Loading...
175-1999 LTC t. CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 htlp:\\ci.miami-beach.f1. us L.T.C. No. 175-1999 LETTER TO COMMISSION DATE: August 23,1999 TO: Mayor Neisen O. Kasdin and Members ofthe City Co ission FROM: Sergio Rodriguez City Manager SUBJECT: PLANS APPROVAL FOR THE ROYAL PALM HOTEL To provide an update on the status of the plans approval for the Royal Palm Hotel, for the past three weeks, the Building Department's structural plan reviewers have met with representatives of the referenced project, including structural engineers and post tension engineers, on a daily basis. Structural plan reviewers have been instructed to meet with the representatives of the project, without any reserved time/appointments, and they have done so almost every day for the past three weeks. As of today, the required corrections for the post tension drawings of the second floor are not completed. Staff has conferred with the developer's engineers and the City is awaiting the revised plans and completed PT shop drawings, based on the agreed upon methodology. If you have any questions, please contact me. SRJdMt&rar F:\CMGRISALLIRARIL TClROYPALM.PLN c: Christina M. Cuervo, Assistant City Manager Janet Gavarrete, Assistant City Manager r, Author: SergioRodriguez at C-H-PO Date: 8/18/99 5:50 PM Priority: Normal TO: JanetGavarrete subject: Re: PLANS APPROVALS OF ROYAL PALM ____________________________________ Message Contents ------------------------------------ PIs, prepare me a transmittal note from me to CC info. FYI, attaching your Reply Separator Subject: PLANS APPROVALS OF ROYAL PALM Author: JanetGavarrete at C-H-PO Date: 8/18/99 9:21 AM fyi- am sending a hard copy of this email to legal. Janet Forward Header Subject: PLANS APPROVALS OF ROYAL PALM Author: HamidOolikhani at C-H-PO Date: 8/17/99 4:55 PM For the past three weeks, the Building Department's Structural Plan Reviewers have met with representatives of the above project including Structural Engineers and Post Tension engineers on daily basis. Structural Plan Reviewers have been instructed to meet with the representaives of the project even without any reserved time/appointments, and they have done so for almost every day for the past three weeks. As of today, the required corrections for the post tension drawings of the second floor are not completed yet. The structural revisions required prior to approval and release of the 2nd floor are not submitted as of this date, but the project's structural engineer is working on it. We have agreed on a solution for the underdesigned pile cap (a letter from the developer was submitted to the department agreeing to the solution and the legal dept. was ok with the language of the letter), providing that the structural revisions for the 2nd floor and corrections on PT shop drawings are submitted and approved, As of today, the said revision plans and completed PT shop drawing corrections have not been submitted. If you have any questions, please let me know.