Loading...
329-99 RDA RESOLUTION NO. 329-99 A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AMENDMENT NO. 3 TO THE AGREEMENT BETWEEN THE AGENCY AND KIMLEY -HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT -TO-EXCEED $70,925.00, FOR SURVEYING OF PHASE II OF THE SOUTH POINTE STREETSCAPE WHEREAS, on January 20, 1999, the Chairmen and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an Agreement with Kimley-Hom and Associates, Inc. (the Agreement), to provide professional engineering and landscaping architectural services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, Staff has negotiated a not-to-exceed fee of$170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not-to-exceed fee, in the amount of$389,100, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26,1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of$103,800, including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington Avenue extension; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, Phase II surveying was scheduled to begin simultaneously with the completion of the ninety percent plan for Phase I; and WHEREAS, Phase II includes the following streets: (1) Lenox Avenue (from Fifth Street to Fourth Street); (2) Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second Street); (3) Euclid Street (from Fifth Street to Third Street); (4) Fourth Street (from Alton Road to Washington Avenue); and (5) Second Street (from Alton Road to Washington Avenue); and WHEREAS, in the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will need to be within 100 feet on either side of the intersecting north/south streets for Phase II construction documents, it has been included within Phase II survey services; and WHEREAS, the proposed not-to-exceed fee for Phase II is $ 70,925 with the following defined tasks: Phase II survey - $54,300 and reimbursements - $16,625 (consisting of geo- technical studies - $4,500, aerials - $9,625 and direct expenses - $2,500); and WHEREAS, the South Pointe Advisory Board voted in favor of the Phase II amendment at its meeting of October 14t\ 1999 and, accordingly, the RDA has negotiated an Amendment No. 3 to the Agreement. NOW, THEREFORE, BE IT DULY RESOLVED BY THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY, that the Chairman and Members of the Miami Beach Redevelopment Agency herein approve Amendment No.3 to the Agreement between the Agency and Kimley-Hom and Associates, Inc., for professional engineering and landscaping services, in an amount not-to-exceed $70,925.00, for surveying of Phase II of the South Pointe Streetscape. PASSED and ADOPTED this 20th day of October, 1999. ;f~AN ATTEST: t~\6 .P CU~ SECRETARY SR/CMC/ AR APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION ~iJ!:i.~q G~~~,.!".~, C0tH'1l''''! lq/:l-~/ ~, Dote \\CH2ISYSIDDHP\$ALL\AlexandraISouth PointelKimley Horn Phase II Survey AD3,doc Miami Beach Redevelopment Agency 1700 Convention Center Drive, Miami Beach, FI, 33139 http \\ci miami-beach,f1 us Telephone (305) 673-7193 Facsimile (305) 673-7772 MEMORANDUM NO. c:f=\ -~ '2.... TO: ChairJ11~n and Members of the Miami Beach Redevel pment Agency DATE: October 20, 1999 SUBJECT: A RESOLUT 0 OF THE CHAIRMAN AND THE MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY RATIFYING AMENDMENT NO.3 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., APPROVED UNDER RESOLUTION NO. 99-23073 FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES IN AN AMOUNT NOT - TO-EXCEED $70,925.00 FOR SURVEYING OF PHASE II OF THE SOUTH POINTE STREETSCAPE . FROM: Sergio Rodriguez City Manager ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. BACKGROUND On January 20, 1999, the City Commission authorized the Administration to negotiate an agreement with Kimley-Hom and Associates, Inc. The Administration negotiated a not-to-exceed fee of $170,760 for the preparation of the final master plan and opinion of probable cost for the entire project. The scope of services included in the initial phase of work. consisted of data collection and a review of existing documents resulting in the preparation of a master plan and surveying for the Phase I improvements. Amendment No.1 approved on May 26, 1999 included a not-to-exceed fee in the amount of $389,100 for the preparation of construction documents, permitting and bidding services for Phase 1. AGENDA ITEM 3A DATE 10-2.0-99 Amendment No. 2 approved on May 26, 1999 included a not-to-exceed fee in the amount of $103,800 included surveying, master plan design, preparation of bidding and construction documents and permitting for the W ashington Avenue extension. ANALYSIS In order to meet the time schedule prepared as part of the master plan, Phase II surveying was scheduled to begin simultaneously with the completion of the ninety percent plan for Phase I. Phase II includes the fonowing streets: . Lenox Avenue (from Fifth Street to Fourth Street); . Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second Street); . Euclid Street (from Fifth Street to Third Street); . Fourth Street (from Alton Road to Washington Avenue) and . Second Street (from Alton Road to Washington Avenue). In the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will need to be within 100 feet on either side of the intersecting north/south streets for Phase II construction documents, it has been included within Phase II survey services. The proposed not-to-exceed fee for Phase II is $ 70,925 with the following defined tasks: Phase II survey - $54,300 and reimbursements - $16,625 (consisting of geo-technical studies - $4,500, aerials - $9,625 and direct expenses - $2,500). The South Pointe Advisory Board voted in favor of the Phase II amendment at their meeting of October 141\ 1999. CONCLUSION The Administration recommends that the Chairman and the Members of the Miami Beach Redevelopment Agency ratify Amendment No. 3 to the agreement with Kimley-Hom and Associates, Inc. for a fee not-to-exceed $70,925. SR/C~/AR I\CH2\SYS\DDHP\$ALLlAlexandra\Soulh Pointe\Kimley Horn Phase II Survey AD3 doc RESOLUTION NO. 99-23375 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.3 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT-TO-EXCEED $70,925.00, FOR SURVEYING OF PHASE II OF THE SOUTH POINTE STREETSCAPE WHEREAS, on January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an Agreement with Kimley-Hom and Associates, Inc. (the Agreement) to provide professional engineering and landscaping architectural services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, Staff negotiated a not-to-exceed fee of$170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not-to-exceed fee, in the amount of $3 89,100, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of$103,800, including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington A venue extension; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, Phase II surveying was scheduled to begin simultaneously with the completion of the ninety percent plan for Phase I; and WHEREAS, Phase II includes the following streets: (1) Lenox Avenue (from Fifth Street to Fourth Street); (2) Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second Street); (3) Euclid Street (from Fifth Street to Third Street); (4) Fourth Street (from Alton Road to Washington Avenue); and (5) Second Street (from Alton Road to Washington Avenue); and WHEREAS, in the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will need to be within 100 feet on either side of the intersecting north/south streets for Phase II construction documents, it has been included within Phase II surveying services; and WHEREAS, the proposed not-to-exceed fee for Phase II is $ 70,925 with the following defined tasks: Phase II survey - $54,300 and reimbursements - $16,625 (consisting of geo- technical studies - $4,500, aerials - $9,625 and direct expenses - $2,500); and WHEREAS, the South Pointe Advisory Board voted in favor of the Phase II work at its meeting of October 14th, 1999 and, accordingly, Staff has negotiated an Amendment No.3 to the Agreement; and WHEREAS, the Executive Director and RDA Staff will herein recommend that the Mayor and City Commission ratify said Amendment No.3 to the Agreement. NOW, THEREFORE, BE IT nUL Y RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein ratify Amendment No.3 to the Agreement between the Miami Beach Redevelopment Agency and Kimley-Hom and Associates, Inc., for professional engineering and landscaping services, in an amount not-to-exceed $70,925.00, for surveying of Phase II of the South Pointe Streetscape Area. PASSED and ADOPTED this 20th day of October, 1999. .. '. ~YOR ATTEST: . ULLLl Y PCCLLQL----- CITY CLERK APPROVED p.s TO FOPl" & LA.NGU}..GE 8.~ FOR EXECUTiOi'-,l 1iIvit!l1tiL/ (U/11 SR/CMCI AR \\CH2\SYS\DDHP\SALLWexandra\South PointelKimley Horn Phase II Survey AD3,doc ItITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMIBEACH, FLORIDA 33139 tlp \\ci miami-beach fI us :- - - COMMISSION MEMORANDUM NO. I q 1-1'1 TO: Mayor Neisen O. Kasdin and Members of the City mission DATE: October 20,1999 I I I I I FROM: Sergio Rodriguez City Manager SUBJECT: A RESOL ION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO. 3 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., APPROVED UNDER RESOLUTION NO. 99-23073 FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES IN AN AMOUNT NOT-TO-EXCEED $70,925.00 FOR SURVEYING OF PHASE II OF THE SOUTH POINTE STREETSCAPE I I ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. BACKGROUND I On January 20, 1999, the City Commission authorized the Administration to negotiate an agreement with Kimley-Hom and Associates, Inc. The Administration negotiated a not-to-exceed fee of $170,760 for the preparation of the final master plan and opinion of probable cost for the entire project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a master plan and surveying for the Phase I improvements. I M I I I - Amendment No.1 approved on May 26, 1999 included a noHo-exceed fee in the amount of $389,100 for the preparation of construction documents, permitting and bidding services for Phase 1. Amendment No.2 approved on May 26, 1999 included a not-to-exceed fee in the amount of $103,800 included surveying, master plan design, preparation of bidding and construction documents and permitting for the Washington Avenue extension. AGENDA ITEM ~ :J G DATE b-w-cr9 I r 543 ANAL YSIS In order to meet the time schedule prepared as part of the master plan, Phase II surveying wa~':;j,;~ scheduled to begin simultaneously with the completion of the ninety percent plan for Phase L ~ Phase II includes the following streets: . Lenox Avenue (from Fifth Street to Fourth Street); . Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second Street); . Euclid Street (from Fifth Street to Third Street); . Fourth Street (from Alton Road to Washington Avenue) and . Second Street (from Alton Road to Washington Avenue). In the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will need to be within 100 feet on either side of the intersecting north/south streets for Phase II construction documents, it has been included within Phase II survey services. The proposed not-to-exceed fee for Phase II is $ 70,925 with the following defined tasks: Phase II survey _ $54,300 and reimbursements - $16,625 (consisting of geo-technical studies - $4,500, aerials - $9,625 and direct expenses - $2,500). The South Pointe Advisory Board voted in favor of the Phase II amendment at their meeting of October 14th, 1999. CONCLUSION The Administration recommends that the Mayor and City Commission ratify Amendment No. 3 to the agreement with Kimley-Horn and Associates, Inc. for a fee not-to-exceed $70,925. SR/C~/ AR \\CH2\SYS\DDHP\SALL\Alexandra\South pointelKimley Horn Phase II Survey AD3 doc 544 II AMENDMENT NO.3 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY, FLORIDA AND KIMLEY-HORN AND ASSOCIATES, INCORPORATED, FOR PROFESSIONAL ENGINEERING AND LANDSCAPE ARCHITECTURAL SERVICES FOR SURVEYING OF PHASE II OF THE SOUTH POINTE STREETSCAPE This Amendment No.3, dated as of Oc~~1A (7J..U , 1999, to that certain Professional Services Agreement (Agreement), dated February 17, 1999, by and between the Miami Beach Redevelopment Agency (RDA), Florida and Kimley-Hom and Associates, Inc. (Consultant). RECIT ALS WHEREAS, the Agreement provides for the preparation of the final Master Plan for the South Pointe Redevelopment Area Project; and WHEREAS, this Amendment No.3 to the Agreement provides for surveying Phase II of the South Pointe Streetscape; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, Phase II surveying was scheduled to begin simultaneously with the completion of the ninety percent plan for Phase I; and WHEREAS, Phase II includes the following streets: (1) Lenox Avenue (from Fifth Street to Fourth Street); (2) Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second Street); (3) Euclid Street (from Fifth Street to Third Street); (4) Fourth Street (from Alton Road to Washington Avenue); and (5) Second Street (from Alton Road to Washington Avenue); and WHEREAS, in the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will need to be within 100 feet on either side of the intersecting north/south streets for Phase II construction documents, it has been included within Phase II survey services; and WHEREAS, the South Pointe Advisory Board voted in favor of the Phase II amendment at its meeting of October 14th, 1999 and, accordingly, the RDA has negotiated this Amendment No.3 to the Agreement. 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.3. 2. MODIFICATIONS The Agreement is amended as follows: Exhibit "A", entitled "Scope of Services/Fee", is amended to add the work attached hereto and incorporated herein as Exhibit "A-I" of this Amendment. Exhibit "C", entitled "Schedule", is amended to add the schedule attached hereto and incorporated herein as Exhibit "C-l " to this Amendment. 3. OTHER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The RDA and Consultant ratify the terms of the Agreement, as modified by this Amendment No. 3. IN WITNESS WHEREOF, the parties hereto have caused this Third Amendment to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: MIAMI BEACH REDEVLOPMENT AGENCY ~{~ fa~~~~~~E By: & FOR EXECUTION SECRETARY 1/;/ /JfIJidL .U"1~9J7 RedeYelopment Agency Date Geneml Counsel m CHAIRMAN SEAL CONSULTANT: KIMLEY -HORN AND ASSOCIATES, INC. By: ATTEST: \\CH2ISYSIDDHP\$ALLWexandraISouth PointelKimley HornlKimley Horn PllAD3 AMD.doc ~=n Kimley-Horn and Associates, Inc. Exhibit A, September 24, 1999, Page I Exhibit "A .1" SCOPE OF SERVICES Task 1 - Survey Services Kimley-Hom and Associates will provide the following survey services: a) The consultant will place and locate 11 aerial targets for use in providing Raster aerial imagery. The aerial targets will be set at the locations as specified by the photogrammetist. b) Ground control (horizontal) will be established along Second Street, Fourth Street, Fifth Street, Lenox A venue, Michigan A venue, Jefferson A venue, Meridian A venue, and Euclid A venue corridors. Additional control will be required in the future for the development of other roadway corridors. c) A centerline of construction will be calculated for Second Street, Fourth Street, Fifth Street, Lenox Avenue, Michigan Avenue, Jefferson Avenue, Meridian Avenue, Euclid A venue and Alton Road. Minimal right-of-way and/or property monuments will be located. A bench level run will be performed and bench marks will be set along the Second Street, Fourth Street, Fifth Street, Lenox Avenue, Michigan Avenue, Jefferson Avenue, Meridian Avenue, and Euclid Avenue corridors. The elevations of the bench marks will reference the local- Miami Bay Datum. These bench marks will be set outside the limits of construction (where possible), and referenced by station and offset to the center line of construction. d) A field topography survey (survey points only) will be performed along the existing roadway corridor (Second Street, Fourth Street, Lenox Avenue, Michigan A venue, Jefferson Avenue, Meridian Avenue, and Euclid Avenue). The survey limits are to the buildings or to 10 feet beyond the right-of-way (whichever comes first), subject to accessibility. Survey limits of Fifth Street are the south one-half of the roadway. Trees, street signs and driveway profiles will not be surveyed. e) The location, pipe size, rim and invert elevations will be obtained for accessible drainage structures and gravity flow sewers within the existing roadway corridors (Second Street, Fourth Street, Fifth Street, Lenox Avenue, Michigan Avenue, Jefferson Avenue, Meridian A venue and Euclid A venue). Confined space entry surveys of structures will not be performed. t) The above ground (surface) utilities associated with underground utilities (such as valves, meters, fire hydrants, etc.) will be located. g) Field surveys will be suitable for preparing engineering and construction drawings. ~=n Kimley-Horn and Associates, Inc. Exhibit A, September 24, 1999, Page 2 Note: All references to survey associated with Fifth Street are limited to the south half of the roadway. All references to survey associated with Alton Road are limited to the locations of intersecting streets at this time. Task 2 - Reimbursements a) Kimley-Hom will have geotechnical data gathered consisting of five (5) percolation tests and three (3) pavement cores within the project area. The percolation test will be performed in general accordance with the Usual Open-Hole Constant head procedures suggested by South Florida Water Management District (SFWMD) to a depth of 15 feet to provide data required for drainage evaluation at the subject site. b) Kimley-Hom will have professional photogrammetric services flown including aerial photography, aerial triangulation, and raster imagery (Descartes format). Task 3 - Additional Services Upon your authorization, we will provide any additional services that may be required beyond those described in Task 1. These services may include but are not limited to such items as the following: a) Preparation of right of way acquisition sketches or descriptions. b) Construction Documentation for Phase II through V c) Conducting subsurface geotechnical investigations. d) Providing construction phase services. e) Making traffic counts or undertaking other traffic related analysis. t) Traffic signal plans. ~=n Kimley-Horn and Associates, Inc. COMPENSA nON Exhibit A, September 24, 1999, Page 3 We will provide the services described above for the lump sum amounts (not including direct expenses) outlined below. Task 1 2 2-a 2-b 3 Description Phase II Survey Reimbursements Geotechnical Aerials Direct Expenses Subtotal reimbursements (for budget purposes) Total authorization Additional services Lump Sum Fee $54,300.00 $4,500.00 $9,625.00 $2,500.00 $16,625.00 $70.925.00 as requested S:\SMINGONE\ Word Docs\South Pointe\contracts\surveyphaseII.doc ~=n Kimley-Horn and Associates, Inc. Exhibit 8, September 24, 1999, Page 1 Exhibit II C-1" SCHEDULE We will provide our services in an expeditious and orderly manner to meet the schedule mutually agreed to by the Client and the Consultant for the various elements of the project. I .------,,.?/ -- J:;'I r { I .... ----'/li1 1\' ,. 'I ::,., ".. ',',), / i .' , '/1 .'f., r LI !.l I~~ L !! ! '[ '. ," />:~f i:' _//I} . !; . I;: I!i I ,. '1 I' II !! / . . , I '. II I . . . It! ! "h ~ . i 1/ I! III! II i! L JL2:J ~ ~.I.: ". t /! /" ,'(i ;117 --=:~ Q..,_..;,;J L.:...-:!,1 :::. .-~,~~ ;.., ~_ ,~;_...!, d J ~ If" -.- "'fi I r- . -,r " - ~I I ':'., '~):')rl' --.....,~L.!"'" ~! -1~~'li ' i i' "11 _ !'.' ,'; ,~ (_ , .", II '.' It . . - ". 1 rt t . / , _ _ i:m I 'I II I", - I, . - .Ii' . , '. . . I !ill " II> Ii .' . / , i "" - ~ ~ I. . - i 19 I', I r '! __ - . _ , . , I!, . If /-.. " ..' . , .-<t!, :. -- .,rl' ~~ '. '\;ii. J '/...., /!~ . Ii _ -/1U1 . .'" ,h! ,," iai ,,_, '-!-i', '" ii":" !fT/'''''ii' ",;i." " _' l~:~ ~! . ilojl '. II "': I ~ ,'- - 'ii:':::>/12J/:<:i('~':'- !/o!f. ::,' :~" ";"<'ll!I~'I!I.. c". .. '!I!l" :.~.~.~~~ i..' '~.ii'''''._.,-, / ";'. -. .._.,..I-J/lh.".... _. ., !1.2'1- J. . _.'" It . . - ~ .~- " -.., J -.' .It.. "ir1/'",~. !I...., II "fl_.," " '," ," "-'\11-" <>'" . 1'1 ,H ':..-:... c ... ::..1;' '-j-(JI.r~:':!..:/i'.-.! './'8, .,.,.'__.. ""1-___" ~:- r____"'_ -----_ '/. "-"0' --""-~'''' -'- ._= '-31"O-~~=___. !-...._=_.-...........,'... 1.&oC.. .,h~_:.-., ;! _ ---. -;;..-..-....-....::-7~ ~ . . '. .1 1- 1, -::" -""-,, -', .. -.,..~~.... ~ /(/7 r' _ r 1'"""1 LcL;~r~; T f:i;3! ~~i;-;c;;~ifi ';J!,!I'1 !!!",:, ..:........,...............:.,.:.,.. .,"......."...,...._. .......'.. ',...,..'!!!." i'!'t l......c... '.,., ...:...... ;;,...,...... ..... ..... .':...... ........ .'.'."" '.i:,. ......c......,., ....~ ~i", i. H_; t"C1f.;';!j t:~,~i c q ..c. .... .... ... !-.i.~... ';..0.;. ~if'~J~" Ji,,;: l~;~0 I ~~;;:ii ',f' / T. .. ~,.~.. ~J J!":".~":.,,,,.JI /! ~ ..... '~~. ....... . ",. ,,- 7 ( ii'::~:i::;-i / ..!/ /! ..... 'i';'y,~~rL.<.., c, ! /' :1 E 'j x~s~ ~{ii1}~ ~ . -.'. 'i II .. """'." /1 k ,. . t:, ,)t:. :;// If' .....JtE}~:~;!7 {~.;~.., ;;...~ ' ", -. '! I;., - /... ",/ j,. '. ", ~-I.'.'-'-~,,;l1j!, 0, ~(~::i!!J;:iil /". _; c .,.. 1.-",:.;) , \.\., ". J :~~~;;:~. [.:;:;fE::/' /f?!jr;;J~V ' '\ ~ / . "..,1 b~""1 I ; i- H,;.,! I; \'~ ,-, 'noaT - : !t'i\,il If /!-~TJ; / \ '. ~- . ,..--.. f.-... ~'- / ;' . - '( i! '~>\:~\\\,>\~\\. r.".~:;,..';.' ;r....':-._._\/', ;:.,-;-// r/ / i // il! \L" . L...!: !/., _. 'ii' .)\ II i ~':"'-::::=:=:=::, '<''''_.11 if i 'L . ~ I '1,' 'I 'I i r--'- ,'. ". . ", I. i i. J ^ L . _ _ _ _ .i:.:c:1L._.....!? (j, '-' --'~iU/ ";i'l J -'--. I II '.. :_--- ---~114~.__.__. ___ ~._. ~TH ~T'RE:T U RESOURCE GROUP U R B A I' 104.11 III ISSle II! ! l, II ~ I II1ISIII II ClIl! LAIAIIl teIilWM PUIIIrJ l.AlIl9C.\PE ~ m~ 11111' IIUllUCl nOl11& 11111 III LI~o.~..-n.!... _ -.c... _ ._ _ n K:mley-~cm ~ _ L,J ar,d r\.ssec:ales, Ire. .- TER ZTIlERX & CO.MP.-\.'IY DUANY PLA - c as - A. .. G) .. (I) cae :I~ c>>~ ..II. C - .- .c 00 A.: .em .. .- ::sE o.! CI):II! ~ l' - JaO .... 0.- e, ~e, 0.. -- lI4Q2ZS75 IlPC SIll f1~ - .. ... ,..., iii _ '""... -:......._ ... ......_ 4 ...~ ... 4 .. ~ ......_1_......-_...... =..---- ....-- .___M._ . c: as - At at c: I- f#) as .c At !'mI SOUTH POliTI 11RIITICAPI PHAIIIIG PI.AII . PHASE 1 . 3RD STREET - FROM EAST ROW LINE OF MICI-IICrAN AVENUE TO WEST ROW LINE OF CCEAN DRIvE. . WA...-'oj..IlNUTON AVENUE - FROM 50UT14 RCUJ LINE OF 5T14 STREET TO NORTI4 ROW LINE OF 5CtJTI-I POINTE DRIvE . PLAZA AT INTERSECTION OF 3RD 5TRE:T AND WASI-lINCrTCN AVENUE. II P~~~~X2AVENUE _ FROM 5OUT14 ROW LINE OF 5TI-l STREET TO NORTI-I ROW LINE CF 4TI-l STREET. - MICI-IICrAN AvENUE - FROM SOUTI4 ROW LINE OF 5TI-l STREET TO NORTI-I ROW LINE OF 2ND STREET. - JEFFERSON A vENUE - FROM SOUTI-I ROW LINE OF :; TI-l STREET TO NORTI4 ROW LINE OF 2ND STREET. - MERIDIAN AvENUE - FROM SCUTI4 ROW LINE OF 5T14 STREET TO NORTI4 ROW LINE OF 2ND STREET, . EUCLID AVENUE - FROM SOUTI4 ROW LINE OF 5TI-l STR:E:T TO PLAZA AT INTERSECTION OF 3RD STREE:T AND WASI-lINCrTCN AvENUE, . 4TI-I STRE:T (WEST OF WASI-IINCrTON AvENUE) FROM EAST RCW LINE OF ALTON ROAD TO u"'EST ROW LINE OF WASI4INCrTCN AvENUE. - LENOX COURT - FROM SOUTI-l ROW LINE OF 5TI-l STREET TO NORTI-l ROW LINE OF 4TI-I STREET. - MICI-IICrAN COURT - FROM SOUTI-I ROW LINE OF 5Tl-i STREET TO NORTl-i ROW LINE OF 2ND STREET. - JEFFERSON COURT - FRCt1 5OUTl-i ROW LINE OF 5TI-l STREET TO NORTl-i ROW LINE OF 2ND STREET. - EUCLID CCtlRT - FROM 5OUTl-i ROW LINE OF 5TI-I STREET TO NORTI-l ROW LINE OF 2ND STREET. II lUll . . 4TI-l STREET (EAST OF WASl-iINC:.TON AvENUE) FROM EAST RCW LINE OF UJASl-iINC:.TON AVENUE TO WEST ROW LINE OF OCEAN DRIVE. I. 2ND STREET - FROM EAST ROW LINE OF ALTeN ROAD TO WEST ROW LINE OF ~EAN DRIVE. I. 1ST STREET (WEST OF WA~INCrTON AVENUE) FROM INTER-9:CTION WITI-l J~R5CN AVENUE TO WEST ROW LINE OF WAel-ilNUTON AvENUE. . 1ST STRE:T (EAST OF WASl-iINCrTON AvENUE) FROM EAST RCW LINE OF WASl-iINC:.TON AVENUE TO WEST ROW LINE OF OCEAN DRIVE. . COMMERCE STREET - FROM EAST ROW LINE OF AL TeN ROAD TO WEST ROW LINE OF WASI-lINc:::.rON AVENUE. . SOUTI-I POINTE COURT - FROM EAST ROW LINE OF AL TeN ROAD TO WEST ROW LINE OF UJA5I-lINCrTCN AvENUE. . COMMERCE COURT - FROM EAST ROW LINE OF JEFFERSON AvENUE TO WEST ROW LINE OF WASI-lINCrTCN STREET. I RDA RESPONSIBLE FOR CONSTRUCTION BASED ON DEvELOFMENT APPROvALS. Ii PH.lS! 4 - OCEAN DRIVE - FROM SOUTI4 ROW LINE OF 5TI-l STREET TO NORTI-l ROUJ LINE OF SOUTl-i POINTE DRIVE. . COLLINS AVENUE - FROM 5OUTI-l ROW LINE OF 5TI-I STREET TO NORTI-l ROW LINE OF 5OUTI-l POINTE DRIVE. . OCEAN COURT - FReM SOUTI4 ROW LINE OF 5TI-l STREET TO NORTI-l ROW LINE OF 50UTI-I POINTE DRIVE. . COLLINS COURT - FROM SOUTl-i ROUJ LINE OF 5TI-l STRE:T TO NORTI4 ROW LINE OF SOUTI-l POINTE DRIVE. . PH AS! a - ALTON ROAD - FROM 5OUTI-I ROW LINE OF 5TI-I STREET TO INTERSECTION WITI-I 5OUTI-I FOINTE DRIvE. . 5OUTI-I FOINTE DRIVE - FROM INTERSECTION UJITI-l ALTON ROAD TO EASTERN LIMITS. ~ \\ \. 1~~: H rl~ \\ ' ' \ ~ I~j i . ,i!:" 1 i \ ~ l!::_._.JL.,'_.!J L \\ ~._.- . .,' ",4] rr=--- '\ \ ; i~ Ii' \'. . \ ~ o;:\\~\\:~.,.. ~ ~I<. \ \ \\ '<{ . ';~~~~~~JL 1J[~ \~ \', : ";,,.. -. - \\v.: \~... .\~ \\. l '\~:\ \ \ r \\'\\ "'",,, r. ,; \\ \' \ .,<\ \\ I' . \~'::;.\~,\ ~ - (: \~,':\\\.J fJ.~- .. \ '\ \::';: '\ '\\' ~ \~\{". "\\) \~. ,. (\ ., \ -,\\\" '.\\\ \\ \, .~\ " \ \ \. \. I ~J,' J,:, : L1 ,B. ',',! [! .'"~~ : L! ':~;JL:f!';.;1 Ir I, ! ! " ! . I I' It " '.' I t' "I, .'-; t .., r 1/ {' , . '..J L '..i.iL'- 'j t,:. 'jb.,~.'j i.. {, I,', j,- !",,!i f' I; , -.-. ,- '-' ,_. ,-. J '~. .' /' !I i' '!I I' J' ~., } :~I;-:~ 2?:""l: ". ! i:'.' :.1;' . j' j." ',,:"'; , :'.;! ~,;' ii: :'.i , (.~o ..:', I ;~ ,,'.!., "il j"',':;'Y. , ..".. ,.. '^ 1- ., . '. I 1"....~It....,. I '., t.., """".'-) 'n)l:"""-;'::"" .-<(. ;',..'. . . 0 - I' I,. ' ", 'r' ,14 ,. . . I I :' It. I I I' I -, t . i - 'I~ I' .' . j, .'" i.,.',"ii' i i ii.,'.~:..idii.} r ,'!~"-:f I{,. ',,;i":",IULt- , '. " " . _ . .," _ ~ '. " ,.' J. '. -' { " .. -- . OC -- ,'.. I ~ / I, "{ ,.,.. " . I ,,'... ,,' .','wl.' II-""','!!!". ""II" ,.... ~~ ij'<""'.11('" ..Ii,..,.. 'ifif .. " .' _ -;-;'j '"ii,'; ""jj^~':::'/i I:j. - '.li:/';~'~'1 ~ {,'~,c;":ii,.:,.:.':'!I.Jli>~:.,.,::>,j!:,;'-.:' !Cl~:.;: ;,:,.-.-- ,,'~' ~_... ....._......... _,,,, .... _....... _... v I '. ". " 'l/~/; "'/1 h {iflr- ". -- " " .' .'_,~ ~-_-.....-....-=-_-::-~ ~I~_~~:f!:-.:-> .~',J.;:..::J...!... 'i{iJl,' i/~\:'Jllili~~'.'~~~;':~'i"': ! I .11- .:." I. ..Il .' I i{.......~. ~--'--!..J(., "<.":",181. .,.'.. ,',' '. ' :: ~;J l B / : ~.~ L..~..:: H . ;. ,I =- ~ t!'" ,; ';-{~!~:~'~7-?' ~~~: -~-j' tr . ; . . - . . - .. _ .. .... 2' ,,~ .. "} It - -;..... ~ t: -"4:..1 ,,~-- - I '-'. , . !! :::.:::') ! _, !!.-::.. , ~ ;::-,:":'!!:,;,..;.! i.::;.;:: '!!,' .- ',-;)0; I '. II, ': ,~-,:I I ::<',It~ --:, 'oj Ig) I ~;.. ~ J I<':"''-~;'! i',~" :" !! , '::1 I' ,! i :<:,;,;"ir;~>;:i i.'-;::'.~'ii_ ::__"" 11,;"" .'f; '!; -" "!! !/ If I ! :~:.. : ';!!. ~.":.-~ ~ ! < ~'~ j L ;:-:> J / :," ! !c2:" : ,j ;-[," // ' IJ / .'::t.-'~~ · "~_"'~'''_~:;;, ~ jkf,?~~.N !f / . ~ I' '."". I t, ;".." if 'I / ".,'"..,-- ~~ ,:- ',Y" , t:~:1ll;J'~U~;H _ . .f{ elL../; If - ! !:it'! f *'r;;;~;" c-'-'-'-'-M 'M'-'; J.,. ....H'.',../I II .... lb..... il I.~ ' . .. T 81 I ::....:~ )1"''-- )itji.~':Yf j!;~i';'" ~~( !!~~~/ #~fj*f;i'l!f!!'l";'~r;\;; \\ .~\ CC'l""I"1ERCE ~~ I !!. . . i /; ii' .; {/ 1/ \\ ~\ rL"'-::'-"~-:-'-'--;-'" ,,i-,,;. /t . 0-;/;// . /! '\'} 1:' . 1\/ ill r=:=l=~l=l=:~~ . t...::;;~.// dl:/ . /./....1/),1/ I l {,',':: '>.. . (t'; It .' I , ~! lJ ~ _._._ _._._ _J 'l'::,,:'L,JL i .;..ii. .J.. i .' '. .. 1,[ -~ ._, l:'-'- -'-'~UI""-'-'-'-'-'-'-'- l!o(;UTI1 ~"" ~ ~ l.-.._._,_. -. -. _. _,_~, ,r;:;::7 '. "_' _'_'_'_"._.I._"~'_'_'_'_'_'_'_'_' _,_, _, _'_ URBAN RESOURCE GROUP 11"11101 If IllltH.III.. llleelll!~ II~ lRAIlll8B.lABll' PlNIIII I.NIl9CAfE .w:HE1UE !IE WPICl III LlleGUIGU.UITI au. lUll tuea FUIIU IlIU ......,.. .0. W"f .... ........... II?W _ ",., _ n Kimfey-Hom ~ _ '--.J and Associates, Inc, DUANY PLATER-Zl'BERK. & COMPAi.'IT' c as - A. .. CD .... en as'" .~ .. ..s ....11. C - c:: .- .I: 00 '" - A.'" At . .em at c:: .... .- .- :IE II) o.! '" .I: en. A. ....... l' - NT8 JaIl*' lI4ClI2:ZSJS 0.- Br IlPC ~Br 8M Dolo fl,J,/Hl//ll - ... =- ~~~o:::..-:.~'::: =:::.:......:.-~ ~:= .,II1II-.....-.......- ... IOUTH POliTI ITRIITICAPI PHAI.la PLAN . PHASI! 1 _ 3RD STREET - FROM EAST ROW LINE OF MICI-IICsAN AVENUE TO WEST ROW LINE OF OCEAN DRIve. _ W~INCsTON AveNUE - FROM SOUTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF SOUTI-I POINTE DRIve _ PLAZA AT INTERSECTICN OF 3RD STREET AND WASI-IINCsTCN AveNUE. . PHAI. 2 . LENOX AVENUE - FROM SOUTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF 4TI-I STREET. _ MICI-IIC:sAN AvENUE - FROM SOUTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF 2ND STREET, _ JEFFERSON AveNUE - FROM SOUTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF 2ND STREET. . MERIDIAN AveNUE - FROM SCtiTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF 2ND STREET, _ EUCLID AvENUE.. FROM SOUTI-I ROW LINE OF STI-I STREET TO PLAZA AT INTERSECTION OF 3RD STREET AND WASI-IINC:sTCN AveNUE. _ 4TI-I STREET (WEST OF WASI-IINCsTON AveNUE) FROM EAST ROW LINE OF ALTON ROAD TO WEST ROW LINE OF WASI-IINGTCN AveNUE. _ LENOX COURT - FROM SOUTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF 4TI-I STREET. . MICI-IIC:sAN COURT.. FROM SCtiTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF 2ND STREET. . JEFFERSON COURT .. FROM SOUTI-l ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF 2ND STREET. _ EUCLID CCtiRT - FROM SOUTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF 2ND STREET, II PUll . . 4TI-I STREET (EAST OF WASI-IINCsTON AvENUE) FROM EAST ROW LINE OF WASI-IINCsTON AVENUE TO WEST ROW LINE OF OCEAN DRIVE. e. 2ND STREET - FROM EAST ROW LINE OF ALTCN ROAD TO WEST ROW LINE OF <SlCEAN DRIVE. e. 1ST STREET (WEST OF WASI-lINCsTON AVENUE) FROM INTERSECTION WITI-I JEFFERSON AVENUE TO WEST ROW LINE OF WASI-lINCsTON AvENUE. . 1ST STREET (EAST OF WASI-IINC:sTON AVENUE) FROM EAST ROW LINE OF WASI-IINCsTON AVENUE TO WEST ROW LINE OF OCEAN DRIVE. . COMMERCE STREET - FROM EAST ROW LINE OF ALTON ROAD TO WEST ROW LINE OF WASI-IINCsTON AvENUE, . SOUTI4 POINTE CCtiRT - FROM EAST ROW LINE OF ALTON ROAD TO WEST ROW LINE OF WASI-lINCsTCN AveNUE. . COMMERCE COURT - FROM EAST ROW LINE OF JEFFERSON AvENUE TO WEST ROW LINE OF WASI-IINC:sTON STREET, \, i \\\ \ , ,,",J 11: ,II ' l \\" '\ ~-_.X .. '..' ',\ ,\! 0 .Y ,-,', ,! ~",' \~\ ~:_, __.J ~ l. _,~.'J F,~'.',cd L \\. '\ -, \:'::-\;, "", '\\\\:,' :~...., \it;~~~:;;,;r~{';; .~~ \\ ",'''''-' \~~ \~,;i~::.." " \\ \\1\, \ \\, " ,( \~~:~\ \\ . '\'\\ \\ \\\'o\-, \\ \' \ -:\\\ \\ '\ \ \ \: \\ \ \ ,\ \\\\ \\ ~. '~.:>\\\' .! \'o \, \\ I .;i;. '\ ~ \, \ \\\{, '\'\\ \0. ',\ {\ \\ '\\\ \\\\ \\ \ , \ - \\ , e RDA RESPONSI6LE FOR CONSTRUCTION eASED ON DEveLOPMENT APPRovALS. Ii PHASi .. _ OCEAN DRIve - FROM SOUTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF SOUTI-I POINTE DRIve. _ COLLINS AvENUE - FROM SOUTI-I ROW LINE OF STI-I STREET TO NORTI-I ROW LINE OF SOUTI-I POINTE DRIve. _ OCEAN COURT - FROM SOUTI4 ROW LINE OF STI4 STREET TO NORTI4 ROW LINE OF SOUTI-I POINTE DRIVE. - COLL INS COURT - FROM SOUTI-I ROW LINE OF 50 TI-I STREET TO NORTI4 ROW LINE OF SOUTI4 POINTE DRIVE. . PHASE ! - ALTON ROAD .. FROM SOUTI-I ROW LINE OF STI-I STREET TO INTERSECTION WITI-I SOUTI-l POINTE DRIVE. - SOUTI-I POINTE DRIve .. FROM INTERSECTION WITI-I ALTON ROAD TO EASTERN LIMITS. ~=n ro -- I I ,2000 TUk N....... ..... ""nf_h May , Jun .... ... Oct fiolt' I Dee Jon '.. ~... All, May Jon Jo Au. I.. , Phase 1 Wad 51281" Thu 7/27100 ~ :::; Bagln Construction Documentatfon Wad 51281" Wad 5128/" . $/21 , Construction Documentatfon Wad 5I2C/S, Wad 5IU/" 5121 . .'. .-'. 8121 I ParnWlang Wid '11", Thu 10/28/" 811 c...:~. . _,o..:':::::} 10121 , Advartfsament & Bidding Thu '130/" Thu 10/28/" I~ C::::S;10121 Award INTI' I'rtl0/U/" I'rll1/12/" '0121 b, '1/12 around Braaklng Mon 11/1''', Mon 11/1''', ., '1/15 Construction Tua 11/1$'" Thu 7/27100 l111e 7127 Phase 2 Mon 1 fll'" I'rl 7/27101 ~ Bagln Survay Mon 11/1", Mon 11/1'" .'111 Survay Mon 1111'" Mon 1131/00 11/1 1/:11 Bagln Construction Documentation Tua 2/1/00 Tua 2/1/00 +,211 Construction Documentatfon Wid 2/2/00 Mon $/12/00 , 212 1/12 "arnWlang Mon 511/00 Wad 7112/00 511 . . . . . . . . . 7112 Advartlsament & Bidding Tua 8/13/00 I'rt 7/14/00 , 1113 ~111' Awanll NT,. Set 7/15/00 Tua 7121/00 11150,7125 around Breeklng Wad 7/U/00 Wad 7/2$/00 "'1121 Construction Thu 7/27100 I'rt 7/27101 7127 : , ! Phase 3 Wid 7/12/00 I'rf 12/21/01 i ... Begin Survay Wad 7/12/00 Wad 7/12/00 ! "'-1112 lIurvlY Thu 7/13/00 Wad 10/18/00 ! 7f13 Bagln Construction Documentation Thu 10/15100 Thu 10/1S/00 : f Construction Documentatfon I'r110120/00 Tua 3/8101 : I 1012. "arnwtllng Tua 1/1$/01 Mon 4/2/01 I Advartlsament & Bidding Wad 3/7/01 Tua 4/3/01 Awanll NT,. Wad 4/4/01 Wad 4/18101 I around Braaklng Thu 4/15101 Thu 4/15101 T Construction 1'" 4/20/01 1'''12/21/01 : I : Phase 4 Mon 4/2/01 Tua 513/02 aagln lIurvay Mpn 4/2/01 Mon 4/2/01 : lIurvay Mon 4/2/01 Tua 7/3/01 : Bagin Construction Documenlatlon Wad 7/4/01 Wad 714/01 Construction DocUmentatfon Thu 7/1/01 Thu 11/11/01 "arnWlang Wad S/28/01 I'rf 12/14/01 Advartlsament & Bidding 1"'11/1$/01 Tua 12/18/01 Awanll NT,. Wad 12/15101 Wad 1/2/02 ! around Breeklng Thu 1/3/02 Thu 1/3/02 Construction I'rf 1/4/02 Tue S/3/02 Phase 5 Mon 12/3/01 I'rl4/18/03 I Bagin Survay Mon 12/3/01 Mon 12/3/01 Survay Mon 12/3101 Tua 3/1/02 I Bagin Construction Documenlatlon Wad 3/8/02 Wad 3/8102 i Construction Documentatfon Thu 3/7/02 Mon 7/25102 I "arnwtllng Mon $/17102 Thu 8125102 Advartlsament & Bidding Tua 7130/02 Thu 8/25102 I Awanll NT,. I'rf 8/30102 1'" 5113/02 ! (Jround Braaklng Mon "1"02 Mon 5118102 I Constractlon Tua 5117/02 1'" 4/18/03 I IP'oJ_' SOUln POInt. /.. c::::::::l "__ -- . "- ~_~f_ c::::::::::5 ............... 0 -...........-- -'- ~ Dot., F,' 9124198 ! I I I I I I I I I I tl18 . . I ! I I I I I I I I I I -- 2001 JM I ....b or r I May Jun Jul AuQ .... -:.:- .:-: :-:-:-:-:- . . . ... 311 . , . ' ',. 412 'JI7~413 ~ b.,lI .,.,10 4f20 [." . "2 412 ...... .. .) 717.7 ...713 ---';7/10 715 op 2002 ct 1'40'1 o.c .JWl 'eb rAifar I Apr I M-v I i I I . ". ".j 1Z121 11/15 1/28 " . . , , , ,..',. 12/14 1t/11 ~ 12/11 12/10 t;:; 112 113 1/10 .12J:1 1Z13 .. ..... . .. . ' 315 4>,318 'JI7 SOUTH POINTE MASTERPLAN PROJECT SCHEDULE 003 uQ *.., I Oct .. Noy o.c an pre. M.r Aur '13 . . . . . .. 1121 ..,7 !." - . ....-j-.'.. '." 1/28 7130 """"'c::I, 1/28 1130 b 0113 ., 0118 ~11 .. .,