Loading...
99-23346 RESO RESOLUTION NO. 99-23346 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING, BY 517THS VOTE, THE WAIVER OF FORMAL COMPETITIVE BIDDING AND AWARD OF A CONTRACT TO DPC GENERAL CONTRACTORS, INC., IN THE AMOUNT OF $15,775.00, FOR THE EMERGENCY REMOVAL OF ASBESTOS MATERIAL AT THE EXISTING BASS MUSEUM BUILDING WHEREAS, on December 3, 1997, the Mayor and City Commission authorized the award of a construction contract, in the amount of $6,450,500, to Danville-Findorff, Inc., for the Expansion and Renovation of the Bass Museum of Art; and WHEREAS, during demolition of installations in the existing building, a material containing friable asbestos has been discovered; and WHEREAS, construction in the area has been stopped until abatement can be performed, thereby creating a significant delay to the Project; and WHEREAS, the Administration has obtained quotations on an emergency basis to perform the asbestos abatement services. NOW, THEREFORE BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission authorize, by 5/7ths vote, the waiver of formal competitive bidding and award a contract to DPC General Contractors, Inc., in the amount of$15,775.00, for the emergency removal of asbestos material at the existing Bass Museum building. PASSED AND ADOPTED this 6th day ofOctobe~ 1999 f}4 MAYOR ATTEST: ~lJ~~ APPROVED AS TO FORM & LANGUAGE & fOR EXECUTION SR/MDB/MDS/JGdP/MR/JECh ~JJ:!f: lo!?!9! " .," ENVIRONMENTAL CONTRACTING ASBESTOS. LEAD. HAZARDOUS MATERIALS. UST. SOIL REMEDIATION GENERAL CONTRACTORS, INC. 1860 NW 21 Terrace, Miami, Florida 33142 (305) 325-0447 Fax (305) 325-8016 (800) 488-0447 October 7, 1999 Mr. Bruce Henderson CITY OF MIAMI BEACH, FLORIDA Environmental Division 1700 Convention Center Drive Miami Beach, Florida 33139 RE: Emergency Asbestos Abatement BASS MUSEUM 2121 Park Avenue Miami Beach, Florida Dear Mr. Henderson: Please accept the following as our proposal for the above referenced project: SCOPE OF WORK 1. DPC General Contractors, Inc. proposes to furnish all labor, materials and equipment necessary to remove and dispose of the following asbestos containing materials, as per information supplied by Bruce Henderson, City of Miami Beach, Florida: a) Popcorn ceiling spray (:t 600 SF) b) Carpet, vinyl floor tile and mastic (:t 4,800 SF) located on the first and second floor levels, as per plans 2. Schedule - begin work on Monday, October 11, 1999. 3. Air monitoring and clearances to be performed by an independent testing laboratory. 4. In addition, all work to be done in accordance with attached General Scope of Work. PROPOSAL PRICE Removal and disposal Final air clearance DERM Fee TOTAL PROPOSAL PRICE $ 14,980.00 $ 375.00 $ 420.00 $15,775.00 Alternate # 1 1. Any additional vinyl floor tile and mastic - unit price of $2.35 per SF 2. Any additional popcorn ceiling spray - unit price of $4.50 per SF. 3. Above prices based on unit price work being done during same mobilization as above scope of work. If the above terms and prices are acceptable to you, please sign below and fax the proposal to my office (305/325- 8016), so we may schedule the work as soon as possible. If you have any questions, or require additional information, please do not hesitate to contact my office. Sincerely, tl6>~6Z: e-M~ &!PJJ~l}.~t>JeC7> C~~/;(/;4i~X- O@~c-;R. 8J;; /991 Date Branch Office 250 Arizona Avenue, Building A, Atlanta, Georgia 30307 / (404) 373-0561 Fax (404) 373-7720 (800) 676-0561