Loading...
HomeMy WebLinkAbout2005-25789 Reso RESOLUTION NO. 2005-25789 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT WITH HARGREAVES ASSOCIATES, IN THE NOT TO EXCEED AMOUNT OF $328,505, FOR THE PLANNING OF THE SOUTH POINTE PARK IMPROVEMENTS. WHEREAS, in 1995, the City adopted a Parks Bond Master Plan that included major improvements to South Pointe Park; and WHEREAS, on June 26th 1997, the Mayor and City Commission approved a Resolution authorizing the City to enter into an agreement with Bermello and Ajamil for the design of improvements to the Park; and WHEREAS, although some degree of planning of Park improvements was completed for the Park by 2002, in November 2002, the City Commission terminated its agreement with Bermello and Ajamil and authorized the issuance of (a new) RFQ NO. 16- 02/03 for architecture and engineering services for the design of Park improvements; and WHEREAS, responses to the RFQ were received in February 2003, and an Evaluation Committee was appointed and met to short-list the top ranked firms; and WHEREAS, however, at approximately the same time, the City's options for settling the long standing land use litigation related to the Alaska Parcel expanded to include the possible addition of approximately two acres to the Park, which would substantially affect the scope of services for the project completed under the RFQ; and WHEREAS, while it was anticipated that this issue could be resolved in a manner that would allow the RFQ process underway to continue, it was ultimately determined that the addition of the land would substantially change the scope of services for the project, and RFQ NO. 16-02/03 was therefore terminated by the City Commission on February 25, 2004; and WHEREAS, in July 2004, the City reached a settlement on the long standing Alaska Parcel land use litigation that will add 2 acres to the Park and, on September 8,2004, the City Commission authorized the issuance of RFQ No. 39-03/04 which included a revised scope of services which addressed the land being added and related issues; and WHEREAS, the RFQ was issued, six responses were received, and an Evaluation Committee appointed by the City Manager convened and heard presentations from the six firms, and ranked Hargreaves Associates number one; and WHEREAS, on November 10, 2004, the City Commission authorized the Administration to negotiate an agreement with Hargreaves Associates for the design of Park improvements, and City staff subsequ~htly held a negotiation session on December 16, 2004 with Hargreaves Associates; and WHEREAS, the City and Hargreaves Associates have reached substantial agreement on a scope of services which is limited to the planning phase of the project, to be performed for a fee of $328,505, which is approximately 3.7% of the approximate project construction budget of $8,700,000; and WHEREAS, funding in the amount of $328,505, is available from South Pointe Redevelopment Area funds; and WHEREAS, although the fee was negotiated as a part of the process of entering into a standard City agreement for AlE services, the Related Group (TRG), the former developer of the Alaska Parcel, may be willing to fund either all or a substantial portion of this fee and staff is currently working with TRG to determine the feasibility of this happening. NOW, THEREFORE, BE IT DULY RESOLVED BYTHE MAYOR AND CITY COMISSION OF THE CITY OF MIAMI BEACH, that the Mayor and City Commission approve and authorize the Mayor and City Clerk to execute a professional services agreement with Hargreaves Associates, in the not to exceed amount of $328,505, for the provision of professional services required to plan South Pointe Park Improvements. ~:x p~ CITY CLERK ,2005. APPROVED M TO FORM & LANGUAGE & FOR EXECUTION T:\AGENDA\2005\Jan 1205IRegular\soulhpoinleparkreso,doc ~ l-~-"'$ CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY m Condensed Title: A Resolution of the Mayor and Commission of the City of Miami Beach Authorizing the Execution of an Agreement with Hargreaves Associates In the Not To Exceed Amount of $328,505 for the Planning of South Pointe Park Improvements. Issue: Should the Mayor and City Commission Authorize the Execution of an Agreement with Hargreaves Associates In the Not To Exceed Amount of $328,505 for the Planning of South Pointe Park Improvements? Item Summary/Recommendation: In 1995 the City adopted a Parks Bond Master Plan that included major improvements to South Pointe Park. On June 26th 1997, the Mayor and City Commission approved a Resolution authorizing the City to enter into an agreement with Bermello and Ajamil for the design of improvements to South Pointe Park. In November 2002, the City Commission terminated this agreement with Bermello and Ajamil and authorized the issuance of a new RFQ for architecture and engineering services for the design of Park improvements. However, due to delays in settling various City land use litigation in the immediate area, this RFQ was terminated. After this litigation was settled, on September 8,2004 the City Commission authorized the issuance of RFQ No. 39-03/04. The RFQ was issued, six responses were received, and an Evaluation Committee appointed by the City Manager convened and listened to presentations from the six firms and ranked Hargreaves Associates number one, On November 10, 2004, the City Commission authorized the Administration to negotiate an agreement with Hargreaves Associates for the design of park improvements. City staff held a negotiation session on December 16th with Hargreaves Associates and reached substantial agreement on the attached scope of services (Attachment A) to be performed for a fee of $328,505 (Attachment B). The budget for the park is approximately $10,200,000 dollars including $2,000,000 in 1999 City G.O. Bond funding, $3,200,000 in South Pointe RDA funding, and $5,000,000 in 2004 Miami Dade Countv G.O. Bond funding, Advisory Board Recommendation: I NA Financial Information: Source of Funds: Approved D Finance Dept. Ci Clerk's Office Le islative Trackin Donald P. Shockey AGENDAITEM R7E DATE /-/~-tJj CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www,miamibeachft.gov COMMISSION MEMORANDUM To: From: Mayor David Dermer and Members of the City Commission Jorge M, Gonzalez \v"V- City Manager U 0 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH HARGREAVES ASSOCIATES IN THE NOT TO EXCEED AMOUNT OF $328,505 FOR THE PLANNING OF SOUTH POINTE PARK IMPROVEMENTS. Date: January 12, 2005 Subject: FundinQ Funding in the amount of $328,505 has previously been appropriated from South Pointe RDATIF funds for South Point Park Improvements. Analvsis In 1995 the City adopted a Parks Bond Master Plan that included major improvements to South Pointe Park. On June 26th 1997, the Mayor and City Commission approved a Resolution authorizing the City to enter into an agreement with Bermello and Ajamil forthe design of improvements to South Pointe Park. Although some degree of planning of Park improvements was completed for the Park by 2002, in November 2002 the City Commission terminated its agreement with Bermello and Ajamil and authorized the issuance of a new RFQ NO. 16-02/03 for architecture and engineering services for the design of Park improvements. Responses to the RFQ were received in February 2003, and an Evaluation Committee was appointed and met to short-list the top ranked firms. However, at approximately the same time, the City's options for settling the long standing land use litigation related to the Alaska parcel expanded to include the possible addition of approximately two acres to South Pointe Park which would substantially affect the scope of services for the Project. It was anticipated that this issue could be resolved in a manner that would allow the RFQ process underway to continue. However, it was ultimately determined that the addition of the land would substantially change the scope of services for the Project, and RFQ NO. 16-02/03 was therefore terminated by the City Commission on February 25, 2004. In July 2004, the City reached a settlement on the long standing Alaska Parcel land use litigation that will add 2 acres to the Park. After this litigation was settled, on September 8, 2004 the City Commission authorized the issuance of RFQ No. 39-03/04 which included a revised scope of services which addressed the land being added and related issues. The City Commission Memorandum South Pointe Park Improvement Project Planning Services Contract Award January 12, 2005 -2- RFQ was issued, six responses were received, and an Evaluation Committee appointed by the City Manager convened and heard presentations from the six firms and ranked Hargreaves and Associates number one. On November 10,2004, the City Commission authorized the Administration to negotiate an agreement with Hargreaves and Associates for the design of Park improvements. City staff held a negotiation session on December 16, 2004 with Hargreaves and Associates and reached substantial agreement on the attached scope of services (Attachment A) to be performed for a fee of $328,505 (Attachment B). This fee represents approximately 3.7% of the approximate project construction budget of $8,700,000. Funding in the amount of $328,505 is available from South Pointe RDA funds. The total budget for the Park is approximately $10,200,000 dollars including $2,000,000 in 1999 City GoO. Bond funding, $3,200,000 in South Pointe RDA funding, and $5,000,000 in 2004 Miami-Dade County G.O. Bond South funding. The fee negotiated is limited to the planning phase of the Project. The fee was negotiated as a part of the process of entering into a standard City agreement for AlE services. However, the possibility remains that The Related Group (TRG), the former developer of the Alaska Parcel, may be willing to fund either all or a substantial portion of this fee. Staff is currently working with TRG to determine the feasibility of this happening. Regardless, the Planning portion of the Project would be managed by City staff in accordance with the City's regular process for planning park improvements. Thereafter, the City could elect to exercise the option contained in the Settlement Agreement between the City of Miami Beach and The Related Group dated July 28, 2004, that provides for the Developer to build, at their cost and at the City's expense, the public facilities in South Pointe Park. Hargreaves and Associates has also expressed interest in performing the design and construction administration services for the entire Project. Staff is continuing the negotiation of these services for the Commission's future consideration. Administration Recommendation The negotiated fee is commensurate with the level of improvements contemplated in the scope of services for this high profile City Park. The Administration recommends adoption of the Resolution so that the planning process can be completed in a timely manner. JMG:RCM:TH:DPS T:IAGENDA 12005\Jan 12051Regularlsouthpoinleparkawardmemo,doc Attachment A SCHEDULE A CITY OF MIAMI BEACH, FLORIDA SOUTH POINTE PARK IMPROVEMENT PROJECT SCOPE OF AlE CONSULTANT SERVICES CONSULTANT: HARGREAVES ASSOCIATES Program Background The City of Miami Beach (CITY) has developed its multi-million dollar, multi-year "Planned Progress" Capital Improvement Program to rebuild the City's existing roads, infrastructure, utilities, parks and facilities, and to build new capital projects where they are needed. The Program will dramatically improve the quality of life of the City's residents and complement the enormous amount of private reinvestment that has taken place in the City. One of the projects included in the "Planned Progress" program is the South Pointe Park Improvement Project. Project Background Since the City's Parks Bond Master Plan was issued n 1995, there have been various efforts to consider and plan improvements to South Pointe Park. Because of ongoing dramatic land use and demographic changes in the immediate area around the Park, the planning of these improvements has been delayed. The recent agreement between the City and the private landowner adjacent to the park provides for a transfer of approximately two additional acres to the Park. Now that the final configuration of the Park has been determined, and that the final development of the land surrounding the Park has been determined, this is an optimal point to begin designing the final South Pointe Park Improvement Project. In addition, the successful 2004 County G.O. Bond referendum added another $5 million dollars to the Park Project resulting in a total Project budget of $10.2 million dollars. Of this, the Target Construction Budget is approximately $8 million. The City has undertaken a competitive consultant selection process that has resulted in the selection of Hargreaves Associates as the CONSULTANT which will provide the necessary services outlined in this Scope of Services. At this time the Scope of Services for the Planning of the South Pointe Park Improvement Project includes the following: Provide the planning, urban design, architecture, landscape architecture, and engineering services required to identify and plan comprehensive improvements to the City of Miami Beach's South Pointe Park. Anticipated improvements include landscaping, irrigation. recreational areas, walkways, rest rooms, signage, support structures, parking, lighting, seawall improvements, bay walk, water features, natural/historic/maritime information interpretive features, and concession areas and appropriate accessory park commercial uses and any other Park elements or public facilities determined to be required or desired by the City during the planning process. The CONSULTANT will collaborate with an artist to identify opportunities to place passive and interactive art elements that will be a significant component of the Project. In identifying optimal Park improvements, the CONSULTANT will consider improvements described in the 1995 "City of Miami Beach Parks Master Plan" and those identified in community workshops previously held by the City on the Project. The professional services provider will also undertake original planning and design analysis and hold additional community workshops to identify all potential improvements and determine those to be implemented. An optimal master plan of improvements shall be identified in a Basis of Design Report (BODR). It is required that this BODR will be completed by July 28, 2005 to enable the City to potentially take advantage of the City's agreement with the adjacent property developer to design and construct the planned improvements at the cost of said improvements with no mark up. The Park boundary shall include any or all of a substantial portion of the adjacent "Alaska parcel" property, consisting of approximately 2 :.t acres and the unifying Washington Avenue Extension that connects the park to the Alaska Parcel that is being contemplated for addition to the Park as will be ultimately determined by the City. The scope of the Park improvements may include any of the above-identified improvements on this additional Park area. Required professional services will include any urban design services needed to successfully integrate this additional park area into the existing Park, to establish optimal pedestrian connections both within the Park and between the Park and the surrounding area, and to design Park improvements in a manner that creates an optimal relationship between said improvements and the surrounding urban fabric including built structures, open space, view corridors, roadways, and pedestrian ways. At this time, the Scope of Services for the Project is limited to the Planning Phase (Task 1), one sub-task of the Design Phase (Task 2.1), and Reimbursable Expenses (Task 6) as identified below. However, the CITY may at it's option within 60 days of the completion of the Basis of Design Report, accept the CONSULTANT'S fee to extend the Scope of Services to include the following: · detailed design services, · bidding and award services · construction administration services. Refer to Schedule B. TASK 1 -PLANNING SERVICES The purpose of this Task is to develop a concept plan that meets the City's functional requirements, addresses community input. and stays within established schedule and cost parameters. The planning phase of the Project will include the following major tasks: (1) Project Kick -Off Meeting; (2) Visioning Session to clarify project goals and confirm Project Budget; (3) Site Reconnaissance Visit and Development of Design Concept Alternatives; (4) two Community Design Workshops to provide residents the opportunity to participate in the planning process; and (5) the preparation and presentation of a Basis of Design Report (BOOR) for approval by the Mayor and City Commission. A final Basis of Design Report shall then be prepared summarizing the accepted design concept, budget level cost estimate and implementation schedule as noted in Task 1.8. To facilitate the implementation of a Public Information Program, CONSULTANT shall provide electronic files of all project documents, as requested by CITY. Task 1.1 - Proiect Kick-Off Meetinq: CONSULTANT shall meet with CITY to review existing planning documents and receive copies of available reference documents. CITY shall provide general specific information regarding procedures and direction. Based on this meeting CONSULTANT will schedule a reconnaissance visit of the Project site(s). Deliverables: - Attend Project kick-off meeting. Schedule: - Within 7 calendar days of Task 1 - Planning Phase Notice-to- Proceed. Task 1.2 - Proiect Site Reconnaissance Visit: CONSULTANT shall attend a reconnaissance site visit. The site visit will be attended by CONSULTANT and CITY staff. The intent of this task is to facilitate CONSULTANT's understanding of the project needs. Based on the results of the site visit, CONSULTANT shall prepare 3 possible design strategies that are responsive to the project program, budget and schedule. The CITY has performed certain planning efforts that identified potential locations and types of improvements anticipated. These efforts are summarized in the RFQ. Deliverables: - Attend reconnaissance project site visit. Schedule: - Within 14 calendar days of completion of Task 1.1 services. Task 1.3 - Attend "Visionina" Session and Development of Concept Alternatives: After conducting the Project site visit and developing design concept alternatives and cost estimates, CONSULTANT shall attend a half-day "Visioning" session to be scheduled with representatives of the CITY. The purpose of the "Visioning" session shall be to clarify Project goals to prepare for the Community Design Workshops. Issues to be discussed shall include the proposed alternatives, budget and schedule. The CITY may also arrange meetings with Collaborative working Groups and utility companies/agencies and the CONSULTANT shall attend and minute the meetings. The CONSULTANT shall assemble a minimum of three graphic images identifying alternative Project design concepts. At least two of the images shall present proposed improvements possible under current budget limitations. The other image shall reflect additional levels of potential improvements that may be possible should additional funding become available. In addition, CONSULTANT shall prepare preliminary "budget" level cost estimates (+30%, -15% as defined by the American Association of Cost Engineers) for each alternative treatment indicating opinions of probable cost. Estimates shall present costs by category types (Leo paving, lighting, landscaping, etc.) and shall be prepared in a Microsoft Excel Spreadsheet format. Deliverables: - Attend "Visioning" session with representatives from CITY. - Develop three alternative design concepts. - Develop "budget" level cost estimates for each concept. Schedule - Within 30 calendar days of Task 1.2 completion. Task 1.4 - Review MeetinQ Prior to Community DesiQn Workshops: CONSULTANT shall meet with applicable CITY Staff to ensure that any and all concerns regarding Project scope, schedule and cost parameters are addressed prior to scheduling the Community Design Workshops. CONSULTANT shall prepare and distribute meeting minutes, accordingly. Deliverables: - Meet with representatives of CITY during Tasks 1.1 through 1.3 work. Schedule - Through completion of Task 1.1 through 1.3 work. Task 1.5 - Community DesiQn Workshops: Design workshops provide an opportunity for City residents to participate in the planning process for projects in their respective neighborhoods. To this end, a series of two (2) community workshops shall be conducted. CITY will schedule, find locations for, and notify residents of all such meetings. CONSULTANT shall prepare all materials for presentation at each workshop. At a minimum these shall include "full size" graphics, a summary of cost estimates, workshop agendas, and requisite handouts of each. CONSULTANT shall prepare draft meeting minutes and forward them to the CITY who shall finalize and distribute accordingly. Each workshop is intended to address specific design issues as follows: Task 1.5.1 Community Design Workshop No. 1 - The first workshop is intended to provide community residents with a review of the proposed Project scope, budget and schedule and create a consensus plan with community concurrence. CONSULTANT shall prepare full size presentation graphics illustrating the Site Analysis Maps and Design Concept Alternatives developed under Tasks 1.2 and 1.3. As previously noted, the alternatives shall present proposed improvements possible under current budget limitations. In addition, graphics shall be prepared presenting a summary of probable costs for the various improvements and the workshop agenda. "Budget" level cost estimates shall be +30%, -15% as defined by the American Association of Cost Engineers. Based on this data, CONSULTANT shall present the preliminary planning information to attendees. CITY Staff will also attend these meetings, and assist CONSULTANT with responses to resident questions, as applicable. CONSULTANT shall note reasonable design revision requests from residents for review and incorporation into the proposed plan. Due to the fixed nature of Project funding, budget limits must be adhered to. CONSULTANT shall be prepared to discuss budgets and the various impacts of resident requested revisions on such, accordingly. Deliverables: - Prepare materials, attend and conduct Community Design Workshop NO.1 Schedule: - Within 30 calendar days after completion of Task 1.3 Task 1.5.2 Community Design Workshop No.2 - The second workshop is intended to present community residents with the selected design concept, budget and schedule based on the input received during Workshop No. 1. CONSULTANT shall prepare full size presentation graphics illustrating the selected design concept, along with a summary of probable costs for the improvements and the workshop agenda. The selected design concept shall be presented and shall illustrate proposed improvements possible under current budget limitations. "Budget" level cost estimates shall be +30%, _ 15% as defined by the American Association of Cost Engineers. Based on this data, CONSUL T ANT shall present the information to attendees. CITY Staff will also attend these meetings, and assist CONSULTANT with responses to resident questions, as applicable. CONSULTANT shall note that the design concepts presented during this meeting are considered "near final" and CITY will consider only minor design revision requests from residents for review and incorporation into the proposed plan. Deliverables: - Prepare materials, attend and conduct Community Design Workshop NO.2 Schedule - Within 30 calendar days of Community Design Workshop NO.1 Task 1.6 - Basis of DesiQn Report (DRAFT): CONSULTANT shall prepare a draft Basis of Design Report (BOOR) presenting the results of the Community Design Workshops and final design concept plan. The BOOR will include a summary of findings and a Site Plan illustrating all proposed improvements, inclusive of demolition, utilities, buildings, lighting and landscape. Where required, CONSULTANT shall perform a study to determine the most desirable routing for proposed underground improvements. The BODR shall include sufficient detail in plans, sections, notes and key descriptions to facilitate review by the various CITY permitting and planning divisions discussed in Task 1.7. The draft BODR shall also include discussions and graphics illustrating: · A Project implementation plan, inclusive of demolition, utilities, buildings, landscape, lighting and landscape construction with a discussion of expected impacts to the facility operations. · A detailed description of all proposed improvements. · A "budget" level cost estimate prepared in conformance with format approved by CITY. Estimates shall be provided for both current phase and future (unfunded) improvements. Based upon CONSULTANT's cost estimate, CITY shall advise CONSULTANT if portions of the Project need to be deleted, phased and/or bid as alternate bid items to satisfy existing fiscal constraints. CONSULTANT shall revise BOOR to reflect such issues accordingly. · A schedule for implementing the Project itemized phase by phase (design, bid, award, and construction) including critical issues and the time period allowed for resolving each issue. The schedule shall be prepared in "Primavera Project Planner, Version 3,0" format, SureTrak, or other format specified and provided to the CITY. · Discussion regarding permitting authorities having jurisdiction over Projects and provide a list of permits typically retained by the City, as Owner, and/or the Contractor. Unique and/or special permitting requirements shall be identified as well as permitting fees. Deliverables: - Prepare 25 copies of the draft BODR. Schedule: - Within 45 calendar days from completion of Community Design Workshop NO.2. Task 1.7 - Review of BOOR with CITY Divisions: CONSULTANT shall meet to present and review the draft BODR with the following review agencies: · City of Miami Beach Departments, to include representatives of the Fire, Police, Planning, Parking, Building Department, Parks Department, Public Works. · City of Miami Beach Planning Review Board if necessary · City of Miami Beach Design Review Board . City of Miami Beach City Commission CITY shall attend review meetings and assist CONSULTANT, as practicable, in obtaining approvals from noted review agencies by participating in negotiations with such authorities. CONSULTANT retains final responsibility for obtaining approval of all required applications, and for making agency required revisions to obtain necessary approvals. It is recognized by CITY that the various agency's review time and assessments based on interpretation are beyond the control of CONSULTANT, except for issues concerning the acceptability of the proposed design concepts and Consultant's ability to respond to review agency comments. CONSULTANT shall address and respond to comments received from the various reviews in writing, and implement requested revisions into the draft BODR, as directed by CITY, within fourteen (14) calendar days of receipt of comments, unless agreed to otherwise with CITY. CONSULTANT shall draft meeting minutes and forward them to CITY, who shall finalize and distribute accordingly. Deliverables: - Attend BODR review meetings with noted committees. - Prepare draft meeting notes. - Address comments and revise BODR accordingly. Schedule: - Within 30 calendar days of draft BODR completion. Task 1.8 - Final Basis of Desion Report: CONSULTANT shall prepare a final BODR based on comments and revisions implemented during the reviews with the various CITY Divisions. The final BOOR will serve as the basis for development of detailed design documents as discussed in Task 2. Deliverables: - Prepare 25 copies of a final BOOR. Schedule: - Within 30 calendar days after completion of reviews noted in Task 1.7. TASK 2 -DESIGN SERVICES The purpose of this Task is to prepare of contract documents for the Project. Only one sub- task of this Task, Task 2.1 - Field Verification of Existing Conditions, is included in this Scope of Services. Task 2.1 requires that CONSULTANT perform a variety of forensic tasks to verify, to the extent practicable, existing conditions and the accuracy of base maps as required to successfully complete the Planning Phase. To facilitate the implementation of a Public Information Program, CONSULTANT shall provide electronic files of all Project documents, as requested by CITY. Task 2.1 - Field Verification of Existino Conditions: CONSULTANT shall perform a detailed topographic survey of the existing Project areas to be impacted by construction activities under the scope of this Project. The survey shall be performed by a Certified Land Surveyor in the State of Florida and shall meet the minimum technical standards identified in Chapter 61G17-6, FAC. All survey files shall be prepared in AutoCAD Version 14 format with a layering system as approved by CITY. As a minimum, the survey shall address the following: · Topographic survey shall consist of establishing a baseline with 100-foot stations, and identify sectionalized land corners. Baseline of survey shall be tied into the sectionalized land monuments. · CONSULTANT shall set benchmarks at convenient locations within the Project site to be used during both the design and construction phases of the Project. At a minimum, permanent benchmarks shall be set at corners of the Project site. CONSULTANT shall tie-in at least two existing County benchmarks. The benchmarks shall be derived from existing government benchmarks and be carried into the proposed system using Second Order, Class II procedures. A full listing of benchmark locations shall accompany the survey data. . CONSULTANT shall locate and identify all the existing surface improvements I topographic features that are visible within the Project site, such as the following: >- Existing valve boxes, water I electrical meter boxes, electrical pull boxes, telephone I cable risers, fences, hydrants, roof drains, etc. >- Aboveground and underground utilities, invert elevations of accessible underground utilities, wood I concrete utility poles, culverts, guardrails, pavement limits, headwalls, endwalls, manholes, vaults, mailboxes, driveways, side streets, trees, landscaping, traffic signage and any other noted improvements. Survey shall identify fence material I height, landscaping plant materials and driveway construction materials. Landscaping materials with a trunk diameter greater than 6 - inches in diameter shall be identified. >- All buildings including overall dimensions and finished floor elevations. · Survey limits shall include the entire Project site and an additional overlap of 10 feet on either side of the property line. · Topographic survey I base map shall be prepared in AutoCAD version 14.0 and submitted on a 3.5-inch diskette or CD with one copy on 24-inch by 36-inch bond paper to the CITY. CAD mapping shall be performed to a scale of 1: 1 in the World Coordinate System. Text size shall be 100 leroy for a final product at 1 =20 units. · Indicate geometry of perimeter private property plats (inclusive of fences, landscaping and driveways). Upon completion of the survey, CONSULTANT shall forward the same to the following agencies with a request to mark I identify their respective utilities on the survey base map. CONSULTANT shall coordinate this effort with each agency in an effort to identify the location of all underground utilities. CONSULTANT shall incorporate utility owner markups I edits into its survey base map file. CONSULTANT shall contact the following entities and request that they each verify locations of their existing improvements in the affected areas: . Florida Power and Light . BellSouth . Charter Communications . Natural Gas Utility · Miami-Dade Public Works Department . Miami-Dade Water and Sewer Authority . Others as deemed necessary by the City Based on the collected data, CONSULTANT shall develop base plans showing the existing conditions of the Project site which will be used both in the Planning Phase covered by this Agreement and, if applicable, in the subsequent design phases of the Project (as may be negotiated, if at all, in a future agreement between CITY and CONSULTANT for design and construction phase services). The site plans shall include an overall key map and partial plans scaled at 1-inch equals 20 feet. CONSULTANT shall illustrate proposed improvements on the site plans based on available planning documents provided by CITY. A subsequent review shall be scheduled with CITY staff to determine locations where additional field verifications, via "Soft-Dig" underground identification services, may be implemented. As a minimum, a $5,000 underground improvements verification budget allowance shall be included under this Scope of Services. Unused amounts in this allowance shall be credited back to the CITY upon completion of the Services contemplated in this Agreement. CONSULTANT shall prepare final site plans based on the information gathered herein. Copies of base maps shall be distributed to CITY. Oeliverables: - Perform forensic work as noted to develop final base maps. Deliver five (5) sets of site plans to the CITY. Schedule: - Task shall be performed concurrently with Task 1and will be completed within 90 working days of the issuance of Notice to Proceed for Task 1 which will include authorization to proceed with this Task. TASK 6 - REIMBURSABLES Task 6.1 - Reproduction Services: CONSULTANT shall be reimbursed at the usual and customary rate for reproduction of reports, contract documents and miscellaneous items, as may be requested by CITY. An allowance of $6,150 has been allocated to this project. Unused amounts in this allowance shall be credited back to the CITY at the completion of the project. Task 6.2 - Travel and Subsistence: Not Allowed. Task 6.3 - Survevina: CONSULTANT shall arrange for and coordinate the efforts of licensed surveyors to prepare a topographical survey of the project limits which meets the requirements of sub-task 2.1. CONSULTANT's compensation shall be a reimbursement of actual costs. CONSULTANT shall solicit no fewer than 3 proposals from properly licensed and qualified surveyors, recommend the desired firm, and receive approval from the CITY prior to engaging the surveyor. CITY will pay for actual survey cost. Task 6.4 - Geotechnical Evaluation CONSULTANT and CITY shall jointly determine if any geotechnical evaluations need to be undertaken to properly complete the Project Planning Phase. If such evaluations are required, CONSULTANT will identify the kind and quantity of evaluations needed and assist the CITY in obtaining said evaluations. No allowance for the cost of any said evaluations is included in the CONSULTANT COMPENSATION portion of this AGREEMENT. If it is determined that the best method of obtaining any required evaluations is to have the CONSULTANT procure them, CITY and CONSULTANT will negotiate the required additional Reimburseable Expenses and amend this AGREEMENT as required. Task 6.5 - Underaround Utility Verification: CONSULTANT shall employ the services of an underground utility location service in an effort to better identify existing underground conditions where work is to be performed. Actual locations shall be as directed by CONSULTANT. Cost shall be limited to a $5,000 not-to-exceed amount. Unused amounts in this allowance shall be credited back to the CITY at the completion of the project. Task 6.9 - Desian Sub Consultants: CONSULTANT shall arrange for and coordinate the efforts of design sub consultant expertise as such expertise is needed and determined by the evolution of the project program requirements and/or site conditions. A not-to-exceed fee amount of all such design sub consultant costs is included in Schedule B to be drawn upon as needed. CONSULTANT's compensation shall be a reimbursement of actual costs for design sub consultants. Minimum Drawina Reauirements The composite set of drawings to be produced shall contain sufficient information and detail to clearly define all proposed improvements in terms of quantity, quality and location. All drawings and details shall be to a scale sufficient to be legible. The CONSULTANT shall propose a drawing list to be reviewed and approved by the CITY. Site Plans Existing Conditions - Site Survey - to include property lines, sidewalks, pavement, landscaping, existing site improvements and buildings, fencing, lighting, overhead and underground utilities, and dimensions of buildings, pavement areas, fencing, etc. Demolition - Clearly depict existing conditions to be demolished or modified. Proposed Improvements - Clearly depict all new design elements including sidewalks, pavement areas, landscaping, buildings, recreational courts and fields, fencing lighting, utility modifications, replacements, and additions, etc. Enlarged Site plans - Where necessary to clearly define Project requirements, provide enlarged site plans for specific areas of improvement. Buildina Drawinas All buildings to be renovated or constructed shall be detailed in the Project drawings in sufficient detail to clearly and thoroughly depict the intended improvements or modifications. Attachment B SCHEDULE B CITY OF MIAMI BEACH, FLORIDA SOUTH POINTE PARK IMPROVEMENT PROJECT ITEMIZED SCHEDULE OF COMPENSATION o z "" V> < t- TASK DESCRIPTION -' --' tJ w tJ"'< tJ"'< t- Z Z Wa. -' w ~ ~ ~ wO!: ~~O t::: \.J ~ \.J ~ -tJu oi u Vi < Vi < ~UJ~ ~z~ V> I 0 w t- w t- U V> V> V> a."'''' a.<'" '" V> 0 0 Cia. ::;; a. < < -' < ~ '" w -' U -,'" <'" t-=> 00 t-I t- V> o U -' < t- O t- '" w a.w V> V> -,"" <I t-a. o t- ~ 1 PLANNING 5ERVICE5 ilrl.-PROJECf, KI.CK:q~F}.,1E.EIIN~ '" 1.1.1 Attend kick off meeting with City 1,1.2 Review. reference rnat~rial from City SITE RECON, VISIT & DEVELOPMEN'rOFPLANNING ,1.2 STRATEGIES 1.2.1 Visit site with City Review with City possible planning strategies Undertake site analysis - physical feature conditon Undertak:use~",s~r,~;t~3.~.~.~u_~;:k~ay &. 24hr weekend day 1.3 "VISIONING" 5ES510N & i:ii:vd:oPMENTOF CONCEPTS"m Research & review reference material unavailable from City Prepare material for session 1.3.2 Attend half-day session with City Attend meeting with Collaborative group Minute agreed scope, schedule & cost goals Facilitate design subconsultant charratte Meet with Utility Companies/Agencies 1.3.3 Development of (3) three design concept alternatives 1.3,4 ,[)ev,elopbudget~f'velcost ,estir:natefor ea~h alter,~ative REVIEW MEETING PRIOR TO'COMMUNITY DE51GN _WOR,KSHOPS'%k' .... '.m. \\1% .~'1*,"', 'w',"""" '" Attend meetings with City and review (3) concept alternatives & costs Minute agreed scope, schedule & cost goals for workshops Build working model to scale ~.;,~.n.f';:''':~ ~k~;h()p. wesenta t ion,ll1 aterials 1.5 ''''""COMMyt:JjfX"'OESlGNWORKSHOPS,= 1.5.1 Conduct Workshop #1 - (3) options for discussion Minute issues from workshop Attend meeting with regulatory agencies Refine design based on results Modify working model to scale Refine workshop presentation materials 1.5.2 Conduct Workshop #2 . prefered option for discussion Minute issues from workshop Refine design based on results iW""'"'''''' ;Xl BASIS OF DESIGN REPORT (draft) Prepare analysis plans Prepare concept plans Show demolition, utilities Show bUilding/structures Show landscape, lighting Prepare phasing plans Prepare text & graphics Prepare schedule & estimate & phasing Prepare permitting strategy Facilitate design subconsultant review & input Make changes toreport REVIEW OF BASIS OF DESIGN REPORT (Draft) WITH CITY DIV1SIONS,.,w,,,,,m, % 11I,llL.,,"0(( ,);', ,,",,,; Wii%"'"'''''"'''"''' (1) Mtg. W/ Planning, Parking, Building, Parks, Works, Fire Police (1) Mtg. W / Design Review Board (l) Mtg. W/ City Commission Minute issues from meeting Agree on changes to report and if additional meetings are required ri~~BASI5 OF DESiCFl"REPoRT(f.nal) Make changes to report Final review of report hargreaves associates ~::!W~ __~~~ 4 4 8 8 24 16 8 8 8 8 8 8 24 24 8 8 4 8 8 8 16 24 4 8 1 16 4 40 16 8 16 4 32 16 16 8 6 6 1 32 40 6 4 1 40 4 8 8 1 4 40 8 16 8 1 24 4 4 24 1 16 8 16 4 4 24 16 4 1 1 1 1 1 4 32 8 4 16 8 16 16 16 16 16 16 40 8 4 16 16 16 8 4 4 4 4 4 4 2 2 8 2 32 8 12/22/2004 24 16 40 16 32 40 8 40 16 16 24 16 16 16 16 16 16 40 8 16 32 8 50 8 56 $1,080 $5,800 $6,880 16 16 32 32 $2,160 $2,160 $3,680 $3,680 $11,680 56 56 8 16 1 32 8 136 56 $5,640 $5,800 $1,080 $2,160 $95 $4,320 $1,080 $16,840 $6,440 $43,455 18 1 65 124 $3,570 $95 $5,615 $15,100 $24,380 28 1 8 124 25 48 20 1 92 $4,060 $95 $1,080 $14,140 $2,135 $5,S20 $3,460 $95 $11 ,420 $42,005 ! 33 34 33 33 33 36 178 32 8 36 40 $2,895 $3,220 $2,895 $2,895 $2,895 $3,420 $16,740 $3,680 $1,080 $5,620 $4,120 $49,460 8 8 12 2 $1,080 $1.080 $2,380 $190 $865 $5,595 72 20 $6,840 $2,360 $9,200 SCHEDULE B CITY OF MIAMI BEACH, FLORIDA SOUTH POINTE PARK IMPROVEMENT PROJECT ITEMIZED SCHEDULE OF COMPENSATION ci z '" Vl <( .... TASK DESCRIPTION '" -", tJ '" tJ'" <( tJ "'<( !;;: 0. "'0. '" '" ",0 u ~~u t:: U -tJ .,: 0", z ~z~ Vl I 0 g:~ iX u Vl 0.<('" '" Vl 0 0. ::Eo. <( <( z~ LJ~ Vl<( "'.... OVl z~ LJ~ -<( Vl.... ~Vl '" <( U '" '" '" U .... Vl o U -' <( .... o .... '" '" 0.", VlVl -'<( <(I ....0. o .... -,Vl <('" ....=> 00 ....I 2 DESIGN SERVICES FIELI:lJ(~~,\FJ~1\!?N!?F EX1STI~S;r:!?~D"lTLO.NS,_ Set requirements & hire surveyor Survey Review draft survey Revise draft survey with Utility Companies/Agencies input Review with City need for "soft dig" subsurface investigation "Soft dig" if necessary Complete sealed survey 6 OTHER DIRECT COSTS 6,1 REPRODUCTION SERVICES 6,3 SURVEYING ALLOWANCE 6,5 UNDERGROUND UTILITY VERIFICATION ALLOWANCE SUBCONSULTANT ALLOWANCE -local landscape architect SUBCONSULTANT ALLOWANCE. architect SUBCONSULTANT ALLOWANCE. civil engineer SUBCONSULTANT ALLOWANCE - marine engineer SUBCON5UlTANT ALLOWANCE. environmental/ecologist SUBCONSULTANT ALLOWANCE -lighting designer SUBCONSUlTANT ALLOWANCE. playground designer TOTAL HOURS TOTAL FEE ESTIMATE Hourly Rates hargreaves associates -- ~,~ -- 2 2 $3S0 0 $0 2 7 $825 1 1 $17S $175 0 $0 1 $17S $1,700 $6,1S0 $60,000 $5,000 $71,1S0 46 $14,950 $325 380 $66,SOO $175 104 $11,960 $115 6S1 $61,84S $95 488 $36,600 $75 12/22/2004 o $0 $60 SO $2,500 $50 $17,000 $1 S,OOO $5,000 $S.OOO $8,000 $8,000 $S,OOO $63,000 1719 $194,355 $328,50S $328,SOS