Loading...
LTC 164-2005 Evaluation Committee for Issuance of RFQ for Mngmt Services for Bicycle/Pedestrian Greenway Projects (Atlantic Greenway Network)De CITY OF MIAMI BEACH Office of the City Manager Letter to Commission No. 164-2005 m From: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez ~ City Manager £:/ (... - Date: June 16, 2005 To: Subject: EVALUATION COMMITTEE FOR ISSUANCE OF A REQUEST FOR QUALIFICATIONS (RFQ) FOR PROGRAMMING, DESIGN, CONSTRUCTION DOCUMENTS, PERMITTING, BID AND AWARD, AND CONSTRUCTION MANAGMENT SERVICES FOR BICYCLE/PEDESTRIAN/GREENWAY PROJECTS TO BE KNOWN AS THE ATLANTIC GREENWAY NETWORK (AGN). The City of Miami Beach is planning to develop a series of bicycle/pedestrian/greenway projects to be known as the Atlantic Greenway Network (AGN). The Atlantic Greenway Network is made up of two main trail systems; the Beach Corridors, which extend in a general northbound/southbound direction, running between the erosion control line and the dune system; and the Neighborhood Trails, which extend in a general east-west as well as north-south directions through the south, middle, and north beach neighborhoods. Individual projects will be constructed as part of the AGN Master Plan to create a continuous trail network allowing for alternative transportation and community enhancement. The City has issued a RFO for the programming, design, construction documents, permitting, bid and award, and construction management services for three segments of the Atlantic Greenway Network: Dade Boulevard Bike Path; Middle Beach Neighborhood Interconnector Trails; and the North Beach Interconnector Trails. I am considering appointing the following individuals to serve on the Evaluation Committee for the above subject RFO: · Jack Ruiz, Miami Beach Bicycle Center · Frederick C. Sake, Attorney, Resident of Miami Beach · Fernando Vazquez, City Engineer, City of Miami Beach · Jordanna Rubin, Environmental Resources Manager, City of Miami Beach · Tom Mooney, Planning Department, Cityof Miami Beach Should you have any questions or suggestions, please contact me byMay 13,2005. F:\WORK\$ALL\JORDANNA RUBIN\Master Bike Plan\bike path\L TC eval commt.doc c ) 0 CJ1 ::t:i -!"" c.... c:: m ~:~ (") Pi N N m . ::Þo < (f) :::1t C· m -rt ...,., 0 n c..n fTI ex) JMG\RCM\FHB~zr cc: Robert C. Middaugh, Assistant City Manager Fred Beckmann, Public Works Director Fernando Vazquez, City Engineer Jordanna Rubin, Environmental Resources Manager