Loading...
2004-25558 Reso RESOLUTION NO. 2004-25558 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RATIFYING A CONTRACT, IN THE AMOUNT OF $42,875, TO MIAMI STAGECRAFT, INC., FOR THE DEVELOPMENT OF ELECTRICAL ENGINEERING CONSTRUCTION DOCUMENTS, AND THE INSTALLATION OF THEATER HOUSE AND STAGE LIGHTING EQUIPMENT AND MATERIALS REQUIRED FOR THE BYRON CARLYLE THEATER PROJECT. WHEREAS, the operation of a performing arts theater requires theatrical stage lighting, house lights, front of stage lighting, dimming controls, cables and other accessories to provide for the multiple lighting effects needed for the productions and performance artists that will use the facility; and WHEREAS, the Mayor and City Commission, on November 28, 2001, adopted Resolution No. 2001-24677 authorizing the Property Management Division Director to serve as the Certified General Contractor for the renovations of the Byron Carlyle Theater (the Project); and WHEREAS, the Property Management Division Director prepared a scope of work necessary to prepare electrical engineering construction documents and for the installation of the required lighting and accessories for the Project; and WHEREAS, Miami Stagecraft, Inc. was requested to provide a quote for the installation of lighting equipment; and WHEREAS, it was determined that the quote provided was within the Project budget, and that the installation contractor had proper licenses, insurance, and previous experience in specialized lighting in theater projects; and WHEREAS, a contract was awarded to Miami Stagecraft, Inc., in the amount of $42,875, for the installation of theater stage and house lighting equipment and materials required for the Byron Carlyle Theater; and WHEREAS, as required by Resolution No.2001-24677, the Administration herein requests that the Mayor and City Commission ratify the contract with Miami Stagecraft, Inc., in the amount of $42,875. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby ratify a contract, in the total amount of $42,875, to Miami Stagecraft, Inc. to provide for the installation of theater stage and house lighting, equipment, and materials required for the Byron Carlyle Theater Project. PASSED and ADOPTED THIS 5th day of May 2004. ATTEST: CITY CLERK MAYOR ~~~ Resolution No. 2004-25558 APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION . ~~30-0f ~ uaae T:\AGENDA\2004lMay0504lConsentlByronRatifyStagelightlnglnstallRESO.doc Byron Carlyle Theatre Renovation Project Budget and Project Status Report As of April 29, 2004 Fundinll Date Fundinll Source Appropriated Expended Balance 04/18/2001 General Fund Undesignated $ 500,000.00 $500,000.00 OS/29/2002 Reallocation of CDBG funds FY 00/01 NBDC Com. Fac;:ade $ 150,000.00 $ 150,000.00 FY 01/02 NBDC Com. Fac;:ade $ 150,000.00 $ 150,000.00 MBCDC Pres. & Rehab Prog. $ 100,000.00 $ 92,456.14 03/20/2002 Quality of Life (via NBDC) $ 150,000.00 $ 150,000.00 05/16/2001 Quality of Life (via NBDC) $ 150,000.00 $ 148,278.84 06/06/2002 Miami-Dade CDBG (via NBDC) $ 50,000.00 $ 49,937.28 06/13/2002 Miami-Dade Cultural Affairs Grant $ 16,096.00 $ 15,748.00 09/18/2002 State Cultural Facilities Program Grant FY 01/02 $ 460,000.00 $ 459,999.81 10/01/2003 Miami-Dade Cultural Affairs Capital Development Grant $ 12,500.00 Total Funding: $ 1,738,596.00 $ 1,716,420.07 $ 22,175.93 Phase One: Lobbv area converted into Office Space Total Proiect Expenditures for Phase One. Property Management charge, (construction of offices) Laumar Roofing (Roof and HVAC system replacement) Property Management (Maintenance, beginning of project) Sub-total Phase I Phase Two: Theater Lobbv and Performance space. Restrooms. and Interior Finishes Budllet Expended Balance $ 118,072.21 $ 401,501.00 $ 40,000.00 $ 1,738,596.00 $ 559,573.21 $ 1,179,022.79 $ 1,179,022.79 Demolition Lango Equipment ( Demolition) Lango Equipment ( Additional Demolition) Total Fire Protection Fire Controls Inc.(Fire Alarm Installation) Falcon Fire Protection (Fire Sprinkler Installation) Total $ 43,450.00 (ratified) $ 5,800.00 (ratified) $ 49,250.00 $ 785.00 $ 1,800.00 $ 3,500.00 $ 43.61 $ 3,200.00 $ 4,950.00 $ 14,278.61 $ 62,904.64 (ratified) $ 106,418.00 (ratified) $ 169,322.64 $ 34,836.00 (ratified) $ 34,836.00 $ 21,370.00 $ 10,739.51 $ 8,245.00 $ 1,841.00 $ 5,700.00 Byron Carlyle Theater Budget Expenditure Public Works Dept. Property Mgt. Division April 2004 Reports. Desion. Plans review ATe (Asbestos/ Environmental Reports) M.L. Cain & Assoc. (Appraisal report) Accurate Fire Sprinkler (Fire sprinkier system design) Federal Express Tri-City Electric Co. (Fire Alarm System Design) Olga V. Cordero, PE. (plans review, signed and seal) Total Concrete Work Luis E. Roca, Inc (Concrete form and pour services) Total Interior Finishes Lotspeich Company, Inc (acoustical ceilings and installation) Daltile ( materials for restrooms tile) Farrey's Wholesale Hardware (Lobby Light fixtures) Casinos's Carpet (Projector room tile) Mardale (toilets partitions and accessories) Ricky's Doors ( doors and specialty hardware) Artistry in Glass (railings stairs, mezzanine, ramp, mirrors, etc) Lobby Floors (Carpet and art design installation) CPL Const. Inc (spray knockdown wall texture) ArchiTile, Inc.( decorative bathrooms counters} Total $ 18,126.00 $ 41,455.60 (pending) $ 9,000.00 $ 1,260.00 $ 5,552.49 $ 123,289.60 $ 49,937.09 $ 135,430.00 (ratified) $ 58,300.00 (ratified) $ 42,875.00 (pending) $ 24,340.00 $ 143,145.20 $ 24,603.29 $ 478,630.58 $ 235.56 $ 3,150.00 $ 4,972.52 $ 24,924.00 $ 1,000.00 $ 9,024.23 $ 43,306.31 Theater Eauipment and Components Theater Equipment ( stage lighting and microphones material supply Sound Concepts (Stage installation) Miami Stagecraft (Stage Lighting Equipment and Materials) Miami Stagecraft (Stage Lighting, Sound System Installation) Kelly Benson Electric ( Theater House Lights materials and installation) NUTECH (seats, Curtains, Carpets, aisle lights..) Sound Equipments (NUTECH) Total Miscellaneous Waste Management (Portable Toilets) IT (phones and computer hook-ups) Plumbing Fixtures (Home Depot materials and fixtures) Mamia Plumbing (Sanitary Sewer Lift Station Repairs) DPC (duct insulation removal of asbestos) Refri-Cool (HV AC materials) Total Internal Charaes Property Management Charges (Internal labor and materials) for HVAC, Electrical, Plumbing, Carpentry, Ceramic Tile Installation, and Painting charged to the project budget Total $ $ 243,933.22 243,933.22 Total Project Expenditures Sub-total Phase II Phase Two Budget $ 1,179,022.79 $ 1,156,846.86 $ 22,175.93 Work remainina to complete: Site Clean up and Punch List Items (Estimated Cost) $ 21,575.00 Projected Project Balance: $ 600.93 The scope of work on the Phase II project is substantially complete and the status of final inspections required to receive a TCO is as follows: Final Inspections Approved: Electrical ADA Wheelchair Lift Sound and Low Voltage Plumbing Fire Sprinkler System HV AC Electrical Stage and House Lighting Pendina Final Inspections Building Final Fire Alarm ADA Fire Final Although the scope of work on the Phase II project is substantially complete and pending final inspections, existing building maintenance, waterproofing, fire issues, and building exterior repairs that are beyond the scope of work of the Phase II project have and will require additional funding. Project Balance Byron Carlyle Theater Budget Expenditure Public Works Oept. Property Mgt. Division April 2004 ....c-'. ',-" MI4MI ST4t;t:Ct:?4.I"T I~C. August 29,2003 Mr. Eric Fliss Gty of Miami Beach 1245 Michigan Ave. Miami Beach, Florida 33139 Eric, It is my pleasure to writ.e this letter .on behalf of Kelly Benson Elet;lJ"ic. I have had the opportUnity to work 'With KeDy Benson On more than twenty theacric.U lighting instalLations. These installations are a specialty type of work that requires a specific knowledge of stage terminology, methods and practices along with highly skilled elearicians. In my opinion Kelly Benson Electric rates an A + in this area because of his signifiCoUlt experience in this type work. The Byron Carlisle theatre renovation project will require a skilled contractOr to negotiate the special challenges presemed by this renovation. I believe Kelly Benson Electric would serve this project and the City of Miami Beach superbly. Please feel free to call on me if I can offer any more information. ~/ /J,1 ~ Vice Presi~m Miami Stagecraft: Inc. ESTA ...4t. 2B!i!oEAST unl AV.NUE HIALEAH. FLORIDA .DOD PHONE,JOS.'H.9lS. FAX,JOS.696.JJ22 FlUIA. ff .;..f"..,ll....;.....;...~....,..".h ...._ ESTA . rJ!" CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY m Condensed Title: Ratification of a contract awarded to Miami Stagecraft, Inc., in the amount of $42,875, for the development of electrical construction documents and the installation of house and stage lighting, equipment, and materials required for the Byron Carlyle Theater. Issue: Shall the City Commission ratify a contract, in the amount of $42,875, to Miami Stagecraft Inc: Item Summary/Recommendation: In accordance with Resolution No. 2001-24677 adopted by the City Commission on November 28'",2001 the Administration, through its Property Management Division Director, is providing General Contracting services including bidding, the award of contracts for work, and change orders on the Byron Carlyle Theater project. Under the provisions of the Resolution, contracts and purchases exceeding $25,000 must be brought back to the City Commission for Ratification. Due to the highly specialized nature of the work with theater lighting and dimming controls equipment installations and specifications that are specific to the needs of the Byron Carlyle Theater, Miami Stagecraft, Inc. was determined to be the only responsive responsible bidder for the scope of work required. The Administration recommends that the Mayor and City Commission ratify a contract awarded to Miami Stagecraft, Inc. in the amount of $42,875, for the development of electrical construction documents and the installation of house and stage lighting, equipment, and materials for the Byron Carlyle Theater. Advisory Board Recommendation: I N/A Financial Information: Amount to be expended: Source of ... Amount Account ..... Approved Funds: t ... $42,875 # 301.2316.000676 C 2 (General Fund) 3 4 Finance Dept. Totell I $42,875 Cit Clerk's Office Le islative Trackin R.T. Halfhill, Public Works, 6833 Si City Manager C.7(';-- ~-s:0CI DATE CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE, MIAMI BEACH. FLORIDA 33139 http://ci.miami-beach. fl. us COMMISSION MEMORANDUM NO. DATE: May 5, 2004 TO: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez \ 4 City Manager 0 FROM: SUBJECT: A RESOLUTION OF THE MAYOR AND MEMBERS OF THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, RATIFYING A CONTRACT IN THE AMOUNT OF $42,875, AWARDED TO MIAMI STAGECRAFT, INC., FOR THE DEVELOPMENT OF ELECTRICAL ENGINEERED CONSTRUCTION DOCUMENTS AND THE INSTALLATION OF THEATER HOUSE AND STAGE LIGHTING EQUIPMENT AND MATERIALS REQUIRED FOR THE BYRON CARLYLE THEATER. ADMINISTRATION RECOMMENDATION Adopt the resolution. ANALYSIS The operation of any performing arts theater requires theatrical stage lighting, house lighting, and front of stage lighting to provide proper illumination for the many different types of performances venues that will perform in the theater. In addition to the lights, dimming controls, cables, distribution system, clamps to attach lights to the stage superstructure, and low voltage terminations are required to properly set and control the multiple lighting effects. During the design of the stage for the Byron Carlyle Theater, experts in theater operations and lighting were consulted to prepare a stage and front of house lighting system to be consistent with the size, configuration, and design of the stage in the theater. The Mayor and City Commission on November 28, 2001, adopted Resolution No. 2001-24677, authorizing the Property Management Division Director to serve as the Certified General Contractor for the renovations of the Byron Carlyle Theater. The Property Management Division Director developed a scope of work necessaryforthe project that included electrical engineered construction documents required for a 1 the installation of the lighting equipment and related materials necessary for the house and stage lighting at the Byron Carlyle Theater. Electrical contractors were contacted to provide quotes for the installation of the specialized theater stage lighting equipment. Electrical contractors contacted were unable to provide quotes because they lacked experience in performing arts theater lighting equipment unique to theater lighting. Based on the non-response from electrical contractors, Miami Stagecraft, Inc. was contacted to provide a quote. Miami Stagecraft's electrical installation contractor, Kelly Benson Electric, provided a quote for the installation of all stage-light equipment, house lighting, conduit installations, stage motors, dimming racks, and to place a lighting control remote station at the center house location and master controls and panel in the lighting and sound control room. After receiving the quote and finding it within the project's estimated budget and reviewing Miami Stagecraft's electrical contractor's past performance in providing stage lighting and equipment installations on other theater projects, the Property Management Division Director determined that Miami Stagecraft, Inc. was a responsive responsible bidder. A contract was awarded to Miami Stagecraft, Inc., in the amount of $42,875, for the development of electrical construction documents required for permitting the project and for the installation of the theater stage lighting equipment, house lighting, and all related materials and equipment required for the theater house and stage lighting in the Byron Carlyle Theater. The bid tabulation worksheet is included as an attachment. The Administration recommends that the Mayor and Members of the City Commission of The City of Miami Beach ratify the Property Management Division Director's contract awarded to Miami Stagecraft, Inc., in the amount of $42,875, for the development of electrical construction documents and the installation of theater stage lighting, house lighting, equipment and materials required for the Byron Carlyle Theater. A project budget report reflecting funding and expenditures is included as an attachment. ATTACHMENTS JMG/RCM/FB/BAJ T:\AGENDAI2004\Apr1404\Consent\ByronRatifyStagelighting InstallMemo.DOC 2