Loading...
99-23366 RESO RESOLUTION NO. 99-23366 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, REQUESTING A PUBLIC PURPOSE CONVEYANCE FROM THE FLORIDA DEPARTMENT OF TRANSPORTATION, OF A PORTION OF THE RIGHT-OF-WAY ON TERMINAL ISLAND, FOR THE PURPOSE OF CONSTRUCTING A WATER BOOSTER PUMP STATION. WHEREAS, the City needs a water booster pump station to maintain the pressure and supply of potable water to Palm, Hibiscus and Star Islands and the South Beach area; and WHEREAS, such a pump station was designed within a City easement on a Florida Department of Transportation (FDOT) right-of-way on Terminal Island, over a piping network infrastructure constructed during a previous construction project on MacArthur Causeway; and WHEREAS, on June 6, 1995, the Design Review Board granted approval to a glass enclosure elevated pumping station, with architectural features, for a Terminal Island Booster Station; and WHEREAS, to construct such a structure, the City has requested a deed of said parcel from FDOT, and the FDOT has reviewed said request, together with the Miami-Dade Transit Authority, which is planning to construct a Light Rail Transit (LRT) line within this right-of-way; and WHEREAS, the City has agreed to modify the proposed Terminal Island Booster Station enclosure to conform to MDTA's Fire Code requirements when the Light Rail Transit (LRT) line is scheduled for construction. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein request a public purpose conveyance from the Florida Department of Transportation (FDOT), of a portion of the right-of-way on Terminal Island, as shown in the attached Exhibit "A", for the purpose of constructing a water booster pump station. PASSED and ADOPTED this 20th daYOfW,1999 MAYOR ATTEST: --l~/W-t r &u ~ CITY CLERK F:\ WORK\$ALL\ VGK\COMMEMOIOTHER\FDOT WPD APPROVED pS TO fORM & LANGUAGE & FOR EXECUTlON -~~~ - 16-{8-~ -Ocrie JEB BUSH GOVERNOR ~ Florida Debartment of Transbortation OFFICE OF RlGIfT OF WAY ADMINI~TRAT10N - diSTRICT SIX 1000 N.W.111 AVENUE, ROOM 6116 - MIAMI, FLORIDA 33172-5800 PHONE: (305) 470-5450 (SC) 429-5450 I FAX: (305) 429-2340 THOMAS F. BARRY, JR. SECRETARY September 21, 1999 Mr. Julio Grave de Peralta Director of Public Works City of Miami Beach 1700 Convention Center Miami Beach, Florida 33139 c; c.;. --. '...c: ~ (/) ... .- r; -0 -~~ ::t.: N ' fTI ~:> ~':(J --P'l :"'- " ;-..~ :::: .~fT1 w cC .. rn :- > CD () :::: Dear Mr. Grave de Peralta: - .~ 00' c SUBJECT: FOOT PUBLIC PURPOSE CONVEYANCE FOR PUMP ST ATION :~ Applicant City of Miami Beach - FPID No. 2488611 (87060-2202/6113038) r.; S.R. No. AlA (MacArthur Causeway) .... County Miami-Dade Parcel No.: 6000 This is to advise that the Florida Department of Transportation is ready to proceed with the public purpose donation of the subject parcel. The Miami-Dade Transit Agency in conjunction with FOOT has approved the revised pump station design. At this time the Department requests the City of Miami Beach to please submit an adopted resolution which states the justification and purpose of this conveyance. The Department has requested provisions in the resolution include the pump station will confonn to MDT A's fire code. Also, kindly prepare a specific purpose survey and legal description in accordance with the enclosed guidelines. The instrument of conveyance will be a Public Purpose Quitclaim Deed with a mineral rights reservation clause and a reverter clause allowing FDOT to recover the land in the event it is ever devoted to other than the specified public purpose. If you have any question, please call me at (305) 470-5706. Sincerely, .dJ~~~~~ Damaris Rodriguez v ~ Property Management Agent enclosure cc: L. Van Bergen - MDT A, G. Kokorian - CMB, 1. Chartrand - CMB 1. Boucle, D. Rivera, S. Day, A. Casals, R. Cochrane, A. Villarreal www.dot.state.fl.us (!) RECYCLED PAPER Attachment No.1 EXHIBIT "A" LEGAL DESCRIPTION OF PROPOSED PARCEL TO BE CONVEYED TO THE CITY OF MIAMI BEACH FOR CONSTRUCTION OF A PUMP STATION Commence at a point which is 1,580.00 feet North of and 2,015000 feet West of the Southeast comer of Section 4, Township 54, South, Range 42, East, said Point of Commencement (PoOoC.) defined as being the intersection of the center line of the roadway of the original county causeway viaduct and the face of the west bridge abutment; thence run South 660 53' 52" West for a distance of 58.70 feet; thence South 310 54' 08" East for a distance of 64.75 feet; thence South 660 53' 52" West for a distance of20.36 feet; thence North 230 06' 08" East for a distance of 11.65 feet to the POINT OF BEGINNING (PoOoB.) of the tract ofland herein described; thence continue North 23006' 08" East for a distance of 47.00 feet; thence North 660 53' 52" East for a distance of 51.00 feet; thence South 230 06' 08" West for a distance of 47.00 feet; thence South 660 53' 52" West for a distance of 51.00 feet to the POINT OF BEGINNING. Said lands located in section 4, Township 54, south, Range 42 East, City of Miami Beach, Florida and containing 2,397 square feet more or less. I HEREBY CERTIFY: that this SKETCH AND LEGAL DESCRIPTION is correct and meets the Minimum Technical Standards set by the FLORIDA BOARD OF LAND SURVEYORS AND MAPPERS. Not valid without the signature and raised seal of a Florida Licensed Surveyor and Mapper. FIELD BOOK#: 1131.14 egistered Surveyor and Mapper No. 2916 State of Florida J.A. VARGAS City Surveyor City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida, 33139 Tel.: (305) 673 7080 Florida Department of Transportastion District VI \VPl No. Sec/Job No. F.A.P. No. State Road No. County/KeylMM Parcel No. : N/A : 87060-2202 :N/A : AlA (MacArthur Causeway) : Dade : T /B/ A Sheet 1 of 2 F \WORK\$ALLIVGKIPUMP-STAIV ARGAS: EXHIBIT "A" SKETCH OF LEGAL DESCRIPTION OF PROPOSED PARCEL TO BE CONVEYED TO THE CITY OF MIAMI BEACH FOR CONSTRUCTION OF A PUMP STATION . ./'1 :ie_ / ~6" : ",'" .(,\~-IJ ! '0' ",0) -0....0'0 . ,)t ,'Ie ~<b' C '1,'1, ....'OJ /..;.. W\, "''''''''''''''''>:f.,'':;'' ~ ~ A~ I '?"-~' ~A...-=._e !...t"'~,J ~..c,'4\'4~" E:- M".c LSl.:I\-\ \J p, C 6.\JSE vi A '( N \ \ _L_ \.l '~'4i'+2.~ 5<:>. 57' N,.'B'5Z"e 51.DO' '0 C) U\' ,...:,. ~..\ ~ ,\ '8 i7'U ~ .~ :~ j' ~ ';;;\ III RD Q, "'\ ~ 6~'~j' s2"'!I ~1.:0 . \ol2,.O~e~E'~~~5' >-~ : 4.c~ \: '[' _ ;..J 10' t- III GOOYc\:lolME-~\ . ~ __ _ _ - - _ _ - - - ~ -l.______ ,",C~UMe.~\, .- c--._ 84.1/ --- -- 20.;<; -- - . ____ eST INTEQf't\Ce. ~ ~ '.;(," 5;' 52' W CL\\?::\N\::\ -I< ~. "'a' ~~ ~~ '~ II \, I i .,. ., ~, I \1 Q Q "" T ;U <Xl () . " () ;.., '" z I I _ 5.";;;-53'~2."W 5a.:..7~ ?a.C' I ~ I!)J III uJ~ Z4 ~C U U1 :;5 GCV=~\M=-N\ ":<,,,,<:)'-l'-..,)..,...\E.4 ~ .A. VARGAS Registered Surveyor and Mapper No. 2916 J.A. VARGAS-City Surveyor City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida, 33139 Tel.: (305) 673 7080 Florida Department of Transportastion - District VI WPI No. : NIA SeclJob No. : 87060-2202 FA? No. : NIA State Road No. : AlA (MacArthur Causeway) County/Key/MM : Dade Parcel No. : TIBIA Sheet 2 of 2 F.\WORKISALL \ VGKIPUMp.ST A \ V ARGAS: CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 COMMISSION MEMORANDUM NO. "119 ..Ct~ TO: Mayor Neisen O. Kasdin and Members of the City C mission DATE: October 20, 1999 SUBJECT: A RESOL N OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, REQUESTING OF THE FLORIDA DEPARTMENT OF TRANSPORTATION A PUBLIC PURPOSE CONVEYANCE OF A PORTION OF THE RIGHT-OF-WAY ON TERMINAL ISLAND, MIAMI BEACH, FOR THE PURPOSE OF CONSTRUCTING A WATER BOOSTER PUMP STATION. FROM: Sergio Rodriguez City Manager ADMINISTRA TION RECOMMENDATION Adopt the Resolution. BACKGROUND The water booster pump station serving Star, Palm and Hibiscus Islands, and the South Beach area has been out of service since 1988. The replacement pump station was delayed until it was included in the City's Pump Station Upgrades project. The design of these Pump Station Upgrades was awarded to Camp Dresser & McKee (CDM) in July 1992. In 1992, when the Florida Department of Transportation (FDOT) was reconstructing the MacArthur Causeway, a new water main was installed on the causeway, and in anticipation of the new Terminal Island Pump Station, a piping network infrastructure consisting of large valves, fittings, pipe branches, and interconnects was constructed within the City's easement located within the FDOT Right-of-way on Terminal Island. In 1995, plans for an elevated, glass enclosed pump station structure to be located in Terminal Island, were approved by the City's Design Review Board. Due to restrictions on the land lease for the FDOT right-of-way, the City requested of the FDOT to quit-claim a portion of said right-of-way for the construction of this permanent structure. During the review of this request, the FDOT required the City to relocate the proposed structure to accommodate a future light rail transit line planned by the Miami-Dade Transit Agency (MDT A). After several meetings with the FDOT and the MDTA, the City finalized the location of the proposed pump station and the required parcel. A provision required by the FDOT was to modify the glass structure ofthe building to meet MDT A's fire code requirements, at the time the light rail transit is constructed adjacent to this pump station. AGENDA ITEM C 'l S DATE~D-2D-99 1 Commission Memorandum - October 20, 1999 Page 2 ANALYSIS The City of Miami Beach is supplied its drinking water from the Miami-Dade Water and Sewer Department (MDW ASD) through large transmission pipelines at each of the four major causeways to the City (MacArthur, Venetian, Julia Tuttle and 79th Street Causeways). Since the City is responsible for water pressures within its limits, an additional pressure boost is required for distribution to City customers. The water boosters are used additionally as backup, in case of a sudden pressure loss at the County's pumps, and to maintain a minimum specified pressure for fire fighting. The existing water booster pump station in the MacArthur Causeway pipeline has been out of service for some time. This pump station served the entire South Beach area. As peak demands for water increased, the need for a new water booster pump station became a priority. The Florida Department of Transportation has requested the City to provide a resolution stating the justification and purpose of the conveyance (Attaclunent No.1). The instrument of conveyance will be a public purpose quit-claim deed with a mineral rights reservation clause and a reverter clause allowing the FDOT to recover the land in the event it is ever devoted to other that the specified public purpose. CONCLUSION The City Commission should adopt the attached Resolution requesting of the FDOT the parcel of land described in the attached Exhibit "A". SR/~:~~M/JC/NHP/~~~ f:\WORK\SALL\tCOMMEMO\OTHER\fDOT2 WPD -- Attachments 2