Loading...
HomeMy WebLinkAbout2004-25652 Reso RESOLUTION NO. 2004-25652 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH MC HARRY, AS THE TOP-RANKED FIRM PURSUANT TO REQUEST FOR QUALIFICATIONS NO. 02-03/04 FOR THE ROTUNDA RENOVATION PROJECT, WHICH INCLUDED WORK FOR THE DESIGN OF RENOVATION TO COLLINS PARK, FOR PLANNING, DESIGN, BID/AWARD AND CONSTRUCTION ADMINISTRATION SERVICES IN THE AMOUNT OF $657,072; APPROPRIATING $56,514 FROM PARKING FUNDS FOR SAID AGREEMENT; FURTHER ACCEPTING AND APPROPRIATING A $20,000 DONATION FROM THE BANANA REPUBLIC FOUNDATION FOR THE RENOVATION OF THE ROTUNDA. WHEREAS, on September 23, 1998 the Mayor and City Commission adopted Resolution No.98-22904, authorizing the Mayor and City Clerk to execute an Agreement with the firm of Robert A.M. Stern Architects (Stern) for the Architectural and Engineering Design of a Regional Library, and a Master Plan for Collins Park and the Cultural Campus Streetscape (the Project); and WHEREAS, on November 2, 1999 the voters of Miami Beach approved the issuance of an approximately $92 Million General Obligation Bond, which included recommended improvements for complete renovation of Collins Park, $1.8 million was allocated for the costs for the renovation; and WHEREAS, the Administration and Stern agreed to negotiate and proceed with Project design in phases. Approval was given to Stern to complete the design and construction drawings of the Regional Library, the Master Plan for Collins Park, and Cultural Campus Streetscape; and WHEREAS, when the Collins Park Phase was ready to begin, the City and Stern could not reach an agreement on a fair market price for the implementation of the master plan design, and WHEREAS, the Collins Park Oversight Committee made a recommendation on January 16,2004 to terminate all negotiations with Stern, add the scope for the Design phase of Collins Park, Parking Lot and Streetscape to the Rotunda Renovation Request for Qualifications (RFQ) No. 02-03/04 and to do both Projects at the same time with a single consultant; and WHEREAS, RFQ No. 02-03/04 for the Rotunda Renovation Project was issued on October 29, 2003. On February 9, 2004 Addendum No.4 to the RFQ was issued, which included renovations to Collins Park, the Parking Lot to the East of the park, and adjacent Streetscape Improvements; and WHEREAS, it is estimated that the total cost for construction of these desired improvements will be approximately $5.5 million, to be funded mainly from the 1999 General Obligation Bond funds, City Center Redevelopment Agency (RDA) Tax Increments Funds (TIF), and Parking Enterprise Funds; and WHEREAS, the Evaluation Committee met and ranked MC Harry Associates (MC Harry) as the top firm and the City Commission authorized the Administration to negotiate a fee on April 14, 2004; and WHEREAS, City staff negotiated a total planning, design and construction administration services and reimbursable fee of $657,072, and WHEREAS, Construction Administration services, in the amount of $168,148, are included in the negotiated fee which represents approximately 11 % of the total overall construction project estimate of $5.5 million, and an estimated timeframe of thirteen (13) months; and WHEREAS, the final duration on the construction schedule will be determined during negotiations on the final language of the Agreement with MC Harry, and the final cost for the monthly charges on Construction Administration services will be included in the Agreement; and WHEREAS, the Administration recommends that the Mayor and City Commission approve the award ofthe Architectural and Engineering Services Agreement for planning, design and construction administration in the amount of $657,072 to the firm of MC Harry Associates and appropriate the necessary funding for the Agreement. NOW THERE BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and the City Commission approve and authorize the Mayor and City Clerk to execute a Professional Services Agreement with Mc Harry, as the top-ranked firm pursuant to Request for Qualifications No. 02-03/04 for the Rotunda Renovation Project, which included work for the design of renovation to Collins Park, for planning, design, bid/award and construction administration services in the amount of $657,072; appropriating $56,514 from Parking Funds for said agreement; further accepting and appropriating a $20.000 donation from the Banana Republic Foundation for the renovation of the Rotunda. PASSED AND ADOPTED this 28th day of APPROVED M TO FORM & LANGUAGE & FOR EXECunON ATTEST: . ~~ ~_ j1{fJ-d-~~~:( h-/. CITY CLERK I T;\AGENDA\2004\JuI2804\Regular\Commission Memo -Collins Park Cultural Center.doc CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY m Condensed Title: A resolution authorizing the execution of an agreement with MC Harry Associates in the amount of $657,072 for AlE professional services and other direct costs required for the Collins Park Cultural Center Improvement Project; and appropriating funds in the amount of $56,514 from Parking Funds; Accepting and Appropriating a $20,000 donation from the Banana Republic Foundation for the renovation of the Rotunda. Issue: Shall the Mayor and City Commission authorize the execution of an agreement with MC Harry Associates in the amount of $657,072 (See attachments A, B & C) for AlE professional services required for the Collins Park, Parkin a Lot, Streetscaoe Imorovements, and Rotunda Renovation? Item Summary/Recommendation: Robert AM Stern Architects was hired initially to design the Regional Library, Collins Park and Cultural Campus Streetscape projects, with the design to proceed in Phases. Unfortunately at the time the Collins Park Phase was ready to begin, agreement on a complete and satisfactory amount was not achieved between the Administration and Stern for the implementation of the master plan design. The Collins Park Oversight Committee made a recommendation on January 16, 2004 to terminate all negotiations with Stern and add the scope for the Design phase of Collins Park, Parking Lot and Streetscape to the Rotunda Renovation Request for Qualification (RFQ) No 02-03/04 and to do both Projects at the same time with a single consultant. Responses to the RFQ were received by the opening date of February 27, 2004. The Evaluation Committee met and ranked MC Harry Associates as the top firm and the City Commission authorized the Administration to negotiate a fee on April 14, 2004, Substantial agreement was reached on the scope and fees for the project. City Staff negotiated a total planning, design and construction administration services and reimbursable fee of $657,072 (See attachment A, B, and C). The fee represents approximately 11 % of the total overall construction project estimate of $5.5 million. The Administration believes the proposed fee is appropriate for the effort required during the planning, design and construction administration phases. The Administration recommends that MC Harrv be awarded a total AlE fee and direct costs of $657,072. ave their recommendation to this item at the Jul 12, 2004 meetin . Financial Information: Finance Dept. Approved Source of Funds: D Ci Clerk's Office Le islative Trackin Luz Maria Ciccia 1:V[~ DATE 7-rl8-or; S-CoIIPKSt II-02-07282004-LMC-01 CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www,miamibeachfl,gov COMMISSION MEMORANDUM From: Mayor David Dermer and Date: July 28, 2004 Members of the City Commission --- Jorge M. Gonzalez \ Y'-~ City Manager 0 U A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AWARDING A PROFESSIONAL SERVICE AGREEMENT TO MC HARRY FOR PLANNING, DESIGN, BID/AWARD AND CONSTRUCTION ADMINISTRATION SERVICES FOR THE COLLINS PARK CULTURAL CENTER IMPROVEMENT PROJECT, IN THE AMOUNT OF $657,072; APPROPRIATING $56,514 FROM PARKING FUNDS FOR SAID AGREEMENT; ACCEPTING AND APPROPRIATING A $20,000 DONATION FROM THE BANANA REPUBLIC FOUNDATION FOR THE RENOVATION OF THE ROTUNDA. To: Subject: ADMINISTRATION RECOMMENDATION Adopt the Resolution FUNDING The Administration recommends appropriating funding in the amount of $56,514 from Parking Funds. Also, the City was given a $20,000 donation from the Banana Republic Foundation to fund the AlE fee for the renovation of the Rotunda that need to be appropriated. Additional funds in the amount of $108,659 were previously appropriated from GO Bond funds allocated to this project. The Administration is seeking an appropriation of $471,899 in City Center RDA TIF funds elsewhere on this agenda to fully fund this agreement. ANALYSIS On September 23, 1998 the Mayor and City Commission adopted Resolution NO.98- 22904, authorizing the Mayor and City Clerk to execute an Agreement with the firm of Robert A.M. Stern Architects (Stern) for the Architectural and Engineering Design of a Regional Library, and a Master Plan for Collins Park and the Cultural Campus Streetscape. On January 6, 1999, the Mayor and City Commission authorized appropriation of the funding necessary to implement the Agreement with Stern for the project. On November 2, 1999 the voters of Miami Beach approved the issuance of an approximately $92 Million General Obligation Bond, which included recommended improvements for complete renovation of Collins Park. $1.8 million was allocated for the costs for the renovation. City Commission Memorandum July 28, 2004 Collins Park Cultural Center Page 2 of 4 The Administration and Stern agreed to negotiate and proceed with project design in Phases. Approval was given to Stern to complete the Design and Construction Drawings of the Regional Library, the Master Plan for Collins Park, and Cultural Campus Streetscape. When the Collins Park Phase was ready to begin, the City and Stern could not reach an agreement on a fair market price for the implementation of the master plan design. Stern requested a total fee of $774,785 for the design of Collins Park, which did not include the Rotunda. In comparison, MC Harry Associates' fee for Collins Park, including the Rotunda is $657,072. The Collins Park Oversight Committee made a recommendation on January 16, 2004 to terminate all negotiations with Stern, add the scope for the Design phase of Collins Park, Parking Lot and Streetscape to the Rotunda Renovation Request for Qualifications (RFQ) No. 02-03/04 and to do both Projects at the same time with a single consultant. RFQ No. 02-03/04 for the Rotunda Renovation Project was issued on October 29, 2003. On February 9, 2004 Addendum No. 4 to the RFQ was issued, which included the additional scope of work for the design of renovations to Collins Park. The project scope added to the RFQ through Addendum NO.4 included renovations to Collins Park, the Parking Lot to the East of the park, and adjacent Streetscape Improvements. The scope of services for this portion of the project will include planning, design, bidding, and construction administration services, and are further detailed below. . Collins Park Renovation of existing park includes landscaping, irrigation, lighting, hardscape, including but not limited to curbs, sidewalk, drainage and ADA ramps, and street furniture as described in the Collins Park Master Plan originally prepared by the Architectural firm of Robert A.M. Stern. Design must include coordinated design documents for the installation of proposed Art-In-Public Places opportunities. . 21st Street Parking Lot Renovation of existing parking lot, including new landscaping, irrigation, lighting, and proposed hardscape improvements, including but not limited to curbs, sidewalks, drainage and ADA ramps. Design may include a transition area and pavilion between parking lot and existing beach (public restroom and beach walk). . Streetscape Renovation of existing streetscape including replacement of existing sidewalks, lighting, irrigation, landscaping, street paving, street furniture, drainage and waterline improvement. Streetscape improvements should compliment and be consistent with the surrounding area improvements and the Collins Park Master Plan. City Commission Memorandum July 28, 2004 Collins Park Cultural Center Page 3 of 4 It is estimated that the total cost for construction of these desired improvements will be approximately $5.5 million, to be funded mainly from the 1999 General Obligation Bond funds, City Center Redevelopment Agency (RDA) Tax Increments Funds (TIF), and Parking Enterprise Funds. It is important to note that only the Collins Park portion of the project can be funded with the 1999 General Obligation funds. Responses to the RFQ were received by the opening date of February 27, 2004. The Evaluation Committee met and ranked MC Harry Associates (MC Harry) as the top firm and the City Commission authorized the Administration to negotiate a fee on April 14, 2004. Initial negotiation sessions were held in May and June 2004 and substantial agreement was reached on the scope and fees for the project. City staff negotiated a total planning, design and construction administration services and reimbursable fee of $657,072. The breakdown of this fee by man-hours is provided in Attachment A, by phase (Planning, Design, Bid/Award and Construction Administration) in Attachment B, and an outline of MC Harry's schedule of hourly rates is provided in Attachment C. This fee represents approximately 11 % of the total overall construction project estimate of $5.5 million. Construction Administration services, in the amount of $168,148, are included in the negotiated fee. This amount results in a cost of $13,000 per month for the services provided by the consultant during construction based on an estimated construction timeframe of thirteen (13) months. MC Harry has agreed to include two months of additional Construction Administration services at no additional cost to the City if the Project exceeds the estimated schedule of thirteen (13) months. After the additional two months, MC Harry and the City have agreed that the consultant will provide additional services at a not to exceed cost of eighty percent (80%) of the monthly cost of Construction Administration services established in the negotiated fee. This will result in additional services at a not to exceed an estimated cost of $10,000 per month if the construction schedule were to be delayed. The Consultant declined to price an unlimited Construction Administration term. The final duration on the construction schedule will be determined during negotiations on the final language of the Agreement with MC Harry. At that time the final cost for the monthly charges on Construction Administration services will be included in the Agreement. The City believes this to be a fair approach to account for possible delays in the construction process. Any Construction Administration services due to delays deemed to be the responsibility of MC Harry will be provided by the consultant at no cost. Based on the above, the Administration recommends the proposed fee as appropriate for the effort required during the planning, design and construction administration phases. City Commission Memorandum July 28, 2004 Collins Park Cultural Center Page 4 of 4 CONCLUSION Therefore, the Administration recommends that the Mayor and City Commission approve the award of the Architectural and Engineering Services Agreement in the amount of $657,072 to the firm of MC Harry Associates and appropriate the necessary funding for the Agreement. T:\AGENDA\2004\JuI2804IRegularICommission Memo -Collins Park Cultural Center.doc ~ ! ~ . ! - - - 2 8 2 8 2 8 2 8 ,. 0 8 . 0 1 2 7 -'- 1 . ,. ;g 1 . ,. 32 1 2 8 . 1 ~ t---'-'- ,. 1 -.2 t--- 7 7 0 - - 32 ~ 0 Pogo, of3 Arch Prlnclpllll Proj Mgr I CAOO $ 150 S 110 S . 8 . 8 8 8 2' 40 40 . 2. 8 8 8 8 8 8 8 8 0 8 8 8 See Optional ~ervlces Below 8 . . . '0 160 . . i . . 8 2 1!!! 16.500 11% 40 5 51 11 53 3 7 40 52 33 eo 8 8 T T . 2i . . 8 2 !!. '14,100 8 3 5 1 5 if 1 .- 5 3 20 .- 8 o 2' June 30. 2004 Project; Conins Park I Rotunda Breakdown of Fee Rata , Planning Serville. (lctllHMtlc) 1.1 PROJECT KICK-QFF MEETlNG 1.2.1 PROJECT SITE RECONNAISSANCE VISIT 12.2 DEVELOPMENT Of DESIGN CONCEPT AlTERNATIVES 12.3 DEVELOP BUDGET LEVEL COST eSTIMATE FOR EACH ALTERNATIVE 1.3 ATTENO-vlSIONING- SESSION 4.1 REVIEW MEETING PRIOR TO COMMUNITY DESIGN WORKSHOPS 4.2 REFINE AlTERNATIVES BASED ON VISIONING REVIEW 1.5 COMMUNITY DESIGN WORKSHOPS 5.1 COMMUNITY DESIGN WORKSHOP NO. 1 5.2 COMMUNITY DESIGN WORKSHOP NO.2 1.6 BASIS OF DESIGN REPORT (DRAFT) PROJECT IMPLEMENT. PLAN BUDGET COST ESTIMATE SCHEDUlE PERMITTING DISCUSSIONS 1.7 REVIEW OF BOOR WI CITY DIVISIONS LtJG. WI POLICE, PW, PARKING, SANITATION, ETC. UTG. WI HISTORIC PRESERVATION BOARD MfG. WI CITY COMMISSION BASIS Of DESIGN REPORT (FINAl) 575 54,513 0% .. 2. o..lgn Oev.lopment SeMCH (30% CD) 2.1 FIELD VERIFICATION Of EXISTING CONDIT10NS SURVEY COORDINATION COORDINATION WITH UTILITY COMPANIES COORDINATION WITH SOFT-DIG DEVELOP BASE SITE PlANS - EXISTING CONDITIONS INFO 2.2 OETAlLED DESIGN Develop overed design OOrJcepts SilaAnalysis I PrllpExisITraaPlan LayoutPlaM SInIetPlanslProfl181 ParklP8IIclngPlans SIts & DraInage Detlllls WaterMaln~n&IProflla. TIIChnlcalSpeclfications PI'DgI'8II Meetings Landacapa 30%; 60" Rolunc1a Building Design Devalopment Gaotechnic8lEvaluallon Inl8rdillpllnaCoordinatlon 30% DESIGN SUBMISSION INCORPORATE 30% DESIGN REVIEW COMMENTS Oeslgn/Conslruc1abily _ CostE>1imate Estimate of Man-hrs; Basis for Lump Sum Fee :;; i I .. ~a ~ Ww l! S! ~ , 11'1 ~ ' . . 18= "2a~ .... 2 III N ri ~ ww ww ll:e ... ~ ~ S!~~~~S!. . Q = ... .....# I'~ .... ~ ~ :e C'I 11'1 11'1 C'I 11'1 .., S! , .. .. 10 . . ~ ~ N N.!l 0 Ww . lii ;: !i!.. 00.....,...,....... "'. ......~ ...O....OOl'll ~ '" N '" "-w 'll N ~O... 00 OO~ 000000 t 'fw - Ii! -5r. ~"-w m 'D ~ 0: ~ ~.! 8,5 '5 ",'ll , tJ i fil ~~ ~ '2"~ ,0... ~ & i I H~ IH d~ "H I:lww ~ ~ "- if E " , C'" m ::! E '53 H E .f! = . . m WlO ~NN II) II) ~II)~ <00 -. ~ .. ~ MW ~OO~~~""~2~~~II)II)""N""NII)~II)~ I ~.. ... ."!i II)II)"'~II)"'~ I!ii! ::! M 5 ~ ~ w .......N...NON I' ~ ~OO~NII)O_II)~N~..,...,.l'lINl'lINNII)_... .~. H ~ a ~ If M " ~ roit# NI; U A.. . ~ iI ~ ~ ii)~ ~ ~ ~ ~ ~Ji _ ;~ ; 8 8 ~a '0 li'~1i :; ~ ~ ....~ ~! ~~~ =. ## ~ ~ :~-~~ ~ az~ lOe- ii ~ ~ .clJ::##2 !z t~~ ; ~j~ ~~ z z .~~a~ w ;;~ ~~o i&~al!~~~~ :i~~~~ ~e I~l~~~~fi jir~~i;i;m~~~~~~~~~~ &1 ~~~i~~~JI~~<'~'~~~~M~w~~zNN l~iIS!i~~~~ijtti~i~~~~~w~i~ii~!! 2~~~5"'o."'~~o.~iiiM~M ,~zo ~~~~II 1iIU.<lltClli.dd'ti.....:ci.c....:::~3~ ffi~S21- 2~:Egl-l- ~~~~ ~Uz~UzG ~~~i ffiwii UN~N ~_~_~ ooo~ aZ.. C'I" 11'110,," A ~ N ~ ~ ~ ~ ;; ll! ~ z w ~ ~ ~ ~ w U >- ~ j g ~ ~ ~ . ! 8 ~ ~ ~ C I- j J ~ ~ ~ ffi ! ~ ~ ~ ; ~ . I- ~ ~ . ~ < I- . . ~h~~HHi w Q ~ w w ~ - I- I- ;8~i~~s;i! ....... f'I" 11'110,... ... (OJ (OJ f'i .., f'i .., .., ntH! ~ . ~ '~;#! flU ill;!; 000..,. ~~ ill ' ~ ~ fi3 ~ ~ .. II 0 ~ lil ~~ ... ~ iq ~. ..,.ooao w ~~ . 8 2 ~ iil U !l~ 110.........,. '" l~ II COON ~ ill -1l ~ <r -t! ~Il x ~~ C5 :5'5 :;; ~ ~ ~ l! ~ ~~ 00 ....00..,. 00_ Q ~ t~ <<t~:RCO~~(I)I * I :e ill (II) co -.... C').... 1 N Ii; ~"i", f ~= ~ Ii" ~ ~ 8 hH[Q~ I J~ffiz~-f3 I wwoa::~u ~:;:~~~~ .... 1l8~il''''i3}jj f:2 1~~U~g~~~J ~:s~~a::o:::(f.I~..,. , ~1!:8~~~ffi~~it U~~Uh~H ~"'wll"s.!c;:!,,>->- a[~ll1~~~~~H '"':(,!'"1'"':ll:!"''''':(!) ............~ '~ H >->- H I:;: u ~ '" < ~&:M w u ~ w "' ~ Q ii: 9 . j J . . 2 2 55 o Q : w Q ~ ~ n. ~ ~ CJ ~ Q: :I tI o~~"'8.. la ~,j:: UJ ~ ~ ~ II /.J ~ ~ ~ ~ 9l iI i UB~U ~ ~~~i~f!. 2 ~~o~~!.! .... -' '::: U 0 -.I ~ 8~~~~JJ N ~ s ~ Ii ~ H ~'" . :>; e '03 !.e E .!! :ni "' ~ "' ~ ~ ~ '" '0 '" & :. I;; !II '" ~~ ~!!l ~ = UU~ 0900t) ..;;- s ~ ~ I ~ 2 I H ~"' 3 j ~.~ . <5 ~ i ~ li'f Ihll ~ ~ ih c: I ~ J J OS<({!~ ~ E II 81 ~ ~ IJ or!l i5iill !It ... <"I .. III . cci cD ci iii /lrTflcHmt11lt 13 July 21, 2004 Collins Park Cuttural Center Project MCHarry Associates, Inc, 2780 SW Douglas Road Miami, Florida 33133 305-445-3765 Schedule "8" Itemized schedule of compensation 1 Phase FEE/PHASE FEE/SECTION Planning Services (Schematic) $64,613.00 SECTION 1 Streetscape 39% $21,491.00 SECTION 2 Parking Lot 7% $4,087,00 SECTION 3 Collins Park 23% $12,581.00 SECTION 4 Rotunda 30% $16,354.00 Design Development $133,248.00 SECTION 1 Streetscape 40% $53,407,00 SECTION 2 Parking Lot 8% $10,157,00 SECTION 3 Collins Park 23% $31,264.00 SECTION 4 Rotunda 29% $38,420,00 Construction Documents $218,976.00 SECTION 1 Streetscape 39% $84,979,00 SECTION 2 Parking Lot 7% $16,161,00 SECTION 3 Collins Park 23% $49,745,00 SECTION 4 Rotunda 31% $68,090.00 Bidding & Award Services $22,188.00 SECTION 1 Streetscape 45% $9,997,00 SECTION 2 Parking Lot 9% $1,901,00 SECTION 3 Collins Park 26% $5,852,00 SECTION 4 Rotunda 20% $4,438,00 Construction Administration Services [365 DAYS) $168,148.00 SECTION 1 Streetscape 45% $75,761,00 SECTION 2 Parking Lot 9% $14,408,00 SECTION 3 Collins Park 26% $44,349,00 SECTION 4 Rotunda 20% $33,630.00 SUB TOTAL BASIC SERVICE FEE $ 597,072.00 I 2a 2b 3 4 OTHER DIRECT COSTS Reproduction Costs SECTION 1 Streetscape SECTION 2 Parking Lot SECTION 3 Collins Park SECTION 4 Rotunda $10,000.00 41% $4,100.00 8% $800.00 24% $2,400,00 27% $2,700,00 $30,000.00 45% $13,500.00 15% $4,500,00 24% $7,225,00 16% $4,775,00 $10,000.00 25% $2,500.00 25% $2,500.00 0% $0,00 50% $5,000,00 $10,000.00 50% $5,000,00 20% $2,000.00 20% $2,000,00 10% $1,000.00 Surveying SECTION 1 Streetscape SECTION 2 Parking Lot SECTION 3 Collins Park SECTION 4 Rotunda Geotechnical Engineering SECTION 1 Streetscape SECTION 2 Parking Lot SECTION 3 Collins Park SECTION 4 Rotunda Underground utility Verification SECTION 1 Streetscape SECTION 2 Parking Lot SECTION 3 Collins Park SECTION 4 Rotunda SUB TOTAL OTHER DIRECT COSTS $60,000.00 I Total Professional Services and Expenses $ 657,072.00 I July 21,2004 Collins Park Cu~ural Center Project Schedule "8" Itemized schedule of compensation MCHarry Associates, Inc, 2780 SW Douglas Road Miami, Florida 33133 305-445-3765 Phase FEE/PHASE FEE/SECTION SUMMARY OF FEES BY SECTION SECTION 1 Streetscape SECTION 2 Parking Lot SECTION 3 Collins Park SECTION 4 Rotunda $597,072.00 41% 8% 24% 27% $245,635,00 $46,714,00 $143,791,00 $160932,00 SUMMARY OF DIRECT COSTS BY SECTION SECTION 1 Streetscape SECTION 2 Parkin9 Lot SECTION 3 Collins Park SECTION 4 Rotunda $60,000.00 42% 16% 19% 22% $25,100,00 $9,800,00 $11,625,00 $13475,00 SUMMARY ALL FEES and DIRECT COST SECTION 1 Streetscape SECTION 2 Parking Lot SECTION 3 Collins Park SECTION 4 Rotunda $657,072.00 41% 9% 24% 27% $270,735.00 $56,514.00 $155,416.00 $174407,00 ,.4 rTlJc/!/l1trv T c. July 2004 Collins Park Cultural Center Project M.C. Harry Associates, Inc. 2780 SW Douglas Road Miami, Florida 33133 305445 3765 Schedule "e" Schedule of Hourly Rates BilLING RATE PRINCIPAL $ 150.00 Project Manger - Senior $ 126.00 Project Manger $111.00 Engineer $ 126.00 Architect $ 99.00 Engineer $ 99.00 Senior Inspector $ 87.00 Specifications Writter $ 78.00 Inspector $ 69.00 Technical Drafting - Senior $ 67.00 Technical Drafting $ 58.00 Architect! Engineer Intern $ 41.00 Clerical! Administrative $ 45.00