HV AC REPLACEMENT PROJECT
FIRE STATION #1
QUOTATION #V A-QT01M-005
QUOTATION DUE: JUNE 6TH, 2005 AT 3:00 P.M.
CITY CLERK V
Brad A. Judd, Property Management Director
City of Miami Beach - Property Management Division
1245 Michigan Avenue
Miami Beach, FL 33139
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
1
~ CJJ v ~ A c..J:f
~
1700 CONVENTION CENTER DRIVE, MIAMI BEACH, FLORIDA 33139
http:\\miamibeachfl.gov
Telephone (305) 673-7000
Facsimile (305) 673-7650
QUOTATION NO: VA-QTOIM-005
BV AC REPLACEMENT PROJECT
FIRE STATION #1
Description: This Project covers the complete replacement of the air conditioning system at Fire
Station #1, located at 1051 Jefferson Avenue, Miami Beach, Florida.
Scope of Work: The work will include the replacement of the air conditioning system to include
the replacement of the duct work; support stands; and the replacement of controls and related
equipment. The Contractor will include in the quotation any equipment necessary for placement
of the equipment; all necessary electrical and plumbing work related to the Project; and any
required engineered drawings and permits necessary to successfully complete the work. Staging;
scheduling; and coordination of the Project will be done with the approval of the Property
Management Director. All work shall be completed in accordance with Florida Building Codes;
all other applicable codes; and in a manner that is consistent with industry standards. Contractor
shall be solely responsible for the verification of all HV AC equipment's tonnage and voltage
requirement necessary for the successful completion of the Project.
Contractor shall verify that the new units comply with outside air requirements as outline by
ASHRAE and any other guidelines applicable to the work being performed. The City shall not
supply any current engineering drawings or heat load calculations. These requirements shall be
provided by the Contractor.
Contractors submitting quotes for the Project shall examine the site and all current specifications
and base their quotation on existing field conditions and the scope of work of the proposed
renovations. Failure to do so will not be considered justification for additional charges after
contract is awarded.
Contractors submitting quotes on this Project must include in the quotation all costs of labor;
materials; and equipment necessary for the completion of the required work as per the
specifications provided.
The Contractor awarded this Contract must be able to pull any/all required permits no later than
three (3) weeks after the contract is executed and approved.
F or purposes of this quotation the Contractor understand that they will be working under a
General Building Permit pull by the Property Management Director. However, all Contractors
working under the General Building Permit must pull their own individual permits required for
their specifics trades and the scope of work.
QUOTE NO: V A-QTOIM-005 CITY OF MIAMI BEACH
DATE: OS/20/05 2
.
A Pre-Bid Conference/ Visit has been schedule for 10:00 a.m. on May 23rd , 2005 at Fire
Station #1 located at 1051 Jefferson Avenue, Miami Beach, FI33139.
The successful Contractor will be required to furnish General and Automobile Liability insurance
in the respective amounts of $1,000,000 and include the City of Miami Beach, Florida, as
additional insured on the certificate. The Contractor shall also provide a current copy of their
Occupational License and current copy of their State of Florida Contractor's License.
Quotations will be received until 3:00 p.m. on the June 6th, 2005, at the following address:
City of Miami Beach Property Management Division, 1245 Michigan Avenue, Miami
Beach, F133139.
Any questions or clarifications concerning this Quotation shall be submitted in writing by mail or
facsimile to the Property Management Director, 1245 Michigan Avenue, Miami Beach, FL
33139, or FAX: (305) 673-7650. The Quotation title/number shall be referenced on all
correspondence. All questions must be received no later than three (3) calendar days prior to the
scheduled Quotation opening date. All responses to questions/clarifications will be sent to all
prospective bidders in the form of an addendum.
The City of Miami Beach reserves the right to accept any quotation deemed to be in the best
interest of the City of Miami Beach. The City of Miami Beach may reject any and all quotations.
.~&:
Brad . udd, RP A, FMA, CGC
Director, Property Management Division
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
3
r.m J un. 2 1, 2 0 0 5 q 2: 4 8 P M::lb I"; 1 ~b 4
r't<ut-' M(jMI
No.0548 Fp. I 82/83
CITY OF MIAMI BEACH
1100 CONVENTION CENTER DRIVE. MIAMI BEACH. FLORIDA 33139
~- ---- -------
---~-~-- -:~ -:.....-~~~--~---===-~..: . ---
PROPERTY MANAGEMENT OMSION
Telephone; (305) 673-7000
Fecsiml~: (305) 613.7650
Mr. Sean Pinna
Master Mechanical Services, Inc.
6187N_W. 16'f!' St., H-25
Miami, Florida :nOlS
June 211l , 2005
Re: NOTIFICATION OF CONTRACT AW ARD-lNVlTA nON TO QUOTATION (IQ) VA-
QTOIM..ooS, BVAC REPLACEMENT PROn:cr AT FIRE STATION HI
Dear Mr. Pinna:
After reviewing all quotations submitted for the above referenced IQ. The City of Miami Beach
Property Management is awarding a cont.raa to MaStlV MechlDicaJ. Services, Inc. in the amount of
S25,14J.I' for the complete replacelDeat of the air cOIIdltioning system and, Ale Dud
replacement witJI Fibef'llass system witb new difl'NeI'S for $18.120.00.
Attached are four contract boob forwarded to you for (iOmp)etion and submission of the foJlowiog:
1. Sign where indicated 0[1 contract book and have aU four copies sealed; and
2. Attach an orisinal Insurance Certificate to the contract book marked "City Clerk".
Please return all five copies to Ibis office witbin 10 calendar days.
. Should you have any questio~ please contact Viviana Alemany at 305.673.7000 X-2968.
Thank you,
~
Brad A Judd, RPA. FMA, CGC
DiredOft Property Management Division
"
..----_~...._..4.._.... ..._ .n
JoAnn Pinna, President
Bill Pinna, Vice President
CMC 056729 Sean Pinna, Qualifier
~
~
S~, ~Iee,
June 29,2005
City of Miami Beach
Property Management Division
1245 Michigan Avenue
Miami Beach, FL 33139
RE: Contract V A-QT01M-005, HV AC Replacement Project at Fire Station #1 Building
To Whom It May Concern:
As president of Master Mechanical Services, Inc., I authorize Tina Pinna to sign all
contractual documents related to Contract No. V A-QT01M-005 awarded to Master
Mechanical Services, Inc. on June 21, 2005 in the amount of$25,841.80 for the complete
replacement of the air conditioning system and, NC Duct replacement with Fiberglass
system with new diffusers for $18,120.00.
If you have any questions, please contact me at 305/825-3004.
Thank you.
Sinc~ e
J Ann Pinna
resident, Master Mechanical Services, Inc.
6187 N.W. 167th St., H-25 · Miami, Florida 33015
Tel.: (305) 825-3004 · Fax: (305) 825-1607 · 24 hr. Service: (305) 940-6195
BV AC REPLACEMENT PROJECT
FIRE STATION #1
QUOTATION NO. V A-QTOIM-005
Proposal Page 1 of 2
This Project covers the complete replacement of the air conditioning system at Fire Station # 1,
located at 1051 Jefferson Avenue, Miami Beach, Florida.
The work will include the replacement of the air conditioning system to include the replacement
of the duct work; support stands; and the replacement of controls and related equipment. The
Contractor will include price for: the crane; all necessary electrical and plumbing work related to
the project; engineering drawings and permits to successfully complete the work.
LINE ITEM
LUMP SUM
1) BV AC Equipment
2) Labor
3) Crane
4) Duct work
5) Electrical
6) Miscellaneous
$ 9.501.80_
$ 8.500.00
$ 900.00
$ 1.100.00_
$ 2.900.00
$ 2.940.00
GRAND TOTAL:
$ 25.841.80
Replace AlC Duct Work
1) Fiberglass system with new diffusers
2) Sheet metal External Insulated with new diffusers
$ 18.120.00
$ 22.480.00
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
22
HV AC REPLACEMENT PROJECT
FIRE STATION #1
QUOTATION NO. V A-QTOIM-005
Proposal Page 2 of 2
PROMPT PAYMENT DISCOUNT: (i.e., 2%/10;1%/20)
ANY LETTERS, ATTACHMENTS, OR ADDITIONAL INFORMATION TO BE
CONSIDERED PART OF THE QUOTE MUST BE SUBMITTED IN DUPLICATE.
...-r-'". :)" '
SUBMITTED BY: I I/){( I (IJI )C,
/ (('fl(t n I('C(/j~~J-j,i I( (0 :'Jj"~~
"--~ ~-- -
COMPANY NAME:
SIGNED:
certify that I am authorized to execute this QUOTE and
commit the quoting firm)
Contractors!!!!!H acknowledge receipt of addendum (if applicable).
Amendment No. l:1lkLU ,~)ll. Jet.S Amendment No. 2:...7/1/\...(. 3)Dt~
InsedDate Insert Date I
NAMEffiTLE (Print): jJ /1 (\. /1,); Ie,
ADDRESS: {( I~' '1 /U ((.J J{{.f
CITY/STATE: fY)i () fYt I fi.
I
TELEPHONE NO: ,"3 ell) / &' J ~.. 3n{) 1./
I
FACSIMILE NO: ,.~ D5- / ~ J. S' / Lcrrl-.
,
.,~, I
.5,'f '. j I ) 'S
ZIP: 3 3D / j"
QUOTE NO: V A-QTOIM-005
DATE: 05/20/05
CITY OF MIAMI BEACH
23
~'
~
) .
...
THE CITY OF ~IIAMI BEACH
PROPERTY MANAGEMENT
1245 MICHIGAN A VENUE
MIAMI BEACH, FLORIDA 33139
Phone: (305) 673-7000 Fax: (305) 673-7650
~~.
-
HV AC REPLACEMENT PROJECT AT FIRE STATION #1
QUOTATION NO. VA-QTOIM-005
ADDENDUM NO.2
JUNE 3, 2005
1- The following is an addition to the scope of work discuss at the Pr~ Bid
Conference! Visit at the Fire Station # 1. ~
1. Please provide separate price to replace the existing duct installation
through out the building, first and second floor.
Provide 2 different prices; one to be replaced with sheet metal duct and a
second option to be replaced with fiber glass duct.
Please stop at our office as soon as you can to pick up copies of the as
built drawings that will help you in your estimate.
2. We are extending the date line of the quotation (1) one more week, to be
due June 13th, 2005.
The bidder must acknowledge receipt of this clarification, as well as receipt of all
amendments, on the proposal page.
Thank you,
~
Viviana Alemany
Construction Manager
t,
-
THE CITY OF MIAMI BEACH
PROPERTY MANAGEMENT
1245 MICHIGAN AVENUE
MIAMI BEACH, FLORIDA 33139
Phone: (305) 673-7000 Fax: (305) 673-7650
HV AC REPLACEMENT PROJECT AT FIRE STATION #1
QUOTATION NO. V A-QTOIM-005
ADDENDUM NO.1
MAY 24, 2005
1- The following are clarifications from the Pre- lJid Conference/ Visit at
the Fire Station # 1.
1. Contractor shall install duct detector and wiring to the existing fire alarm
panel. The City will make the final connection to the fire alarm panel.
Contractor shall verify duct detector compatibility with existing fire
alarm system.
2. HV AC system thermostat shall be relocated to sleeping quarters.
3. HV AC system shall be provided with outside air filtration system that will
substantially eliminate intrusion of sewer station emissions.
The bidder must acknowledge receipt of this clarification, as well as receipt of all
amendments, on the proposal page.
T~
Viviana Alemany
Construction Manager
Z
Q
U)
:>
Q
t-
Z'"
w*
:i:Z
wO
oj::
<(<(
2t-."
<(u)o
:Ew9
>~~t-
.........ow
D::":t-w
~OOJ:
ow.U)
O::"'~z
a..O 0
::I:D::zj::
oa..Oc:(
c:(t--...J
uJzt-:)
mW~m
-:EO<
:Ew:)t-
<(00
:is
&La..
OW
~~
-<(
0>
::I:
aJ
C
'c
o
;;
:s
c
o
Ou
.: c
<(-
CD
c
c
o
o
u
:E
u
.E
o
'0
...
-
c
o
o
c
o
en
c
.c
o
..,
o
CD
U
.~
CD
U)
Ci
u
'c u
CIS c
.c-
u
CD
:E
...
CD
-
en
CIS
:E
2
o
;::
a..
D2
o
U)
w
c
...
'tij
CD
.c
-
'O~
_ CIS
C _
CD E
E CD
CD-
U CIl
CIS>-
-CIl
Q.CSl
e c
CD 'c
- 0
CD ,_
--
Q..-
E'tI
o C
03
o
o
o
o
II)
00
00
00
00
00
~ai
~~
...
N
o
o
o
cO
....
(f')
cD
~
00
00
.('f)
(f')~
"!. ......-
NO
~~
o
ClO
00
~~
00
ClON
~-~
NClO
N....
00
....
~
ClO
11)"
~
s...
CD CD
T~
-
C
CD
E
CD
u
CIS
ii
e
-
U
:I
C
Jun.24, 2005 10:33AM
No,0696
p. 2
ACORD. CERTIFICATE OF LIABILITY INSURANCE 0' ID ~ DATE (MII/DOIYYYY)
IQSTB-2 06/24/05
''lODUCIR THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMA TlON
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
Kabft-c.rlin . ec.pany, Ine. HOLDeJlt. TtlS CERTlFICATI! oeES NOT AMEND, EXTEND OR
3350 s. Dixie Highway N..:n.!R THE COVERAGE AFPORDED BY THE POUCID BELOW,
Miami VL 33133-"84
Phone; 305-446-2271 Fax:305-448-3127 IN8lIRERS AFFORDING COVDAGE NAIC II
INSURED INIlURERA; .orthe~n Inllukance CCIllDany 1U72
INSURER 8; FCCI MU.~ual Insuran.ce Co
Ma.~er ~i.ilieal ser;iC!8,tnc INSUI\Efl c:
'l81.NW St~e.~ H- 5 INSUREIlI).
M1U1J, 'L 33 15
INSUlU!" eo
COYIRAOE8
THI! ~SOF INSU~ 1I11TB> BELOW H4W !IaN ISSU'D 'IQ THE INSURiD NAMED AIlO\IE FOR 1W~ POLICY "'RIOD INDIOATm. N01'WrTti8TMlDlNG
AMY ~MENT. TEIW OR CONDITION 0' ",." cxmnw;T OR OTICR 00C\JMEH1' WITH RESPECT TO WHICH THIS CliRTlFICAT& MAY lIE lS8U~o OR
MAY PERTAIN. THE INSORAHCI!! AFFOIlDED 8V TIlS PoI,ICIES Of:SCRI8I!O HlREtllS 8U1l.IECT TO AlL TIE TERM5. i:XCWSIONS '-liD CONDITIONS OF 8UC11
POLICES. AOOIIIEGATE LJMrTS SHOWN """ tf,AI/E BEEN REDUCfO BY PAID CLAIMS. l'JL
TTI' I'O&.K:Y NUMlEII 'irt.~ I.lMITlI
~UUlLny -~ $1,000,000
A ~ C~~GIN&IW. LIAIlU1Y SCP04351S3571 08/01/04 08/01/05 s n;,;'_iai-I . SO, 000
f-- 5 CLAIMS ""lli [iJ OCCUR ME!) EXP (Any.... perMI\) $ S. 000
p~ I N:N INJURY '1,000,000
GlIlIEIW. ~'l'E . 2,000,000
nH1.~Elile LNIT "'ri PE~ PROIJUC1'& - COWIOP AGO S 2, 000.000
POLICY 28r LOC
AlnOMOIlLE LIAIILnV ~l) eINQU; UMIT
f-- .
N-tfI\UTO (lia_1nIj
-
- AlL OINNIiD /\UTOS 8ODll. Y INJURY
('''-) .
- IClillIIIl.eO AUTOS
- HIRl!O AUTOS ISODIL Y II'IJURY
(Pt'"OCId4/ll) .
- NOH-<)WNED AUTOs
- PROP=.rMAGE .
(PI'
WUtAGE LIAIILIn' AUTO ONLY - Ei' ACCIOelT .
R' ANY AVTO OTHliR THAN EAAOC .
AUTO ONI.Y: -'GO .
EllC~llILL\ UMlt.ITY ~CH OCCURRENCE '2,000,000
A ~-OCQ~ 0 CLAlWMI\DE SCP043S753571 08/0J./04 08/01/05 AG~EGl\,", .
S
H ~OOC11&lE $
~gmol/ $ I I
-M r.:OIIIl'INSA11OII AND X 1.,.;;........if..1 IQ~lt
8 1IM'LOvlllll' LNlUIV 53760 03/14/05 03/14/06 E.L~" ACClDeHT S 500,000
AH'f'==ARIN!IlIEXECU'I1\IE
0Ff1C R ElCCLIJDEm e.L. DISEASE . EA liW\.0Y8 S 500,000
DIMr~.~NSbllaw E.L. DlSUS4- POLICy UUIT 1500,000
OTtER
A Rented an4 Le<ed SCPOt357S371 08/01/04 08/01/05 Rental $10,000
Cantractozos TOOL' Ii ROUIPIQDft' : DBD $500
0I1CItPI1ON OF 0lIIAA'IIONI1 LOCIATIONt I VEHlCLIS I IXCtUllOil. ADOD IY ENDOMWENT I fI'ICllAL PRCMIIOtl8
RB: ~-QT01M-005, QVAC R.placement P~i.Clt Pire Station #1
City of Miami Beach i. named as additional Insured with r..pect to GGner.l
LiabiUty
Cl!ImFICATE HOLDER
HIAN-1S
CANCILLATION
IHOULD AIl'r OF tHE AIIOV& IIQCRlIED l'Ouan BE CAllClil.l.lO IEFORltHE EX_T~
DAft! 1NIltlOF, 'HliIDlMG IlIIUIlIlI ~ ENU&AYOllIlV... ~ DAft WRIITfN
NOTICE TO TNC CI~'ni HOLDER ~ TO 'ftll Llln. "" FALURE TO DO ao ettALI.
IIIIII'OH Il1O OILIGATION OR UA8R.rrr OF ANY KINO UPON TMI"'UIIIIl.ITS AGENTS 011
The City of IIlam! Be.eh
Procureaent D1vi.ion
1700 Convention Center Drive
Ni..i Beach rL 33139
'W4.~
ACORD 25 (2001108)
o ACORD CORPoRATION 1988
" -... ".'-.""".'--'--.-'--,...---,
i
'l\l "'lltI I LI~Df\V[,,!\ 1\\1[. OF INSURANCE
J un. 24, 2 0 0 5 1 0 : 3 3 AM' - _. . ". . v,"", I ~
li ....LlITATe IN8UIWlCE COIF.wr ClALL8TATe INDEIINITY COMPANY IJAu.aTATE '- u.ovD'8
TI1ls CI!lU1I'1CATE IS /Is"""......".", OF I_TION ONLY AND eotooERS No IlklHT8 UPON "'S QEl\TJFICATE HOI.DeA,
. THIS CERTlP'CATE beES NO,. AMEND, EXTeND OR At TS~ THe COVeRAoe,AFFORDeD BY TI-8 POUCles BELOW.
011 IFIO ffOU)IR ID RI!
NII'IlIIIId II of to Mom eta e te il '''ued Name IIlCf Address of Inauttcl
CITY OF MIA BEA H PROCUREMENT CENTER MASTER MECHANICAL S&~V'C I INC.
DRIVE
1700 CONVENTION CENTER DRIVE e187 NW 167tH ST, H-2e
MIAMI BEACH, FL 33140 MIAMI, I=L 33015
No,0696
p. 31
IS II to ce that polio_ InaYr.,u>> IIitii belOw hfii en lMd to . ina", -"'cI _VI IllIIjed to .". I'IIIlon IftdICidid MIoW.
.-"'"'-... -. - '" -- of.., - or - -.... _....... ... _ ...... _ or m"
F*tIin, The lnsurwa Ifrofded by the PGIofes d81crtb1cf ".,.," IIIUbJect to III the IItmt. --IoIaa, and OOIldilianl or auah pollOlee,
TV OF INIURAHcIi AND L1MfTS
EIte6e
Dell
$
Elph8t1on
D_
unt
.
Elrectlvw
D_
iJcplrallon
DIta
EffectIVe E1cP"'UOn 07/23/08
048871447 0 Date
ANV UTo 08 Combi
T
X SPeOlFIED AUTOS x HCN-OWNIO AUTOa
l~
OWNl!D PRIVATE PA$8ENG!" Autos .
X OWN!D AUTOS OTHER l'tfAN PRIVATE PA8llNGeR S
UM8RILlA LIA8JUTY' Policy 049024137 07/23108
m r
E L I N8 E
000
Polio)' Efftctlve EJcpiIlrlcln
r DIll 0
DEacJQPnON OP OPIRATION84.CCATION8NEHlcL&emeSTRICTJ0N8f4IiecIAL IT_
RE:VA-QT01M..oOS, HVAC REPLACEMENT PROJECT FIRE STATlON'1 CITY OF MIAMI BEACH IS NAMeo AS
DOlilONAL INSURED WITH RESPECT TO N RAL llASI
CANCELLATION
N.,.,..,. of aye 'lollce 30 - 6123104
.,...
Should Illy 01 the above delctlbed pollcIe. be ClMeIted berole ... "lion .,., !he IMUlng CllmJItny Will encf-.vo, to rut Wfttlln the number of
da)lll "'''hilt Mov., wrllten no&Ice to lie certifle.te holder nMlId above. 8U! '.111118 to RIll euch nOllce -hi. impose no oblgatloll Or
li.blt of I on I itl or re 1'Itet' I.
0'0523-2
....,.."..... ... '""'''.-.....-...-......-....-..--,.,,--r------..._
I AC# -' "~Q) u u c.. ,j J.
! e~--~~" -
I"
I
I
5T ATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
CONSTRUCTION .' INDUSTRY LICENSING BOARD SEQ#L04072101704
.
07/21 2004 040074594 CMCOS7200
'rhe MECHANICAL.CONTRACTOR
Named below IS CERTIFIED
Under the provtsions of
Expiration date: AUG 31, 2
FLOWERS , WILLIAM SHAWN'> '
MASTER MECHANICAL SERVICES
6187 NW 167 STREET #H25
I MIAMI FL 330I'S
L/ ",JEll BUSI! . DIANE CARR
~/::~ov~o~ ~_ DISPLAY AS REQUIRED_B\'LAW_~_~____~E~R~~1\l<~_____
I ---'~--'-_._----~_""'__'~'_------~--~""---"":"""';':'':_':'_~''~a;;~~;';';';;~~,,~;,,~
STATE OF FlORIDA AC# 15 (] 0 2 31
DEPARTMENT OF BUSINESS. AND
. 'PROFESSIONAL;REGULATI'::>N
, - ....;' .' .. .'.. "c.. " .. ,:',.,. :..\,.;.'~, .. ".. .: "," .... ",
CMC057200';:;\ ;07j21/04~040 :>745
r: "":-'.._";-,::_-::::. oJ,', :: _ ;';-:,,<.>',_,', :: ......._.. '_";._C.:.::,-, _',... _, .. _', ,
~:: ,', ,",:_.. :'.,' " ' .. '-.. c:, .' '::, ': ','_'.. ",: _.: ',,'.. ':" ~.;.. .: e, "
CERTIFIEI>MECHANICAI.iCONTRACTOR
FLOWERS ,.j'WIL.LIAM".SHAWN
MASTER MECHANICAL SERVICES INC
J "~""-":'::.:;_ ; ....':,., .. .. /;.,1:. .,
',':.""':;'::"":,'-', .-
". ",:,,,,,,-,,,,""..,' .
, " '>.-:.'.;> ,",',,' ,.,.'"
,'.,.':........-.,..- ,
,.
IS CERTIFIED under the provisions of Ch.489 FS.
Expiration date. AUG 31, 2006 L04072101704
DETACH HERE
'-7_.'.;. .....'__.:,.:'
CUPATiONAt'UCENSE TAX . . 2005.'
DE COUNTY ~. STATE OF FLORIDA
. '. EXl?lJiES:SEPT.30,2005 . .'
!BEDISpLAYED At'PLACEOFBUSINES$
:'.P.Y,RSI,IA,NT:Tp'COUNTYC!ODE<:;HAPTER 8A - ART. 9 & 10
FIRST-CLASS
U.S. POSTAGE
PAID
MIAMI, FL
PERMIT NO. 231
454982-1
BUSINESS NAME I LOCATION
MASTER MECHANICAL SERVICES
6181 NW 167 ST
33015 UNIN DADE COUNTY
nus IS NOT t\ BH..L-DO NOT PAY
RENEWAL
LICENSE NO. 474984-3
STATE #CMC057200
INC
H25
OWNER
MASTER MECHANICAL SERVICES INC
Sec. Type of Business
196 GENERAL MECHANICAL CONTRACTOR
THIS IS AN OCCUPATIONAL
TAX ONLY. IT DOES NOT
PERMIT THE LICENSEE TO
VIOLATE ANY EXISTING
REGULATORY OR ZONING
LAWS OF THE COUNTY OR
CITIES. NOR DOES IT
EXEMPT THE L1GENSEE
FROM ANY OTHER LICENSE
OR PERMIT REQUIRED BV
LAW. THIS IS NOT A
CERTIFICATION OF TilE
L1CENSEE'S QUt,LIFICA-
TION.
WORKER/S
4
DO NOT FORWARD
PAYMENT RECEIVEIl
MIAMI-DADE COUNTY TAX
COLLECTOR: .
MASTER MECHANICAL SERVICES
JOANN PINNA PRES
6187 NW 167 5T H25
MIAMI FL 33015
INC
08/03/2004
00240000174
000075 i.Q:9 .
SEE OTHER SIDE
11111 II I j i I j I,! 1111 i II j I illIlll'l Ii II ~,lll '/11111111 J 1I1I1 i i il
HV AC REPLACEMENT PROJECT
FIRE STATION #1
QUOTATION NO: V A-QT01M-005
1.0 GENERAL CONDITIONS
1.1 SEALED QUOTATION:
Original copy of Quotation Form as well as any other pertinent documents must be returned
in order for a quotation to be considered for award. All Quotations are subject to all
conditions specified in this Quotation Form.
The completed Quotation Form must be submitted in a sealed envelope clearly marked to the
City of Miami Beach Property Management Director, 1245 Michigan Avenue, Miami
Beach, Florida 33139. Facsimile quotations will also be accepted.
1.2 EXECUTION OF QUOTE:
Quote must contain a manual signature of an authorized representative in the space provided
on the Quote Form. Failure to properly sign the Quotation Form shall invalidate same and it
shall NOT be considered. All quotes must be completed in pen and ink or typewritten. No
erasures are permitted. If a correction is necessary, draw a single line through the entered
figure and enter the corrected figure above it. Corrections must be initialed by the person
signing the quote. Any illegible entries, pencil bids or corrections not initialed will not be
tabulated. The original quote CANNOT be changed or altered in any way. Altered quotes
will not be considered.
'1.3 NO QUOTE SUBMITTED:
Ifnot submitting a quote, respond by returning the enclosed Quotation Form questionnaire,
and explain the reason. Repeated failure to not quote without sufficient justification may be
cause for removal of a Contractor's name from the quote mailing list.
1.4 PRICES QUOTED:
Deduct trade discounts and quote firm net prices. Give both unit price and extended total,
when requested. Prices must be stated in units of quantity specified in the bidding
specifications. In case of discrepancy in computing the amount of the quote, the UNIT
PRICE quoted will govern. All prices must be F.O.B. destination, freight prepaid (unless
otherwise stated in special conditions). Discounts for prompt payment. Award, if made, will
be in accordance with terms and conditions stated herein. Each item must be quoted
separately and no attempt is to be made to tie any item or items in with any other item or
items. Cash or quantity discounts offered will not be a consideration in determination of
award of quote( s).
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
4
1.5 TAXES:
The City of Miami Beach is exempt from all Federal Excise and State taxes. State Sales Tax
and Use Certificate Number is 23-09-329871-54C.
1.6 MISTAKES:
Contractors submitting quotes are expected, and solely responsible for examining the
specifications, delivery schedules, quotation prices and extensions and all instructions
pertaining to supplies and services. Failure to do so will be at the Contractor's risk.
1.7 CONDITION AND PACKAGING:
It is understood and agreed that any item offered or shipped as a result of this quotation shall
be the latest new and current model offered (most current production model at the time of this
quote). All containers shall be suitable for storage or shipment, and all prices shall include
standard commercial packaging.
1.8 UNDERWRITERS' LABORATORIES:
Unless otherwise stipulated in the quotation, all manufactured items and fabricated assemblies
shall be Underwriters Laboratories listed or re-examination listing where such has been
established by Underwriters Laboratories for the item(s) offered and furnished.
1.9 WAIVER OR REJECTION OF QUOTATIONS:
The City reserves the right to waive irregularities or technicalities in quotations or to reject all
quotations or any part of any quote it deems necessary in the best interest of the City of
Miami Beach.
1.10 EQUIVALENTS:
If Contractor offers makes of equipment or brands of supplies other than those specified in
the following, he must so indicate on his quote. Specific article( s) of equipment/supplies shall
conform in quality, design and construction with all published claims of the manufacturer.
Brand Names: Catalog numbers, manufacturers' and brand names, when listed, are
informational guides as to a standard of acceptable product quality level only and should not
be construed as an endorsement or a product limitation of recognized and legitimate
manufacturers. Contractors shall formally substantiate and verify that product( s) offered
conform with or exceed quality as listed in the specifications.
Contractor shall indicate on the Quotation Form the manufacturer's name and number if
quoting other than the specified brands, and shall indicate ANY deviation from the
specifications as listed. Other than specified items offered requires complete descriptive
technical literature marked to indicate detail(s) conformance with specifications and MUST
BE INCLUDED WITH THE QUOTE. NO QUOTES WILL BE CONSIDERED
WITHOUT THIS DATA.
Lacking any written indication of intent to quote an alternate brand or model number, the
quote will be considered as a quote in complete compliance with the specifications as listed on
the attached form.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
5
1.11 NON-CONFORMANCE TO CONTRACT CONDITIONS:
Items may be tested for compliance with specifications. Items delivered, not conforming to
specifications may be rejected and returned at Contractor's expense. These items and items
not delivered as per delivery date in quote and/or purchase order may be purchased on the
open market. Any increase in cost may be charged against the contractor. Any violation of
these stipulations may also result in Contractor's name being removed from the City's vendor
list.
1.12 SAMPLES:
Samples of items, when required, must be furnished free of expense. Contractors will be
responsible for the removal of all samples furnished within thirty (30) days after quote
opening. All samples will be disposed of after thirty (30) days. Each individual sample must
be labeled with Contractor's name. Failure of Contractor to either deliver required samples or
to clearly identifY samples may be reason for rejection of the quote. Unless otherwise
indicated, samples should be delivered to the Property Management Director, 1245
Michigan Avenue, Miami Beach, Florida 33139.
1.13 DELIVERY:
Unless actual date of delivery is specified (or if specified delivery cannot be met), show
number of days (in calendar days) required to make delivery after receipt of purchase order, in
space provided. Delivery time may become a basis for making an award. Delivery shall be
within the normal working hours of the City, Monday through Friday, excluding holidays.
1.14 AWARDS:
When deemed to be in the best interest of the City of Miami Beach, the City reserves the right,
to reject all quotes or any portion of any quote it deems necessary; to accept any item or
group of items unless qualified by the Contractor; to acquire additional quantities at prices
quoted on the Quotation Form unless additional quantities are not acceptable, in which case
the Quotation Form must be noted "QUOTE IS FOR SPECIFIED QUANTITY ONL Y'
1.15 INSPECTION, ACCEPTANCE & TITLE:
Inspection and acceptance will be at destination unless otherwise provided. Title t%r risk of
loss or damage to all items shall be the responsibility of the successful Contractor until
acceptance by the City unless loss or damage resulting from the sole negligence by the City. If
the materials or services supplied to the City are found to be defective or not conform to
specifications, the City reserves the right to cancel the order upon written notice to the
Contractor and/or the vendor and return product at Contractor's expense.
1.16 PAYMENT:
Payment will be made by the City after the items awarded to a Contractor and/or the vendor
have been received, inspected, and found to comply with award specifications, free of damage
or defect and properly invoiced.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
6
. 1.17 DISPUTES:
In case of any doubt or difference of opinion as to the items to be furnished hereunder, the
decision of the City shall be final and binding on all parties.
1.18 LEGAL REQUIREMENTS:
Federal, State, County and City laws, ordinances, rules and regulations that in any manner
affect the items covered herein apply. Lack of knowledge by the Contractor will in no way be
a cause for relief from responsibility.
1.19 PATENTS & ROYALTIES:
The Contractor, without exception, shall indemnify and save harmless the City of Miami
Beach, Florida and its employees from liability of any nature or kind, including cost and
expenses for, or on account of, any copyrighted, patented, or unpatented invention, process,
or article manufactured or used in the perfonnance of the contract, including its use by the
City of Miami Beach, Florida. If the Contractor uses any design, device or materials covered
by letters, patent, or copyright, it is mutually understood and agreed, without exception, that
the quote prices shall include all royalties or cost arising from the use of such design, device,
or materials in any way involved in the work.
1.20 OSHA:
The Contractor warrants that the product supplied to the City shall confonn in all respects to
the standards set forth in the Occupational Safety and Health Act (OSHA) of 1970, as
amended, and the failure to comply with this condition will be considered as a breach of
contract. Any fines levied because of inadequacies to comply with these requirements shall be
borne solely by the contractor responsible for same.
1.21 SPECIAL CONDITIONS:
Any and all Special Conditions that may vary from the General Conditions shall take
precedence.
1.22 ANTI-DISCRIMINATION:
Contractor certifies that he/she is in compliance with the non-discrimination clause contained
in Section 202, Executive Order 11246, as amended by Executive Order 11375, relative to
equal employment opportunity for all persons without regard to race, color, religion, sex or
national origin.
1.23 AMERICAN WITH DISABILITIES ACT:
Call (305) 673-7490NOICE to request material in accessible fonnat; sign language
interpreters (five days in advance when possible), or infonnation on access for persons with
disabilities. For more infonnation on ADA compliance please call the Heidi Johnson Wright at
the Public Works Department at (305)673-7080.
1.24 QUALITY:
All materials used for the manufacture or construction of any supplies, materials or equipment
covered by this quote shall be new. The items quoted must be new, the latest model, of the
best quality, and highest grade workmanship.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
7
1.25 LIABILITY, INSURANCE, LICENSES AND PERMITS:
Where Contractor is required to enter or go onto City of Miami Beach property to deliver
materials or perform work or services as a result of a quotation award, the Contractor will
assume the full duty, obligation and expense of obtaining all necessary licenses, permits and
insurance and assure all work complies with all applicable Miami Dade County and City of
Miami Beach Building Code requirements and the South Florida Building Code, all as may be
amended. The Contractor shall be liable for any damages or loss to the City occasioned by
negligence of the Contractor, its subcontractor, or any other persons the Contractor has
designated in the completion of the contract as a result of his or her quote.
1.26 PERFORMANCE BONDS, CERTIFICATES OF INSURANCE:
After acceptance of quote, the City will require the successful Contractor to submit a
performance bond and certificate of insurance in the amount specified in the Special
Conditions.
1.27 DEFAULT:
Failure or refusal of a Contractor to execute a contract upon award, or withdrawal of a quote
before such award is made, may result in forfeiture of that portion of any surety required
equal to liquidated damages incurred by the City thereby, or where surety is not required,
failure to execute a contract as described above may be grounds for removing the Contractor
from the City's vendor list.
1.28 CANCELLATION:
In the event any of the provisions of this quote are violated by the Contractor, the Property
Management Director shall give written notice to the Contractor stating the deficiencies, and
unless such deficiencies are corrected within ten (10) days, recommendation will be made for
immediate cancellation.. The City reserves the right to terminate any contract resulting from
this quotation at any time and for any reason, upon giving thirty (30), days prior written notice
to the other party,
1.29 BILLING INSTRUCTIONS:
Invoices, unless otherwise indicated, must show purchase order numbers and shall be
submitted in DUPLICATE to the City of Miami Beach Property Management Division,
1245 Michigan Avenue, Miami Beach, Florida 33139.
1.30 NOTE TO VENDORS DELIVERING TO THE CITY OF MIAMI BEACH:
Receiving hours are Monday through Friday, excluding holidays, from 8:30 AM. to 5:00
P.M.
1.31 SUBSTITUTIONS:
The City WILL NOT accept substitute shipments of any kind. Contractors are expected to
furnish the brand quoted in their quote once awarded. Any substitute shipments will be
returned at the Contractor's expense.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
8
1.32 FACILITIES:
The City reserves the right to inspect the Contractor's facilities at any time with reasonable
prior notice.
1.33 QUOTE TABULATIONS:
Contractor's desiring a copy of the quote tabulation, may request same by enclosing a self-
addressed stamped envelope with the quote.
1.34 CLARIFICATION AND ADDENDA TO QUOTE SPECIFICATIONS:
Any Contractor contemplating submitting a quote who is in doubt as to the true meaning of
the specifications or other quote documents, or any part thereof, must submit to the City of
Miami Beach Property Management Director, 1245 Michigan Avenue, Miami Beach,
Florida, or fax (305)673-7650, at least two (2) calendar days prior to scheduled quote
opening, a written request for clarification and/or interpretation.
All such requests for clarification must be made in writing and the person submitting the
request will be responsible for its timely delivery and/or fax transmission.
Any clarification and/or interpretation of the quote, if made, will be made only by written
Addendum duly issued by the City of Miami Beach Property Management Director. The
City shall issue an Informational Addendum if clarification or minimal changes are required.
The City shall issue a Formal Addendum if substantial changes which impact the technical
submission of quotes is required. A copy of such Addendum shall be sent by mail or facsimile
to each Contractor receiving the quote. In the event of conflict with the original quote,
Addendum shall govern to the extent specified. Subsequent Addendum shall govern over
prior Addendum only to the extent specified. The Contractor shall be required to
acknowledge receipt of Formal Addendum by signing in the space provided on the Quote
Proposal Form. Failure to acknowledge Addendum may deem a quote non-responsive;
provided, however, that the City may waive this requirement when in its best interest. The
City will not be responsible for any clarifications or interpretations made verbally.
1.35 DEMONSTRA TION OF COMPETENCY:
1) Pre-award inspection of the Contractor's facility may be made prior to the award of
contract. Quotes will only be considered from firms which are regularly engaged in the
business of providing the goods and/or services as described in this invitation for quote.
Contractors must be able to demonstrate a good record of performance for a reasonable
period of time, and have sufficient financial support, equipment and organization to insure
that they can satisfactorily execute the services if awarded a contract under the terms and
conditions herein stated. The terms "equipment and organization" as used herein shall be
construed to mean a fully equipped and well established company in line with the best
business practices in the industry and as determined by the City of Miami Beach.
2) The City may consider any evidence available regarding the financial, technical and other
qualifications and abilities of a Contractor, including past performance ( experience) with the
City in making the quote award in the best interest of the City.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
9
3) The Property Management Director may require Contractors to show proof that they have
been designated as authorized representatives of a manufacturer or supplier which is the
actual source of supply. In these instances, the City may also require material information
from the source of supply regarding the quality, packaging, and characteristics of the products
to be supplies to the City through the designated representative. Any conflicts between this
material information provided by the source of supply and the information contained in the
Contractor's quote may render the quote non-responsive.
4) The City may, review the successful contractor's record of performance to ensure that the
Contractor is continuing to provide sufficient financial support, equipment and organization as
prescribed in this Quotation Form. Irrespective of the Contractor's performance on contracts
awarded to it by the City, the City may place said contracts on probationary status and
implement termination procedures if the City determines that the successful Contractor no
longer possesses the financial support, equipment and organization which would have been
necessary during the quote evaluation period in order to comply with this demonstration of
competency section.
1.36 DETERMINATION OF AWARD:
The City shall award the contract to the lowest and best Contractor. In determining the
lowest and best Contractor, in addition to price, there shall be considered the following:
a. The ability, capacity and skill of the contractor to perform the contract.
b. Whether the Contractor can perform the contract within the time specified,
without delay.
c. The character, integrity, reputation, judgment, experience and efficiency of the
Contractor.
d. The quality of performance of previous contracts.
e. The previous and existing compliance by the Contractor with laws and
ordinances relating to the contract.
1.37 ASSIGNMENT:
The Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the contract,
including any or all of its right, title or interest therein, or his or its power to execute such
contract to any person, company or corporation without the prior written consent ofthe City.
1.38 LAWS, PERMITS AND REGULATIONS:
The Contractor shall obtain and pay for all licenses, permits and inspection fees required for
this project; and shall comply with all laws, ordinances, regulations and building code
requirements applicable to the work contemplated herein.
1.39 SPOT MARKET PURCHASES:
It is the intent of the City to purchase the items specifically listed in this quote solicitation
from the Contractor. However, items that are to be Spot Market Purchased may be
purchased by other methods, (i.e. Federal, State or local contracts).
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
10
1.40 ELIMINATION FROM CONSIDERATION:
This quote shall not be awarded to any person or firm which is in arrears to the City upon any
debt, taxes or contracts which are defaulted as surety or otherwise upon any obligation to the
City.
1.41 ESTIMATED QUANTITIES:
Estimated quantities or estimated dollars, if provided, are for City guidance only. No
guarantee is expressed or implied as to quantities or dollars that will be used during the
contract period. The City is not obligated to place any order for a given amount subsequent to
the award of this quote. Estimates are based upon the City's actual needs and/or usage during
a previous contract period. The City, for purposes of determining the successful Contractor
meeting specifications, may use said estimates in reaching a decision.
1.42 COLLUSION:
Quotes from related parties: Where two (2) or more related parties each submit a quote or
proposal for any contract, such bids or quotes shall be presumed to be collusive. The
foregoing presumption may be rebutted by presentation of evidence as to the extent of
ownership, control and management of such related parties in the preparation and submittal of
such bids or proposals. Related parties mean bidders or proposers or in this case,
respondent's to this quote, or the principals thereofwhich have a direct or indirect ownership
interest in another bidder or proposer for the same contract or in which a parent company or
the principals thereof of one bidder or proposer have a direct or indirect ownership interest in
another bidder or proposer for the same contract. Quotes found to be collusive shall be
rejected. Bidders or proposers who have been found to have engaged in collusion shall be
considered non-responsive, and may be suspended or debarred, and any contract resulting
from collusive bidding may be terminated for default.
1.43 DISPUTES:
In the event of a conflict between the documents, the order of priority of the documents shall
be as follows:
· The contract resulting from the award of this quote (if applicable); then
· Addenda released for this quotation, with the latest Addendum taking precedence;
then
· The Quotation Form; then
· Contractor's Quote.
1.44 REASONABLE ACCOMMODATION:
In accordance with Title II of the Americans with Disabilities Act, any person requiring an
accommodation at the quote opening because of a disability must contact Heidi Johnson
Wright at the Public Works Department at (305) 673-7080.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
11
1.45 GRATUITIES:
Contractors shall not offer any gratuities, favors, or anything of monetary value to any
official, employee, or agent of the City, for the purpose of influencing consideration of this
quotation.
1.46 SIGNED QUOTE CONSIDERED AN OFFER:
The signed quote shall be considered an offer on the part of the Contractor, which offer shall
be deemed accepted upon approval by the City, In case of default on the part ofthe successful
Contractor, after such acceptance, the City may procure the items or services from other
sources and hold the Contractor responsible for any excess cost occasioned or incurred
thereby.
1.47 TIE QUOTES:
In accordance with Section 287.087, Florida Statutes, regarding identical tie quotes,
preference will be given to Contractors certifying that they have implemented a drug free
work place program. A certification form will be required at that time.
1.48 PUBLIC ENTITY CRIMES (PEC):
A person or affiliate who has been placed on the convicted vendor list following a conviction
for public entity crimes may not submit a bid on a contract to provide any goods or services
to a public entity, may not submit a bid on a contract with a public entity for the construction
or repair of a public building or public work, may not submit bids on leases of real property to
public entity, may not be awarded or perform work as a contractor, supplier, sub-contractor,
or consultant under a contract with a public entity , and may not transact business with any
public entity in excess of the threshold amount provided in Sec. 287.017, Florida Statutes, for
CA TEGORY TWO for a period of 36 months from the date of being placed on the
convicted vendor list.
QUOTE NO: V A-QTO1 M-005
DATE: OS/20/05
CITY OF MIAMI BEACH
12
HV AC REPLACEMENT PROJECT
FIRE STATION #1
QUOTATION NO. V A-QT01M-005
2.0 SPECIAL CONDITIONS
2.1 PURPOSE:
The purpose of this quote is to award a contract, by means of sealed quotes, to a qualified
Contractor, for the BV AC REPLACEMENT PROJECT AT FIRE STATION #1 located
at 1051 Jefferson Avenue, Miami Beach, as specified in the Quotation Form.
2.2 METHOD OF AWARD:
Award of this contract will be made to the lowest responsive, responsible and best Contractor
whose quote will be in the best interest of the City of Miami Beach.
2.3 PAYMENT:
Payment will be made upon final completion of this Project. The City will pay the contract
price minus any liquidated damages and/or other damages to the Contractor upon final
completion and acceptance.
2.4 [Intentionally Omitted]
2.5 INSURANCE AND INDEMNIFICATION:
(See Check List for applicability to this contract)
The Contractor shall be responsible for its work and every part thereof, and for all materials,
tools, appliances and property of every description, used in connection with this particular
Project. It shall specifically and distinctly assume, and does so assume, all risks of damage or
injury to property or persons used or employed on or in connection with the work and of all
damage or injury to any person or property wherever located, resulting from any action or
operation under the contract or in connection with the work. It is understood and agreed that
at all times the Contractor is acting as an independent contractor.
The Contractor, at all times during the full duration of work under this contract, including
extra work in connection with this Project, shall meet the following requirements:
Maintain Worker's Compensation and Employer's Liability Insurance to meet the statutory
requirements of the State of Florida.
Maintain Comprehensive General Liability Insurance in amounts prescribed by the City (see
checklist for insurance limits) to protect the Contractor and the interests of the City against all
risks of injury to persons (including death) or damage to property wherever located resulting
from any action or operation under the contract or in connection with the work. This policy is
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
13
to provide coverage for premises/operations, independent contractor, broad form property
damage, products/completed operations and contractual liability.
Maintain Automobile Liability Insurance including Property Damage covering all owned, non-
owned or hired automobiles and equipment used in connection with the work.
Maintain any additional coverage required by the City's Risk Manager as indicated on the
Insurance Check List.
Name the City of Miami Beach, Florida, as an additional insured on all liability policies
required by this contract. When naming the City of Miami Beach as an additional insured onto
your policies, the insurance companies must agree and will endorse the policies to state that the
City will not be liable for the payment of any premiums or assessments. A copy of the
endorsement(s) naming the City of Miami Beach, Florida, as an additional insured is required
and must be submitted to the City's Risk Manager.
No change or cancellation in insurance shall be made without thirty (30) days written notice to
the City's Risk Manager.
All insurance' policies shall be issued by companies authorized to do business under the laws of
the State of Florida and these companies must have a rating of at least B+:VI or better per
Best's Key Rating Guide, latest edition.
Original signed certificates of insurance, evidencing such coverages and endorsements, as
required herein, shall be filed with and approved by the City's Risk Manager before work is
started. The certificate must state Quote Number and Title. Upon expiration of the required
insurance, the Contractor must submit updated certificates of insurance for as long a period as
any work is still in progress.
It is understood and agreed that all policies of insurance provided by the Contractor are
primary coverage to any insurance or self-insurance the City of Miami Beach possesses that
may apply to a loss resulting from the work performed in this contract.
All policies issued to cover the insurance requirements herein shall provide full coverage from
the first dollar of exposure. No deductibles will be allowed in any policies issued on this
contract unless specific safeguards have been established to assure an adequate fund for
payment of deductibles by the insured and approved by the City's Risk Manager.
The liability insurance coverage shall extend to and include the following contractual indemnity
and hold harmless agreement:
The preceding indemnity and hold harmless agreement shall apply to any and all claims and
suits other than claims and suits arising out of the sole and exclusive negligence of the City of
Miami Beach, its officers, agents, and employees, as determined by a court of competent
jurisdiction.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
14
"The Contractor hereby agrees to indemnify and hold harmless the City of Miami Beach, a
municipal corporation, its officers, agents, and employees from all claims for bodily injuries to
the public in and up to the amount of$1,000,000.00 for each occurrence and for all damages
to the property of others in and up to the amount of$1,000,000.00 for each occurrence per
the insurance requirement under the specifications including costs of investigation, all expenses
oflitigation, including reasonable attorney fees and the cost of appeals arising out of any such
claims or suits because of any and all acts of omission or commission of any by the contractor,
his agents, servants, or employees, or through the mere existence of the Project under
contract" .
The Contractor will notify its insurance carrier without delay of the existence of the indemnity
and hold harmless agreement contained within this contract, and furnish a copy of the said
agreement to its insurance agent and carrier.
The Contractor will obtain and maintain contractual liability insurance in adequate limits for the
sole purpose of protecting the City of Miami Beach under the preceding indemnity and hold
harmless agreement from any and all claims arising out of the contract.
The Contractor will also be responsible for securing and maintaining policies of subcontractors.
All policies shall be made available to the City upon demand. Compliance by the Contractor
and its subcontractors with the foregoing requirements as to carrying insurance and furnishing
copies of the insurance policies shall not relieve the Contractor and its subcontractors of their
liabilities and obligations under any section or provisions of this contract. Contractor shall be
as fully responsible to the City for the acts and omissions of its subcontractor, and of persons
employed by them, as it is for acts and omissions of persons directly employed by it.
Insurance coverage required in these specifications shall be in force throughout the Contract
term. Should any Contractor fail to provide acceptable evidence of current insurance within
seven (7) days of receipt of written notice at any time during the contract term, the City shall
have the right to consider the contract breached, this justifying the termination thereof
If Contractor can not or does not meet the insurance requirements of the specifications;
alternate insurance coverage, at the sole discretion of the City and satisfactory to the City's
Risk Manager, may be considered.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
15
xxx 1.
xxx 2.
xxx 3.
xxx 5.
XXX?
xxx 8.
xxx 9.
INSURANCE CHECK LIST
Workers' Compensation and Employer's Liability per the Statutory limits of the state of
Florida.
Comprehensive General Liability (occurrence form), limits ofliability $ 1.000.000.00 per
occurrence for bodily injury property damage to include Premises/ Operations; Products,
Completed Operations and Contractual Liability. Contractual Liability and
Contractual Indemnity (Indemnity and hold harmless endorsement exactly as written in
"insurance requirements" of specifications).
Automobile Liability - $1,000,000 each occurrence - owned/non-owned/hired
automobiles included.
4.
Excess Liability - $
.00 per occurrence to follow the primary coverages.
The City must be named as and additional insured on the liability policies; and it must be
stated on the certificate.
6.
Other Insurance as indicated:
_ Builders Risk completed value
_ Liquor Liability
_ Fire Legal Liability
_ Protection and Indemnity
_ Employee Dishonesty Bond
Other
$
$
$
$
$
$
.00
.00
.00
.00
.00
.00
Thirty (30) days written cancellation notice required.
Best's guide rating B+: VI or better, latest edition.
The certificate must state the quote number and title
CONTRACTOR INSURANCE STATEMENT:
Signature of Contractor
~
~r1f1{L. ~rTYIirDl&/\
Print N ame/ Title
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
16
. 2.6 CONTACT PERSON:
For any additional information regarding the specifications and requirements of this Project,
contact Brad A. Judd, Property Management Director, at (305) 673-2984.
.
2.7 SAMPLES:
The Contractor shall provide upon request, a complete and accurate sample of the product(s)
which it proposes to furnish.
2.8 BID, PERFORMANCE AND PAYMENT BOND:
Not required on this Project.
2.9 LIQUIDATED DAMAGES:
The Contractor agrees to pay the City liquidated damages in the amount of$200 per calendar
day beyond the ninety (90) day substantial completion date.
2.10 WARRANTY:
The successful Contractor will be required to warranty all work performed.
2.11 REFERENCES (PROVIDE 4 REFERENCES, PLEASE SEE PAGE 25)
2.12 COMPLETE PROJECT REQUIRED:
The Quotation Form, and the specifications described herein, outline the various items or
classes of work required, enumerating or defining the extent of same necessary, but the City's
failure to list any items or classes under scope of the several sections shall not relieve the
Contractor from furnishing, installing or performing such work where required by any part of
these specifications, or necessary to the satisfactory completion of the Project.
2.13 FACILITY LOCATION:
The Fire Station # 1 is located at 1051 Jefferson Avenue, Miami Beach, Florida 33139.
2.14 CONTRACTOR QUALIFICA nONS:
In order for quotes to be considered, Contractors must submit with their quote evidence that
they are qualified to satisfactorily perform the specified work. Evidence shall include all
information necessary to certify that the Contractor: maintains a permanent place of business;
has technical knowledge and practical experience in the type of equipment required for work
on the Project; has available the organization and qualified manpower to do the work; has
adequate financial status to meet the financial obligations incident to the work; has not had
just or proper claims pending against him or his work; and has provided scope of work to
similar size projects as the Project outlined herein. The evidence will consist of listing of work
that has been provided to public and private sector clients, (ie. nature of work and number of
similar projects completed within the last three (3) years).
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
17
2.15 COMPLETE INFORMA nON REQUIRED ON QUOTATION FORM:
All quotes must be submitted on the form(s) attached in the Quotation Form and all blanks
filled in. To be considered a valid bid, the ORIGINAL AND ONE COPY of the Quotation
Form and all required submittal information must be returned, properly completed, in a sealed
envelope as outlined in the section 1.1 of General Conditions.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
18
Section 3
MEASUREMENT AND PAYMENT
3.1 Measurement of Quantities - All work completed under this contract shall be measured
by the Property Management Director, according to United States Standard Measures. All
measurements shall be taken horizontal or vertical, except for paving surfaces, which will be taken
along the actual surface of the pavement. No allowance shall be made for surfaces laid over a greater
area than authorized or for material moved from outside of slope-stakes and lines shown on the Plans,
except where such work is done upon written instructions ofthe Property Management Director.
3.2 Scope of Payments - It is understood and agreed that the Contractor shall receive and
accept the prices and rates, as herein specified, in full payment for furnishing all materials, labor,
equipment, and tools, and for performing all the work contemplated and embraced in this Quotation
Form and the specifications herein, also for all loss or damage arising out of the nature of the work
aforesaid, or from the action of the elements or for any unforeseen difficulties or obstructions which
may arise or be encountered in the prosecution of the work, until its final acceptance as hereinafter
provided for, and also for all risks of every description and all expenses incurred by or in consequence
of the suspension or discontinuance of the work as herein provided for, or for any infringement of
patent, trademark, or copyright, and for the completion of the work in accordance with this Quotation
Form, the specifications, and contract.
3.3 Payment and Compensation for Altered Quantities -When alterations in plans or
quantities of work not requiring supplemental agreements as herein before provided for are ordered
and performed, the Contractor shall accept payment in full at the contract unit price for the actual
quantities of work done; no allowance will be made for anticipated profits; increased or decreased
work involving supplemental agreements shall be paid for as stipulated in such agreement.
3.4 Force Account Work - All extra work done on a "Force Account" basis shall be
performed by such labor, teams, tools, and equipment as may be specified by the Property
Management Director, and will be paid for in the following manner:
(a) For all labor, teams, and foremen in direct charge of the specified operations, the
Contractor shall receive the current local rate of wages, to be agreed upon in writing before starting
such work, for every hour that said labor, teams, and foremen are actually engaged in such work, to
which shall be added an amount equal to fifteen (15) percent of the sum thereof which shall be
considered as full compensation for general supervision and the furnishing and repairing of small tools
and ordinary equipment used on the contract such as picks, hand shovels, plows, etc. In addition to
the above, the Contractor shall receive the actual cost for Social Security taxes, unemployment
insurance, and Workmen's Compensation insurance involved in such force account work, based on
the actual wages paid the said labor and foremen. No percentage will be added to the cost of such
taxes or insurance.
(b) For all materials used the Contractor shall receive the actual cost of such materials,
delivered at the site, as shown by the original receipted bills, but no percentage shall be allowed on
the cost of such materials.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
19
(c) For any special equipment or machinery, such as power driven rollers, tractors, trucks,
shovels, drills, concrete mixers, pumps, and hoists, also industrial railway equipment, crushers, etc.,
required for the economical performance of the work, the Property Management Director shall allow
the Contractor a reasonable rental price to be agreed upon in writing before such work is begun, for
each and every hour that said special equipment is in use on the work, to which sum no percentage
shall be added.
The compensation as herein provided shall be received by the Contractor as payment in full
for extra work done on a force account basis.
The Contractor's representative and the Project Manager shall compare records of extra work
done on a force account basis at the end of each day. Copies of these records shall be made in
duplicate upon a form provided for this purpose by the Project Manager and signed by both the
Project Manager and the Contractor's representative, one copy being forwarded, respectively, to the
Property Management Director or authorized representative, and to the Contractor. All claims for
extra work done on a force account basis shall be submitted as hereinbefore provided by the
Contractor upon certified statements, to which shall be attached original receipted bills covering the
costs of and the freight charges and hauling on all materials used in such work, and such statements
shall be submitted to the Property Management Director on the current estimate of the month in
which work was actually done.
3.5 Omitted Items - The City shall have the right to cancel the portions of the contract
relating to the construction of any items therein by the payment to the Contractor of a fair and
equitable amount covering all items incurred prior to the date of cancellation or suspension of the
work by order of the Property Management Director.
3.6 Partial Payments - If the work progresses according to contract,. the Contractor will be
paid monthly ninety (90) percent of the value of the work completed, and materials furnished by the
Contractor under these specifications, when such materials have been delivered, inspected, and
payments satisfactorily vouched for to the Property Management Director, provided the materials, in
the judgment of the Property Management Director, are such as will probably be incorporated in the
work within thirty (30) days; ten (10) per cent of the amount due being reserved until a final
settlement after the completion of the work. Contractor shall provide PARTIAL RELEASE OF
LIENS with each application for payment.
It is understood and agreed that the City may also deduct from any estimate, either partial or
final, the amount of any unsatisfied claim against the Contractor for labor, materials, teams,
equipment and/or other things as elsewhere provided herein.
Should any defective work or material be discovered previous to the final acceptance, or
should a reasonable doubt arise previous to the final acceptance as to the integrity of any part of the
completed work, the estimate and payment for such defective or questioned work shall not be allowed
until the defect has been remedied and causes for doubt removed. The monthly payments shall be
approximate only, and all partial estimates and payments shall be subject to correction in the
QUOTE NO: V A-QTOIM-005 CITY OF MIAMI BEACH
DATE: OS/20/05 20
final estimate and payment. Ifthe total amount of the retained percentage of the contract is greatly in
excess of the uncompleted portion of the contract the City upon consultation with the Property
Management Director, may allow the Contractor a portion of the suspended payment, provided that
the City shall at all times retain an amount sufficient to enable it to complete the uncompleted work in
the contract and liquidate unsatisfied claims.
3.7 Acceptance and Final Payment - Whenever the work provided for under this contract
shall have been completely performed on the part of the Contractor, and all parts of the work have
been approved by the Property Management Director, according to the contract, and all trash, debris,
equipment, and other things used in the construction removed from the site of the construction and
from the adjoining land, after final inspection as provided herein, shall certify such fact to the Property
Management Director in writing, recommending the acceptance of the work.
The amount of the final payment, less any sums that may have been deducted or retained
under the provisions of this contract, will be paid to the Contractor within thirty (30) days after the
final payment has been approved by the City upon consultation with the Property Management
Director, provided that the Contractor has furnished to the City a sworn affidavit to the effect that all
bills are paid and no suits are pending in connection with the work done under this Contract. Upon
this final payment the City is to be released from all liability whatever growing out of this contract.
No final payment shall be made without the submittal of the following documents: the
FINAL RELEASE OF LIEN, LETTER OF FINAL COMPLETION (or LEITER OF FINAL
ACCEPTANCE) from the Contractor.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
21
HV AC REPLACEMENT PROJECT
FIRE STATION #1
.
QUOTA nON NO. v A-QTOIM-005
Proposal Page 1 of 2
This Project covers the complete replacement of the air conditioning system at Fire Station #1,
located at 1051 Jefferson Avenue, Miami Beach, Florida.
The work will include the replacement of the air conditioning system to include the replacement
of the duct work; support stands; and the replacement of controls and related equipment. The
Contractor will include price for: the crane; all necessary electrical and plumbing work related to
the project; engineering drawings and permits to successfully complete the work.
LINE ITEM
LUMP SUM
1) HV AC Equipment
2) Labor
3) Crane
4) Duct work
5) Electrical
6) Miscellaneous
$ 9.501.80
$ 8.500.00
$ 900.00
$ 1.100.00
$ 2,900.00
$ 2.940.00
GRAND TOTAL:
$ 25.841.80
Replace AlC Duct Work
1) Fiberglass system with new diffusers
2) Sheet metal External Insulated with new diffusers
$ 18.120.00
$ 22.480.00
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
22
HV AC REPLACEMENT PROJECT
FIRE STATION #1
.
QUOTATION NO. V A-QTOIM-005
Proposal Page 2 of 2
PROMPT PAYMENT DISCOUNT: (i.e., 2%/10; 1 %/20)
ANY LETTERS, A TTACHMENTS, OR ADDITIONAL INFORMA TION TO BE
CONSIDERED PART OF THE QUOTE MUST BE SUBMITTED IN DUPLICATE.
SUBMITTED BY: -r; () Cc P f} n 0-.-.
COMPANY NAME:
r'f/ICu..J st,t/ias. ~-.
~
SIGNED:
,
~
certify that I am authorized to execute this QUOTE and
commit the quoting firm)
Contractors !!!!!H acknowledge receipt of addendum (if applicable).
Amendment No. 1 :{(l~ ;)..J, :Ax>.$ Amendment No. 2:;:]/Uu_ 3 .2/)0::;
lose Date Insert Date '
NAMEmTLE (Print): ---rJ /1 a A /)r) c-\.
(j;1<6~/Vu) Itpl'
CITY/STATE: mia.ml {i.
TELEPHONE NO: 305' J g ~<;r 3{)Qc.J
FACSIMILE NO: 3uS-/~;;)5~ /Vo1-
.
ADDRESS:
9. 11-2-~
ZIP: 33DIS-
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
23
HV AC REPLACEMENT PROJECT
FIRE STATION #1
,
QUOTATION NO. V A-QTOIM-005
CHECK LIST
To ensure that your quotation is submitted in conformance with the Contract, please verify that the
till .. h bid db' d . d
o OWing items ave een comp] ete an su rrutte as reqUire .
X Original and one copy of bid (including all submittal information)
General Conditions Section 1. 1
Special Conditions Section 2.15
X Execution of Quote
General Conditions Section 1.2
Equivalents/Equal Product
General Condition Section 1.10
Insurance and Indemnification (including Insurance Checklist)
X General Condition Section 1.27
Special Conditions Section 2.5
BidlPerformance Bond
General Condition Section 1.27
Special Conditions Section 2.11
X Warranty
Special Conditions Section 2.13
Product/Catalog Information
X References I
Special Conditions Page 25
X Bidder Qualifications
Special Conditions Section 2.17
X Contractor's Questionnaire
(page 26)
QUOTE NO: V A-QTO1 M-005
DATE: OS/20/05
CITY OF MIAMI BEACH
24
,
HV AC REPLACEMENT PROJECT
FIRE STATION #1
QUOTATION NO. V A-QTO1 M-005
CUSTOMER REFERENCE LISTING
Contractor shall furnish the names, addresses, and telephone numbers of a minimum of four (4) firms
or government organizations for which the Contractor is currently furnishing or has furnished, similar
servIces.
1) Company Name Jh~ MU<Jf.."j~
Address '70 E' "7 Sf Hid ~),,, h 330/ b
Contact Person/Contract Amount 6..Jc, Ertl-t cs, un i 31 ~) 50 ()
Telephone Number ,--::SO f)) ~ ~ R ~ ~ 1--'-/1
St. Lv,-;" C~.!Y
~:>,cn V~Ft./!'-~. fi-I?m:e.. A.. 3<-1Qg'2-
Contact Person/Contract Amount '. b E IIstJo lei t -:r; 23 1)
Telephone Number --7l;;l ) L/& 2, ~ /133
In/ami ~f. 11,1/';,,'5 A(f'iJ4f
Address ) tJ u / N iiJl S + /)1 iCt/Yl; !1 , -=13/l.$
Contact Person/Contract Amount mtl.Jl ,in ;U 1JV Do... 'i 5 t-l~ DOO
Telephone Number :?JJ5 / wL/L/ -.J .5;l~+
r!0i vi rnLOIYl;
Address 70 Ibr;c' 33c1V? l}1/al/L/~ K 33;L33
Contact Person/Cnntract ~unt :J J tj 3 &> 5
305 /tf/&- /~F /
,
2)
Company Name
Address
3)
Company Name
4)
Company Name
Telephone Number
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
25
'"
CONTRACTOR'S QUESTIONNAIRE
NOTE:
Information supplied in response to this questionnaire is subject to verification.
Inaccurate or incomplete answers may be grounds for disqualification from
award of this quote.
Submitted to 9t)' k!;ami Beach, FIOrid~~ & ,-r-
By ro (L~ /YLllJ1{U11 Lr 1)/ U~ -J->Y\{ ~
PrincipalOffice ~ J g i- IV(;J JUt- ~+-. #)~ mi(lffll, 11" "3~DJ~
Ho~ many years h~s your organization been in business as a General ContractoJ under ypur prysent/
busmess name? \ /1,. y(6 0..$ (;e-. Il \.~AA. o...s fY\..Cc:ntttl., (01!, &~C::/1:JY'
Include copies of above licenses and certificates with proposal. a):f~J.
How many years experience in similar work has your organization had?
(A) As a General Contractor IS' jUlJ.vL-
(B) As a Sub-Contractor ~5 y~
(C) What contracts has your organization c, omplete~? (use separate sheets ifnecessary)
fftc CH_,t~*o~.c/. )'-L~L l-~<-- t J ~+i ~
~ontract Amt Class of Work When ~mPlete~ Name/Ad?ress ofO~ner, ,J..,-
1 v/ ()f>O tN. W "J "-' " l5o).,luJ 183 ST
4 Il.JO, 01>D ~0 rvol.'S 7fl~6J^--h,j1-4..~'b I a;a.~tF'It'~YV\.iVljC ~">~t f jZs,tL
Have you ever had a contract terminated (as prime contractor or sub-contractor, under existing
company name or. lplother company name) due to failure to comply with contractual
specifications? N D
If so, where and why?
Has any officer or partner of your organization ever failed to complete a construction contract
handled in his own name?
NO
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
26
If so, state name of individual, name of owner, and reason thereof
f\J/fr
J-J... i , ( ~ /1
In what other lines of business are you financially interested or engaged? II V frC. f( t.""l.~
~ I
Give references as to experience" ability, and financial standin
'1- \L l+' c., ~ I -'
What equipment do you own that is available for the proposed work and where located?
J~ .:XX II~ , t.-t.(\)(ks . bJ::..b(fGtJ, elf (c
I
Please list the names and addresses of the subcontractors to be used for the portions of the work
listed below.
Tnriu~ina-f [LuJy;'({fJ ~ 7hsfru/LU-la.ntn If/Jol it; tJekhxJYlf Lr
I I ~
tni a.MI fl 33>n/6- 305" 1<i?;>Cj- '-/<-I2L,
" "
J~ V~ ilie w~ve M~~ ~e true Md oorrect.
,
Contractor
0t'tt Phj\C{ ClJyL~/~
/ Print Nametritle
QUOTE NO: V A-QTO1 M-005
DATE: OS/20/05
CITY OF MIAMI BEACH
27
"
CONTRACT FOR QUOTATION NO. VA-QTOIM-005
THIS CONTRACT made this 't/~r day of W/)(l 20 oS . A.D. between the
CITY OF MIAMI BEACH, a Florida municipal corporation, hereinafter called the City, which
term shall include its successors and assigns, arty of the one part, and
a..~ ' (: i ( ~l r v,. <..' .s
hereinafter called the Contractor, which term shall include its heirs, successors and assigns, party of
the other part.
WITNESSETH that the said Contractor for the consideration and compensation herein agreed to be
paid and the said City in consideration of the Project to be done by said Contractor PURSUANT TO
City Quotation NO. V A-QTOIM-005 and designated "HV AC REPLACEMENT PROJECT
FIRE STATION #1" (also referred to as "the work" or "the Project") by said City, do hereby
mutually agree as follows:
1. This Agreement shall extend to and be obligatory upon said City, its successors and assigns,
and upon said Contractor and its heirs, successors and assigns. Neither this Agreement nor
any part thereof nor any part of the work herein contemplated, shall be assigned or sublet, nor
shall any sums of money provided to be paid to said Contractor be assigned by said
Contractor to anyone without the prior written consent of the City.
2. City of Miami Beach Quotation NO. V A-QT01M-005 and Contractor's Quote in
response there to, are hereby referred to and made a part of this' Agreement and the terms
and conditions set forth therein, except when in direct conflict with this written Contract,
are as much a part hereof as if copied herein. If conflicts exist between them and this
written instrument, only that part of the matter in direct conflict herewith shall not be
construed to be a part hereof The priority of documents shall be as set forth in Section
1.45 of the Quotation Form.
3. The Contractor shall commence work within seven (7) days of the issuance ofa Notice to
Proceed from the City and shall construct and complete in a good and workmanlike manner
the materials herein referred to, strictly in accord herewith the following:
3.1 Unless there is a change in the scheduling of the Project approved by the Property
Management Director, the Contractor shall be substantially completed with the
work within ninety (90) calendar days from the issuance of the Notice to
Proceed, and completed and ready for final payment within one hundred and
twenty (120) calendar days after the issuance of said Notice.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
28
3.2
'"
"
Damages - City and Contractor recognize that the City will suffer direct financial loss
ifwork is not completed within the Contract times specified in Paragraph 3.1. They
also recognize the delays, expense and difficulties involved in proving in a legal or
arbitration preceding the actual loss suffered by City if the work is not completed on
time, and therefore time is of the essence. Accordingly, instead of requiring any such
proof Contractor agrees to forfeit and pay City as liquidated damages for delay (but
not as a penalty) the amount of Two Hundred Dollars ($200.00) for each calendar
day that expires after the Contract Time specified in Paragraph 3.1 for
Substantial Completion until the work is substantially complete. After Substantial
Completion if Contractor shall neglect, refuse, or fail to complete the remaining work
within the Contract Time, Contractor shall pay Owner Two Hundred Dollars
($200.00) for each calendar day that expires after the time specified in
Paragraph 3.1 for completion and readiness for final payment. These amounts
represent a reasonable estimate of City's expenses for extended delays and for
inspection, engineering services and administrative costs associated with such delay.
4. Contractor shall furnish all implements, machinery, equipment, transportation, tools,
materials, supplies labor, and other things necessary to the execution and completion of the
work, nothing being required of the City except that it may, at its expense, supervise such
work and enter upon and inspect the same, at all reasonable times.
5. If any dispute arises between the City and said Contractor with reference to the meaning or
requirements of any part of this contract and they cannot agree, the more stringent
requirements shall govern as determined by the City, through its Property Management
Director.
6. If the Contractor shall complete the work herein contemplated in a good and workmanlike
manner within the time herein specified and in accord herewith, the said City shall pay to the
, Contractor the contract sum in accordance with the conditions of the contract. The City, by
allowing Contractor to continue with said construction after the time for its completion
hereinbefore stated shall not deprive City of the right to exercise any option in this contract
nor shall it operate to alter any other term of this contract.
7. Prior to commencing any work on the Project the Contractor shall file Insurance Certificates,
as required, and they must be signed by a Registered Insurance Agent licensed in the State of
Florida and approved by the City's Risk Manager.
8. All documents shall be executed satisfactorily to the City and until required Bonds and
Insurance Certificates have been filed and approved, this contract shall not be deemed
effective.
9.
City shall pay Contractor for performance of the work in accordance with the Quotation Form
in current funds at the lump sum or unit prices presented in the Quotation Fonn and
Contractor's response there to, as attached to this contract. The parties expressly agree that
the contract price is a stipulated sum except with regard to the items in the Quote which are
subject to unit prices.
QUOTE NO: V A-QTOIM-005
DATE: OS/20/05
CITY OF MIAMI BEACH
29
"
Contract Price:
$ 43.961.80
10.
This contract, and all attachments hereto, comprises the entire agreement between City and
Contractor, to this Agreement.
...
The contract may only be amended, modified or supplemented as provided in the General
Conditions.
IN WITNESS WHEREOF the City has caused this contract to be signed by the Mayor of the City
of Miami Beach, Florida and its corporate seal to be affixed, attested by the City Clerk of the City of
Miami Beach, and the said Contractor has caused this Agreement to be signed it its name.
Signature
Attest:
Print NamelI'itle
A~O p~
City Clerk
CONTR~CTO()
By- -{.,,--, V ~
Signature of Authorized Representative
If VlL<:, f?fJ~, ~/U1
Print NamelI'itle
APPROVED AS TO APPROVED AS
QUOTE NO: V A-QTOIM~ & LANGUAceirv OF MIAMI BEACH FORM & LAN ~GE
DATE: OS/20/05 & FOR CUTION 30 & FOR ON
~- 1-U ~
Date
Da1a