Loading...
2004-25559 Reso RESOLUTION NO. 2004-25559 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RATIFYING THE CONTRACT, IN THE TOTAL AMOUNT OF $41,455.60, TO ARTISTRY IN GLASS, FOR THE INSTALLATION OF CUSTOM MADE GLASS HANDRAILS, REGULAR HANDRAILS AND CUSTOM MADE MIRRORS REQUIRED FOR THE BYRON CARLYLE THEATER PROJECT. WHEREAS, the design and existing conditions of the Byron Carlyle Theater (the Project) require custom made glass handrails, regular handrails and custom made mirrors to meet design criteria, South Florida Building Code, and ADA compliance; and WHEREAS, the Mayor and City Commission, on November 28, 2001, adopted Resolution No. 2001-24677, authorizing the Property Management Division Director to serve as the Certified General Contractor for the renovations of the Byron Carlyle Theater; and WHEREAS, the Property Management Division Director prepared a base scope of work that was necessary to obtain price quotes from contractors that specialized in custom made hand rails and glass installations required for the Project; and WHEREAS, five contractors that specialize in custom handrail systems were contacted to provide bids for the Project, which resulted in two responsive bids; and WHEREAS, the Property Management Division Director determined that Artistry In Glass, was the lowest responsive responsible bidder for the Project installation of custom made glass handrails, regular handrails and custom made mirrors; and WHEREAS, a contract was awarded to Artistry In Glass, in the total amount of $41,455.60, for the installation of the custom made glass handrails, regular handrails and custom made mirrors in the Byron Carlyle Theater; and WHEREAS, as required by Resolution No.2001-24677, the Administration herein requests that the Mayor and City Commission ratify the contract with Artistry In Glass, in the amount of $41 ,455.60. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby ratify the contract, in the total amount of $41 ,455.60, with Artistry In Glass, to provide for the installation of the of the custom made glass handrails, regular handrails and custom made mirrors in the Byron Carlyle Theater Project. PASSED and ADOPTED THIS 5th ATTEST: ~r r()A~ CITY CLERK Resolution No. 2004-25559 T:\AGENDA\2004IMay0504IConsentIByronRatifyGLASS RESO.doc day of May 2004. APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION '-lffdY Date C) z ::i ~ U) ~~ iiiC) >w -z 0_ I-z ~ N Ww ~::iE C) - <(~ z<( <(I-~ ::iEU)1- >0<( I- WI- O::~J:W W I-W o.!eWJ: O.........U) O::O>Z 0.0::""'0 J:~~i= ~::iEO<( ..... . ..... WU)Z:;) l:ll:::!0l:ll ;ij~~~ :::!oOl:ll ::iE~ LLJ: 0<( >0 1:::<( o O!l Ul Ul CO .. - 0 C) l:: c .- o::iE N ";:: o J: ..c CO - ::::J <( Ul Ul CO a c I!! Gl - Ul CO ::iE .. o .. .. :i z o i= a. 0:: o U) W o Byron Carlyle Theatre Renovation Project Budget and Project Status Report As of April 29, 2004 FundinQ Date 04/18/2001 OS/29/2002 10/0112003 Fundina Source Appropriated Expended General Fund Undesignated $ 500,000.00 $500,000.00 Reallocation of CDBG funds FY 00/01 NBDC Com. Fac;:ade $ 150,000.00 $ 150,000.00 FY 01/02 NBDC Com. Fac;:ade $ 150,000.00 $ 150,000.00 MBCDC Pres. & Rehab Prog. $ 100,000.00 $ 92,456.14 Quality of Life (via NBDC) $ 150,000.00 $ 150,000.00 Quality of Life (via NBDC) $ 150,000.00 $ 148,278.84 Miami-Dade CDBG (via NBDC) $ 50,000.00 $ 49,937.28 Miami-Dade Cultural Affairs Grant $ 16,096.00 $ 15,748.00 State Cultural Facilities Program Grant FY 01/02 $ 460,000.00 $ 459,999.81 Miami-Dade Cultural Affairs Capital Development Grant $ 12,500.00 Total Funding: $ 1,738,596.00 $ 1,716,420.07 $ Balance 03/20/2002 05/16/2001 06/06/2002 06/13/2002 09/18/2002 22,175.93 Phase One: Lobby area converted into Office Space Total Prolect Expenditures for Phase One. Property Management charge, (construction of offices) Laumar Roofing (Roof and HV AC system replacement) Property Management (Maintenance, beginning of project) Sub-total Phase I Budaet Expended Balance 118,072.21 401,501.00 40,000.00 559,573.21 $ 1,179,022.79 $ $ $ $ 1,738,596.00 $ Phase Two: Theater Lobbv and Performance space. Restrooms. and Interior Finishes $ 1,179,022.79 Demolition Lango Equipment ( Demolition) Lango Equipment ( Additional Demolition) Total $ 43,450.00 (ratified) $ 5,800.00 (ratified) $ 49,250.00 $ 785.00 $ 1,800.00 $ 3,500.00 $ 43.61 $ 3,200.00 $ 4,950.00 $ 14,278.61 $ 62,904.64 (ratified) $ 106,418.00 (ratified) $ 169,322.64 $ 34,836.00 (ratified) $ 34,836.00 $ 21,370.00 $ 10,739.51 $ 8,245.00 $ 1,841.00 $ 5,700.00 Byron Carlyle Theater Budget Expenditure Public Works Oep!. Property Mg!. Division April 2004 Reports. Desiqn. Plans review ATe (Asbestos/ Environmental Reports) M.L.Cain & Assoc. (Appraisal report) Accurate Fire Sprinkler (Fire sprinkler system design) Federal Express Tri-City Electric Co. (Fire Alarm System Design) Olga V. Cordero, PE. (plans review, signed and seal) Total Fire Protection Fire Controls Inc.(Fire Alarm Installation) Falcon Fire Protection (Fire Sprinkler Installation) Total Concrete Work Luis E. Roca, Inc (Concrete form and pour services) Total Interior Finishes Lotspeich Company, Inc (acoustical ceilings and installation) Daltile ( materials for restrooms tile) Farrey's Wholesale Hardware (Lobby Light fixtures) Casinos's Carpet (Projector room tile) Mardale (toilets partitions and accessories) Ricky's Doors ( doors and specialty hardware) Artistry in Glass (railings stairs, mezzanine, ramp, mirrors, etc) Lobby Floors (Carpet and art design installation) CPL Const. Inc (spray knockdown wall texture) ArchiTile, Inc.( decorative bathrooms counters) Total $ 18,126.00 $ 41,455.60 (pending) $ 9,000.00 $ 1,260.00 $ 5,552.49 $ 123,289.60 $ 49,937.09 $ 135,430.00 (ratified) $ 58,300.00 (ratified) $ 42,875.00 (pending) $ 24,340.00 $ 143,145.20 $ 24,603.29 $ 478,630.58 $ 235.56 $ 3,150.00 $ 4,972.52 $ 24,924.00 $ 1,000.00 $ 9,024.23 $ 43,306.31 Theater Equipment and Components Theater Equipment ( stage lighting and microphones material supply Sound Concepts (Stage installation) Miami Stagecraft (Stage Lighting Equipment and Materials) Miami Stagecraft (Stage Lighting, Sound System Installation) Kelly Benson Electric ( Theater House Lights materials and installation) NUTECH (seats, Curtains, Carpets, aisle lights..) Sound Equipments (NUTECH) Total Miscellaneous Waste Management (Portable Toilets) IT (phones and computer hook-ups) Plumbing Fixtures (Home Depot materials and fixtures) Marnia Plumbing (Sanitary Sewer Lift Station Repairs) DPC (duct insulation removal of asbestos) Refri-Cool (HVAC materials) Total Internal Charqes Property Management Charges (Internal labor and materials) for HVAC, Electrical, Plumbing, Carpentry, Ceramic Tile Installation, and Painting charged to the project budget Total $ $ 243,933.22 243,933.22 Sub-total Phase II Phase Two Budget $ 1,179,022.79 Total Project Expenditures $ 1,156,846.86 $ Project Balance 22,175.93 Work remaininq to complete: Site Clean up and Punch List Items (Estimated Cost) $ 21,575.00 Projected Project Balance: $ 600.93 The scope of work on the Phase II project is substantially complete and the status of final inspections required to receive a TCO is as follows: Final Inspections Approved: Electrical ADA Wheelchair Lift Sound and Low Voltage Plumbing Fire Sprinkler System HV AC Electrical Stage and House Lighting Pendinq Final Inspections Building Final Fire Alarm ADA Fire Final Although the scope of work on the Phase II project is substantially complete and pending final inspections, existing building maintenance, waterproofing, fire issues, and building exterior repairs that are beyond the scope of work of the Phase II project have and will require additional funding. Byron Carlyle Theater Budget Expenditure Public Works Dept. Property Mgt. Division April 2004 CITY OF MIAMI BEACH . . COMMISSION ITEM SUMMARY m Condensed Title: Ratification of contract with Artistry In Glass, in the total amount of $41,455.60, for the installation of custom made glass handrails, regular handrails and custom made mirrors required for the Byron Carlyle Theater. Issue: Shall the City Commission Ratify the contract with Artistry In Glass, in the total amount of $41 ,455.60. Item Summary/Recommendation: In accordance with Resolution No. 2001-24677 adopted by the City Commission on November 28"',2001 the Administration, through its Property Management Division Director, is providing General Contracting services including bidding, the award of contracts for work, and change orders on the Byron Carlyle Theater project. Under the provisions of the Resolution, contracts and purchases exceeding $25,000 must be brought to the City Commission for Ratification. Due to the existing conditions with curved surfaces, design criteria, and the requirements of ADA and Florida Building Codes, custom made glass handrails, regular handrails, and custom made mirrors were required for the construction of the Byron Carlyle Theater. Five vendors provided quotes for the work. It was determined that Artistry In Glass was the lowest responsive responsible bidder for the scope of work required and awarded a contract for the execution of the work. The Administration recommends that the Mayor and City Commission ratify the contract with Artistry in Glass, in the total amount of $41,455.60, for the installation of custom made glass handrails, regular handrails and custom made mirrors for the Byron Carlyle Theater. Advisory Board Recommendation: I N/A Financial Information: Amount to be expended: Source of . Amount . ..... Acc.ount Approved Funds: 1 $41 ,455.60 # 301 .2316.000676 C 2 ( General Fund ) 3 4 Finance Dept. total $41 ,455.60 Cit Clerk's Office Le islative Trackin : R.T. Halfhill, Public Works De artment 6833 Si Manager City Manager <...- AGENDA ITEM C7H y.s:-oy DATE CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE, MIAMI BEACH. FLORIDA 33139 http://ci.miami-beach.f1.us COMMISSION MEMORANDUM TO: FROM: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez ~\ fI<."~ City Manager 0 0 A RESOLUTION OF THE MAYOR AND MEMBERS OF THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, RATIFYING A CONTRACT IN THE TOTAL AMOUNT OF $41,455.60 TO ARTISTRY IN GLASS, FOR THE INSTALLATION OF CUSTOM MADE GLASS HANDRAILS, REGULAR HANDRAILS, AND CUSTOM MADE MIRRORS REQUIRED FOR THE BYRON CARLYLE THEATER. DATE: May 5, 2004 SUBJECT: ADMINISTRATION RECOMMENDATION Adopt the resolution. ANALYSIS During the programming and design of the Byron Carlyle Theater, it was determined that due to the curve of the mezzanine level and the need to provide clear sightlines to the stage, that a custom built glass panel handrail system be incorporated into the design of the project. Also, an additional custom glass handrail was designed into the project for the stairway that leads from the Lobby to the Mezzanine level. Other handrails, that are required for ADA compliance, were also needed for the Project. To meet the design criteria, these basic handrails were required to match the exact color of the metals used to support the glass handrail systems. In addition to the glass and regular handrail systems, other glazing items were required for the design. These included custom made mirrors for the restrooms, waiting rooms, lobby, and dressing rooms in the theater. The Mayor and City Commission, November 28,2001, adopted Resolution No. 2001- 24677, authorizing the Property Management Division Director to serve as the Certified General Contractor for the renovations of the Byron Carlyle Theater. The 1 . . Property Management Division Director prepared a list of specifications that was required to solicit bids for the work that reflected the existing conditions of the building and the applicable code requirements. After completing base specifications five firms that specialize in custom and glass handrail construction were contacted to provide quotes for the specialized work. All five firms submitted quotes for the project. After reviewing the quotes, three of the quotes were determined to be non-responsive due to design approach and inappropriate material submissions. After checking background references, plus licensing and insurance requirements, the Property Management Division Director determined that Artistry in Glass was the lowest responsive responsible bidder. A contract was awarded to Artistry in Glass for the work. As the project progressed, additional requirements were identified, such as custom glass mirrors in the public restrooms, dressing rooms, and ADA handrails in the lobby, seating areas, and egress routes in the main theater area. To maintain consistency in the design and colors in the materials, an additional contract was awarded to Artistry in Glass for these needs. These additional requirements brought the total amount of the contracts awarded to Artistry in Glass to $41,455.60. The bid tabulation worksheet is included as an attachment. The Administration recommends that the Mayor and Members of the City Commission of The City of Miami Beach ratify the contracts to Artistry in Glass in the total amount of $41,455.60, for the purchase and installation of custom made glass handrails, regular handrails, and custom made mirrors for the Byron Carlyle Theater. A project budget report reflecting funding and expenditures is included as an attachment. ATTACHMENTS JMG/RCM/FB/RTH T:\AGENDAI2004\Apr1404IConsentIByronRatifyGLASSmemo.DOC 2