HomeMy WebLinkAbout2005-26036 Reso
RESOLUTION NO. 2005-26036
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE MAYOR AND
CITY CLERK TO EXECUTE AMENDMENT NO. 1 TO THE
AGREEMENT WITH HARGREAVES ASSOCIATES, INC., DATED
JANUARY 12, 2005; SAID AMENDMENT, IN THE AMOUNT OF
$1,322,373, FOR THE REMAINING PROFESSIONAL SERVICES,
INCLUDING DESIGN DEVELOPMENT, CONSTRUCTION
DOCUMENTS, BID AND AWARD, AND CONSTRUCTION
ADMINISTRATION FOR THE SOUTH POINTE PARK IMPROVEMENTS
PROJECT, AS CONTEMPLATED AND PROVIDED BY RFQ NO. 39-
03/04.
WHEREAS, in 1996, the City adopted a Parks Bond Master Plan that included
major improvements to South Pointe Park (the Park); and
WHEREAS, in 1997, the Mayor and City Commission approved a Resolution
authorizing the City to enter into an agreement with Bermello and Ajamil (B&A) for the
design of improvements to the Park (the B&A Agreement); and
WHEREAS, a minimal degree of planning of the Park improvements was completed
by 2002, and B&A and the City mutually agreed to terminate the B&A Agreement; and
WHEREAS, the City Commission authorized the issuance of (a new) RFQ No. 16-
02/03 for architecture and engineering services for the design of Park improvements; and
WHEREAS, at approximately the same time, the City's options for settling the long
standing land use litigation related to the Alaska Parcel expanded to include the possible
addition of approximately two acres to the Park; and
WHEREAS, due to the negotiations on the Settlement of the Alaska Parcel and
modifications to the project scope, RFQ No. 16-02/03 was cancelled by the City
Commission on February 25, 2004; and
WHEREAS, on July 28,2004, the City reached a settlement on the long standing
Alaska Parcel land use litigation and as part of the settlement agreement, the developer,
the Related Group (TRG), is obligated to perform the improvements to the Park, at cost,
without overhead, if the City notifies TRG of its concept plan by July 28, 2005; and
WHEREAS, if the notification timeline was not met, the City would need to bid and
build the Park according to its standard procedures; and
WHEREAS, construction by TRG at its cost represents a projected substantial cost
and time savings to the City; and
WHEREAS, on September 8,2004, the City Commission authorized the issuance of
RFQ No. 39-03/04 for the South Pointe Park Improvements (the Project), which included a
revised scope of services that addressed the land being added as part of the Alaska Parcel
Settlement Agreement and related issues; and
WHEREAS, on January 12, 2005, the City Commission authorized the execution of
a professional services agreement with Hargreaves Associates, Inc. (Hargreaves), as the
successful proposer pursuant to RFQ No 39-03/04; however, the agreement was initially
limited to the planning phase of the Project; and
WHEREAS, the Notice to Proceed was issued to Hargreaves on January 18, 2005,
and the Project planning process has followed the standard park improvement project
sequence, from project kickoff meeting to Community Design Workshops (COW); and
WHEREAS, on July 27, 2005, the Basis of Design Report (BOOR) for the Park was
presented to the City Commission for approval; and
WHEREAS, the Mayor and City Commission approved Resolution No. 2005-25978,
which approved the BOOR as presented; approved the exercise of the option in the Alaska
Parcel Settlement Agreement to have TRG complete the design and construction of the
Project, at cost, as stated in the Alaska Parcel Settlement Agreement; and approved the
appropriation of $14,130,000 from Miami Beach Redevelopment Agency funds to
completely fund the Project, $5,000,000 of which would be refunded when Miami-Dade
County General Obligation Bond Funds become available; and
WHEREAS, by approving the BOOR and the appropriation, the Administration will
be able to proceed with the design development, construction documents, bidding and
award, and construction administration phases of the Project; and
WHEREAS, on July 27, 2005, the Administration presented to the Mayor and City
Commission the Administration's intent to enter into negotiations with Hargreaves for the
remaining services including design development, construction documents, bid and award,
and construction administration phases of the Project; all as contemplated by.and as
provided in RFQ No. 39-03/04 and;
WHEREAS, accordingly, as Hargreaves' Agreement was initially limited to the
planning phase, the City and the Consultant have negotiated Amendment No.1 to the
Agreement, for the aforestated remaining professional services required for the completion
of the Project; and
WHEREAS, the Administration recommends approval of Amendment No.1, in the
amount of $1 ,322,373.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission hereby approve and authorize the Mayor and City Clerk to execute
Amendment No.1 to the Agreement with Hargreaves Associates, Inc., dated January 12,
2005; said Amendment, in the amount of $1,322,373, for the remaining professional
services, including design development, construction documents, bid and award, and
construction administration for the South Pointe Park Improvements Project, as
contemplated in and provided by RFQ No. 39-03/04.
PASSED and ADOPTED this 19th day of
ATTEST:
~\f~
CITY CLERK Robert Parcher
(T:\AGENDA\2005\Ocf1905\Regular\South Pointe Park-Reso.1 O.19.05.doc)
APPROVED AS TO
FORM & LANGUAGE
& FOR EXECUTION
~it/t?~f
City Atto
CITY OF MIAMI BEACH
COMMISSION ITEM SUMMARY
~
Condensed Title:
A Resolution of the Mayor and City Commission of the City of Miami Beach, Florida, authorizing the Mayor
and City Clerk to execute Amendment NO.1 to the Agreement with Hargreaves Associates Inc. in the
amount of $1 ,322,373 for additional professional services for the South Pointe Park Improvement Project.
Issue:
Shall the City Commission adopt the Resolution awarding additional services to Hargreaves Associates,
Inc. for the South Pointe Park 1m rovement Pro'ect?
Item Summary/Recommendation:
In 1996, the City adopted a Parks Bond Master Plan that included improvements to South Pointe Park. In
1997, the City entered into an Agreement with Bermello and Ajamil (B&A) for the design improvements to
South Pointe Park (the Project). In 2002, B&A and the City mutually agreed to remove this scope of work
from the agreement with B&A. On January 12, 2005, the City Commission authorized the execution of an
Agreement between the City and Hargreaves Associates Inc. (Hargreaves). Hargreaves' Scope of
Services was limited to the Planning Phase of the project.
On July 27, 2005, the Basis of Design Report (BOOR) was presented to the City Commission for approval.
The proposed improvements include: redesigned park entrance, pavilion building with a small concession
area, restroom facility, pedestrian walkways, playground, dog integrated park area without a fenced
enclosure, extensive landscaping, irrigation, and site lighting. The Mayor and City Commission approved the
Basis of Design Report (BOOR) as presented, approved the exercise of the option in the Alaska Parcel
Settlement Agreement to have the developer complete the design and construction of the Project, at cost,
and approved the appropriation of $14,130,000 from the Redevelopment Agency to completely fund the
Project, $5,000,000 of which would be refunded when Miami-Dade County General Obligation Bond Funds
become available (Resolution No. 2005-25978 and Resolution No. 512-2005). On July 27, 2005, the
Administration further presented to the Mayor and City Commission the Administration's intent to enter into
negotiations that would retain involvement by Hargreaves in the continuing development of the park design,
and the City Commission was in favor of this approach.
In approving the BOOR and the appropriation, the City could now proceed with the remaining phases of the
project; however, since Hargreaves' Agreement was limited to the planning phase, the City and the
Consultant negotiated additional professional services required for the completion of the Project (Detailed
Design, Bidding and Award, and Construction Administration services) in the amount of $1,322,373. This
amount represents a fee of eleven percent (11 %) of the construction costs of the Project which are currently
estimated at $11 ,200,000 plus an additional allowance of $500,000 for Art in Public Places. If the additional
Planning services of the original Agreement are included, the percentage will be thirteen percent (13%). Both
percentages are within the industry standards for a project of this size and complexity and take into
consideration the commissioning of a world class consultant such as Hargreaves. The City, The Related
Group, and Hargreaves have agreed to continue participating in the design, permitting and construction of
the park project as a team and to address issues and to establish the schedule with the contribution of all
three parties. The Agreement with Hargreaves takes into consideration the un-traditional approach to the
construction of the project due to Related's involvement.
Adviso Board Recommendation:
The GO Bond Oversi ht Committee will consider this item at their October 10, 2005 meetin
Financial Information:
Source of
Funds:
I.~~I
Fi~~6F6e'pt.
South Pointe RDA
AGENDA ITEM -1<1 D
DATE lO-(9--OS-
CITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139
www.miamibeachfl.gov
COMMISSION MEMORANDUM
To:
From:
Mayor David Dermer and Date: October 19, 2005
Members of the City Commission
Jorge M. Gonzalez d.~
City Manager ,., 0
A RESOLUTION F THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY
CLERK TO EXECUTE AMENDMENT NO.1 TO THE AGREEMENT WITH
HARGREAVES ASSOCIATES INC. IN THE AMOUNT OF $1,322,373.00
FOR ADDITIONAL PROFESSIONAL SERVICES FOR THE SOUTH
POINTE PARK IMPROVEMENTS PROJECT.
Subject:
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
FUNDING
Although originally funded in part by City General Obligation Bond funds, the South Pointe
Park Improvements project is currently budgeted to be funded from South Pointe RDA Tax
Increment Financing (TIF) Funds and Miami-Dade County General Obligation Bond Funds
when made available.
ANAL YSIS
On June 19, 1996, the City adopted a Parks Bond Master Plan that included major
improvements to South Pointe Park. On July 16, 1997, the Mayor and City Commission
approved a Resolution authorizing the City to enter into an Agreement with Bermello and
Ajamil (B&A) for the design of improvements to South Pointe Park. Because a minimal
degree of planning of the park improvements was completed by 2002, B&A and the City
agreed to remove this scope of work from the agreement with B&A and the City
Commission authorized the issuance of a new Request for Qualifications (RFQ) for
architecture and engineering services for the design of the park improvements.
Responses to the RFQ were received in 2003, and an Evaluation Committee was
appointed to short-list the top ranked firms. At approximately the same time, the City's
options for settling the long standing land use litigation related to the Alaska Parcel
expanded to include the addition of approximately two acres of land to the South Pointe
Park. Exercising this option, the City substantially affected the scope of services for the
project outlined in the RFQ. Therefore, the RFQ for architect and engineering services for
the park was terminated by the City Commission on February 25, 2004.
On September 8, 2004, the City Commission authorized the issuance of RFQ No. 39-03/04
which included a revised scope of architect and engineering services for the park
improvements. Six responses were received. An Evaluation Committee was appointed by
the City Manager to short-list the top ranked firms. Hargreaves Associates, Inc.
City Commission Memorandum
October 19, 2005
Hargreaves Amendment NO.1
Page 2 of 3
(Hargreaves) was the top ranked firm.
On January 12, 2005, the City Commission authorized the execution of an Agreement
between the City of Miami Beach and Hargreaves for the planning of South Pointe Park
Improvements (the Project). Hargreaves' Scope of Services was limited to the Planning
Phase of the project.
The Consultant's Notice to Proceed was issued on January 18, 2005. The Project planning
process has followed the standard park improvement project sequence, from Project
Kickoff Meeting to Community Design Workshops (CDW).
On July 27, 2005, the Basis of Design Report (BODR) for the South Pointe Park was
presented to the City Commission for approval. The Mayor and City Commission approved
the Basis of Design Report (BODR) as presented, approved the exercise of the option in
the Alaska Parcel Settlement Agreement to have the developer complete the design and
construction of the Project, at cost, as stated in the Alaska Parcel Settlement Agreement,
and approved the appropriation of $14,130,000 from the Redevelopment Agency to
completely fund the Project, $5,000,000 of which would be refunded when Miami-Dade
County General Obligation Bond Funds become available (Resolution No. 2005-25978 and
Resolution No. 512-2005).
In approving the BODR and the appropriation, the City can now proceed with the remaining
phases of the project. However, the original Agreement with Hargreaves' was limited to the
planning phase. On July 27, 2005, the Administration further presented to the Mayor and
City Commission the Administration's intent to enter into negotiations that would retain
involvement by Hargreaves in the continuing development of the park design, and the City
Commission was in favor of this approach.
The City and the Consultant negotiated additional professional services required for the
completion of the Project (Task 2 - Detailed Design, Task 3 - Bidding and Award, and Task
4 - Construction Administration services) in the amount of $1,322,373. This amount
represents a fee of eleven percent (11 %) of the construction costs of the Project wh ich are
currently estimated at $11,200,000 plus an additional allowance of $500,000 for Art in
Public Places. If the additional Planning services of the original Agreement are included the
percentage will be thirteen percent (13010). Both percentages are within the industry
standards for a project of this size and complexity and take into consideration the
commissioning of a world class consultant such as Hargreaves.
As part of detailed design services, Hargreaves will prepare 100% construction
documents, perform constructability review, provide the City with cost opinions, attend and
participate in Community Design Meetings, as applicable, and will procure all requisite
permits from all governmental authorities that have jurisdiction over the Project. As part of
bidding and award services, Hargreaves will provide assistance to the developer, as
applicable, in the pricing and bidding of the project, will review the contractor's cost
proposal, and will assist the City in the award of the construction contract. As part of
construction administration services, Hargreaves will attend and participate in the project's
City Commission Memorandum
October 19, 2005
Hargreaves Amendment NO.1
Page 3 of 3
pre-construction meeting, attend and participate in regular progress meetings, prepare field
observations, respond to RFls (Request for Information) and CDCs (Contract Document
Clarification), review shop drawings, review requests for changes to construction cost
and/or schedule, and provide Project Closeout services.
The Administration also intends to enter into an Agreement with the Related Group
(Related) for the construction of the project as part of the Settlement Agreement on the
Alaska Parcel. The intent is for Related to construct the park in conjunction with the
construction of their Apogee Project. The City, Related, and Hargreaves have agreed to
continue participating in the design, permitting and construction of the park project as a
team and to address issues and to establish the schedule with the contribution of all three
parties. The Agreement with Hargreaves takes into consideration the un-traditional
approach to the construction of the project due to Related's involvement.
ADMINISTRATION RECOMMENDATION
The Administration recommends that the Mayor and City Commission adopt the Resolution
approving and authorizing the Mayor and City Clerk to execute Amendment No.1 to the
Agreement with Hargreaves Associates, in the amount of $1,322,373, for additional
professional services for the South Pointe Park Improvements project.
Attachments
(T:\AGENDA\2005\Oct1905\Regular\South Pointe Park-COMM MM.10.19.05.doc)