329-99 RDA
RESOLUTION NO. 329-99
A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE
MIAMI BEACH REDEVELOPMENT AGENCY APPROVING
AMENDMENT NO. 3 TO THE AGREEMENT BETWEEN THE
AGENCY AND KIMLEY -HORN AND ASSOCIATES, INC., FOR
PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES,
IN AN AMOUNT NOT -TO-EXCEED $70,925.00, FOR SURVEYING OF
PHASE II OF THE SOUTH POINTE STREETSCAPE
WHEREAS, on January 20, 1999, the Chairmen and Members of the Miami Beach
Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an
Agreement with Kimley-Hom and Associates, Inc. (the Agreement), to provide professional
engineering and landscaping architectural services for design of street improvements in the South
Pointe Redevelopment Area (the Project); and
WHEREAS, Staff has negotiated a not-to-exceed fee of$170,760 for the preparation of
the final Master Plan and opinion of probable cost for the entire project; and
WHEREAS, the scope of services included in the initial phase of work consisted of data
collection and a review of existing documents, resulting in the preparation of a Master Plan and
surveying for the Phase I improvements; and
WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement,
which included a not-to-exceed fee, in the amount of$389,100, for the preparation of construction
documents, permitting and bidding services for Phase I; and
WHEREAS, on May 26,1999, the RDA approved Amendment No.2 to the Agreement,
which included a not-to-exceed fee, in the amount of$103,800, including surveying, Master Plan
design, preparation of bidding and construction documents and permitting for the Washington
Avenue extension; and
WHEREAS, in order to meet the time schedule prepared as part of the Master Plan,
Phase II surveying was scheduled to begin simultaneously with the completion of the ninety
percent plan for Phase I; and
WHEREAS, Phase II includes the following streets: (1) Lenox Avenue (from Fifth Street
to Fourth Street); (2) Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth
Street to Second Street); (3) Euclid Street (from Fifth Street to Third Street); (4) Fourth Street
(from Alton Road to Washington Avenue); and (5) Second Street (from Alton Road to
Washington Avenue); and
WHEREAS, in the Master Plan, Second Street is Phase III; however, due to the fact that
the surveying will need to be within 100 feet on either side of the intersecting north/south streets
for Phase II construction documents, it has been included within Phase II survey services; and
WHEREAS, the proposed not-to-exceed fee for Phase II is $ 70,925 with the following
defined tasks: Phase II survey - $54,300 and reimbursements - $16,625 (consisting of geo-
technical studies - $4,500, aerials - $9,625 and direct expenses - $2,500); and
WHEREAS, the South Pointe Advisory Board voted in favor of the Phase II amendment at
its meeting of October 14t\ 1999 and, accordingly, the RDA has negotiated an Amendment No.
3 to the Agreement.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE CHAIRMAN AND
MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY, that the Chairman
and Members of the Miami Beach Redevelopment Agency herein approve Amendment No.3 to
the Agreement between the Agency and Kimley-Hom and Associates, Inc., for professional
engineering and landscaping services, in an amount not-to-exceed $70,925.00, for surveying of
Phase II of the South Pointe Streetscape.
PASSED and ADOPTED this 20th day of October, 1999.
;f~AN
ATTEST:
t~\6 .P CU~
SECRETARY
SR/CMC/ AR
APPROVED AS TO
FORM & LANGUAGE
& FOR EXECUTION
~iJ!:i.~q
G~~~,.!".~, C0tH'1l''''!
lq/:l-~/ ~,
Dote
\\CH2ISYSIDDHP\$ALL\AlexandraISouth PointelKimley Horn Phase II Survey AD3,doc
Miami Beach Redevelopment Agency
1700 Convention Center Drive, Miami Beach, FI, 33139
http \\ci miami-beach,f1 us
Telephone (305) 673-7193
Facsimile (305) 673-7772
MEMORANDUM NO. c:f=\ -~ '2....
TO:
ChairJ11~n and Members of the
Miami Beach Redevel pment Agency
DATE: October 20, 1999
SUBJECT: A RESOLUT 0 OF THE CHAIRMAN AND THE MEMBERS OF THE MIAMI
BEACH REDEVELOPMENT AGENCY RATIFYING AMENDMENT NO.3 TO
THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT
AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., APPROVED
UNDER RESOLUTION NO. 99-23073 FOR PROFESSIONAL ENGINEERING
AND LANDSCAPING SERVICES IN AN AMOUNT NOT - TO-EXCEED
$70,925.00 FOR SURVEYING OF PHASE II OF THE SOUTH POINTE
STREETSCAPE
.
FROM: Sergio Rodriguez
City Manager
ADMINISTRATIVE RECOMMENDATION
Adopt the Resolution.
BACKGROUND
On January 20, 1999, the City Commission authorized the Administration to negotiate an agreement
with Kimley-Hom and Associates, Inc. The Administration negotiated a not-to-exceed fee of
$170,760 for the preparation of the final master plan and opinion of probable cost for the entire
project. The scope of services included in the initial phase of work. consisted of data collection and
a review of existing documents resulting in the preparation of a master plan and surveying for the
Phase I improvements.
Amendment No.1 approved on May 26, 1999 included a not-to-exceed fee in the amount of
$389,100 for the preparation of construction documents, permitting and bidding services for Phase
1.
AGENDA ITEM 3A
DATE 10-2.0-99
Amendment No. 2 approved on May 26, 1999 included a not-to-exceed fee in the amount of
$103,800 included surveying, master plan design, preparation of bidding and construction documents
and permitting for the W ashington Avenue extension.
ANALYSIS
In order to meet the time schedule prepared as part of the master plan, Phase II surveying was
scheduled to begin simultaneously with the completion of the ninety percent plan for Phase I. Phase
II includes the fonowing streets:
. Lenox Avenue (from Fifth Street to Fourth Street);
. Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second Street);
. Euclid Street (from Fifth Street to Third Street);
. Fourth Street (from Alton Road to Washington Avenue) and
. Second Street (from Alton Road to Washington Avenue).
In the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will need
to be within 100 feet on either side of the intersecting north/south streets for Phase II construction
documents, it has been included within Phase II survey services.
The proposed not-to-exceed fee for Phase II is $ 70,925 with the following defined tasks: Phase II
survey - $54,300 and reimbursements - $16,625 (consisting of geo-technical studies - $4,500, aerials
- $9,625 and direct expenses - $2,500).
The South Pointe Advisory Board voted in favor of the Phase II amendment at their meeting of
October 141\ 1999.
CONCLUSION
The Administration recommends that the Chairman and the Members of the Miami Beach
Redevelopment Agency ratify Amendment No. 3 to the agreement with Kimley-Hom and
Associates, Inc. for a fee not-to-exceed $70,925.
SR/C~/AR
I\CH2\SYS\DDHP\$ALLlAlexandra\Soulh Pointe\Kimley Horn Phase II Survey AD3 doc
RESOLUTION NO. 99-23375
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.3 TO THE
AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT
AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR
PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN
AN AMOUNT NOT-TO-EXCEED $70,925.00, FOR SURVEYING OF
PHASE II OF THE SOUTH POINTE STREETSCAPE
WHEREAS, on January 20, 1999, the Chairman and Members of the Miami Beach
Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an
Agreement with Kimley-Hom and Associates, Inc. (the Agreement) to provide professional
engineering and landscaping architectural services for design of street improvements in the South
Pointe Redevelopment Area (the Project); and
WHEREAS, Staff negotiated a not-to-exceed fee of$170,760 for the preparation of the
final Master Plan and opinion of probable cost for the entire Project; and
WHEREAS, the scope of services included in the initial phase of work consisted of data
collection and a review of existing documents, resulting in the preparation of a Master Plan and
surveying for the Phase I improvements; and
WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement,
which included a not-to-exceed fee, in the amount of $3 89,100, for the preparation of construction
documents, permitting and bidding services for Phase I; and
WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement,
which included a not-to-exceed fee, in the amount of$103,800, including surveying, Master Plan
design, preparation of bidding and construction documents and permitting for the Washington
A venue extension; and
WHEREAS, in order to meet the time schedule prepared as part of the Master Plan,
Phase II surveying was scheduled to begin simultaneously with the completion of the ninety
percent plan for Phase I; and
WHEREAS, Phase II includes the following streets: (1) Lenox Avenue (from Fifth Street
to Fourth Street); (2) Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth
Street to Second Street); (3) Euclid Street (from Fifth Street to Third Street); (4) Fourth Street
(from Alton Road to Washington Avenue); and (5) Second Street (from Alton Road to
Washington Avenue); and
WHEREAS, in the Master Plan, Second Street is Phase III; however, due to the fact that
the surveying will need to be within 100 feet on either side of the intersecting north/south streets
for Phase II construction documents, it has been included within Phase II surveying services; and
WHEREAS, the proposed not-to-exceed fee for Phase II is $ 70,925 with the following
defined tasks: Phase II survey - $54,300 and reimbursements - $16,625 (consisting of geo-
technical studies - $4,500, aerials - $9,625 and direct expenses - $2,500); and
WHEREAS, the South Pointe Advisory Board voted in favor of the Phase II work at its
meeting of October 14th, 1999 and, accordingly, Staff has negotiated an Amendment No.3 to the
Agreement; and
WHEREAS, the Executive Director and RDA Staff will herein recommend that the Mayor
and City Commission ratify said Amendment No.3 to the Agreement.
NOW, THEREFORE, BE IT nUL Y RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission herein ratify Amendment No.3 to the Agreement between the Miami Beach
Redevelopment Agency and Kimley-Hom and Associates, Inc., for professional engineering and
landscaping services, in an amount not-to-exceed $70,925.00, for surveying of Phase II of the
South Pointe Streetscape Area.
PASSED and ADOPTED this 20th day of October, 1999.
.. '.
~YOR
ATTEST:
. ULLLl Y PCCLLQL-----
CITY CLERK
APPROVED p.s TO
FOPl" & LA.NGU}..GE
8.~ FOR EXECUTiOi'-,l
1iIvit!l1tiL/ (U/11
SR/CMCI AR
\\CH2\SYS\DDHP\SALLWexandra\South PointelKimley Horn Phase II Survey AD3,doc
ItITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMIBEACH, FLORIDA 33139
tlp \\ci miami-beach fI us
:-
-
-
COMMISSION MEMORANDUM NO. I q 1-1'1
TO:
Mayor Neisen O. Kasdin and
Members of the City mission
DATE: October 20,1999
I
I
I
I
I
FROM: Sergio Rodriguez
City Manager
SUBJECT: A RESOL ION OF THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH RATIFYING AMENDMENT NO. 3 TO THE
AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT
AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., APPROVED
UNDER RESOLUTION NO. 99-23073 FOR PROFESSIONAL ENGINEERING
AND LANDSCAPING SERVICES IN AN AMOUNT NOT-TO-EXCEED
$70,925.00 FOR SURVEYING OF PHASE II OF THE SOUTH POINTE
STREETSCAPE
I
I
ADMINISTRATIVE RECOMMENDATION
Adopt the Resolution.
BACKGROUND
I
On January 20, 1999, the City Commission authorized the Administration to negotiate an
agreement with Kimley-Hom and Associates, Inc. The Administration negotiated a not-to-exceed
fee of $170,760 for the preparation of the final master plan and opinion of probable cost for the
entire project. The scope of services included in the initial phase of work consisted of data
collection and a review of existing documents resulting in the preparation of a master plan and
surveying for the Phase I improvements.
I
M
I
I
I
-
Amendment No.1 approved on May 26, 1999 included a noHo-exceed fee in the amount of
$389,100 for the preparation of construction documents, permitting and bidding services for
Phase 1.
Amendment No.2 approved on May 26, 1999 included a not-to-exceed fee in the amount of
$103,800 included surveying, master plan design, preparation of bidding and construction
documents and permitting for the Washington Avenue extension.
AGENDA ITEM ~ :J G
DATE b-w-cr9
I
r
543
ANAL YSIS
In order to meet the time schedule prepared as part of the master plan, Phase II surveying wa~':;j,;~
scheduled to begin simultaneously with the completion of the ninety percent plan for Phase L ~
Phase II includes the following streets:
. Lenox Avenue (from Fifth Street to Fourth Street);
. Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth Street to Second
Street);
. Euclid Street (from Fifth Street to Third Street);
. Fourth Street (from Alton Road to Washington Avenue) and
. Second Street (from Alton Road to Washington Avenue).
In the Master Plan, Second Street is Phase III; however, due to the fact that the surveying will
need to be within 100 feet on either side of the intersecting north/south streets for Phase II
construction documents, it has been included within Phase II survey services.
The proposed not-to-exceed fee for Phase II is $ 70,925 with the following defined tasks: Phase
II survey _ $54,300 and reimbursements - $16,625 (consisting of geo-technical studies - $4,500,
aerials - $9,625 and direct expenses - $2,500).
The South Pointe Advisory Board voted in favor of the Phase II amendment at their meeting of
October 14th, 1999.
CONCLUSION
The Administration recommends that the Mayor and City Commission ratify Amendment No.
3 to the agreement with Kimley-Horn and Associates, Inc. for a fee not-to-exceed $70,925.
SR/C~/ AR
\\CH2\SYS\DDHP\SALL\Alexandra\South pointelKimley Horn Phase II Survey AD3 doc
544
II
AMENDMENT NO.3
TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE
MIAMI BEACH REDEVELOPMENT AGENCY, FLORIDA AND
KIMLEY-HORN AND ASSOCIATES, INCORPORATED, FOR
PROFESSIONAL ENGINEERING AND LANDSCAPE ARCHITECTURAL
SERVICES FOR SURVEYING OF PHASE II OF THE SOUTH POINTE
STREETSCAPE
This Amendment No.3, dated as of Oc~~1A (7J..U , 1999, to that certain
Professional Services Agreement (Agreement), dated February 17, 1999, by and between the
Miami Beach Redevelopment Agency (RDA), Florida and Kimley-Hom and Associates, Inc.
(Consultant).
RECIT ALS
WHEREAS, the Agreement provides for the preparation of the final Master Plan for the
South Pointe Redevelopment Area Project; and
WHEREAS, this Amendment No.3 to the Agreement provides for surveying Phase II
of the South Pointe Streetscape; and
WHEREAS, in order to meet the time schedule prepared as part of the Master Plan,
Phase II surveying was scheduled to begin simultaneously with the completion of the ninety
percent plan for Phase I; and
WHEREAS, Phase II includes the following streets: (1) Lenox Avenue (from Fifth Street
to Fourth Street); (2) Michigan Avenue, Jefferson Avenue and Meridian Avenue (from Fifth
Street to Second Street); (3) Euclid Street (from Fifth Street to Third Street); (4) Fourth Street
(from Alton Road to Washington Avenue); and (5) Second Street (from Alton Road to
Washington Avenue); and
WHEREAS, in the Master Plan, Second Street is Phase III; however, due to the fact that
the surveying will need to be within 100 feet on either side of the intersecting north/south streets
for Phase II construction documents, it has been included within Phase II survey services; and
WHEREAS, the South Pointe Advisory Board voted in favor of the Phase II amendment
at its meeting of October 14th, 1999 and, accordingly, the RDA has negotiated this Amendment
No.3 to the Agreement.
1. ABOVE RECITALS
The above recitals are true and correct and are incorporated as a part of this Amendment
No.3.
2. MODIFICATIONS
The Agreement is amended as follows:
Exhibit "A", entitled "Scope of Services/Fee", is amended to add the work attached
hereto and incorporated herein as Exhibit "A-I" of this Amendment.
Exhibit "C", entitled "Schedule", is amended to add the schedule attached hereto and
incorporated herein as Exhibit "C-l " to this Amendment.
3. OTHER PROVISIONS
All other provisions of the Agreement, as amended, are unchanged.
4. RATIFICATION
The RDA and Consultant ratify the terms of the Agreement, as modified by this
Amendment No. 3.
IN WITNESS WHEREOF, the parties hereto have caused this Third Amendment to be
executed in their names by their duly authorized officials as of the date first set forth above.
ATTEST:
MIAMI BEACH REDEVLOPMENT AGENCY
~{~ fa~~~~~~E By:
& FOR EXECUTION
SECRETARY
1/;/ /JfIJidL .U"1~9J7
RedeYelopment Agency Date
Geneml Counsel
m
CHAIRMAN
SEAL
CONSULTANT:
KIMLEY -HORN AND ASSOCIATES, INC.
By:
ATTEST:
\\CH2ISYSIDDHP\$ALLWexandraISouth PointelKimley HornlKimley Horn PllAD3 AMD.doc
~=n
Kimley-Horn
and Associates, Inc.
Exhibit A, September 24, 1999, Page I
Exhibit "A .1"
SCOPE OF SERVICES
Task 1 - Survey Services
Kimley-Hom and Associates will provide the following survey services:
a) The consultant will place and locate 11 aerial targets for use in providing Raster aerial
imagery. The aerial targets will be set at the locations as specified by the
photogrammetist.
b) Ground control (horizontal) will be established along Second Street, Fourth Street, Fifth
Street, Lenox A venue, Michigan A venue, Jefferson A venue, Meridian A venue, and
Euclid A venue corridors. Additional control will be required in the future for the
development of other roadway corridors.
c) A centerline of construction will be calculated for Second Street, Fourth Street, Fifth
Street, Lenox Avenue, Michigan Avenue, Jefferson Avenue, Meridian Avenue, Euclid
A venue and Alton Road. Minimal right-of-way and/or property monuments will be
located.
A bench level run will be performed and bench marks will be set along the Second
Street, Fourth Street, Fifth Street, Lenox Avenue, Michigan Avenue, Jefferson Avenue,
Meridian Avenue, and Euclid Avenue corridors. The elevations of the bench marks will
reference the local- Miami Bay Datum. These bench marks will be set outside the limits
of construction (where possible), and referenced by station and offset to the center line of
construction.
d) A field topography survey (survey points only) will be performed along the existing
roadway corridor (Second Street, Fourth Street, Lenox Avenue, Michigan A venue,
Jefferson Avenue, Meridian Avenue, and Euclid Avenue). The survey limits are to the
buildings or to 10 feet beyond the right-of-way (whichever comes first), subject to
accessibility. Survey limits of Fifth Street are the south one-half of the roadway. Trees,
street signs and driveway profiles will not be surveyed.
e) The location, pipe size, rim and invert elevations will be obtained for accessible drainage
structures and gravity flow sewers within the existing roadway corridors (Second Street,
Fourth Street, Fifth Street, Lenox Avenue, Michigan Avenue, Jefferson Avenue,
Meridian A venue and Euclid A venue). Confined space entry surveys of structures will
not be performed.
t) The above ground (surface) utilities associated with underground utilities (such as valves,
meters, fire hydrants, etc.) will be located.
g) Field surveys will be suitable for preparing engineering and construction drawings.
~=n
Kimley-Horn
and Associates, Inc.
Exhibit A, September 24, 1999, Page 2
Note: All references to survey associated with Fifth Street are limited to the south half of
the roadway. All references to survey associated with Alton Road are limited to the
locations of intersecting streets at this time.
Task 2 - Reimbursements
a) Kimley-Hom will have geotechnical data gathered consisting of five (5) percolation tests
and three (3) pavement cores within the project area. The percolation test will be
performed in general accordance with the Usual Open-Hole Constant head procedures
suggested by South Florida Water Management District (SFWMD) to a depth of 15 feet
to provide data required for drainage evaluation at the subject site.
b) Kimley-Hom will have professional photogrammetric services flown including aerial
photography, aerial triangulation, and raster imagery (Descartes format).
Task 3 - Additional Services
Upon your authorization, we will provide any additional services that may be required beyond
those described in Task 1. These services may include but are not limited to such items as the
following:
a) Preparation of right of way acquisition sketches or descriptions.
b) Construction Documentation for Phase II through V
c) Conducting subsurface geotechnical investigations.
d) Providing construction phase services.
e) Making traffic counts or undertaking other traffic related analysis.
t) Traffic signal plans.
~=n
Kimley-Horn
and Associates, Inc.
COMPENSA nON
Exhibit A, September 24, 1999, Page 3
We will provide the services described above for the lump sum amounts (not including direct
expenses) outlined below.
Task
1
2
2-a
2-b
3
Description
Phase II Survey
Reimbursements
Geotechnical
Aerials
Direct Expenses
Subtotal reimbursements (for budget purposes)
Total authorization
Additional services
Lump Sum Fee
$54,300.00
$4,500.00
$9,625.00
$2,500.00
$16,625.00
$70.925.00
as requested
S:\SMINGONE\ Word Docs\South Pointe\contracts\surveyphaseII.doc
~=n
Kimley-Horn
and Associates, Inc.
Exhibit 8, September 24, 1999, Page 1
Exhibit II C-1"
SCHEDULE
We will provide our services in an expeditious and orderly manner to meet the schedule mutually
agreed to by the Client and the Consultant for the various elements of the project.
I
.------,,.?/
-- J:;'I r
{ I ....
----'/li1
1\' ,. 'I ::,.,
".. ',',), / i .' , '/1 .'f.,
r LI !.l I~~ L !! ! '[ '. ," />:~f i:' _//I} . !; . I;: I!i
I ,. '1 I' II !! / . . , I
'. II I . . . It! ! "h ~ . i 1/ I!
III! II i! L JL2:J ~ ~.I.: ". t /! /" ,'(i ;117
--=:~ Q..,_..;,;J L.:...-:!,1 :::. .-~,~~ ;.., ~_ ,~;_...!, d J
~ If" -.- "'fi I r- . -,r " - ~I I ':'., '~):')rl'
--.....,~L.!"'" ~! -1~~'li ' i i' "11 _ !'.' ,'; ,~ (_ , .",
II '.' It . . - ". 1 rt t . / , _ _
i:m I 'I II I", - I, . - .Ii' . , '. . . I !ill
" II> Ii .' . / , i "" - ~ ~ I. . - i 19 I', I r '! __ - . _ , . , I!, . If /-.. " ..' . ,
.-<t!, :. -- .,rl' ~~ '. '\;ii. J '/...., /!~ . Ii _ -/1U1 . .'"
,h! ,," iai ,,_, '-!-i', '" ii":" !fT/'''''ii' ",;i." " _'
l~:~ ~! . ilojl '. II "': I ~ ,'- - 'ii:':::>/12J/:<:i('~':'- !/o!f. ::,' :~"
";"<'ll!I~'I!I.. c". .. '!I!l" :.~.~.~~~ i..' '~.ii'''''._.,-, / ";'. -. .._.,..I-J/lh.".... _. ., !1.2'1- J. . _.'"
It . . - ~ .~- " -.., J -.' .It.. "ir1/'",~. !I...., II "fl_.," " '," ,"
"-'\11-" <>'" . 1'1 ,H ':..-:... c ... ::..1;' '-j-(JI.r~:':!..:/i'.-.! './'8, .,.,.'__..
""1-___" ~:- r____"'_ -----_ '/. "-"0'
--""-~'''' -'- ._= '-31"O-~~=___. !-...._=_.-...........,'... 1.&oC.. .,h~_:.-., ;! _
---. -;;..-..-....-....::-7~ ~ . . '. .1 1- 1, -::" -""-,, -', .. -.,..~~.... ~ /(/7 r' _
r 1'"""1 LcL;~r~; T f:i;3! ~~i;-;c;;~ifi
';J!,!I'1 !!!",:, ..:........,...............:.,.:.,.. .,"......."...,...._. .......'.. ',...,..'!!!." i'!'t l......c... '.,., ...:...... ;;,...,...... ..... ..... .':...... ........ .'.'."" '.i:,. ......c......,., ....~ ~i", i. H_; t"C1f.;';!j t:~,~i c q
..c. .... .... ... !-.i.~... ';..0.;. ~if'~J~" Ji,,;: l~;~0 I ~~;;:ii ',f' /
T. .. ~,.~.. ~J J!":".~":.,,,,.JI /!
~ ..... '~~. ....... . ",. ,,- 7 ( ii'::~:i::;-i / ..!/ /!
..... 'i';'y,~~rL.<..,
c, ! /' :1 E 'j x~s~ ~{ii1}~
~ . -.'. 'i II .. """'." /1 k ,.
. t:, ,)t:. :;// If' .....JtE}~:~;!7 {~.;~..,
;;...~ ' ", -. '! I;., - /... ",/ j,. '. ",
~-I.'.'-'-~,,;l1j!, 0, ~(~::i!!J;:iil /". _;
c .,.. 1.-",:.;) ,
\.\., ". J :~~~;;:~. [.:;:;fE::/' /f?!jr;;J~V
' '\ ~ / . "..,1 b~""1 I ; i- H,;.,! I;
\'~ ,-, 'noaT - : !t'i\,il If /!-~TJ; /
\ '. ~- . ,..--.. f.-... ~'- / ;' . - '( i!
'~>\:~\\\,>\~\\. r.".~:;,..';.' ;r....':-._._\/', ;:.,-;-// r/ / i // il!
\L" . L...!: !/., _. 'ii'
.)\ II i ~':"'-::::=:=:=::, '<''''_.11 if i 'L . ~ I
'1,' 'I 'I i r--'- ,'. ". . ", I. i i. J ^ L . _ _ _ _
.i:.:c:1L._.....!? (j, '-' --'~iU/
";i'l J -'--. I
II '.. :_--- ---~114~.__.__. ___
~._.
~TH ~T'RE:T
U RESOURCE GROUP
U R B A I' 104.11 III ISSle II! ! l, II ~
I II1ISIII II ClIl!
LAIAIIl teIilWM PUIIIrJ
l.AlIl9C.\PE ~
m~
11111' IIUllUCl nOl11& 11111
III LI~o.~..-n.!... _ -.c... _ ._
_ n K:mley-~cm
~ _ L,J ar,d r\.ssec:ales, Ire.
.- TER ZTIlERX & CO.MP.-\.'IY
DUANY PLA -
c
as
-
A.
..
G)
..
(I)
cae
:I~
c>>~
..II.
C -
.- .c
00
A.:
.em
.. .-
::sE
o.!
CI):II!
~
l'
-
JaO ....
0.- e,
~e,
0..
--
lI4Q2ZS75
IlPC
SIll
f1~
-
.. ... ,...,
iii _ '""... -:......._
... ......_ 4 ...~ ... 4 .. ~
......_1_......-_......
=..---- ....--
.___M._
.
c:
as
-
At
at
c:
I-
f#)
as
.c
At
!'mI
SOUTH POliTI 11RIITICAPI PHAIIIIG PI.AII
. PHASE 1
. 3RD STREET - FROM EAST ROW LINE OF MICI-IICrAN AVENUE
TO WEST ROW LINE OF CCEAN DRIvE.
. WA...-'oj..IlNUTON AVENUE - FROM 50UT14 RCUJ LINE OF 5T14
STREET TO NORTI4 ROW LINE OF 5CtJTI-I POINTE DRIvE
. PLAZA AT INTERSECTION OF 3RD 5TRE:T AND
WASI-lINCrTCN AVENUE.
II P~~~~X2AVENUE _ FROM 5OUT14 ROW LINE OF 5TI-l STREET
TO NORTI-I ROW LINE CF 4TI-l STREET.
- MICI-IICrAN AvENUE - FROM SOUTI4 ROW LINE OF 5TI-l
STREET TO NORTI-I ROW LINE OF 2ND STREET.
- JEFFERSON A vENUE - FROM SOUTI-I ROW LINE OF :; TI-l
STREET TO NORTI4 ROW LINE OF 2ND STREET.
- MERIDIAN AvENUE - FROM SCUTI4 ROW LINE OF 5T14
STREET TO NORTI4 ROW LINE OF 2ND STREET,
. EUCLID AVENUE - FROM SOUTI4 ROW LINE OF 5TI-l STR:E:T
TO PLAZA AT INTERSECTION OF 3RD STREE:T AND
WASI-lINCrTCN AvENUE,
. 4TI-I STRE:T (WEST OF WASI-IINCrTON AvENUE) FROM EAST
RCW LINE OF ALTON ROAD TO u"'EST ROW LINE OF
WASI4INCrTCN AvENUE.
- LENOX COURT - FROM SOUTI-l ROW LINE OF 5TI-l STREET TO
NORTI-l ROW LINE OF 4TI-I STREET.
- MICI-IICrAN COURT - FROM SOUTI-I ROW LINE OF 5Tl-i STREET
TO NORTl-i ROW LINE OF 2ND STREET.
- JEFFERSON COURT - FRCt1 5OUTl-i ROW LINE OF 5TI-l
STREET TO NORTl-i ROW LINE OF 2ND STREET.
- EUCLID CCtlRT - FROM 5OUTl-i ROW LINE OF 5TI-I STREET
TO NORTI-l ROW LINE OF 2ND STREET.
II lUll .
. 4TI-l STREET (EAST OF WASl-iINC:.TON AvENUE) FROM EAST
RCW LINE OF UJASl-iINC:.TON AVENUE TO WEST ROW LINE OF
OCEAN DRIVE.
I. 2ND STREET - FROM EAST ROW LINE OF ALTeN ROAD TO
WEST ROW LINE OF ~EAN DRIVE.
I. 1ST STREET (WEST OF WA~INCrTON AVENUE) FROM
INTER-9:CTION WITI-l J~R5CN AVENUE TO WEST ROW LINE
OF WAel-ilNUTON AvENUE.
. 1ST STRE:T (EAST OF WASl-iINCrTON AvENUE) FROM EAST
RCW LINE OF WASl-iINC:.TON AVENUE TO WEST ROW LINE OF
OCEAN DRIVE.
. COMMERCE STREET - FROM EAST ROW LINE OF AL TeN
ROAD TO WEST ROW LINE OF WASI-lINc:::.rON AVENUE.
. SOUTI-I POINTE COURT - FROM EAST ROW LINE OF AL TeN
ROAD TO WEST ROW LINE OF UJA5I-lINCrTCN AvENUE.
. COMMERCE COURT - FROM EAST ROW LINE OF JEFFERSON
AvENUE TO WEST ROW LINE OF WASI-lINCrTCN STREET.
I RDA RESPONSIBLE FOR CONSTRUCTION BASED ON
DEvELOFMENT
APPROvALS.
Ii PH.lS! 4
- OCEAN DRIVE - FROM SOUTI4 ROW LINE OF 5TI-l STREET TO
NORTI-l ROUJ LINE OF SOUTl-i POINTE DRIVE.
. COLLINS AVENUE - FROM 5OUTI-l ROW LINE OF 5TI-I STREET
TO NORTI-l ROW LINE OF 5OUTI-l POINTE DRIVE.
. OCEAN COURT - FReM SOUTI4 ROW LINE OF 5TI-l STREET TO
NORTI-l ROW LINE OF 50UTI-I POINTE DRIVE.
. COLLINS COURT - FROM SOUTl-i ROUJ LINE OF 5TI-l STRE:T
TO NORTI4 ROW LINE OF SOUTI-l POINTE DRIVE.
. PH AS! a
- ALTON ROAD - FROM 5OUTI-I ROW LINE OF 5TI-I STREET TO
INTERSECTION WITI-I 5OUTI-I FOINTE DRIvE.
. 5OUTI-I FOINTE DRIVE - FROM INTERSECTION UJITI-l ALTON
ROAD TO EASTERN LIMITS.
~
\\ \. 1~~: H rl~
\\ ' ' \ ~ I~j i . ,i!:" 1 i
\ ~ l!::_._.JL.,'_.!J L
\\ ~._.- . .,' ",4] rr=---
'\ \ ; i~ Ii'
\'. . \ ~
o;:\\~\\:~.,.. ~ ~I<.
\ \ \\ '<{ .
';~~~~~~JL 1J[~
\~ \', : ";,,.. -.
- \\v.: \~...
.\~ \\. l
'\~:\ \ \ r
\\'\\ "'",,, r. ,;
\\ \' \
.,<\ \\ I' .
\~'::;.\~,\ ~ - (:
\~,':\\\.J fJ.~-
.. \ '\ \::';:
'\
'\\' ~
\~\{".
"\\) \~.
,. (\ ., \
-,\\\"
'.\\\
\\ \,
.~\
"
\
\
\.
\.
I
~J,'
J,:, : L1 ,B. ',',! [! .'"~~ : L! ':~;JL:f!';.;1 Ir
I, ! ! " ! . I I' It " '.' I t' "I, .'-; t .., r 1/ {' ,
. '..J L '..i.iL'- 'j t,:. 'jb.,~.'j i.. {, I,', j,- !",,!i f' I; ,
-.-. ,- '-' ,_. ,-. J '~. .' /' !I i' '!I I' J'
~., } :~I;-:~ 2?:""l: ". ! i:'.' :.1;' . j' j." ',,:"'; ,
:'.;! ~,;' ii: :'.i , (.~o ..:', I ;~ ,,'.!., "il j"',':;'Y.
, ..".. ,.. '^ 1- ., . '.
I 1"....~It....,. I '., t.., """".'-) 'n)l:"""-;'::""
.-<(. ;',..'. . . 0 - I' I,. ' ", 'r' ,14 ,. .
. I I :' It. I I I' I -, t . i - 'I~ I' .' . j,
.'" i.,.',"ii' i i ii.,'.~:..idii.} r ,'!~"-:f I{,. ',,;i":",IULt-
, '. " " . _ . .," _ ~ '. " ,.' J. '. -' { "
.. -- . OC -- ,'.. I ~ / I, "{ ,.,.. " . I ,,'... ,,'
.','wl.' II-""','!!!". ""II" ,.... ~~ ij'<""'.11('" ..Ii,..,.. 'ifif .. " .'
_ -;-;'j '"ii,'; ""jj^~':::'/i I:j. - '.li:/';~'~'1 ~ {,'~,c;":ii,.:,.:.':'!I.Jli>~:.,.,::>,j!:,;'-.:' !Cl~:.;: ;,:,.-.-- ,,'~'
~_... ....._......... _,,,, .... _....... _... v I '. ". " 'l/~/; "'/1 h {iflr- ". -- " " .'
.'_,~ ~-_-.....-....-=-_-::-~ ~I~_~~:f!:-.:-> .~',J.;:..::J...!... 'i{iJl,' i/~\:'Jllili~~'.'~~~;':~'i"':
! I .11- .:." I. ..Il .' I i{.......~. ~--'--!..J(., "<.":",181. .,.'.. ,',' '. '
:: ~;J l B / : ~.~ L..~..:: H . ;. ,I =- ~ t!'" ,; ';-{~!~:~'~7-?' ~~~: -~-j' tr . ;
. . - . . - .. _ .. .... 2' ,,~ .. "} It - -;..... ~ t: -"4:..1 ,,~-- - I
'-'. , . !! :::.:::') ! _, !!.-::.. , ~ ;::-,:":'!!:,;,..;.! i.::;.;:: '!!,' .- ',-;)0;
I '. II, ': ,~-,:I I ::<',It~ --:, 'oj Ig) I ~;.. ~ J I<':"''-~;'! i',~" :" !! , '::1 I'
,! i :<:,;,;"ir;~>;:i i.'-;::'.~'ii_ ::__"" 11,;"" .'f; '!; -" "!! !/ If
I ! :~:.. : ';!!. ~.":.-~ ~ ! < ~'~ j L ;:-:> J / :," ! !c2:" : ,j ;-[," // ' IJ /
.'::t.-'~~ · "~_"'~'''_~:;;, ~ jkf,?~~.N !f /
. ~ I' '."". I t, ;".." if 'I
/ ".,'"..,-- ~~
,:- ',Y" , t:~:1ll;J'~U~;H
_ . .f{ elL../; If - ! !:it'! f *'r;;;~;"
c-'-'-'-'-M 'M'-'; J.,. ....H'.',../I II .... lb..... il I.~ '
. .. T 81 I ::....:~ )1"''-- )itji.~':Yf j!;~i';'"
~~( !!~~~/ #~fj*f;i'l!f!!'l";'~r;\;;
\\ .~\ CC'l""I"1ERCE ~~ I !!. . . i /; ii' .; {/ 1/
\\ ~\ rL"'-::'-"~-:-'-'--;-'" ,,i-,,;. /t . 0-;/;// . /! '\'} 1:' .
1\/ ill r=:=l=~l=l=:~~ . t...::;;~.// dl:/ . /./....1/),1/
I l {,',':: '>.. . (t'; It .' I ,
~! lJ ~ _._._ _._._ _J 'l'::,,:'L,JL i .;..ii. .J.. i .' '. ..
1,[ -~ ._, l:'-'- -'-'~UI""-'-'-'-'-'-'-'-
l!o(;UTI1 ~"" ~ ~
l.-.._._,_. -. -. _. _,_~, ,r;:;::7 '. "_' _'_'_'_"._.I._"~'_'_'_'_'_'_'_'_' _,_, _, _'_
URBAN RESOURCE GROUP
11"11101 If IllltH.III.. llleelll!~ II~
lRAIlll8B.lABll' PlNIIII
I.NIl9CAfE .w:HE1UE
!IE WPICl
III LlleGUIGU.UITI au. lUll tuea FUIIU IlIU
......,.. .0. W"f .... ........... II?W _
",., _ n Kimfey-Hom
~ _ '--.J and Associates, Inc,
DUANY PLATER-Zl'BERK. & COMPAi.'IT'
c
as
-
A.
..
CD
....
en
as'"
.~
..
..s
....11.
C - c::
.- .I:
00 '"
-
A.'" At
.
.em at
c::
.... .- .-
:IE II)
o.! '"
.I:
en. A.
.......
l'
-
NT8
JaIl*' lI4ClI2:ZSJS
0.- Br IlPC
~Br 8M
Dolo fl,J,/Hl//ll
-
...
=- ~~~o:::..-:.~':::
=:::.:......:.-~ ~:=
.,II1II-.....-.......-
...
IOUTH POliTI ITRIITICAPI PHAI.la PLAN
. PHASI! 1
_ 3RD STREET - FROM EAST ROW LINE OF MICI-IICsAN AVENUE
TO WEST ROW LINE OF OCEAN DRIve.
_ W~INCsTON AveNUE - FROM SOUTI-I ROW LINE OF STI-I
STREET TO NORTI-I ROW LINE OF SOUTI-I POINTE DRIve
_ PLAZA AT INTERSECTICN OF 3RD STREET AND
WASI-IINCsTCN AveNUE.
. PHAI. 2
. LENOX AVENUE - FROM SOUTI-I ROW LINE OF STI-I STREET
TO NORTI-I ROW LINE OF 4TI-I STREET.
_ MICI-IIC:sAN AvENUE - FROM SOUTI-I ROW LINE OF STI-I
STREET TO NORTI-I ROW LINE OF 2ND STREET,
_ JEFFERSON AveNUE - FROM SOUTI-I ROW LINE OF STI-I
STREET TO NORTI-I ROW LINE OF 2ND STREET.
. MERIDIAN AveNUE - FROM SCtiTI-I ROW LINE OF STI-I
STREET TO NORTI-I ROW LINE OF 2ND STREET,
_ EUCLID AvENUE.. FROM SOUTI-I ROW LINE OF STI-I STREET
TO PLAZA AT INTERSECTION OF 3RD STREET AND
WASI-IINC:sTCN AveNUE.
_ 4TI-I STREET (WEST OF WASI-IINCsTON AveNUE) FROM EAST
ROW LINE OF ALTON ROAD TO WEST ROW LINE OF
WASI-IINGTCN AveNUE.
_ LENOX COURT - FROM SOUTI-I ROW LINE OF STI-I STREET TO
NORTI-I ROW LINE OF 4TI-I STREET.
. MICI-IIC:sAN COURT.. FROM SCtiTI-I ROW LINE OF STI-I STREET
TO NORTI-I ROW LINE OF 2ND STREET.
. JEFFERSON COURT .. FROM SOUTI-l ROW LINE OF STI-I
STREET TO NORTI-I ROW LINE OF 2ND STREET.
_ EUCLID CCtiRT - FROM SOUTI-I ROW LINE OF STI-I STREET
TO NORTI-I ROW LINE OF 2ND STREET,
II PUll .
. 4TI-I STREET (EAST OF WASI-IINCsTON AvENUE) FROM EAST
ROW LINE OF WASI-IINCsTON AVENUE TO WEST ROW LINE OF
OCEAN DRIVE.
e. 2ND STREET - FROM EAST ROW LINE OF ALTCN ROAD TO
WEST ROW LINE OF <SlCEAN DRIVE.
e. 1ST STREET (WEST OF WASI-lINCsTON AVENUE) FROM
INTERSECTION WITI-I JEFFERSON AVENUE TO WEST ROW LINE
OF WASI-lINCsTON AvENUE.
. 1ST STREET (EAST OF WASI-IINC:sTON AVENUE) FROM EAST
ROW LINE OF WASI-IINCsTON AVENUE TO WEST ROW LINE OF
OCEAN DRIVE.
. COMMERCE STREET - FROM EAST ROW LINE OF ALTON
ROAD TO WEST ROW LINE OF WASI-IINCsTON AvENUE,
. SOUTI4 POINTE CCtiRT - FROM EAST ROW LINE OF ALTON
ROAD TO WEST ROW LINE OF WASI-lINCsTCN AveNUE.
. COMMERCE COURT - FROM EAST ROW LINE OF JEFFERSON
AvENUE TO WEST ROW LINE OF WASI-IINC:sTON STREET,
\, i
\\\ \ , ,,",J 11: ,II ' l
\\" '\ ~-_.X .. '..'
',\ ,\! 0 .Y ,-,', ,! ~",'
\~\ ~:_, __.J ~ l. _,~.'J F,~'.',cd L
\\. '\ -,
\:'::-\;, "",
'\\\\:,' :~....,
\it;~~~:;;,;r~{';;
.~~ \\ ",'''''-'
\~~ \~,;i~::.."
" \\
\\1\, \ \\, " ,(
\~~:~\ \\ .
'\'\\ \\
\\\'o\-,
\\ \' \
-:\\\ \\
'\ \ \ \:
\\ \ \ ,\
\\\\ \\ ~.
'~.:>\\\' .!
\'o \, \\ I .;i;.
'\ ~
\, \
\\\{,
'\'\\ \0.
',\ {\ \\
'\\\
\\\\
\\ \
, \ -
\\
,
e RDA RESPONSI6LE FOR CONSTRUCTION eASED ON
DEveLOPMENT
APPRovALS.
Ii PHASi ..
_ OCEAN DRIve - FROM SOUTI-I ROW LINE OF STI-I STREET TO
NORTI-I ROW LINE OF SOUTI-I POINTE DRIve.
_ COLLINS AvENUE - FROM SOUTI-I ROW LINE OF STI-I STREET
TO NORTI-I ROW LINE OF SOUTI-I POINTE DRIve.
_ OCEAN COURT - FROM SOUTI4 ROW LINE OF STI4 STREET TO
NORTI4 ROW LINE OF SOUTI-I POINTE DRIVE.
- COLL INS COURT - FROM SOUTI-I ROW LINE OF 50 TI-I STREET
TO NORTI4 ROW LINE OF SOUTI4 POINTE DRIVE.
. PHASE !
- ALTON ROAD .. FROM SOUTI-I ROW LINE OF STI-I STREET TO
INTERSECTION WITI-I SOUTI-l POINTE DRIVE.
- SOUTI-I POINTE DRIve .. FROM INTERSECTION WITI-I ALTON
ROAD TO EASTERN LIMITS.
~=n ro
--
I I ,2000
TUk N....... ..... ""nf_h May , Jun .... ... Oct fiolt' I Dee Jon '.. ~... All, May Jon Jo Au. I..
,
Phase 1 Wad 51281" Thu 7/27100 ~ :::;
Bagln Construction Documentatfon Wad 51281" Wad 5128/" . $/21 ,
Construction Documentatfon Wad 5I2C/S, Wad 5IU/" 5121 . .'. .-'. 8121 I
ParnWlang Wid '11", Thu 10/28/" 811 c...:~. . _,o..:':::::} 10121 ,
Advartfsament & Bidding Thu '130/" Thu 10/28/" I~ C::::S;10121
Award INTI' I'rtl0/U/" I'rll1/12/" '0121 b, '1/12
around Braaklng Mon 11/1''', Mon 11/1''', ., '1/15
Construction Tua 11/1$'" Thu 7/27100 l111e 7127
Phase 2 Mon 1 fll'" I'rl 7/27101 ~
Bagln Survay Mon 11/1", Mon 11/1'" .'111
Survay Mon 1111'" Mon 1131/00 11/1 1/:11
Bagln Construction Documentation Tua 2/1/00 Tua 2/1/00 +,211
Construction Documentatfon Wid 2/2/00 Mon $/12/00 , 212 1/12
"arnWlang Mon 511/00 Wad 7112/00 511 . . . . . . . . . 7112
Advartlsament & Bidding Tua 8/13/00 I'rt 7/14/00 , 1113 ~111'
Awanll NT,. Set 7/15/00 Tua 7121/00 11150,7125
around Breeklng Wad 7/U/00 Wad 7/2$/00 "'1121
Construction Thu 7/27100 I'rt 7/27101 7127
: ,
!
Phase 3 Wid 7/12/00 I'rf 12/21/01 i ...
Begin Survay Wad 7/12/00 Wad 7/12/00 ! "'-1112
lIurvlY Thu 7/13/00 Wad 10/18/00 ! 7f13
Bagln Construction Documentation Thu 10/15100 Thu 10/1S/00 : f
Construction Documentatfon I'r110120/00 Tua 3/8101 : I 1012.
"arnwtllng Tua 1/1$/01 Mon 4/2/01 I
Advartlsament & Bidding Wad 3/7/01 Tua 4/3/01
Awanll NT,. Wad 4/4/01 Wad 4/18101 I
around Braaklng Thu 4/15101 Thu 4/15101 T
Construction 1'" 4/20/01 1'''12/21/01 : I
:
Phase 4 Mon 4/2/01 Tua 513/02
aagln lIurvay Mpn 4/2/01 Mon 4/2/01 :
lIurvay Mon 4/2/01 Tua 7/3/01 :
Bagin Construction Documenlatlon Wad 7/4/01 Wad 714/01
Construction DocUmentatfon Thu 7/1/01 Thu 11/11/01
"arnWlang Wad S/28/01 I'rf 12/14/01
Advartlsament & Bidding 1"'11/1$/01 Tua 12/18/01
Awanll NT,. Wad 12/15101 Wad 1/2/02 !
around Breeklng Thu 1/3/02 Thu 1/3/02
Construction I'rf 1/4/02 Tue S/3/02
Phase 5 Mon 12/3/01 I'rl4/18/03 I
Bagin Survay Mon 12/3/01 Mon 12/3/01
Survay Mon 12/3101 Tua 3/1/02 I
Bagin Construction Documenlatlon Wad 3/8/02 Wad 3/8102 i
Construction Documentatfon Thu 3/7/02 Mon 7/25102 I
"arnwtllng Mon $/17102 Thu 8125102
Advartlsament & Bidding Tua 7130/02 Thu 8/25102 I
Awanll NT,. I'rf 8/30102 1'" 5113/02 !
(Jround Braaklng Mon "1"02 Mon 5118102 I
Constractlon Tua 5117/02 1'" 4/18/03 I
IP'oJ_' SOUln POInt. /.. c::::::::l "__ -- . "- ~_~f_ c::::::::::5 ............... 0 -...........-- -'- ~
Dot., F,' 9124198
!
I
I
I
I
I
I
I
I
I
I
tl18 . .
I
!
I
I
I
I
I
I
I
I
I
I
--
2001
JM I ....b
or
r I May Jun Jul AuQ
.... -:.:- .:-: :-:-:-:-:-
. . . ... 311
. , . ' ',. 412
'JI7~413
~ b.,lI
.,.,10
4f20 [."
. "2
412 ......
.. .) 717.7
...713
---';7/10
715
op
2002
ct 1'40'1 o.c .JWl 'eb rAifar I Apr I M-v
I
i
I
I
. ". ".j 1Z121
11/15
1/28 " . . , , , ,..',. 12/14
1t/11 ~ 12/11
12/10 t;:; 112
113
1/10
.12J:1
1Z13 .. .....
. .. . ' 315
4>,318
'JI7
SOUTH POINTE MASTERPLAN
PROJECT SCHEDULE
003
uQ *.., I Oct .. Noy o.c an pre. M.r Aur
'13
. . . . . .. 1121
..,7 !." -
. ....-j-.'.. '." 1/28
7130 """"'c::I, 1/28
1130 b 0113
., 0118
~11 ..
.,