion Time. .. All clauses of this Contract shall be
applicable to each Job Order. The Job Order shall be signed by the
CITY and delivered to the Contractor for signature. The Contractor
shall sign a copy of evidencing acceptance of the Job Order.
12.6.5. In the eVent that immediate emergency response is necessary the
Contractor shall be required to follow alternative procedures as
established by the CITY. This altemate procedure may be more
burdensome to the CONTRACTOR than the procedures described in
this section. The Contractor shall begin Work as directed not
withstanding the absence of a fully developed Request for Proposal,
Detailed Scope of Work, or Job Order. The Contractor shall be
compensated in accordance with the CTC and NOll Pre-priced Tasks
as if the Work had been ordered under the standard procedures.
12.6.6. If the City finds inconsistencies with the Contractor's Price Proposal
the CITY may request the Contractor to re-submit its Price Proposal
or cancel the Job Order. If the Contractor consistently submits Price
12.6.
Page 143
~
~
.:::~..
proJect Manual
Proposals which are rejected by the CITY, the CITY may declare the
Contractor in default and initiate termil'lation of the Contract,
according to Article 15 of the General Conditions.
12.6.7. After the CITY has reviewed the Contractor's Price Proposal and an
agreement has been reached as to the nature of the revisions, if any,
the Contractor is not allowed to make any changes to the revised
Price Proposal other than the changes agreed to.
ARTICLE 13... CONTRACTORS RESPONSIBILITY TO BECoME FAMILIAR
WITH THE WORK
13.1. The Contractor is required to inspect the site of the work Of each Job Order
and to examine and become familiar with the Detailed Scope of Work, plans,
specifications and all other contract documents pertaining to the proposed
work. The submission of a Job Order Price Proposal shall be sufficient to
.establish the presumption that the Contractor has investigated the site of the
work and is satisfied as to all reasonable conditions to be encountered,
quantity and quality of the work to be performed and materials furnished in
the completion thereof.
13.2. Unless otherwise directed, CITY will furnish subsurface information through
the use of borings. If, in thacourse of the work, subsurface conditions vary
materially from the record indicated by the borings, the Contractor shall give
immediate notification, in writing, of such variation to the CITY and the
Contract price shall be adjusted by unit prices establiShed in the bid or
agreement, as appropriate.
13.3. Contractor is required to examine and be familiar with existing contracts and
work being constructed.
ARTICLE 14 MEASUREMENTS TO BE VERIFIED
14.1. Before ordering any material or doing any work, the Contractor shall verify all
measurements at the site of a specific Job Order, and shall be responsible for
the correctness of same. No extra charge or compensation will be allowed on
account of difference between actual dimensions and the measurements
indicated in the RFP. Any difference, which may be found, shall be submitted
to CITY for consideration before proceeding with the work.
. ARTICLE 15 FINAL INSPECTION, ACCEPTANcE AND JOB ORDER
COMPLETION
. 15.1. Contractor's Punch List
Page 144
.......~......................................-..................
~
~
~
Project Manual
15.1.1. When the Work is near completion, the Contractor, CITY and or
Program Manager shall inspect the Work and the Contractor shall
prepare a list of all items remaining on the Work prior to final
completion. Said list shall be known as the Contractor's Punch List.
15,1.2. The Contractor shall proceed to complete or c:orrectall items listed on
the Contractor's Punch List and verify that the items have been
completed or corrected by signing said Punch List.
15.1.3. The Contractor shall submit the signed Contractor's Punch Iistto the
CITY and or Program Manager with a retjuest for a Final Inspection
of the Work.
15.2 The CITY's Punch List
15.2.1. Upon receipt of the Contractor's request, the CITY and or program
Manager shall conduct a Final Inspection to determine whether the
Work complies with the Contract Documents.
15.2.2. At the conclusion of the Final Inspection, the CITY and or Program
Manager shall notify the Contractor of any items remaining which is
in a deficient or unacceptable condition. Said list shall be known as
the City's Punch List.
15.3. Correction of the CITY'S punch List
15.3.1. Within 3 days of receipt of the City's Punch list, the Contractor shall
commence correcting all items on the City's Punch List.
15.3.2. If the Contractor does not complete the items on the Owner's Punch
List within 10 days of receipt of the Owner's Punch List, the provision .
in Article 15 of the General Conditions may be invoked.
15.3.3. If the Work on the City's Punch List cannot be completed within the
stated time, the Contractor shall justify to the approval of the CITY
and or Program Manager why items cannot be completed and a
mutual time will be agreed upon when such items will be completed.
If liquidated damages have been applied to the Job Order, this time
in no way effects the original contract schedule.
15.3.4. Failure of the CITY and or Program Manager to include any item on
the City's Punch List shall not alter the responsibility of the Contractor
to complete all the Work in accordance with the Contract Documents.
15.4. Items discovered after the onginalPunch List which are part of the Job Order
shall be completed under warranty and within 10 days of notification to the
Contractor.
March 2004
City of Miami Beach
copyright 0 2004 The Gordian Group
Page 145
m
..-
~
prOject Manual
ARTICLE 16 CITY FURNISHED EQUIPMEN'rlMAtERIALS
16.1. From time to time CITY may elect to supply its own materials and/or
equipment for a specific project. In those cases the Contractor shall provide
transportation of any CITY furnished equipment/materials included on the Job
Order. The Contractor shall be paid for transportation of said materials by
means of the appropriate line items from the CTC included in its Job Order
Price Proposal. The equipment/materials will be transported from CITY
storage area to the work site indicated on the Job Order. The Contractor
assumes the risk and responsibility for the loss or damage to City-furnished
property. The Contractor shall follow the instructions of City's representative
regarding the disposition of all City-furnished property not consumed in
performance of a Job Order,
ARTICLE 17 SALVAGE AND SALVAGE I)ISPOSAL
17.1. The material and equipment which are removed or disconnected and, in the
opinion of CITY, are of value, but are not specified for reuse, shall remain the
property of CITY. CITY representative shall be informed of the presence of
the property and disposition instructions shall be requested.
17.2. Debris, rubbish, hazardous waste, and non-usable material resulting from the
work under this Contract to which CITY does not claim a further interest as a
result of the preceding paragraph, shall be disposed of by and at the expense
of the Contractor at a location off CITY property. Hazardous wastes must be
disposed of in accordance with the Resource Conservation and Recovery Act
and state and local regulations. The contract adjustment factor includes the
cost of all clean-up, including final cleanup on each individual Job Order.
ARtiCLE 18 WORK BY OTHERS HIREI) OR EMPLOYED BY THE CITY
18.1. CITY reserves the right to undertake performance by other Contractors or
CITY forces for the same type or similar work as provided for hereunder, as
CITY deems necessary or desirable, and to do so will not breach or otherwise
violate this Contract. The specific Detailed Scope of Work contracted for
hereunder shall be defined by the individual Job Order issued.
ARtiCLE 19 L1QUIDATEI) DAMAGES
19.1 Timely completion of Job. Orders issued under this Contract is of the essence.
Should the Contractor fail to complete the work specified in the Job Order,
also see Article 2.3 in the General Conditions concerning Liquidated
Damages.
Page 146
March 2004
.
~
Project Manual
19.2. Nothing in this article shall be construed as limiting the right of CITY to
proceed under Article 15 entitled "City's Right to Terminate Contract" in the
General Conditions.
19.3. Nothing herein contained shall becbnstrued as limiting the right of the CITY
to recover from the Contractor any and all amounts due or to become due,
and any and all costs and expenses sustained by the CITY for improper
performance hereunder, repudiation of the Contract by the Contractor, failure
to perform or breaches in any other respect, including but not limited to
defective workmanship or materials.
19.4. Liquidated daniages received herein are not intended to be nor shall they be
treated as either a partial or full waiver or discharge of the City's right to
indemnification (as described in a separate article herein) or the Contractor's
obligation to indemnify the CITY, or to any other remedy provided for by
Contract or by Law.
19.5. The CITY will deduct and retain out of the monies which may become due
herein, the amount of any such liquidated damages; and in case the amount
which may become due herein shall be less than the amount of liquidated
damages suffered by the CITY, the Contractor or the Surety shall be liable to
pay the difference upon demand by the CITY.
ARTICLE 2() REQUESTS FOR INFORMATION OR APPROVAL
20.1. From time to time as the Work progresses and in the sequence indicated by
the approved Progress Schedule, the Contractor must submit to the CITY a
specific request in writing for each item of information or approval required by
him. These requests must state the latest date upon which the information or
approval is actually required by the Contractor, and must be submitted
sufficiently in advance thereof to allow the CITY a reasonable time to act
upon such submissions or any necessary re-submissions thereof.
ARTICLE 21 CONTRACT ADMINISTRATOR
21.1. The City will assign a Contract Administrator and to oversee the execution of
the Job Order Contract. The Contract Administrator will manage and
administer the JOC Program on behalf of the CITY and oversee the work of
the Project Coordinators/Program Managers.
21.2. The contractor shall submit all disputes and rnatters Which touch or relate to
the contract, including a claim for breach of contract, to the Contract
Administrator, and his/her/her decision shall be final and binding on the
contractor and shall also be a condition precedent to the right of the
March 2004
City of Miami Beach
copyright 02004 The Gordian Group
Page 147
Project Manual
.
~
Contractor to receive arlY monies under the contract (except as otherwise
enumerated in the CITY General Conditions).
ARTICLE 22 THE PROJECT COORDINATOR/PROGRAM MANAGER
22.1. The CITY'S project CoordinatorlProgram Manager, in addition to those
matters elsewhere herein delegated to the Project Coordinator/Program
Manager and expressly made subject to his/her/her determination, direction
or approval, shall have the CITY:
22.1.1. To determine the amount or quantity, quality, arid acceptability of the
work and materials and location of the Work to be paid for hereunder;
22.1.2. To determine all questions in relation to the Work and performance
thereof, to interpret the Detailed Scope of Work, Contract Drawings,
Specifications, and Addenda, and to resolve all patent
inconsistencies or ambiguities therein;
22.2.3. To determine how the Work of this Contract Shall be coordinated with
Work of Other Contractors engaged simultaneously on this Project,
including the power to suspend any part of the Work, but not the
whole thereof;
22.1.4. To make changes in the Work as the Project Coordinator/Program
Manager deems necessary, including the necessity for issuing
additional Job Orders, however subject to review and approval by the
Contract Administrator.
22.1.5. Toarnplify the Contract Drawings, add explanatory information and
furnish additional Specifications and Drawings, consistent with the
intent of the Detailed Scope of Work,
22.1.6. To suspend the whole or any part of the Work whenever in its
judgment such suspension is required (a) in the interest of the CITY
generally, or (b) to coordinate the Work of the various Contractors
engaged on a specific Project, or (c) to expedite the completion of a
Project even though the completion of a particular Job Order may be
thereby delayed.
22.2. The foregoing enumeration shall not imply any limitation upon the powerof
the Project Coordinator/Program Manager, for it is the intent of this Contract
that all of the Work shall generally be subject to its determination, direction or
approval, except where the determination, direction or approval of someone
other than the Project Coordinator/Program Manager is expressly called for
herein.
Page 148
..
project Manual
ARTICLE 23 THE INSPECTOR
23.1. The CITY may appoint such person or persons as it may deem necessary to
inspect, at any time or times, the work done under this contract. The
Inspector designated by the CITY shall be the representative of the Project
Coordinator/Program Manager at the Site, and subject to review by the
Project Coordinator/Program Manager, shall have the power, in the first
instance, to inspect, supervise and control the performance of the Work.
23.2. The Inspector, shall not hoWever, have the power to issue a Job Order for
Extra Work, and the performance of such Work by the Contractor by direction
of the Inspector without thereafter obtaining a Job Order duly signed and
issued in accordance with the established procedures therefore, shall
constitute a waiver of any right to extra compensation therefore. The
Contractor is warned that the Inspector has no power to change the terms
and provisions of this Contract in any respect.
ARtiCLE 24 SITE PREPARATION AND CLEANUP
The Contractor shall:
24.1. CoordiMte with CITY on a sequence of proCedures for gaining access to the
premises, space for storage of materials and equipment, work of materials,
use of approaches, corridors stairways, and similar features of a structure.
This coordination is required prior to commencement of work at a time
directed by CITY.
24.2. Move the furniture and portable office equipment in the immediate work area
to a designated location prior to start of work, and replace these items to their
original location upon completion of the work. The Contractor will be liable for
damages incurred while moving furniture and ectuipment, and be responsible
for contacting appropriate agencies for movement of vending machines.
24.3. Perform clean up and site restoration prior to final walk-through inspection.
All projects shall be delivered in a clean, orderly and usable condition.
ARTICLE 25 ON-SITE STORAGE
25.1. If, during the course of the contract, the Contractor-finds it necessary to place
temporary storage trailers containing materials and/or equipment on CITY
property, an onsite area will be designated by the CITY. However, the CITY
assumes no responsibility for such stored material, equipment, buildings, or
trailers.
City of Miami Beach
copyright 0 2004 The Gordian G"oup
Page 149
.
Project Manual
~,.
ARtiCLE 26. DISRUl=>>TloN bFCOMMONIl'Y ACTIVitiES
26.1. The Gontractor shall not cause any disruption to on-going commUnity
activities at the work site. Planned activities will be coordinated with CITY
and construction will be accomplished in accordance with the schedule set
forth in Job Orders issued hereunder. Schedule revisions shall be made
known to CITY on a timely basis. Work operations shall not create a
nuisance to adjacent tenants or the surrounding neighborhood.
ARTICLE 27 tRUCKING
27.1. The Contractor shall reqUire that all trucks entering or leaving the project site
with loose materials be loaded and covered in a manner that will prevent
dropping of materials on streets while in transit. Suitable tarpaulins shall be
placed over the loads for materials subject to blowing.
A~TICLE 28 EXiStiNG ELevATORS
28.1. Any temporary use of existing elevators shall be by arrangement with CITY
staff. Such use will be of an intermittent nature. The Contractor shall provide
and maintain suitable and adequate protection covering for the elevator
machinery, the hatchway entrance, and the interior of elevator during the
periods of temporary use. Elevators shall not be loaded in excess of the
rated capacity of the elevator.
28.2. CITY will bear the cost. of electrical current for such tempOrary eXisting
elevator usage. On eompletionof the work, the Contractor shall remove the
protective coverings together with any resultant dirt and debris.
ARTICLE 29 . CbNStRUCTlbN ELEVATORS, ETC.
29.1. The Contractor Shall construct elevators, craneS and other rigging, lifts, etc,.
as required for the work.
29.2. All such construction shall be carried out as required by the local prevailing
Building Codes within the City of Miami Beach and subject to the approval of
the City.
29.3, The Contractor shall maintain stairways throughout the whole height of the
structures in condition for safe usage by mechanics and others.
.;....ZfIS........................... ....................
t:.Lu
-
--::::zr-
project Manual
AFtTICLE 30 ACCeSS TO BUILDINGS AND SECURITY
30.1. It shall be the Contractor's responsibility, through CITY and appropriate CITY
staff, to obtain access to buildings and facilities and arrange for the buildings
to be opened and closed. It shall be the Contractor's responsibility to arrange
for adequate security of the work site(s) at the end of each work day and on
weekends.
30.2. It is the responsibility of the Contractor to prohibit the opening of locked areas
by the Contractor's employees to permit the entrance of personal other than
the Contractor's employees engaged in-the performance of assigned work in
those areas.
ARTICLE 31 EQUIPMeNT AND FURNITURE
31.1. Furniture and portable equipment in the immediate area of work will be
moved by the Contractor and replaced to original position upon completion of
work. If the work required by the Job Order will not allow furniture and
portable office equipment to be replaced to its original positions, CITY will be
notified and new locations will be designated by CITY for replacement of the
furniture and equipment by the Contractor.
31.2. Work of materials and equipment and accomplishment of work shall be made
with a minimum of interference to CITY operations and personnel.
31.3. The work shall, so far as practicable, be done in definite sections or divisions
and confined to limited areas. Work shall be completed in the section before
work in other sections or divisions are started.
ARTICLE 32 APPLICABLE REGULATIONS
32.1 The site of the Contract work is on CITY property and all rules and regulations
issued covering fire, safety, sanitation, severe weather conditions, conduct of
operations, etc., shall be observed by the Contractor, Contractor's employees,
and subcontractors. The regulations include:
32.1.1. Fire Prevention:
32.1.1.1. Contractor's and . subcontractor's employees shall be.
cognizant of, and shall comply with, all requirements for
handling and storing combustible supplies and materials,
daily disposal of combustible waste, trash, etc., in
accordance with National Fire Code and National
Association of Fire Underwriters. The Contractor will
require employees to become familiar with methods of
City of Miami Beach
copyright C 2004 lhe Gordian Group
..
.-.-...-
Project Manual
activating CITY fire alarms and any City of Miami Beach
requirements regardil1g same.
32.2.1. Safety:
32.2.1.1. All rules of safety that are or may be imposed upon the
Contractor by Federal, State, or local code or regulation
shall be effectively carried out in the performance of the
work set forth herein. Specific attention is called to
adherence to all applicable rules governed by the Florida
Occupational Safety and Health Administration. Contractor
shall take proper safety and health precautions to protect
the work, the Contractor's employees, the public and the
property of others.
32.3.1. Sanitation:
32.3.1.1. The Contractor, shall keep the premises as clean as the
progress of the work will permit (reasonably free of
accumulations of debris), Which shall include the controlling
of any noxious weed growth and upon completion, remove
all materials and rubbish from the premises, leaving the
site clean.
32.3.1.2. Surplus materials, waste materials and debris, sweepings,
soot and rubbish shall not be allowed to accumulate and
shall be removed from the site forthwith to authorized
. dumping areas as it is generated. No waste materials or
debris shall be tossed or thrown onto adjacent Properties
or adjacent land areas.
32.3.1.3. The entire Work area shall be cleaned up at the end of
each Work session.
/
32.3.1.4. The Contractor shall thoroughly clean all equipment and
materials installed by him and deliver over such materials
. and equipment undamaged in a bright, clean and new
appearing condition.
32.3.1.5. At completion of the Work, the premises should be left in a
neat, unobstructed condition and everything in perfect
repair and order.
32.3.1.6. Upon completion of the Work, the Contractor shall remove
all equipment, scaffolding, etc., and thoroughly clean the
Work site before submitting the project to the CITY for final
acceptance.
March 2004
.
.-
~
Project Manual
,
/
33.4.1. Conduct:
33.4.1.1. Contrac:tor and Contractor's employees shall be subject to
the same general rules of conduct while on CITY property
that apply to a CITY employee. CITY reserves the right to
refuse access to any Contractor's employee if CITY
determines it to be in the best interests of CITY.
AFtTICLE 33 ENVIRONMENTAL PROTECTION
33.1. . The Contractor shall. be responsible to protect the environment of work areas
. as affected by this Contract. Contractor shall be responsible for the proper
disposal of all hazardous, solid, liquid, and gaseous contaminants and refuse
in accordance with all federal, state, local codes and regulations.
33.2. All chutes for refuse,. and the like shall be covered or of such a design to fully
confine the material to prevent the dissemination of dust.
ARTICLE 34 PROTECTION OF WORK ANDPFtOPERTY
34.1. The Contractor shall continuously maintain adequate protection of all the
Contractor's work from damage, and shall protect City's property from injury
or loss arising in connection with this Contract. The Contractor shall make
good any such damage, injury or loss, except as may be directly due to or
caused by agents or employees of CITY.
34.2. The Contractor shall at all times provide adequate protection and facilities to
safeguard all persons passing on or about the premises in the usual conduct
of their business, and any special instructions to the Contractor from the CITY
to insure protection, etc. shall be complied with in each and every instance.
34.3. The Contractor shall adequately protect adjacent property as provided by law
and or as directed by the CITY.
34.4. TheC:ontractor shall provide and maintain alllights,fooMiays, guards, fences,
gates, etc., for the proper protection of the public, and shall comply with all
Municipal rules, regulations, ordinances and laws.
34.5. The Contractor shall properly a.nd carefully shore up or otherwise support all
live water, sewer and gas pipes, electric wires, conduits, free standing walls,
etc., which may be encountered. He shall immediately notify the CITY of
such and give such CITY permission to protect the same. The Contractor
shall provide sufficient, safe and proper facilities at all times for the inspection
of the work.
March 2004
.
PrOject Manual
;~
". ' -:::;;::-
. 34.6. The Contractor shall fumish throughout the entire project, all scaffolding,
ladders, decking or runways as necessary to execute the Work in a safe
manner.
34.7. In an emergency affecting the safety of life, of the work, or of adjoining
property of CITY, the Contractor, without special instructions or authorization
from CITY, is hereby permitted to act in at the Contractor's discretion to
prevent such threatened loss or injury.
34.8. Any compensation claimed by the Contractor on accouht of emergency work
as set forth in 12.6.5 above shall be determined by agreement of CITY and
the Contractor.
34.9. The .Contractor shall csrefullyprotect all trees, shrubs, and hedges, not
specified as being removed, from injury during building work and pay for
damages to same resulting from insufficient or improper protection.
34.10. The Contrac:tor shall send proper notice, make all necessary arrangements
. and perform all other services required for the care, protection and
maintenance of all public utilities, including mail boxes,fire plugs, power and
telephone poles and wires, and all other items of this character on or around
the building site.
34.11. Building materials, Contractor's equipment, and other supplies necessary to
the project may be stored on the premises with approval of CITY. This shall
in no manner relieve the Contractor from full responsibility for such materials.
34.12. Where materialS are not sold or furnished in packages or cohtainers, the
Contractor, when . requested by CITY, shall obtain invoices from the
manufacturer or its agents covering such materials showing the name and
brand of the materials furnished, which invoices must be furnished to CITY.
34.13. In the event of accidental damage to or disruption of anyof City's equipment,
. utilities, or facilities by the Contractor or any of the subcontractors, or when
life or property are endangered, the Contractor shall immediately take all
necessary steps to replace/repair all pieces/parts of any damaged
equipment/materials, make all necessary repairs and restore all services to
normal. Further, the Contractor shall engage any and all required additional
subcontractors, labor, individuals or other outside services, deemed
. necessary by CITY, to operate on a continuous, "around-the-clock" basis until
all restoration is complete. Also, the Contractor shall provide and install all
required materials and equipment.
34.14. All costs involved in making repairs andrestoring disrupted services to normal
shall be borne by the Contractor.
34.15. The Contractor and/or his/her subcontrac:tors shallfumish, erect and maintain
such signs as may be required by compliance with local codes and/or safety
Page 154
.
':':'-- -,-
Project Manual
regulations for the purposes of controlling traffic and safeguarding life and
property.
34.16. The Contractor shall provicleadequate climatic protection for exposed part of
buildings wherever work under this Contract is performed.
AFtTICLE 35 FLOOFt LOADING
35.1 ~ Care shall be taken that floors are not overloaded at any time.
ARTICLE 36 PROJECT SITE MAINTENANCE
36.1. The Contractor shall store all supplies and equipment on project site(s) so as
.to preclude mechanical and climatic damage and maintain project sites in a
neat and orderly manner at all times. Materials to be stored on the site shall
be neatly stacked and protected and kept clear of all passageways. The
Contractor shall coordinate the work in such a manner as to reduce the
disturbances and inconveniences to the tenants to a minimum.
ARTICLE 37 MArEFtIAL AND EQUIPMENT PROTECtiON ANO SECURITY
37.1. The Contractor shall cover equipment that is to remain in place within the
area of contract operations and protect it against damage or loss. This
includes equipment that is removed in the performance of Job Orders where
directed for reuse in work as required by drawings and specifications.
Equipment temporarily removed that is in good operating condition at the time
of removal shall be protected, cleaned and replaced equal to or better than its
conditions prior to its removal. Security for equipment or material that is to be
reused and is removed for temporary storage at the work site shall be the
sole responsibility of the Contractor. If the Contractor considers the
equipment to be at risk after removal, arrangements should be made for
storage while removed. Transportation to and from the storage site shall be
provided for and at the Contractors risk.
37.2. The CONTRACTOR, its Subcontractors and Materialmen Shall be solely
responsible for the proper storage, security and protection of all their tools,
equipment, materials and personal property that they may store or leave on
CITY property. The Contractor's materials shall be stored in an area
approved by the CITY. Receipt of such approval, however, does not relieve
the Contractor of its liability for prevention of any theft, loss or damage that
may occur. The Contractor is responsible for keeping the Work site(s)
secured at all times and is responsible for any damages, vandalism or theft to
the Work or materials on the site at all times prior to final acceptance of the
March 2004
Page 155
\
.......~...../.......................-...........................
UIa
Project Manual
.~
.-=-:-
Work by the CITY. The Contractor agrees not to hold the CITY liable for any
damage thereto or loss thereof.
ARTICLE 38 EXPLOSIVES AND BLASTING
38.1. Use of explosives will not be permitted without prior written permission from
the CITY and the prior to the contractor obtaining all applicable permits.
38:2. If and. when the use of explosives is riecessaryfor the execution of the work,
the CONTRACTOR shall observe the utmost care, performing such work with
.experienced men and in accordance with all federal, state, and local
regulations so as not to endanger life or property. In addition to observing all
governmental regulations relating to the transportation, storage, handling and
use of explosives, the CONTRACTOR shall conform to any further
regulations that the CITY may deem necessary in this respect. Signals of
danger shall be given before the firing of any blasts and blasts shall not be
fired until all persons in the vicinity are known to have reached position out of
danger therefrom.
38.3. Quantities and Records: CONTRACTOR shall keep explosives on the site
only in such quantity as may be needed for the work underway and only
during such time as they are being used. He shall notify the Project Manager
in advance of his/her intention to store and use explosives. Explosives shall
be stored in a secure and safe manner in strict conformity with all state and
municipal regulations and all such storage shall be marked clearly, "DANGER
EXPLOSIVES," A daily record shall be kept showing the amounts of
explosives on hand, the quantities received and issued, and the purpose for
which issued.
38.4. Damage or Injury: All blastingnecessal"yon this contract shall be done with
the express provisions that the Contractor shall be and is hereunder
responsible for any and all damages and claims arising from such blasting or
by accidental explosions and for the defense of all actions arising from such
causes. In case injury occurs to any portion of the work or to the material
surrounding or supporting the. same, through blasting, the Contractor, at
his/her own expense, shall remove and replace such injured work and shall
furnish such material and perform such work or repairs or replacements as
the Project Manager may order. Any damage whatever to existing structures
or property due to blasting shall be promptly, completely, a satisfactorily
repaired by the Contractor at his/her own expense.
38.5. Restrictions: Blasting will not be permitted within 25 feet of any structure
unless proper precautions are taken, as approved by the Project Manager, to
insure that the structure and the material surrounding and supporting the
same are not damaged by such blasting.
March 2004
ZfIS.
.~
~
Project Manual
38.6. Rock encountered within 5 feet of existing pipelines or building shall be
removed without blasting.
38.7. All blasts in open cut shall be well covered and provisions made to protect
pipes, conduits, sewer structures, persons, and property adjacent to the site
of the work. Blasting shall be done only with such quantities and strength of
explosives and in such manner as will break the rock approximately to the
intended lines and grades and yet will leave the rock not to be excavated in
an unshattered condition. Care shall betaken to avoid excessive cracking of
. the rock upon or against which any structure will be built and to prevent injury
to existing pipes or other structures and property above or below ground.
Where rock is to be removed from sheeted excavations, all braces and wales
shall be fastened securely in place to prevent movement during blasting.
Blasting will not be permitted between the hours of 5:00 p.m. and 8:00 a.m.
except with special written permission of the Project Manager. After a blast is
fired, the Contractor shall cause the excavation to be thoroughly scaled and
all loose and shattered rock or other loose material which appears dangerous
to the structure or to the workmen shall be removed and the excavation made
safe before proceeding with the work. The fact that the removal of loose or
shattered rock or other loose material may enlarge the excavation beyond the
required limits shall not operate to relieve the Contractor from the necessity
for making such removal and for backfilling as speCified herein.
ARTICLE 39 CUTTING AND PATCHING
39.1. The CONTRACTOR shall do all cutting, patching aM restoration required by
the Work, except as otherwise specified. All restorations shall be to the
satisfaction of the CITY.
AFtTICLE 40 BARRIERS
40.1. The CONTRACTOR shall erect temporary barriers and warning signs to alert
and protectthe public, CITY tenants and CITY employees from the Work as
deemed necessary and or as directed by the CITY.
ARTICLE 41 POLLUTION CONTROL
41.1. During the course of construction, the CONTRACTOR shall conduct hislher
operations in such a manner as to present or reduce to the minimum any
damage to any stream or lake from pollution by debris, sediment, chemical, or
other foreign material, or from the manipulation of equipment and/or materials
in or near such stream or ditch flowing directly to such stream or lake. Any
March 2004
Page 157
\
.
...~
..~
PrOject Manual
water which haS been used for wash purposes or other similar operations
which become pollution with sewage, silt, cement, concentrated chlorine, oil,
fuels, lubricants, bitumens, or other impurities shall not be discharged into any
such stream or lake. There will be no open burning of materials.
41.2. Techniques identified in USDA-Soil Conservation Service "Guidelines for
Urban Erosion & Sediment Control" shall be utilized as applicable for erosion
and pollution control.
AFtTICLE42 TEMPORARY SEFtVICES AND UTILITIES
Unless the Detailed Scope of Work states otherwise:
42.1. Temporary Services and Utilities:
42.1.1. General:
,
42.1.1.1. The CONTRACTOR shan be responsible for arranging for
. and providing all general services and temporary facilities a
s specified herein and as required for the proper and
expeditious prosecution of the Work. The CONTRACTOR
shall pay all costs for such general services and temporary
facilities.
42.1.1.2. Temporary connections for an utilities and facilities used bY .
the CONTRACTOR including installation, maintenance and
removal of such facilities shall be at the CONTRACTOR's
expense.
4Z2. Water:
42.2.1. The CONTRACTOR shall provide temporary water connections as
required for drinking and construction purposes, unless potable water
is available at the Site and it's use by the CONTRACTOR is
approved by the CITY.
42.2.2.' The CONTRACTOR shall note that the CITY reserves the right to
regulate the use of water, and may impose restriction on the use in
the event water is being used carelessly by the CONTRACTOR.
42.3. Light and Power:
42.3.1. The CONTRACTOR may utilize power which is available at the job
site. The CONTRACTOR shall provide his/her own portable electric
system or make temporary connections to the existing electrical
system as necessary or make arrangements with the power company
at his/her own expense, to supply his/her construction needs. An
\ ----~.~~-~~-,
.
~
~
Project Manual
alternate power source shall be provided for temporary heat. The
CITY will not provide electrical power for heating.
42.4. Temporary Heating and Ventilation:
42.4.1. The CONTRACTOR shall provide temporary closures or enclosures
for all exterior door, window, roof or other types of exterior openings
as required to protect his/her completed Work, protect material and
equipment being installed, protect the City's facilities, and enable its
workmen to accomplish their work in a satisfactory manner and while
maintaining the approved progress schedule. It shall be the
CONTRACTOR's responsibility to keep water in pipes from freezing
and to maintain temporary heat in areas where Work is being
performed at not less than 50 F. before plastering and painting and
not less than 60 F thereafter. The CONTRACTOR must obtain the
City's approval for the types, sizes,amounts and location of heating
equipment. The equipment must have a seal of approval from the
Underwriters Laboratory or other organization satisfactory to the
CITY.
42.4.2. The CONTRACTO~ shall furnish,install, operate and maintain all
required temporary heating equipment, and shall provide and pay all
fuel costs. Oil fired or gas heating units shall be self-contained units
which shall be furnished in sufficient number and adequate capacity
to conform with the requirements for temporary heat stated above.
Each oil-fired or gas~fired unit shall be properly vented as required to
dissipate noxious fumes and prevent discoloration of building
construction. Temporary electrical connection shall be provided by
the CONTRACTOR.
42.5.T emporary Field Offices:
42.5.1. On some Job Orders the CONTRACTO~ may be required provide
his/her own field office and utilities as directed by the CITY in the
Detailed Scope of Work. The cost of the Field Office will be treated
as a Pre-priced item and paid for in the CONTRACTOR's Price
Proposal. All other cost will be paid for by the CONTRACTOR.
Location shall be approved by the CITY.
42.5.2. The CONTRACTOR shall provide separate telephones in the
temporary offices for its use. The CONTRACTOR shall pay for the
cost of installing such telephones and the cost of all telephone
service. The Contractor must provide a stationary telephone or
cellular phone at the job site for their own needs and for the CITY to
contact them.
March 2004
Page 159
City of Miami Beach
-c:opyrlght 0 2004 The Gordian Group
.......~......................................................
.~
~
Proj~ct Manual
42.5.3. The CONTRACTOR shall provide a faCsimile machine in the
temporary field offices to expedite written communication between
the parties. The CONTRACTOR shall bear all costs of providing said
equipment.
42.5.4. The facilities mentionedabo\le shall be made available for the use by
the City's designated representative during its site visits.
42.6. Temporary Sanitation Facilities:
. 42.6.1. CONTRACTOR's personnel will normally not be permitted to use
toilet facilities on project premises subject to regulation and control of
CITY staff. The CONTRACTOR shall provide adequate and suitable
temporary facilities.
42.6.2. ThE! CONTRACTOR. shall provide temporary tOilets for the use of the
Workmen, placed where directed and maintained in a sanitary
condition.
42.6.3. At the completion of the contrac:t the temporary toilets shall be
removed.
42.6.4. Existing on-site toilet facilities may be used to meet the above
requirements subject to the prior approval of the CITY.
42.7. Temporary Fire Protection:
42.7.1. The CONTRACTOR shall take all precautions necessary and
required to prevent fire and comply with the requirements of local
authorities having jurisdiction
42.7.2. Fuel to cutting and heating torches shall be gas only, and Shall be
contained in Underwriters' Laboratory approved containers. The
CONTRACTOR shall provide and maintain a 20 pound capacity, dry
chemical type fire extinguisher in the immediate vicinity of the work
when welding tools or torches of any type are in use.
42.7.3. The CONTRACTOR shall not use volatile liquids for cleaning agents
or as fuels for motorized equipment or tools within building.
42.7.3.1. Tarpaulins shall be securely anChored and flame proofed,
when attached to any wood scaffolding and when used to
enclose any portion of a building above the first floor.
42.7.3.1. Flammable materials shall not be stored, nor debris