Loading...
99-23427 RESO RESOLUTION NO. 99-23427 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.5 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND SAVINO AND MILLER DESIGN STUDIO TO PROVIDE PRO F E S S ION A L ARCHITECTURAL/ENGINEERING SERVICES FOR THE WASHINGTON AVENUE STREETSCAPE MASTER PLAN; SAID AMENDMENT IN AN AMOUNT NOT TO EXCEED $376,000 TO PROVIDE PRO F E S S ION A L ARCHITECTURAL/ENGINEERING SERVICES FOR PHASE 2,4, &5 IMPROVEMENTS. WHEREAS, pursuant to Request for Letters of Interest No. 138-93/94 for Professional Landscape Architectural/Engineering Services for Master Planning for the Washington A venue Streetscape, on July 3, 1996, the Mayor and City Commission authorized the execution of an Agreement with Savino and Miller Design Studio (Consultant) (the Agreement), as the top ranked proposer, for the preparation of a Master Plan for improvements on Washington Avenue, from 5th Street to 16th Street (Project); and WHEREAS, the Master Plan has been completed, and a revised plan and budget were developed based on available funding; and WHEREAS, the Administration would recommend that the Consultant proceed to prepare construction documents for median plantings and irrigation improvements for the Project; and WHEREAS, the Consultant has performed additional electrical engineering serVIces associated with the median lighting improvements; and WHEREAS, the Consultant has performed construction administration services associated with the Phase Three median improvements; and WHEREAS, the Consultant will perform professional architectural/engineering services associated with Phase 2, 4, & 5 improvements; and WHEREAS, the cost for performing this work is in an amount not to exceed $376,000; and WHEREAS, funding is available from Work Order No. 2143 and Work Order 2190, respectively, and, accordingly, the Administration would recommend that the Mayor and City Commission approve the attached Amendment No.5 to the Agreement. NOW, THEREFORE, BE IT FULLY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Clerk are herein authorized to execute the attached Fifth Amendment to the Agreement between the City of Miami Beach and Savino and Miller Design Studio to provide professional architectural/engineering services for the Washington Avenue Streetscape Master Plan; said Amendment in an amount not to exceed $376,000, to provide professional architectural/engineering services associated with Phase 2, 4, & 5 improvements for the Project. PASSED and ADOPTED this 15th day of ,1999. D7i4r Mayor A TTES1i1 r) ,J.. () .' j\> Ii ), d r Ct. I (ttl~.- City Clerk F:I WORKI$ALL ICANDIDA ICOMMEMOSISA YMIL4.WPD ,\PPROVED AS TO fOR}", & LA.NGUAGE &. FOR EXECUTtOI\J 41t~ 1"iJ/.~ 1 CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 http:\\ci.miami-beach.fl.us COMMISSION MEMORANDUM NO. ~ TO: Mayor Neisen o. Kasdin and Members of the City Commission DATE: December 15, 1999 FROM: Sergio Rodriguez City Manager SUBJECT: A RESOLUT ON OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING AN AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND SAVINO AND MILLER DESIGN STUDIO, TO PROVIDE PROFESSIONAL ARCHITECTURAL/ENGINEERING SERVICES FOR THE WASHINGTON AVENUE STREETS CAPE MASTER PLAN IN AN AMOUNT NOT TO EXCEED $376,000 FOR PHASE 2, 4, & 5 IMPROVEMENTS. ADMINISTRATION RECOMMENDATION Adopt the Resolution. ANALYSIS: On July 3, 1996, the City Commission authorized an agreement with Savino & Miller Design Studio for the preparation of a master plan for Washington Avenue. In January 1998, following several neighborhood meetings with the community, Savino & Miller completed a master plan for recommended improvements on Washington A venue. Subsequently, a revised plan with a phased approach was developed and presented to the Finance and Citywide Projects Committee on November 19, 1998. The Committee recommended that architecturaVengineering fees be negotiated to implement the revised plan and that this amount be included in the budget and funding plan for the project. The project budget has been amended to include architectural/engineering fees, the cost of project administration and an appropriate contingency. This revised budget amount is estimated to be $3,588,220. AGENDA ITEM C 1 P DATE~q'1 Commission Memorandum December J 5, J 999 Page 2 On December 16, 1998, the City Commission authorized Amendment No. 1 to this Agreement in the amount of $9,500 to prepare a study and plan to illustrate landscaping and engineering improvements which conform to the budget developed for this project. On January 6, 1999, the City Commission authorized Amendment No.2 to this agreement in the amount of $18, 135 to prepare construction documents for median plantings and irrigation improvements. On March 3, 1999, the City Commission authorized Amendment No.3 to this agreement in the amount of$9,800 to prepare construction documents for median lighting improvements. On October 20, 1999, the City Commission authorized Amendment No. 4 to this agreement in the amount of $ 8,100 for construction phase services associated with the Phase three improvements. The Administration is now seeking approval for professional architectural/engineering services associated with the Phase 2, 4, & 5 improvements. Included in the proposal from Savino & Miller Design Studio is the cost associated with designing drainage improvements required throughout the project not previously identified in the original Master Plan. In addition, the proposal includes provisions for designing landscape improvements to the median on W ashington Avenue between 16th Street and Lincoln Road also not addressed in the original Master Plan. The cost to perform the work is $376,000. Funding is available from previously appropriated funds in Work Order No. 2143 and Work Order 2190. The City Commission should adopt the Resolution in order to provide for professional architectural/engineering services for Phase 2, 4, & 5 improvements. ~ rtl'f~ ~:'K.~~;~=MO_'M'U.WO Attachment ..' ...... <. _, ,,;' NO&M I LLERDES I GNSTUD I 0 F~X NO. 3055349062 BASIC SCOPE OF SERVICES FEES . PHASES 2, 4 & 5 11/22/99 ESTTh-1A TED CONSTRUCTION COST BASIC SCOPE OF SERVICES FEE - (9.1 % Construction Cost) Reimbursables (Not including Additional Services) Deliverables: 6 Sets of24" x 36" Bond Sheets (Part One - 2 Sets, Part Two - 4 Sets) 1 Set of24" x 36" Vellum Sheets 14 Sets of 11" x 17" Bond Sheets (2 Meetings) Miscellaneous (Travel, office copies/printing, etc.) Additional Services (See Appendix A) Median Extension Survey Drainage/PermitlCET Geotechnical Consultant - not to exceed Additional Services Fee 1IJ ~^VINO C6 ~IILLER Ii DESIGN ~TUDIO S 2,485,867 $ 227,000" $ 2,000. S 16,500 S 23,000 . S 103,000 $ 4500 S 147,000 Nov. 14 1999 07:07PM P2 Attachment No. I Page I of I AMENDMENT NO.5 AMENDMENT NO. 5 TO THE AGREEMENT BETWEEN CITY OF MIAMI BEACH AND SAVINO AND MILLER DESIGN STUDIO TO PROVIDE PROFESSIONAL ARCHITECTURAL/ENGINEERING SERVICES FOR THE WASHINGTON AVENUE STREETSCAPE MASTER PLAN This Amendment No.5, dated as of _Dtt:CllA f; t1L IS-, 1999, to that certain Agreement, dated July 3, 1996, by and between the City of Miami Beach, Florida (City) and Savino and Miller Design Studio for the preparation of a Master Plan for improvements on Washington Avenue, from 5th Street to 16th Street (Consultant) (Agreement). WHEREAS, the Agreement provides for the preparation of a Master Plan for improvements on Washington Avenue, from 5th Street to 16th Street (Project); and WHEREAS, the Master Plan has been completed and a revised plan and budget were developed based on available funding; and WHEREAS, the preparation of construction documents for median plantings and irrigation improvements were completed; and WHEREAS, additional electrical engineering services for median lighting were completed; and WHEREAS, construction administration services for the Phase Three median improvements were completed; and WHEREAS, professional architectural/engineering services for Phase 2, 4, & 5 improvements are necessary to complete the Master Plan improvements. 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Fifth Amendment. 2. MODIFICATIONS The Agreement is amended as follows: a. Exhibit "A" is amended to revise the following at the end of the "Scope of Services" : Part 7 - Professional Architectural/Engineering Services for Phase 2. 4. & 5 improvements: The Consultant will provide professional Architectural/Engineering Services, which include Design Development Drawings, Construction Documents. Specifications, Bidding, and Construction Phase Services for the Phase 2. 4. & 5 improvements outlined in the Master Plan. b. At the end of "Compensation/Fees," add: Part 7 - Professional Architectural! En~ineering Services for Phase 2. 4. & 5 improvements Estimated Construction Cost $2,485,867 Basic Scope of Service Fee (9.1 % of Construction Cost) $ 227,000 Reimbursables $ 2,000 Additional Services Median Extension Survey Drainage/Permit/CEI Geotechnical(not to exceed) $ 16,500 $ 23,000 $ 103,000 $ 4.500 $ 147,000 Total: $ 376,000 3. OTHER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The City and Consultant ratify the terms of the Agreement, as amended, as modified by this Fourth Amendment. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No.5 to be executed in their names by their duly authorized officials as of the date first set forth above. ATFST: jw k( ftt~Lh^, City Clerk ATTEST: (Signature) Print Name and Title CITY OF MIAMI BEACH BY ~~ Mayor '" By: / ! L CORPORATE SEAL APPROVED A.') TO FORM & LA.NGUAGE & FOR EXECUTiOI\J 1i~~ ~ )