Loading...
HomeMy WebLinkAbout2005-25902 Reso RESOLUTION NO. 2005-25902 A RESOLUTION OF THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH FLORIDA APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT, IN THE AMOUNT OF $2,017,009, WITH CHEN AND ASSOCIATES, TO PROVIDE URBAN DESIGN ARCHITECTURE, LANDSCAPE ARCHITECHTURE, ENGINEERING AND CONSTRUCTION ADMINISTRATION SERVICES NECESSARY TO COMPLETE THE PLANNING, DESIGN AND CONSTRUCITON OF PHASES III IV AND V OF THE SOUTH POINT STREETSCAPE IMPROVEMENT PROJECT. WHEREAS, the South Pointe Streetscape Improvement Project is a comprehensive multi-phase street and infrastructure improvement project based on the South Pointe Master Plan developed and approved by the City in 1999 (the Project); and WHEREAS, the South Pointe Master Plan includes all of the area of the City, south of Fifth Street; and WHEREAS, the Master Plan identified comprehensive improvements at a conceptual level and outlined a schedule of five implementation phases; and WHEREAS, Phase I of the Project addressed Third Street, from Ocean Drive to Michigan Avenue, and Washington Avenue, from 5th Street to South Pointe Drive; and WHEREAS, Construction of Phase I improvements was completed in 2002; and WHEREAS, work on design of Phase II of the Project is at a 30% completion level; Phase II includes Michigan Avenue, between 5th and 2nd Streets: Jefferson Avenue, between 5th and 2nd Streets: Meridian Avenue, between 5th and 2nd Streets: Euclid Avenue, between 5th and 3rd Streets: 2nd Street, between Washington; and Michigan Avenues: and 4th Street, between Alton Road and Washington Avenue; and WHEREAS, the scope of work for Phase II includes roadway, drainage, landscaping, streetscape, irrigation, water and sewer, electrical, and street lighting improvements; and WHEREAS, currently, there is also a need to initiate the planning and design of the remaining Phases III, IV, and V of the Project; and WHEREAS, currently, Project costs are estimated to be approximately $23 million dollars; it is anticipated that all Project funding will be provided through the South Pointe RDA; and WHEREAS, the scope of work for Phases III, IV, and V of the Project also includes roadway, drainage, landscaping, streetscape, irrigation, water and sewer, electrical, and street lighting improvements; and WHEREAS, The following areas are included in Phases III, IV, and Vof the Project: · 4th Street, between Washington Avenue and the eastern street end; · 2nd Street, between Washington Avenue and Ocean Drive; · 1 st Street, between Alton Road and Ocean Drive; · Commerce Street, from Alton Road to Washington Avenue; · Ocean Drive and Ocean Court, from 5th Street to South Pointe Drive; · Collins Avenue and Collins Court, from 5th Street to South Pointe Drive; · South Pointe Drive, from Alton Road to eastern street end; · Alton Road, from 5th Street to South Pointe Drive; · Jefferson Avenue, between South Pointe Drive and 1 st Street; · Other adjacent alleys, roadways, and rights of way as determined necessary; and WHEREAS, a portion of the Project area falls within the boundaries of the City of Miami Beach Ocean Beach Historic District; and WHEREAS, in recognition of the need to move forward with the Project, on November 25, 2003, the City Commission authorized the issuance of a Request for Qualifications (RFQ) for engineering, urban design, and landscape architecture services needed for the planning, design, bid and award, and construction administration of Phases III, IV, and V; and WHEREAS, RFQ No. 08-03/04 was issued in January 2004, eight responses were received, and an Evaluation Committee ranked Chen and Associates as the top ranked proposer; and WHEREAS, on September 8, 2004, the City Commission authorized the Administration to enter into negotiations with Chen and Associates; and WHEREAS, four negotiation sessions were held and agreement reached on a required scope of services to be provided for a not to exceed fee of $2,017,009; and WHEREAS, Project funding, in the amount of approximately $23,000,000, is available from South Pointe RDA TIF funding; and <ib~~ f AYOR ~ David Dermer APPROVED AlTO FORM & LANGUAGI & FOR EXECUTlON WHEREAS, the AlE fee, including direct costs and reimbursables, is $263,000; and WHEREAS, the fee also includes an allowance for additional services, in the amount of $52,591 for the design of several blocks within the Project that, though they have been recently improved through private sector projects, may require some additional work; and WHEREAS, these charges will only be approved and incurred if deem required during the Project planning process; and WHEREAS, construction administration services, in the amount of $388,078, for a 42 month construction period are included in the fee; and WHEREAS, Chen & Associates has agreed to include two months of additional Construction Administration services at no additional cost to the City if the Project exceeds the estimated construction schedule; and WHEREAS, at the end of the additional two months, if they are required, Chen and Associates will provide additional services at a cost of eighty percent (80%) of the monthly cost of Construction Administration services established in the negotiated fee; and WHEREAS, the total fee is approximately 10.2% of the estimated Project construction budget, which is within the general range of AlE cost percentages for streetscape projects that the City has been approving recently. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, approving and authorizing the Mayor and City Clerk to execute a Professional Services Agreement, in the amount of $2,017,009, with Chen and Associates, to provide urban design architecture, landscape architecture, engineering and construction administration services necessary to complete the planning, design and construction of the phases III IV and V of the South Point Streetscape Improvement Project. PASSED and ADOPTED this 18th day of May 2005 ATTEST: .~C(/N~ CITY CLERK Robert Parcher T:\AGENDA \2005\MayI805\regular\southpointIII IV V RESO.doc ;JtI~ 6-{)-OS ... CITY OF MtAMI BEACH COMMISSION ITEM SUMMARY lQ Condensed Title: A Resolution of the Mayor and City Commission awarding a professional services agreement to Chen and Associates in the amount of $2,017,009 to provide urban design, architecture, landscape architecture, engineering, and construction administration services necessary to complete the planning, design, and construction of the Phases III, IV, and V of the South Pointe Streetscape Project. Issue: Should the City Commission award a professional services agreement to Chen and Associates in the amount of $2,017,009 to provide urban design, architecture, landscape architecture, engineering, and construction administration services necessary to complete the planning, design, and construction of Phases III, IV, and V of the South Pointe Streetscape Proiee!? Item Summary/Recommendation: The South Pointe Streetscape Improvement Project is a multi-phase, comprehensive streetscape improvement project based on a Master Plan developed and approved in 1999 and covering the entire neighborhood south of Fifth Street. Construction of Phase I was completed in 2002 and the design of Phase II is underway. There is a need to begin the planning and design of the remaining Phases III, IV, and V of the project. The scope of work includes roadway, drainage, sidewalk and curb, lighting, landscaping and tree planting, and water line improvements. Estimated total costs are $23 million; it is anticipated that RDA funding in this amount will be made available for the Project. On 11/25/2003, the City Comm ission authorized the issuance of an RFQ for engineering, urban design, and landscape architecture services needed for the planning, design, bid and award, and construction administration of Phases III, IV, and V of the South Pointe Streetscape Improvement Project. RFQ No. 08-03/04 was issued in January 2004. Eight responses were received, and an Evaluation Committee was appointed and met and ranked Chen and Associates as the most responsive firm. On September 8,2004, the City Commission authorized the Administration to enter into negotiations with Chen and Associates. Negotiation sessions were held and agreement reached on a required scope of services (Attachment A) to be provided for a not to exceed fee of $2,017,009 (Attachment B). Project funding in the amount of approximately $23,000,000 is available from the South Pointe RDA. The total fee is approximately 10.2 % of the estimated Project construction budget. The Administration recommends award of the agreement. Advisory Board Recommendation: I NA Financial Information: Finance Dept. Approved Source of Funds: D Ci Clerk's Office Le islative Trackin : Diana Trettin, Senior Capital Projects Coordinator AGENDA ITEM DATE RlE -- y-l~ -O~ CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www.miamibeachfl.gov CITY COMMISSION MEMORANDUM From: Mayor David Dermer and Date: May 18, 2005 Members of the Miami ~eaC,h City C mmission Jorge M. GonzaleZl City Manager A RESOLUTIO OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH AWARDING A PROFESSIONAL SERVICES AGREEMENT TO CHEN AND ASSOCIATES IN THE AMOUNT OF $2,017,009 TO PROVIDE URBAN DESIGN, ARCHITECTURE, LANDSCAPE ARCHITECTURE, ENGINEERING, AND CONSTRUCTION ADMINISTRATION SERVICES NECESSARY TO COMPLETE THE PLANNING, DESIGN, AND CONSTRUCTION OF THE PHASES III, IV, AND V OF THE SOUTH POINTE STREETSCAPE PROJECT. PROJECT FUNDING To: Subject: Project funding in the amount of $2,017,009 is available from South Pointe RDA TIF funding. A total of $932,009 has already been appropriated, leaving the balance of $1,085,000 to be appropriated to fully fund the agreement, which has been requested in the companion RDA item on this agenda. ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. ANALYSIS The South Pointe Streetscape Improvement Project is a comprehensive multi-phase street and infrastructure improvement project based on the South Pointe Master Plan developed and approved by the City in 1999. The South Pointe Master Plan includes all of the area of the City south of Fifth Street. The Master Plan identified comprehensive improvements at a conceptual level and outlined a schedule of five implementation phases. Phase I of the Project addressed Third Street from Ocean Drive to Michigan Avenue and Washington Avenue from 5th Street to South Pointe Drive; construction of Phase I improvements was completed in 2002. Work on design of Phase II of the project is at a 30% completion level. Phase II includes Michigan Avenue between 5th and 2nd Streets, Jefferson Avenue between 5th and 2nd Streets, Meridian Avenue between 5th and 2nd Streets, Euclid Avenue between 5th and 3rd Streets, 2nd Street between Washington and Michigan Avenues, and 4th Street between Alton Road and Washington Avenue. The scope of work for Phase II includes roadway, drainage, landscaping, streetscape, irrigation, water and sewer, electrical, and street lighting improvements. Miami Beach City Commission Item May 18,2005 A ward of AlE Services for South Pointe Streetscape Phases III, IV, and V Page 2 of 3 Currently, there is a need to initiate the planning and design of the remaining Phases III, IV, and V of the Project. The terms of the agreement which governs the South Pointe Redevelopment Area are scheduled to change at the end of FY 2005 and it is important that funding commitments for RDA-funded projects be secured by that time. In order to have a reasonably accurate current planning level estimate of the cost of the remaining three project Phases, the planning process will need to be substantially complete. Since the planning process can take between 6 months and a year to complete, it needs to be initiated as soon as possible so that an accurate funding allocation can be approved prior to the anticipated restructuring of the RDA and so that the long overdue improvements can move forward. Currently, Project costs are estimated to be approximately $23 million dollars; it is anticipated that all Project funding will be provided through the South Pointe RDA. The scope of work for Phases III, IV, and V of the Project includes roadway, drainage, landscaping, streetscape, irrigation, water and sewer, electrical, and street lighting improvements. The following areas are included in Phases III, IV, and V of the Project: · 4th Street between Washington Avenue and the eastern street end · 2nd Street between Washington Avenue and Ocean Drive · 1 st Street between Alton Road and Ocean Drive · Commerce Street from Alton Road to Washington Avenue · Ocean Drive and Ocean Court from 5th Street to South Pointe Drive · Collins Avenue and Collins Court from 5th Street to South Pointe Drive · South Pointe Drive from Alton Road to eastern street end · Alton Road from 5th Street to South Pointe Drive · Jefferson Avenue between South Pointe Drive and 1st Street · Other adjacent alleys, roadways, and rights of way as determined necessary A portion of the Project area falls within the boundaries of the City of Miami Beach Ocean Beach Historic District. In recognition of the need to move forward with the Project, on 11/25/2003, the City Commission authorized the issuance of an RFQ for engineering, urban design, and landscape architecture services needed for the planning, design, bid and award, and construction administration of Phases III, IV, and V of the South Pointe Streetscape Improvement Project. RFQ No. 08-03/04 was issued in January 2004. Eight responses were received, and an Evaluation Committee was appointed and met and ranked Chen and Associates as the most responsive firm. On September 8, 2004, the City Commission authorized the Administration to enter into negotiations with Chen and Associates. Miami Beach City Commission Item May 18,2005 Award of AlE Services for South Pointe Streetscape Phases III, IV, and V Page 3 of 3 Four negotiation sessions were held and agreement reached on a required scope of Services (Attachment A) to be provided for a not to exceed fee of $2,017,009 (Attachment B). Project funding in the amount of approximately $23,000,000 is available from the South Pointe RDA TIF funding. The fee includes direct costs and reimbursables in the amount of $263,000. It also includes an allowance for additional services in the amount of $52,591 for the design of several blocks within the project that, though they have been recently improved through private sector projects, may require some additional work. These charges will only be approved and incurred if deem required during the Project planning process. Construction Administration services in the amount of $388,078 for a 42 month construction period are included in the fee. Chen & Associates has agreed to include two months of additional Construction Administration services at no additional cost to the City if the Project exceeds the estimated construction schedule. At the end of the additional two months, if they are required, Chen and Associates will provide additional services at a cost of eighty percent (80%) of the monthly cost of Construction Administration services established in the negotiated fee. If this is the case, Additional Services will have to be awarded at that time. The total fee is approximately 10.2% of the estimated Project construction budget which is within the general range of AlE cost percentages for streetscape projects that the City has been approving recently. The Administration recommends award ofthe agreement. Upon completion of Phases III, IV, and V of the South Pointe Streetscape Improvement Project, every street south of Fifth Street will have been substantially rehabilitated. JMG: RCM:TH:JECh: KLM: DKT T:\AGENDA \2005\May1805\Regular\southpointe345memo.doc