RESOLUTION NO. 2005-25968
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF. MIAMI BEACH, FLORIDA, AUTHORIZING T~E
ADMINISTRATION.TO ISSUE A Pl)RCHASE ORDER FOR $126,955 TO
SOUTHEASTERN SURFACES & 'EQUIPMENT INC., THE STATE OF
FLORIDA SOLE SOURCE DISTRIBUTOR OF MONDO FLOORING,
WHICH IS NECESSARY FOR THE SCOTT RAKOW YOUTH CENTER
ICE RINK AND THE COVERED PLAY AREA; ADDITIONAllY,
APPROPRIATING $8,500 FOR THE PROJECT CONTINGENCY, FOR A
GRAND TOTAL OF $135,455.
WHEREAS, on August 1, 2003, International Builders of Latin America's (IBLA)
was certified in default, pursuant to its contract with the City for construction, and as
part of the IBLA contract with the City, IBLA was required to install" Mondo Flooring" in
and around the areas of the ice rink and in the covered play area of the Scott Rakow
Youth Center; and
WHEREAS, IBLA did not install the "Mondo Flooring" as specified; and
WHEREAS, IBLA installed an inferior product which was not approved by the
City's Architect of Record, nor the City's Capital Improvement Projects Office (CIP); and
WHEREAS, currently, the flooring material which was installed is not standing up
to the normal traffic generated by the ice skaters; and
WHEREAS, the "Mondo Flooring", as originally specified in IBLA's contract with
the City, is only available through Southeastern Surfaces and Equipment Inc.(SSE1,
which is the.only distributor of "Mondo Flooring" in the State of Florida; and
WHEREAS, the "Mondo Flooring" for the ice rink corridor and support spaces
and the covered play area including labor and material is not expected to exceed
$135,455; and
WHEREAS, a project contingency of $8,500 has been included in the
project cost; and
WHEREAS, the funding for the "Mondo Flooring" has been allocated through the
existing IBLA purchase order and the cost of the work will be reimbursed by the Surety
when the claim has been finalized on the Project; and
.;'
WHEREAS, the Administration has complied with the requirements for sole
source purchases, pursuant to Section 2-367(d) of the City Code:
T:agenda/2005/july2705/regular/scott rakow mondo floor resolution
NOW THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND
CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that
the Mayor and City Commission hereby authorize the Administration to
approve a Purchase Order for $126,955 to Southeastern Surfaces &
Equipment Inc., the State of Florida sole source distributor of "Mondo
Flooring", for the Scott Rakow Youth Center ice rink and covered play
area; and additionally appropriating $8,500 for the project contingency, for
a grand total of $135,455.
PASSED and ADOPTED this 27th day of July, 2
ATTEST:
'~lPtVt~
, ' CITY CLERK
,:Robert Parcher
PATH
APPROVED AS TO
FOR & LANGUAGE
& F EXECUTION
T:agenda/2005/july2705/regular/scott rakow mondo floor resolution
CITY OF MIAMI BEACH
COMMISSION ITEM SUMMARY
~
~
Condensed Title:
A Resolution authorizing the Administration to issue Purchase Order to Southeastern Surfaces & Equipment,
Inc., the State of Florida Sole Source Distributor of Mondo Flooring for the Scott Rakow Youth Center Ice Rink
and Play Area.
Issue:
Shall the City Commission authorize the issuance of a Purchase Order to Southeastern Surfaces &
Equipment, Inc., a sole source distributor of Mondo Flooring for the Scott Rakow Youth Center Ice Rink
and Play Area?
Item Summa IRecommendation:
On August 1,2003, International Builders of Latin America's (IBLA) was certified in default, pursuant to its
contract with the City of Miami Beach. As part of IBLA contract with the City, IBLA was required to install "
Mondo Flooring" in and around the areas of the ice rink and in the covered play area.
IBLA did not install the "Mondo Flooring" as specified in the following areas: ice rink entry, storage room, ice
rink corridors, men bath/lockers, women bath/lockers, disc jockey room, coaches room, ice maker room,
skate rental, lobby, vestibule, and pro-shop, but rather installed an inferior product which was not approved by
the Architect of record, nor the City's Capital Improvement Projects office. In addition, IBLA did not provide
flooring in the covered play area which was part of their contract. (Mondo Flooring was specified).
Currently, the flooring material which was installed is not standing up to the normal traffic generated by the ice
skaters.
The Administration recommends a
Advisory Board Recommendation:
IN/A
Financial Information:
Finance Dept.
$135,455
Source of
Funds:
D
Cit Clerk's Office Le islative Trackin :
Gus Lopez, ext. 6641
AGENDA ITEM
DATE
C70
1-~ 7-o~
CITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139
www.miamibeachfl. ov
COMMISSION MEMORANDUM
From:
Mayor David Dermer and
Members of the c~.ty omm' sion
Jorge M. Gonzalez
City Manager
Date: July 27,2005
To:
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH, FLORIDA, AUTHORIZING THE ADMINISTRATION TO
ISSUE A PURCHASE ORDER FOR $126,955 TO SOUTHEASTERN
SURFACES & EQUIPMENT, INC., THE STATE OF FLORIDA SOLE
SOURCE DISTRIBUTOR OF MONDO FLOORING, FOR THE SCOTT
RAKOW YOUTH CENTER ICE RINK AND THE COVERED PLAY AREA,
ADDITIONALLY, APPROPRIATING $8,500 FOR PROJECT
CONTINGENCY, FOR A GRAND TOTAL OF $135,455.
ADMINISTRATION RECOMMENDATION
Subject:
Adopt the Resolution.
FUNDING
Funding is available from the following Account Number:
Ice Skating Rink and Play Area 370-2164-067357 $ 126,955
Project Contingency 370-2164-067357 $ 8,500
Total: $ 135,455
ANAL YSIS
On August 1, 2003, International Builders of Latin America's (IBLA) was certified in default,
pursuant to its contract with the City of Miami Beach. As part of IBLA contract with the City,
IBLA was required to install" Mondo Flooring" in and around the areas of the ice rink and in
the covered play area.
IBLA did not install the "Mondo Flooring" as specified in the following areas: ice rink entry,
storage room, ice rink corridors, men bath/lockers, women bath/lockers, disc jockey room,
coaches room, ice maker room, skate rental, lobby, vestibule, and pro-shop, but rather
installed an inferior product which was not approved by the Architect of record, nor the
City's Capital Improvement Projects office. In addition, IBLA did not provide flooring in the
covered play area which was part of their contract. (Mondo Flooring was specified).
Currently, the flooring material which was installed is not standing up to the normal traffic
generated by the ice skaters.
The "Mondo Flooring" specifically, the "ramflex" product, is recommended for the ice rink
corridors and support spaces since it is specifically made to withstand the particular traffic
generated by ice skaters. The "Mondo Flooring", specifically, the "sportsflex" product is
recommended for the covered play area. The Mondo Flooring as originally specified in
IBLA's contract with the City is only available thru Southeastern Surfaces and Equipment
Inc., which is the only distributor of "Mondo Flooring" in the state of Florida.
This flooring has an 8 to 10 week lead time before installation can occur. In order to
provide the Scott Rakow Youth Center with the product specified in IBLA's contract, the
Capital Improvement Project Office (CIP) recommends that the Commission award the sole
source distributor, SSE the contract to provide the labor and material necessary to install
the "Mondo Flooring" in the Scott Rakow ice rink, support spaces and in the covered play
areas.
The "Mondo Flooring" for the ice rink corridor and support spaces as listed above and the
covered play area including labor and material is not expected to exceed $135,455. The
funding for the "Mondo Flooring" has been allocated thru the IBLA purchase order. This
portion of the work will be reimbursed by the Surety when the claim has been finalized.
CONCLUSION
The Administration recommends that the Mayor and City Commission adopt the attached
resolution, approving the issuance of a Purchase Order for $126,955.00 to Southeastern
Surfaces & Equipment, Inc., the State of Florida Sole Source Distributor of Mondo Flooring,
for the Scott Rakow Youth Center Ice Rink and the covered play area, additionally,
appropriating $8,500 for project contingency, for a grand total of $135,455.00
JMGITH/SF
T:\AGENDA\2005\JuI2705\Consent\MundoSportlmpactSoleSourceMemo.doc
~ STAN~
~~ ~
~S El
~ <(,
=+-C'E'lLE.~v
~~~~~
9nc;
Corporate
569 Canal Street
New Smyrna, FL 32168
Office (386) 428-8875
Fax (386) 428-8767
South Florida
10116 N. W. 53rd Street
Sunrise, FL 33351
Office (561) 252-9799
Fax (561) 422-3554
TO:
Ms. Grace Escalante
City of Miami Beach
21 00 Washington Ave.
Miami Beach, FL 33139
100% FLORIDA STATE CERTIFIED
MINORITY WOMEN BUSINESS ENTERPRISE (MWBE)
QUOTATION
DATE:
PHONE:
FAX:
QUOTE #:
7/22/2005
(305) 673-7769
(305) 673-7159
05-244
PROJECT: Scott Rakow Center / Mondo Flooring
We are pleased to quote you as follows:
Rubber Floorinl!
Manufacturer: MONDO
. Series
. Wear Layer
. Surface
. Warranty
. Amount
. Area
. Installation
. Floor Prep
. Delivery
. Base
Play Area
. Series
. Surface
. Warranty
. Amount
. Installation
. Floor Prep
. Delivery
Ramflex 10 mm
2mm
Hammered
2 years
Approximately 6237 sq. ft. (Tiles at rink entrance)
Pro Shop, Skate Rental, Coaches Room, Bathrooms and Underneath Bleachers,
By Certified Installers
By certified Installers (Includes removal and disposal of existing flooring)
6-8 Weeks from submittal of colors and final field verified dimensions
Vinyl Black
DELIVERED & INSTALLED: $80,155.00
(If moisture barrier is needed ADD: $9,500.00
Sport Flex 6 mm
Sealskin
3 years
Approximately 5480 sq. ft. (children's play area)
By Certified Installers
By certified Installers
6-8 Weeks from submittal of colors and fmal field verified dimensions
DELIVERED & INSTALLED: $46,800.00
(If moisture barrier is needed ADD: $3,700.00)
www.sseteam.com
~ STAI\t~
(5 E~'
~ <(,
=+-C'~LLE.~V
/JJ~/JJ~~
~ dlU"A
CorDorate
569 Canal Street
New Smyrna, FL 32168
Office (386) 428-8875
Fax (386) 428-8767
South Florida
10116 N. W. 53rd Street
Sunrise, FL 33351
Office (561) 252-9799
Fax (561) 422-3554
Notes:
100% FLORIDA STATE CERTIFIED
MINORITY WOMEN BUSINESS ENTERPRISE (MWBE)
We accept Visa and Master Card
Cuts around utility covers included
Sales/Use taxes are INCLUDED in above bid amount.
Removal and disposal of existing equipment or materials is NOT INCLUDED.
All electrical work, if required, shall be by others.
Payment and Performance Bond is NOT included in the above price. Add 1% if required.
This quotation is good for 45 days and subject to delivery and installation in six months.
50% deposit upon receipt of order the remainder upon delivery
Sincerely,
,~~ ~~#
(561) 252-9799
Accepted By:
Date:
www.sseteam.com
.
@
(8)
Juty 22, 2005
Mr. Roman Martine~
Mr. Gus Lopez
City of Miami Beach Fl.
Procurement Division
Mia~ Beach, Florida
Re= Scott Rakow Center
Florida Representation
TO Whom it may concern,
This letter is to confir.m that SSE Ine.1s the only local Mondo Certified
Dealer / Installer tor .Athlec1C r.looring. SSE Inc. hA~ been - Mondo dea1er
for the past 10 years and ar.e in excellent standing with our company.
If you should have any quest10ns or concerns OL l! 1 c~n be of any further
assistance, plea$e do not hesitate to give me a call.
5incefllY, . If ~
g~~~~
Mondo USA
Davi.d GoodWl.n
southeastern Regional Representative
770-463"'8513 phone .
"70-46~-4~9o fax
Mondo Amerb ....c. 2655 Fr4lnc:iEo Hughca, t.v.', Quebec, Canada H7L 3$8
Phone: 450-967-6800 · Fax: ~7927 · ToIl-free USA: 8QO.361~47. ToJj.free CDA : 800-e83-8138
Emu: too~<?A..~Ui@';GQID · Websit.: www.mondousa.com