Loading...
99-23375 RESO RESOLUTION NO. 99-23375 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.3 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY -HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT -TO-EXCEED $70,925.00, FOR SURVEYING OF PHASE II OJ' THE SOUTH POINTE STREETSCAPE WHEREAS, on January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an Agreement with Kimley-Hom and Associates, Inc. (the Agreement) to provide professional engineering and landscaping architectural services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, Staff negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not -to-exceed fee, in the amount of $3 89,100, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of $1 03,800, including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington A venue extension; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, Phase II surveying was scheduled to begin simultaneously with the completion of the ninety percent plan for Phase I; and WHEREAS, Phase II includes the following streets: (1) Lenox Avenue (from Fifth Street to Fourth Street); (2) Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second Street); (3) Euclid Street (from Fifth Street to Third Street); (4) Fourth Street (from Alton Road to Washington Avenue); and (5) Second Street (from Alton Road to Washington Avenue); and WHEREAS, in the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will need to be within 100 feet on either side of the intersecting north/south streets for Phase II construction documents, it has been included within Phase II surveying services; and WHEREAS, the proposed not-to-exceed fee for Phase II is $ 70,925 with the following defined tasks: Phase II survey - $54,300 and reimbursements - $16,625 (consisting of geo- technical studies - $4,500, aerials - $9,625 and direct expenses - $2,500); and WHEREAS, the South Pointe Advisory Board voted in favor of the Phase II work at its meeting of October 14th, 1999 and, accordingly, Staffhas negotiated an Amendment No.3 to the Agreement; and WHEREAS, the Executive Director and RDA Staff will herein recommend that the Mayor and City Commission ratify said Amendment No.3 to the Agreement. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein ratify Amendment No.3 to the Agreement between the Miami Beach Redevelopment Agency and Kimley-Horn and Associates, Inc., for professional engineering and landscaping services, in an amount not-to-exceed $70,925.00, for surveying of Phase II of the South Pointe Streetscape Area. PASSED and ADOPTED this 20th day of October, 1999. lj -- "MAYOR ATTEST: /J 0 J011,c{ ~ ~ {(A~ CITY CLERK APPROVED AS TO FO?,M & LANGUAGE 11 FOR EXECUTION 1JiliJJLLiW11 SR/CMC/AR IICH2\SYSIDDHP\$ALLlAlexandra\South PoinlelKimley Horn Phase II Survey AD3.doc ~" ' ~ITY OF MIAMI BEACH ITY HALL 1700 CONVENTION CENTER DRIVE MIAMIBEACH, FLORIDA 33139 "tp: \ \ci. miami-beach. fJ, us COMMISSION MEMORANDUM NO. I q 1-7<7 TO: Mayor Neisen O. Kasdin and Members of the City mission DATE: October 20, 1999 FROM: Sergio Rodriguez City Manager SUBJECT: A RESOL ION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RA TIFYING AMENDMENT NO. 3 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., APPROVED UNDER RESOLUTION NO. 99-23073 FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES IN AN AMOUNT NOT-TO-EXCEED $70,925.00 FOR SURVEYING OF PHASE II OF THE SOUTH POINTE STREETS CAPE ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. \ BACKGROUND On January 20, 1999, the City Commission authorized the Administration to negotiate an agreement with Kimley-Hom and Associates, Inc. The Administration negotiated a not-to-exceed fee of $170,760 for the preparation of the final master plan and opinion of probable cost for the entire project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a master plan and surveying for the Phase I improvements. Amendment No.1 approved on May 26, 1999 included a not-to-exceed fee in the amount of $389,100 for the preparation of construction documents, permitting and bidding services for Phase 1. Amendment No.2 approved on May 26, 1999 included a not-to-exceed fee in the amount of $103,800 included surveying, master plan design, preparation of bidding and construction documents and permitting for the Washington Avenue extension. AGENDA ITEM _~ J G DATE b-W-'19 ANALYSIS In order to meet the time schedule prepared as part of the master plan, Phase II surveying was scheduled to begin simultaneously with the completion of the ninety percent plan for Phase I. Phase II includes the following streets: · Lenox Avenue (from Fifth Street to Fourth Street); · Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second Street); · Euclid Street (from Fifth Street to Third Street); · Fourth Street (from Alton Road to Washington Avenue) and · Second Street (from Alton Road to Washington Avenue). In the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will need to be within 100 feet on either side of the intersecting north/south streets for Phase II construction documents, it has been included within Phase II survey services. The proposed not-to-exceed fee for Phase II is $ 70,925 with the following defined tasks: Phase II survey - $54,300 and reimbursements - $16,625 (consisting of geo-technical studies - $4,500, aerials - $9,625 and direct expenses - $2,500). The South Pointe Adtisory Board voted in favor of the Phase II amendment at their meeting of October 14th, 1999. CONCLUSION The Administration recommends that the Mayor and City Commission ratify Amendment No. 3 to the agreement with Kimley-Hom and Associates, Inc. for a fee not-to-exceed $70,925. SR!C~/ AR \\CH2\SYS\DDHPlSALLlAlexandra\South PointelKimley Horn Phase II Survey AD3.doc RESOLUTION NO. 329-99 A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AMENDMENT NO. 3 TO THE AGREEMENT BETWEEN THE AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT-TO-EXCEED $70,925.00, FOR SURVEYING OF PHASE II OF THE SOUTH POINTE STREETS CAPE WHEREAS, on January 20, 1999, the Chairmen and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an Agreement with Kimley-Hom and Associates, Inc. (the Agreement), to provide professional engineering and landscaping architectural services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, Staffhas negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not-to-exceed fee, in the amount of $3 89,100, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of $1 03,800, including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington A venue extension; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, Phase II surveying was scheduled to begin simultaneously with the completion of the ninety percent plan for Phase I; and WHEREAS, Phase II includes the following streets: (1) Lenox Avenue (from Fifth Street to Fourth Street); (2) Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second Street); (3) Euclid Street (from Fifth Street to Third Street); (4) Fourth Street (from Aiton Road to Washington Avenue); and (5) Second Street (from Aiton Road to Washington Avenue); and WHEREAS, in the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will need to be within 100 feet on either side of the intersecting north/south streets for Phase II construction documents, it has been included within Phase II survey services; and WHEREAS, the proposed not-to-exceed fee for Phase II is $ 70,925 with the following defined tasks: Phase II survey - $54,300 and reimbursements - $16,625 (consisting of geo- technical studies - $4,500, aerials - $9,625 and direct expenses - $2,500); and WHEREAS, the South Pointe Advisory Board voted in favor of the Phase II amendment at its meeting of October 14th, 1999 and, accordingly, the RDA has negotiated an Amendment No. 3 to the Agreement. NOW, THEREFORE, BE IT DULY RESOLVED BY THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY, that the Chairman and Members of the Miami Beach Redevelopment Agency herein approve Amendment No.3 to the Agreement between the Agency and Kimley-Horn and Associates, Inc., for professional engineering and landscaping services, in an amount not-to-exceed $70,925.00, for surveying of Phase II of the South Pointe Streetscape. PASSED and ADOPTED this 20th day of October, 1999. 7!IRMAN ATTEST: !!11 ,() ..1 t x :{ , II :;~: \"lltt 0 \,/ ClLLIG"--'" SECRET ARY APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION SR/CMC/ AR 1f /4i4fL Redevelopment Agency G,.-~.e,.....,' C':'~:"""r,' ~~ /2-~/ ~~ Dote \\CH2\SYS\DDHPlSALLlAlexandra\South Pointe\Kimley Horn Phase 1I Survey AD3,doc I ~ I I I I I I I I I I I I Miami Beach Redevelopment Agency 1700 Convention Center Drive, Miami Beach, FI. 33139 http \\ci miami-beach,f1 us Telephone (305) 673-7193 Facsimile (305) 673-7772 MEMORANDUM NO. Cf=\ -~ L. TO: ChairJll~n and Members of the DATE: October 20, 1999 pment Agency .. FROM: Sergio Rodriguez City Manager SUBJECT: A RESOLD 0 OF THE CHAIRl\1AN AND THE l\1EMBERS OF THE MIAMI BEACH REDEVELOPl\1ENT AGENCY RATIFYING AMENDMENT NO.3 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., APPROVED UNDER RESOLUTION NO. FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVIC S IN AN AMOUNT NOT-TO-EXCEED $70,925.00 FOR SURVEYING F PHASE II OF THE SOUTH POINTE STREETS CAPE 3l4. '7C} ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. BACKGROUND On January 20, 1999, the City Commission authorized the Administration to negotiate an agreement with Ki~ley-Hom and Associates, Inc. The Administration negotiated a not-to-exceed fee of $170,760 for the preparation of the final master plan and opinion of probable cost for the entire project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a master plan and surveying for the Phase I improvements. Amendment No.1 approved on May 26, 1999 included a not-to-exceed fee in the amount of $389,100 for the preparation of construction documents, permitting and bidding services for Phase 1. AGENDA ITEM 3A DATE 10-2.0-99 7 Amendment No. 2 approved on May 26, 1999 included a not-to-exceed fee in the amount of $103,800 included surveying, master plan design, preparation of bidding and construction documents and permitting for the Washington Avenue extension. ANAL YSIS In order to meet the time schedule prepared as part of the master plan, Phase II surveying Was scheduled to begin simultaneously with the completi on of the ninety percent p Ian for Phase 1. Phase II includes the following streets: · Lenox Avenue (from Fifth Street to Fourth Street); · Michigan A venue, Jefferson A Veoue and Meridian A venue (from Fifth S ITeet to Second S ITeet); · Euclid Street (from Fifth Street to Third Street); · Fourth Street (from Alton Road to Washington Avenue) and · Second Street (from Alton Road to Washington Avenue). In the Master Plan, Secood Street is Phase III; however, due to the fact that the surveying will need to be within 100 feet on either side 0 f the intersecting north/south streets for Phase II construction documents, it has been included within Phase II survey services. The proposed not-to-exceed fee for Phase II is $ 70,925 with the fOllowing defmed tasks: Phase II survey - $54,300 and reimbursements - $] 6,625 (consisting 0 f geo-technical studies _ $4,500, aerials - $9,625 and direct expenses - $2,500). The South Pointe Advisory Board voted in favor of the Phase II amendment at their meeting of October 14th, 1999. CONCLUSION The AdminiSITation recommends that the Chairman and the Members of the Miami Beach Redevelopment Agency ratify Amendment No.3 to the agreement with Kimley-Horn and Associates, Inc. for a fee not-to-exceed $70,925. SR/C~/AR \\CH2\SYSIDDHPISALLlAlexalldraISouth Pointe\Kimley Horn Phase II Survey AD3 doc 8 t l a I I I . . . , ~ a-- I t{. Redevelopment Agency Memorandum No. A Resolution Ratifying Amendment No.3 to the Agreement between the Miami Beach Redevelopment Agency and Kimley-Hom and Associates, Inc., Approved Under Resolution No. 99-23073 for Professional Engineering and Landscaping Services in an Amount Not-to-Exceed $70,925 for Surveying of Phase II of the South Pointe Streetscape. (Resolution to be Submitted) 9 AMENDMENT NO.3 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY, FLORIDA AND KIMLEY-HORN AND ASSOCIATES, INCORPORATED, FOR PROFESSIONAL ENGINEERING AND LANDSCAPE ARCHITECTURAL SERVICES FOR SURVEYING OF PHASE II OF THE SOUTH POINTE STREETSCAPE This Amendment No.3, dated as of (clcl....L i .~ ,1999, to that certain Professional Services Agreement (Agreement), dated February 17, 1999, by and between the Miami Beach Redevelopment Agency (RDA), Florida and Kimley-Hom and Associates, Inc. (Consultant) . RECIT ALS WHEREAS, the Agreement provides for the preparation of the final Master Plan for the South Pointe Redevelopment Area Project; and WHEREAS, this Amendment No.3 to the Agreement provides for surveying Phase II of the South Pointe Streetscape; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, Phase II surveying was scheduled to begin simultaneously with the completion of the ninety percent plan for Phase I; and WHEREAS, Phase II includes the following streets: (1) Lenox Avenue (from Fifth Street to Fourth Street); (2) Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second Street); (3) Euclid Street (from Fifth Street to Third Street); (4) Fourth Street (from Alton Road to Washington Avenue); and (5) Second Street (from Alton Road to Washington Avenue); and WHEREAS, in the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will need to be within 100 feet on either side of the intersecting north/south streets for Phase II construction documents, it has been included within Phase II survey services; and WHEREAS, the South Pointe Advisory Board voted in favor of the Phase II amendment at its meeting of October 14th, 1999 and, accordingly, the RDA has negotiated this Amendment No.3 to the Agreement. 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.3. 2. MODIFICATIONS The Agreement is amended as follows: Exhibit "A", entitled "Scope of Services/Fee", is amended to add the work attached hereto and incorporated herein as Exhibit "A-I" of this Amendment. Exhibit "C", entitled "Schedule", is amended to add the schedule attached hereto and incorporated herein as Exhibit "C-l" to this Amendment. 3. OTHER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The RDA and Consultant ratify the terms of the Agreement, as modified by this Amendment No. 3. IN WITNESS WHEREOF, the parties hereto have caused this Third Amendment to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: MIAMI BEACH REDEVLOPMENT AGENCY ~tlc.l5 ()F . A APPROVED AS TO t LLA...ctl-'-/FORM & LANGUAGE By: ECUTlON m SECRETARY J . 1f! ijUUlL Redevelopment IvJenq General Counsel CHAIRMAN J.-1 . '5) ~ ,?) J) Dote SEAL CONSULTANT: KIMLEY-HORN AND ASSOCIATES, INC. By: ATTEST: /ltPr SECRETA Y \\CH2\SYS\DDHP\$ALLlAlexandra\South PoinlelKimley HornlKimley Horn PlIAD3 AMD,doc ~=r~ Kimley-Horn and Associates, Inc. Exhibit A. September 2-l, 1999, Page I Exhibit "A -1" SCOPE OF SERVICES Task 1 - Survey Services Kimley-Hom and Associates will provide the following survey services: a) The consultant will place and locate I I aerial targets for use in providing Raster aerial imagery, The aerial targets will be set at the locations as specified by the photogrammetist. b) Ground control (horizontal) will be established along Second Street, Fourth Street, Fifth Street, Lenox Avenue, Michigan Avenue, Jefferson Avenue, Meridian Avenue, and Euclid A venue corridors, Additional control will be required in the future for the development of other roadway corridors. c) A centerline of construction will be calculated for Second Street, Fourth Street, Fifth Street, Lenox Avenue, Michigan Avenue, Jefferson Avenue, Meridian Avenue, Euclid Avenue and Alton Road, Minimal right-of-way and/or property monuments will be located, A bench level run will be perfonned and bench marks wiII be set along the Second Street, Fourth Street, Fifth Street, Lenox Avenue, Michigan Avenue, Jefferson Avenue, Meridian A venue, and Euclid A venue corridors. The elevations of the bench marks will reference the local- Miami Bay Datum. These bench marks wiII be set outside the limits of construction (where possible), and referenced by station and offset to the center line of cO'nstruction, d) A field topography survey (survey points only) will be perfonned along the existing roadway corridor (Second Street, Fourth Street, Lenox Avenue, Michigan Avenue, Jefferson A venue, Meridian A venue, and Euclid Avenue). The survey limits are to the buildings or to 10 feet beyond the right-of-way (whichever comes first), subject to accessibility. Survey limits of Fifth Street are the south one-half of the roadway. Trees, street signs and driveway profiles will not be surveyed. e) The location, pipe size, rim and invert elevations will be obtained for accessible drainage structures and gravity flow sewers within the existing roadway corridors (Second Street, Fourth Street, Fifth Street, Lenox A venue, Michigan A venue, Jefferson A venue, Meridian Avenue and Euclid Avenue), Confined space entry surveys of structures will not be perfonned. f) The above ground (surface) utilities associated with underground utilities (such as valves, meters, fire hydrants, etc.) wi\I be located, g) Field surveys will be suitable for preparing engineering and construction drawings, ~-n ~_r , Kimley-Horn and Associates, Inc, Exhibit A, September 24, 1999, Page 2 Note: AI! references to survey associated with Fifth Street are limited to the south half of the roadway, All references to survey associated with AIton Road are limited to the locations of intersecting streets at this time, Task 2 - Reimbursements a) Kim ley-Horn will have geotechnical data gathered consisting of five (5) percolation tests and three (3) pavement cores within the project area. The percolation test will be performed in general accordance with the Usual Open-Hole Constant head procedures suggested by South Florida Water Management District (SFWMD) to a depth of IS feet to provide data required for drainage evaluation at the subject site. b) Kim ley-Horn will have professional photogrammetric services flown including aerial photography, aerial triangulation, and raster imagery (Descartes format), Task 3 - Additional Services Upon your authorization, we will provide any additional services that may be required beyond those described in Task I. These services may include but are not limited to such items as the following: a) Preparation of right of way acquisition sketches or descriptions. b) Construction Documentation for Phase II through V c) Conducting subsurface geotechnical investigations. d) Providing construction phase services, e) Making traffic counts or undertaking other traffic related analysis. f) Traffic signal plans. ~=n Kimley-Horn and Associates, Inc. COMPENSA nON Exhibit A, September 2-1. 1999. Page 3 We will provide the services described above for the lump sum amounts (not including direct expenses) outlined below. Task I 2 2-a 2-b 3 Description Phase II Survey Reimbursements Geotechnical Aerials Direct Expenses Subtotal reimbursements (for budget purposes) Total authorization Additional services Lump Sum Fee $54,300,00 $4,500,00 $9,625.00 $2.500,00 $16,625,00 $70.925,00 as requested S:\SMINGONE\ Word Docs\South Pointe\contracts\surveyphaseIl.doc ~=n Kimley-Horn and Associates, Inc. Exhibit S, September 24, 1999. Page 1 Exhibit "C_1" SCHEDULE We will provide our services in an expeditious and orderly manner to meet the schedule mutually agreed to by the Client and the Consultant for the various elements of the project. ~',j/!... Ii'" -----'J ,/ /r_-,~. I ;~' , - -I ,/j-:.,_' II ,. ~ ',' ',,';1.' ., '/. l( Lt It !r[ l. ! ~ :r Li ' /.':t, Ii ,/ . .I: . ,;' / . I. .. II I II .. , t !, 'ih' ~ " !/ I~ I 'I " .. ii I I, , .. . , . ,/., !I I~ !~ !!! ji:.".:.::jJ i.., J ~.I':" ( /I!',,/, /; I~ _.....l' (!,.. --'" L. c ..,!) ..':-,"' ''"7~. ~"'"'" "~\ ], ..!,' if.i -'-'1:=J rr- '-:]1- - ~:g-'- ~f :'~'!~~! i' . ':', ~:7rl ..'. . L" .' - 1- I L ' !:, . i-t ~ . I ~', ' , i i . ~ ( . , 0' ~ I II, :l( 'I II I" - " -.- _ !i / ' , _. _ . I 1./([ :'lt~lli.:',.H, -i~l: ,,' il9!'" r ,!!.,., . "f_.,(/"".:-, -<{ - .. l-t [I I L .. ,..J J '. I , _ _, III I " II" '," '.~, -- ','Y'. , !'","'".. ."'.....11,..,,.' ~i" '" . 'ill' ", --~" ':"I"";'I'~/"::':"""I~.!' , :i,l ~ 11.::'.! f;~:;;: (II: .' 'J. ~~1;'.i -- f ;':!ft{ik:~':W,~ - - ,~;: . . _ ~(~r:~;;":;~1 (r~ifH:~; F-:;;Y~"~tff' ~3},;ioV ".i Ii, . !!, "~lll -I, .-:il - J t <'-"." -'I i::,"" "'('" II . .-. 2:, . . ,_1/ ",',. _';;. I!, "., /. :.!! -- '. 'i i !!' :;;.." E ': ". ii /"~ ",I;' e: '" ii ''',/ I' ".1 I !! ..., "'. 'I : ',,'It' ""'J J:11 . "..": "'j j .' :.. , ii Ii . ~, -.' " ',' ;.!! ! " <, ,',':'. i,_ ~ ';~<" .:,':: 1. !I ''''::.~,~;!. il., '~.':~"I l'. - i i'~:':, ' ! / !., i i !/ I! : - ill", !/; '/.:~ I It-. '-.::~, j !f I! Ill:: ':11, ,"- f ':,ii' :~J ~...Jj.':7:(';;':)lj!"""__;I- II II ~~::::~:::~(~~'~Iii'<.' I( ii '.' ~ ,f':; 7!J::;~ ~O~! <'1 I !: ./ Lf-;:~}~]~r'iJ{(,.-.;.,:".,;, ' f " / Ii!',. ~jj:,':IB.J / /i~':,:;<\:- H"/ " //, !/ 1/ /t-:~,~'il Ir.'.:~~:" , ..'! I /, . -...:: . :. J/ I!., ' 1-, _! !., . :- I! / j' ".! !: 0.::;; I,.. ". ., '.,.! f ' " I !: , ,> ; ".~ II /" ;. ." - _.;;...~ '.. '. . . I{;', _ '" ",/ /r .' '. 'G-_._._._.....gt"[~[...~.. "l':., "," ,I-'.-,"':'ii ;'''':'/ /;'__, ......- . - , , 'I'j::::~.~~ei~i " .... ,~, v... ~ -..~ I ! r:3):;;:;7,';s~i" , , ~ or, ".'>\\, .~=====; P;~~~'M'lt 1,i-;:ji.d __J./ ' J ',' ',' 1./ '. " ",/ I,' ',' \\" \ ~'~-t';;;;;'-:~ _ . . I I I ' - C> , t ! ,i,: ;i/': !.' if Ii .\ '__'_1, 'r:, /. II -;;. '\~\;\ ["ri,. -.-.=: 1"'/; :! !,' i i J.;' \1 \ i ! \,,::,=,=>=:-.-.~ >. \" ii/I" il Ii _ __ :::j! l ."-dr.~_~!!~=~'-~d2:_ _______ ~._. !!oTH !~:T U A 8 A H RES O,~, ~,~ l~l~[~!?~~'~ I "'Ill" H CIIIO-4 LAWll~~ l.AIClCNIE .'non.."'...... m~ I' Ill" IIACl FlUIU 11111 II LIICGLJ IOU'JaITl.!!- __... "... .0_ · ~.D.- _ n K:mley-~c~ ~ _ '-.J ar.d Asscc:ales. Ire, .- TER 2YBERX, & COMP.-\.'lY DUANY PLA - c ca - a. .. G) .. en as :E C ." .- .. CD~ ..... C - ._~ 00 A.: .era .. .- ::IE o.! u):E c: as - A. at c: .- (I) ca .-: A. - l' - JalI NIl. ~9r CI.-! 9r 0.. -- 00lQ:ZZS]S 9PC SIll fI ,UI1lII -- . .. - .. "':" .::: .... -'::"4_0_':4"_ .. :.... II' .. l_ ,....... ..... _ .... ="1Io_~:_,,__ ,,--- .. rmI IOUTH POliTI ITHIITICAP' PHASlla Pl.AI . PHASE 1 . 3RD STREET - FROM EAST ROW LINE OF MICl-lICrAN AVENUE TO u.eST ROW LINE Cf= OCEAN DRIVE. . WA..~INCsTON AVENUE - FROM SOUTi-t RCUJ LINE Of' STi-t STREET TO NORTi-t ROW LINE Of' SCtJTi-t POINTE DRIVE - PLAZA AT INTERSECTICN Cf= 3RD STREET AND WASi-tINGTCN AVENUE. . PH.lSI 2 . LENOX AvENUE - FRCM SCUTi-t ROW LINE OF STi-t STREET TO NCRTl-l RCW LINE CF 4T1-4 STREET. . MICi-tIGAN AveNUE - FROM SOUTl-l ROW LINE OF STl-l STREET TO NORTl-l ROW LINE OF 2ND STREET. . JE~ERSCN A veNUE - FROM SOUTl-l RCW LINE OF 5 TI-t STREET TO NORTi-t ROW LINE Of' 2ND STREET. - MERIDIAN AveNUE - FROM SCUTi-t ROW LINE CF STi-t STREET TO NORTI-4 ROW LINE Of' 2ND STREE:T. - EUCLID AVENUE - FRCM SOUTi-t ROW LINE OF STi-t STR!:ET TO PLAZA AT INTERSECTICN Of' 3RD STREE:T AND WASi-tINCrTCN AVENUE. - 4Ti-t STREE:T (WEST Cf' WASt-IlNCsTON AVENUE) FRCM EAST ROW LINE OF ALTON ROAD TO U.':EST ROW LINE OF WASi-tINCrTCN AVENUE. . LENOX COURT - FROM 5OUTI-4 ROW LINE OF STI-4 STREET TO NORTI-4 ROW LINE OF 4T1-4 STREET. . MICi-tIGAN COURT - FROM SCUTI-! RCW LINE OF 5TI-! STREET TO NORTI-! ROW LINE OF 2ND STREET. . JEFFERSON COURT - FROM SOUTI-! ROW LINE OF 5Tl-l STREET TO NORTI-! ROW LINE OF 2ND STREET. . EUCLID CCURT - FROM SOUTI-! ROW LINE OF 5TI-! STREET TO NORTi-t ROW LINE OF 2ND STREET. II lUll . . 4Ti-t STREET (EAST OF WASI-!INGTON AVENUE) FROM EAST ROW LINE OF WASI-4INCsTON AVENUE TO UJEST ROW LINE OF OCEAN DRIVE. I. 2ND STREET - FROM EAST ROW LINE a= ALTeN ROAD TO WEST ROW LINE OF <Sl'cEAN DRIVE. I. 1ST STREET (WEST OF WASI-lINGTON AVENUE) FROM INTER-CoECTION WITI-! JEFFERSON AVENUE TO WEST ROW LINE OF WASI-4INCsTON AVENUE. . 1ST STREET (EAST OF WASI-4INCrTON AVENUE) FROM EAST ROW LINE OF WASt-IlNGTON AVENUE TO WEST ROW LINE OF OCEAN DRIVE. . COMMERCE STREET - FROM EAST ROW LINE OF ALTON ROAD TO WEST ROW LINE Cf= WASI-!INCsTON AVENUE. . SOUTi-t POINTE CCURT - FROM EAST ROW LINE OF ALTON ROAD TO WEST ROW LINE OF WASI-lINGTON AVENUE. . COMMERCE COURT - FROM EAST ROW LINE OF JEFFERSON AVENUE TO lL'EST ROW LINE OF WASI-IINCrTON STREET. I RDA RESPONSIBLE FOR CONSTRUCTION BASED ON DEveLOPMENT APPROvALS. Ii PHAS! Ai - OCEAN DRIVE - FROM 5OUTi-t ROW LINE OF STi-t STREET TO NORTi-t ROW LINE OF SCUTI-! POINTE DRIVE. - COLLINS AVENUE - FROM SOUTi-t ROW LINE OF 5Ti-t STREET TO NORTI-4 ROW LINE OF SOUTI-! POINTE DRIVE. . OCEAN COURT - FROM SCtJTl-l ROW LINE OF 5Tl-l STREET TO NORTl-l ROW LINE OF SOUTI-! POINT: DRIVE. - COLLINS COURT - FROM SOUTI-! ROW LINE OF 5TI-! STREET TO NCRTi-t ROW LINE OF 5OUTi-t POINTE DRIVE. . PMAS! ~ - ALTON ROAD - FROM SCtJTi-t ROW LINE OF 5Ti-t STREET TO INTERSECTION WITi-t 5CUTi-t POINTE DRIve. - 5CUTi-t POINTE DRIve - FROM INTERSECTION WITl-l ALTON ROAD TO EASTERN LIMITS. \ \ ~ '\ \ J ~~ l' II ~ l \., \ \ ! :6J!' . ! ! !l ! \\ \ ~ 1m I II :". I I '\ '~l!::-,~,jL,:...,'_,lJ L ~,-,- ,~~~" \\ \ ...,1 ,!- _. '\ \ ," I 11 '\\\\\., i~ t, \\'.\ .~, I ~ Ii. \\~\.' ">,'.:':'.~.'.',"'~.'.".',.,'.,', i l2li,', :T;\ .\ '"..;..,.: . ::t _.'. \\Q;, \,..'..::::, I 01 . '\'f~ \"-{'~:C" i 1: i' \~ \\ . ''':'','' ; -~- \\~. .\\ . ? \\\ \\ ! .1, '.. \..\ \, I I :,<,'\\ \~. i r '\\\\ \~ . i; " '\\.\, i [.,.,..',.', '\\ \ '-. \',. .... - . ',>\'(\,\,P'! - '\:\\~\\ I ~ '\ ~ '.\ \ . '\ \\ !,' ,\ \ \ \ l '\,\j \\ ','. ,\ \, .~\\\ ,\ \ \ \,\\ \\ " , ,~ub~." ) \ " I' ",' 'I".....,.: J:!L. ., L' ". ",,\;,!.,,::,'!/! ii!j 'I1;i~ .. I 1 ' II I ",.,??;/",','.,j :!j.. i/ 'i:;'. :..''-! 1,';1 j',.".'j "" _,_,:...I L._....J L,:...~ , , .. ,,-'. I' , ..:! ~..;< ii :' i ~ i .' ..'! !,' , .: .. .-" " " ,'( i ,. ',~" . " ,......,}j"., "'j 1 j" I ~" !.,,'....., 1~)(jJl~~;"''':'' ..., i -<( i ;', -- . i . . . Q j, t ' , !!: .." i ~ ,.. " J I.' -".i'....~! !. !~ .-.!~.> r II......~'I "'., ..J~" ~ ~. ....,..!!, !_! !! ~ ..!~!,.J , ji:...C!~!J ,,/!,:'.. i iJ~..:. "(<, !, "',,, ,~! .'.,.~~~! .,,~! <:::.... I ,~ , 1 .,~ :-,i'::~.:' :!# !;)!;:. !!~,...., i~,1',:.:>':-",", ,...,; ,'..I~I," 1I,"'..-.II!!I'.. ""11' ...".1 -.. Ij"."'"'''!/1(''' ,.!l'.""'i!lf..'" .... .": ,j ~ j..': ,;'>ii"'" .>j 1: i . li:,':~""'1 " ...c:...'i. :.~~.:! ~ ;,:;"-.:'_"!I:.'~ ..:, ! Q/~ " '. . '.. .'.. ~-- -~FlQ.~~_E1..-_" ----....' j /........./........1.../.-. .,'.......'.', ~---~-,..-:::~._::::-, _.- --..-....... - '1 - Co.. "." I . g~/" I. _'..,'.":"':/',_". I", '~ ';""f",';"I'" ... '_: .. ~-.... ('" :..' '<'. j I. ':; :.. ..;,' ".".J_";,,., '{ ..~'i"..... ~,...'Jt.'...;. 'I "0': ~!,':'! I>., II I . .. "';".' '~:"6~" ::~""'-""-!o;,;",'"'1 I. . 1',,';,)/1 i":',>'~'.ii.,..,..'..,,.."'. .. I "f 1-. ii.:,,:I f"'7.~"""-----~0! ,'Ii',',;,,':,::,'," i ".:...2 .'; ""~i' ." '''j ..''';: "'>-"~"O I . b . lOr,' " __ I ',' ,'" r,.".. '." '^.; . I.' . i i;:E~t:i i,',;':~"J '~, ~ :_' ,,' I i,:,:'~ "'1,'; i',~<!!",~!; / 1 "U"') i:";,~:",~ ,0', 'ii "'j i '.. ,'! !//! ;;~ofEi!!1t;~i [,D/ ,~/ifLJl ,..., ' " "~J~t :'-: 71.t"<'~': ~~~""/~lj ,.-/ / // ;/1; 1/ '. !1)5Y l~L~.,:, " i i' ii' i p,,, ,~/ ;!' . Ii - '-~'''. . if jh.. ir:~'?.','JJI If ~- ~J.l:,:j!/dr', \J F,};:::-;;!; }~ofo/. \~\~ '.'." ....., , "," 1/.' r I! ,\ " _J ,i:,.:,;,:::n ';IJ;'ii. i^J; ".,. ,', !l ~~'--'-' !\<iiTI4~1 c...='-- -'-'=:3]'-'-'-'- -,-- -,- L._._,_. . _,_._~, ,r;;:-:_.._,_,_._.~.,_,,_,_,_;_,_,_,_,_,_t_,_, _. _._ ~T~ 5TIeET c-._._._._~ ~.....; T ~I 1 URBAN RESOURCE GROUP II"'SIOI If IIH(!"IIIIIIIISlCIII!~ II~ lRAIIllaBJNlll' PUIIIIl IJIIl9CNlE NDIIEt1lIE m WPICl III LIICOU IOU-11m III- IIUIIIA" FlOlIU 11111 ~ .Q. IV- ..ea.. .-...x I.... .,.. _ ",., _ n Kimley-Hom ~ _ ~_J and Associates, Inc, DUANY PLATER-:lYBERK & COMPA,,"{'r' c as - A. .. CD .... en as ca . ." .- .. CD.!! ..... c - c: .- .c 00 .. - A.ca A. . .ela at c: .. -- -- ::IE . O.! as .c en_ A. ...... l' .... Nt1I JaIl NI>. er- Ilr ~Ilr 0.- - 04Qi/2iS1S BPC SM 17....... ... Ii -. .., . .. ... .....,..... ... .._~"iI"'''Ir'''''' _ .. .. IIr ..1_ ...... ... ~ .. .... -....--............. .,1IloI_~....__"IIIlIl- - IOUTH POliTI ITRIITICAP. PHAI.IO PLAN . PHASE 1 - 3RD 5TREET - FROM EA5T ROW LINE OF MICI-4IGAN AVEl'-lUE TO WE5T ROW LINE OF OCEAN DRIve. _ WA$I-4INGTON AveNUE - FROM 5OUTI-i ROW LINE OF STI-1 5TREET TO NORTI-4 ROW LINE OF 5OUT1-4 FOINTE DRIve - PLAZA AT INTERSECTION OF 3RD STREET AND WA51-41NGTON AVENUE. II PHAI. 2 - LENOX AvENUE - FROM 5OOT1-4 ROW LINE OF STI-4 5TREET TO NORTI-4 ROW LINE OF 4T1-4 5TREET. _ MICI-4IGAN AveNUE - FROM 50UTI-i ROW LINE OF STI-4 STREET TO NORTI-4 ROW LINE OF 2ND STREET. - JEFFERSON AveNUE - FROM 50UT1-4 ROW LINE OF STI-4 5TREET TO NORTI-4 ROW LINE OF 2ND STREET. _ MERIDIAN AveNUE - FROM 5OUT1-4 ROW LINE OF STI-4 STREET TO NORTI-i ROW LINE OF 2ND STREET, _ EUCLID AVENUE - FROM SOUTI-I ROW LINE OF STI-4 5TREET TO PLAZA AT INTERSECTION OF 3RD STREET AND WA51-41NGTON AveNUE. _ 4T1-4 5TREET (WE5T CF WASI-IINGTON AVENUE) FROM EAST ROW LINE OF ALTON ROAD TO l.LIEST ROW LINE OF WASI-4INGTON AVENUE. _ LENOX COURT - FROM 5OUTI-I ROW LINE OF STI-I 5TREET TO NORTI-4 ROW LINE OF 4T1-4 STREET. _ MICI-iIGAN COURT - FROM 5OUT1-4 ROW LINE OF STI-I 5TREET TO NORTI-I ROW LINE OF 2ND STREET. _ JEFFERSON COURT - FROM SOUTI-4 ROW LINE OF STI-4 STREET TO NORTI-I ROW LINE OF 2ND STREET. _ EUCLID COURT - FROM 5OUTI-4 ROW LINE OF STI-4 STREET TO NORTI-I ROW LINE OF 2ND STREET. IlIIIIAII . . 4TI-i STREET (EAST OF WASI-IINGTON AVENUE) FROM EA5T ROW LINE OF WASI-IINGTON AveNUE TO WEST ROW LINE OF OCEAN DRIVE. .. 2ND 5TREET - FROM EAST ROW LINE OF ALTON ROAD TO WEST ROW LINE OF ecEAN DRIve. .. 1ST STREET (l.LIEST OF WASI-IINGTON AveNUE) FROM INTERSECTION WITI-4 JEFFERSON AVENUE TO WEST ROW LINE OF WASI-IINGTON AVENUE. . 1ST STREET (EAST OF WASI-4INGTON AveNUE) FROM EAST ROW LINE OF WASI-iINGTON AveNUE TO WEST ROW LINE OF OCEAN DRIve. . COMMERCE STREET - FROM EAST ROW LINE OF ALTON ROAD TO WEST ROW LINE OF WASI-IINGTON AVENUE. . 50UTI-i FOINTE COURT - FROM EAST ROW LINE OF ALTON ROAD TO WEST ROW LINE OF WA~INGTON AveNUE. . COMMERCE COURT - FROM EAST ROW LINE OF JEFFERSON AVENUE TO WE5T ROW LINE OF WASI-4INGTON STREET. \ ~ \'\ .' . 11: I l \,\\ .'~rx!!' [t. '\\ \\!jP .! !.! ~,.,' \'o'.,'\ lful ,,'...<',..'<.1 1 \\~\\::::.:.__.j~~ i,_,~ji,'~,,:Jj i.. ~. . '\ '\ p\ " ".' ~ 17'" '': '\ \\ ..!~.,;:. i ,~ ~,"\.\ -, '..... i r \\. ..\. '\ \ , 1l Le. \>~\:\' ......'... ~ 1". ~. " ..""." ~ I'" '.zt~\\ '~;:.~H . iIj j': .\~i'\\.';>;>.' f i' \~\",., \'o~\\' '\\>\ ' \\\\ \'1 \\ \' \ -\\\ \\ "" \ \, \. ',\\,\, \,\ ',\ \ '. \\ . ..\\ \"1 \\\'\i '\ ('""f"- \\ \ ' '~,\ {, .' . \..\j 'o\ .\ ,,\, \\,'\\' \.\ \ \ \\ \ . \ . \\ \ . RDA RE5FON516LE FOR CONSTRUCTION 6ASED ON DEveLOPMENT AFFROvALS. Ii PHAli .. _ OCEAN DRIve - FROM 5OOTI-i ROW LINE OF STI-I 5TREET TO NORTI-I ROW LINE OF 5OUTI-I FOINTE DRIve. _ COLLINS AveNUE - FROM SOUTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF 5OOTI-i POINTE DRIVE. _ OCEAN COURT - FROM SOUTI-4 ROW LINE OF STI-i STREET TO NORTI-I ROW LINE OF 50UT1-4 POINTE DRIve. - COLLINS COURT - FROM 50UTI-I ROW LINE OF STI-4 5TREET TO NORTI-I ROW LINE OF 5OUTI-I POINTE DRIVE. . PH.lS! ~ - ALTON ROAD - FROM 5OUTI-I ROW LINE OF STI-I STREET TO INTERSECTION WITI-I 5OUTI-I FOINTE DRIve. - 5OUTI-i POINTE DRIVE - FROM INTERSECTION WITI-i ALTON ROAD TO EASTERN L1MIT5. ~=~ lO - I I 12000 Tas. H.",. Itlllt "nI.h M.. Jun 0 ... Oct No. O.c Jon ',. ","or I A>>r I ","oy Jun Ju 'uO ... Phase 1 W.d 1/2"" Thu 7/27/00 .. .; B.gln Construction Oocu...ntlltlon W.d I/2c/" W.d I/2C/" . m. Construction OOCu...ntallon W.d 1/2"" W.d "2"" 5/21 lIf2. I PorrnlUlng Wed'/1/" Thu 10/28/" III C' [. .:';:::::J 10121 : AdV.rtlse"'nt & Bidding Thu '130'" Thu 10/28/" .rn.:~1112' : Awerd I NTP PM 10/2"" PrlI1/121" 10/21 q--11112 around Br.aklng Man 11/11'" Man 11/11'" ., 11115 ConS1rUCtlon Tu. ff/1~'" Thu 7/27/00 l1f18 1f27 Phase 2 Man 11/1'" Prl 7/27/01 ~ B.g/n Surv.y Man 11/1'" Man 11/1'" . 11/1 Surv.y Man 11/1'" Man 1131/00 1111 1/:J1 BegJn Construction Dacu"..ntatlon Tu. 2/1/00 Tu. 211/00 ~2Jl ConstrucUon Docu".ntaUan Wed 212100 Man C/12100 , 2J2 1112 P.rrnlUlng Man 1/1/00 W.d 7/12100 : '" G..::....:~.;.:. . . l;,o':,,:-:::::J 7112 Adv.rtI.....nt & Bidding Tu. C/13/00 PM 7/14100 , 8I13~7/f. Award I NTP Sat 7/11/00 Tu. 7/21/00 111501/25 around Breaking W.d 7/21/00 W." 7128100 ., 112' ConsvucUon Thu 7/27/00 PM 7/27/01 j 1/21 '"-" ' , , : I Phase 3 Wed 7/12100 PM 12121/01 r ... B.gln Surv.y W.d 7/12100 W.d 7/12100 I "-1112 Surv.y Thu 7/13/00 W.d 10/18/00 7/13 Bagln Construction OOcu...ntallon Th u 10/1 "00 Thu 10/1"00 I ConstruCtIon OOcu...ntallon Pr110120/00 Tu. 3/lIJ01 ! 11120 P.l'rniUlng Tu. 1/1C/01 Man 4/2101 I AdVOrtls....nt & Bidding W.d 317/01 TU.4/3/01 AWard / NTP W.d 4/4101 W.d 4/18/01 r around Br.aklng Thu 4/1"01 Thu 4/1"01 ! Construction Prl 4/20/01 PM 12121/01 I : I : I I Phase 4 Man 4/2101 Tu. "3102 I a.gln Surv.y McIn 4/2101 Man 4/2101 Survey Mon 412101 Tu. 7/3/01 B.gln ConS1ructlon oocu...ntllUon W.d 7/4/01 W.d 7/4/01 ConstruCtIon OOCU"'n1lIllon Th u 7/1/01 Thu 11/11/01 P.rrnlUlng W.d "2C/01 PM 12114101 Adv.rtI.....nt & Bidding Prlff/1C/01 Tu. 12118/01 Awerd / NTP W.d 1211"01 W.d 1/2102 ! around Breaking Thu 1/3/02 Thu 1/3/02 I COnS1ructlon PM 1/4/02 Tu. '13/02 Phase 5 Mon 1213/01 Prl 4/18/03 B.gln Surv.y Man 1213/01 Mon 1213/01 I Surv.y Mon 1213101 Tu. 3/1/02 I B.gln ConS1ructlon OOcu...nlallon W.d 3/C/02 W.d 3/lIJ02 I Construction OOcu...ntllllon Thu 317/02 Mon 712"02 I P .l'rniUIn g Mon C/17/02 Thu 1/2"02 I Adv.rus....nt & Bidding Tu. 7130/02 Thu 1/2"02 Awerd / NTP PMI(3t1/02 Pr/ "13102 Oround Br..k/ng Man "15/02 Mon "15/02 Construction Tu. "17/02 Prl 4/11/03 'ProJ.ct: SOuth POlnte 1'- C.. -..:.;:) ...._ -- . -. .---.. _"1- ~-...--<> -..,.".--- ......- ===:J Date: Frl 9/24198 SOUTH POINTE MASTERPLAN PROJECT SCHEDULE 2001 2002 003 ~... .. Mor Apr ov Jun ';"1 'lIIS.PIOct No. 0.. ..... ~'b "Voir Apr May .Aln ~u I AUQ ."" ct o. .. ~... ... Mor Apr I I I I I I i I i I I i I I I I I I I I I I I ! I I I .;. -:.:- .". ':<<':-:':';':-. :- ' , I 7127 I i I I . I I I .... . .... . 311 1/1' 1...... , , "",1"" -.1 412 I 3fT ~U3 I .,. 0,411' I .,411_ I 4120 (." ' , - ." ... . , " ...... ... .....1 12121 . 412 412 113 I .. 714 71S . -... , , " , , " 11115 0121 ... . .... . " 12/14 11111 ~ ' , ':J, 12/1' 1211_ 0112 I ~113 I 1141 ' ' .... . ' , " , _13 I I . 12/3 12/3 ' ' ...' . ..... 315 ';311 3fT .... . ... .. ' , ... . 712_ 1/17 ' , ' , ' , ' I ' , ' , ' , ,"I 012_ 1130 ~ 012_ I 1130 ,,:1, 1113 I .., 1111 I I 1117 ' ' , , 41 ~ -