Loading...
HomeMy WebLinkAbout2006-26095 Reso RESOLUTION NO. 2006-26095 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE APPROPRIATION OF AN ADDITIONAL $101,594 IN CONCURRENCY MITIGATION FUNDS TO COMPLETE THE $194,732 FUNDING PACKET NEEDED TO IMPLEMENT A TRAFFIC SIGNAL IMPROVEMENTS PROJECT ON ALTON ROAD AT 8TH, 11TH, 15TH AND 16TH STREETS; THE $93,138 FUND BALANCE BEING ALREADY AVAILABLE PURSUANT TO RESOLUTION NO. 2002-24796, DATED MARCH 20, 2002, WHICH . APPROPRIATED FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) GRANT FUNDS MATCHED BY CITY FUNDS FOR THE PURPOSE; AUTHORIZING THE ADVANCEMENT OF $194,732 IN CONCURRENCY MITIGATION FUNDS FOR SUBSEQUENT, PARTLY REIMBURSEMENT BY THE $70,000 IN FDOT GRANT FUNDS; AND FURTHER STATING THAT THE PROJECT WILL BE IMPLEMENTED UTILIZING AN EXISTING JOB ORDER CONTRACTING (JOC) MECHANISM AVAILABLE TO THE PUBLIC WORKS DEPARTMENT. WHEREAS, Project #34 of the Miami Beach Municipal Mobility Plan (MMP) calls for capacity improvements on Alton Road, from Dade Boulevard to 5th Street; and WHEREAS, capacity improvements had already been implemented at the intersection of Alton Road and 1 ih Street; and WHEREAS, in order to complete MMP Project #34, the City successfully applied in 2001 for a Florida Department of Transportation (FOOT) fund source known as the County Incentive Grant Program (CIGP), to implement Traffic Signal Improvements on Alton Road, at the intersections with 8th, 11th, 15th and 16th Streets, and Dade Boulevard (the Project); and WHEREAS, Resolution No. 2002-24796, dated March 20, 2002, authorized the execution of a $140,000 CIGP Agreement which included $70,000 in FOOT funds and $70,000 in Miami Beach Concurrency Mitigation (South Beach) funds for the Project; and WHEREAS, Post Buckley Shuh & Jernigan (PBS&J), a City rotational consultant, was engaged in 2003 to conduct a preliminary assessment, prepare implementation plans and construction cost estimate, and provide construction inspection services for the Project, at a negotiated cost of $46,862; and WHEREAS, in December 2004, the Alton Road/Dade Boulevard section of the Project was funded and implemented by FOOT, as an independent priority project; and WHEREAS, the Project fund balance of $93,138 ($70,000 in CIGP funds and $23,138 in City funds) is insufficient to implement the remaining portions of the overall Project; and WHEREAS, $101,594 in additional Concurrency Mitigation funds need to be appropriated to fully fund the quoted $192,732 Project construction cost. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby authorize the appropriation of an additional $101,594 in Concurrency Mitigation funds to complete the $194,732 funding packet needed to implement a Traffic Signal Improvements Project on Alton Road at 8th, 11th, 15th and 16th Streets; the $93,138 fund balance being already available pursuant to Resolution No. 2002-24796, dated March 20, 2002, which appropriated Florida Department of Transportation (FOOT) grant funds matched by City funds for the purpose; authorize the advancement of $194,732 in Concurrency Mitigation Funds for subsequent, partly reimbursement by the $70,000 in FOOT grant funds; and further state that the Project will be implemented utilizing an existing Job Order Contracting (JOC) mechanism available to the Public Works Department. PASSED AND ADOPTED this the 11 th ATTEST: ~r9~ CITY CLERK Robert Parcher T:\AGENDA\2006~an 11 06\Regular\Alton Road Traffic Signals-Reso.doc , 2006. APPROVED AS TO FORM&WAGE & FOR ~nON C' Attome~ Date COMMISSION ITEM SUMMARY Condensed Title: A Resolution authorizing appropriation of an additional $101,594 in Concurrency Mitigation funds to com lete the $194,732 fundin acket needed to im lement Traffic Si nallm rovements on Alton Road. Ke Intended Outcome Su orted: Maintain or improve traffic flow. Issue: Shall the City appropriate additional Concurrency Funds to implement this MMP Project #34? Item Summary/Recommendation: The MMP Project #34 called for capacity improvements to Alton Road, from 8m Street to Dade Boulevard. The City was awarded an FDOT grant of $70,000 matched with City Funds for a total of $140,000 to install protected left-turn movements on Alton Road at 8th, 11th, 15th, 16th Streets, and at Dade Boulevard. Due to County objections, the protected left-turn movement from southbound Alton Road onto eastbound Dade Blvd required unscheduled work by the City consultant. The consultant cost was $46,862, which left a $93,138 fund balance for construction purposes. The Alton Road/Dade Blvd. improvements were funded and implemented by FDOT in 2004. The final plans for the remaining project portion were approved by FDOT and County in 2005, which allows the City to proceed with project implementation. The current construction cost of the Alton Road Improvements is $194,732. The Administration recommends 1) appropriation of an additional $101,594 in Concurrency Mitigation funds to supplement the existing $23,138 CM fund balance; 2) advancement of all funds for subsequent reimbursement at $70,000 by the FDOT funds, which are due to expire March 31, 2006; and 3) project implementation utilizing a JOC contract available to the Public Works Department. Committee. Financial Information: Source of Funds: $ 23,138CM $101,594 CM $ 70,000 FDOT Previously appropriated To be approprtd. 158.8000.341226 Previously appropriated D aBPI $194,732 158.6217.000335 Financial Impact Summary: Only $70,000 of the $194,732 project cost will be reimbursed to the City by the $70,000 FDOT grant funds. City Clerk's Office Legislative Tracking: I Robert Halfhill T:\AGENDA\2006~an1106\Regular\Alton Road Traffic Signals-Summary.doc e MIAMIBEACH AGENDAITEM C7J DATE 1- I / -() " lD MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov TO: FROM: DATE: SUBJECT: COMMISSION MEMORANDUM Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez, City Manager \ ___ ~ January 11, 2006 0 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING THE APPROPRIATION OF AN ADDITIONAL $101,594 IN CONCURRENCY MITIGATION FUNDS TO COMPLETE THE $194,732 FUNDING PACKET NEEDED TO IMPLEMENT TRAFFIC SIGNAL IMPROVEMENTS ON ALTON ROAD AT 8TH, 11TH, 15TH AND 16TH STREETS; THE $93,138 FUND BALANCE BEING AVAILABLE PURSUANT TO RESOLUTION NO. 2002-24796, DATED MARCH 20, 2002, WHICH APPROPRIATED FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) GRANT FUNDS MATCHED BY CITY FUNDS FOR THE PURPOSE; AUTHORIZING THE ADVANCEMENT OF $194,732 IN CONCURRENCY MITIGATION PROGRAM FUNDS FOR SUBSEQUENT REIMBURSEMENT BY THE $70,000 IN FDOT GRANT FUNDS; AND FURTHER STATING THAT THE PROJECT WILL ,BE IMPLEMENTED UTILIZING AN EXISTING JOB ORDER CONTRACTING (JOC) MECHANISM AVAILABLE TO THE PUBLIC WORKS DEPARTMENT. ADMINISTRATION RECOMMENDATION Adopt the Resolution. BACKGROUND Miami Beach Municipal Mobility Plan Project #34 called for capacity improvements on Alton Road, from ath Street to Dade Boulevard. The first of these improvements, protected left turn movements on 1 ih Street at Alton Road, was implemented in 2000 utilizing Concurrency Mitigation Funds. In order to complete MMP Project #34, the City was awarded in 2001 a Florida Department of Transportation (FOOT) grant known as the County Incentive Grant Program (CIGP). The CIGP offered incentives t9 municipalities wishing to implement capacity enhancement projects on State roads to fit specific area needs. At that time, a large number of high-rise condominium developm~nt projects were being approved by the City for construction on West Avenue, which would increase traffic on Alton Road and left-turn movements to/from the crossing streets. Resolution No. 2002-24796, dated March 20, 2002, authorized the execution of a CIGP Agreement with FOOT. The $70,000 CIGP funds plus the $70,000 City matching funds made available a total of $140,000 to cover the costs of a project that would improve traffic signalization on Alton Road,by adding protected left-turn movements at the intersections with atfi, 11th, 15th, and 16th Streets, and Dade Boulevard. City consultant, Post Buckley Shuh & Jernigan (PBS&J) was engaged in 2003 to conduct preliminary assessment, prepare design plans, and perform construction inspection services for the project, at a negotiated cost of $46,862. The proposed new left-turn movement from southbound Alton Road onto eastbound Dade Boulevard raised objections from Miami-Dade County. PBS&J was asked to conduct an unscheduled traffic study justifying the need for the new movement; and conduct four (4) unscheduled meetings with the County/FDOT/City to resolve all issues and finalize the project plans. The additional consultant fees incurred for the unscheduled services exhausted the contract fund balance that had been previously set aside for construction inspection services. In December 2003, the Alton Road/Dade Boulevard section of the overall project was funded and implemented by FDOT, as a priority project. It took the City an additional 18 months to obtain both FDOT and County approvals to proceed with the improvements. ANAL YSIS The Alton Road Signal Improvements Project received $140,000 in funding in 2001, utilizing $70,000 in CIGP grant funds and $70,000 in City Concurrency Mitigation funds. The $46,862 PBS&J contract payment (Concurrency funds) left a $93,138 fund balance, $70,000 of which are the grant funds due to expire March 31, 2006. Successive hurricanes over the last two years have created a shortage of traffic signal equipment, parts, and contract costs have escalated. The current cost estimate is $194,732 for the project. As previously determined by the MMP, this project will help the City "maintain or improve traffic flow" on the southern portion of Alton Road. Therefore, the Administration recommends the following: 1. Appropriation of an additional $101,594 in Concurrency Mitigation/South Beach funds to supplement the remaining $23,138 in previously appropriated CM funds; 2. Advancement of $194,732 in total funds needed to implement the project (utilizing City Concurrency Funds) for subsequent reimbursement by the $70,000 FDOT grant funds; and 3. Utilization of a Job Order Contracting (JOC) mechanism available to the Public Works Department, in order to avoid further construction delays. After the JOC contractor has procured the necessary traffic signal material, it will take approximately 45 days to implement the project. In case the project is not fully implemented by March 31, 2006, the Administration will officially request that FDOT consider extending the $70,000 grant deadline beyond the above-mentioned date. Attachments: . FDOT Agreement to extend CIGP grant deadline to March 31, 2006 . GIGP Agreement between Miami Beach and FDOT, dated June 24, 2002 . JOC cost estimate for project construction. JG/RM/FB/FV/ME/AJ T:\AGENDA\2006~an11 06\Regular\Alton Road Traffic Signals-Memo.doc ~EB-10-2005 16:58 CITY i'--- M I AI'.l r TRANSPORT 305 604 2498 P.02 CITY OF MIAMI BEACH CITY HALL 1700 CONVeNTION CENTER DRive MIAMI BEACH, Fl..ORIOA 33139 \WIW.miamibeachff .goll 7 Oapanmenl of Public Works Telephone (305) 673-7080 Facsimife (305) 613-102B February 10, 2005 Mr. Gary L. Donn, P.E. Director of Planning and Programs/Administration Florida Department of Transportation. District Six 1000 NW 111 In Avenue, Room 6234 Miami, Florida 33172 Subject: Request for Extension of County Incentive Grant Program Contract # AL 478 Dear Mr. Donn: On behalf of the City of Miami Beach, I respectfully request a twelve-month extension of time for the County Incentive Grant Program Agreement between the Florida Department of Transportation (FOOT) and the City of Miami Beach, for the project described beJow: Proiect Descriotion: FM No. Contract # Extension Requested Signal head improvements and modification of pavement markings SR 907/Alton. Rd, from alh Street to 161h Street. (design & construction). 41295615401 AL478 March 31,2006 This is our very last reauest for arant extension. since we intend to imolement the Droiect within the next ten (10) months. The following actions are being taken by the City: 1. Four sets of theprojecfs design plans, prepared by Post Buckley Schuh & Jernigan (PBS&J). were mailed 02/03/05 to Mr. Rory Santana for FDOrs review, approval, and permitting. 2. Attached to this letter is the City's first request for reimbursement under this CIGP/JP A. in the amount of $11,715.50. It covers FDors 50% share of PBS&J's first invoice, which totaled $23,431. The City paid the full invoice amount with Check # 135522 dated 02/2112003. 3. We have just received PBS&J's second invoice. also in the amount of $23,431, which is undergoing the City accounts payable process. FDOT's share will be invoiced subsequently. 4. By 02111/05, PBS&J project manager, Rafiq Alqasem. will submit to the City new cost estimates for construction inspection services (as an amendment to the original contract), and for project construction. ,....: FEB-10-2005 16:58 CITY M I Aryl I TRA~~SPORT 305 604 2498 P.03 Mr. Gary Donn February 10, 2005 Page 2 5. With the updated cost estimates in hand, we wilt request that the City Commission, at the March 17, 2005 meeting, appropriate Miami Beach Concurrency Mitigation Funds to cover the increased construction and construction inspection costs of the project. 6. The ,City intends to utilize an on-going FOOT or County contractor to install the traffic signal improvements to SR 924/AJton Road, from 8th Street to 161ft Street. As previously stated, we intend to complete this Project within the next ten (10) months. Should you have any questions. do not hesitate to contact me at (305) 673..7080. or Ms. Amelia Johnson of my staff at (305) 673..7000 Ext. 6347. Your approval to extend the grant until March 31. 2006 is appreciated. Attachment: First City Invoice against the CIGPJFDOT grant. FB/RH/AJ c: Linda Glass-Johnson, Work Program Manager. FOOT Kenneth Jeffries. Planning Division, FOOT Rory Santana, Traffic Operations Engineer, FDOT Rafiq Alqasem, P.E., PBS&J Amelia Johnson, Transportation Coordinator Date: cZ-JI-OS F:\WORK\$TRA\AMELIA\FOOT\CIGPextensiot'l.ltr.doc RESOLUTION NO. 2002-24796 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A COUNTY INCENTIVE GRANT PROGRAM AGREEMENT (CIGP-JPA) WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION AND MIAMI-DADE COUNTY, IN THE AMOUNT OF $140,000; BEING $70,000 IN CIGP GRANT FUNDS, AND $70,000 IN CONCURRENCY MITIGATION-SOUTH BEACH FUNDS, AS PREVIOUSLY AUTHORIZED BY RESOLUTION NO. 2001-24374, DATED MAY 16, 2001; AND FURTHER APPROPRIATING BOTH THE GRANT AND CONCURRENCY MITIGATION FUNDS FOR THE FINAL DESIGN AND IMPLEMENTATION OF TRAFFIC SIGNAL HEADnNTERSECTION IMPROVEMENTS ON ALTON ROAD, FROM 8TH STREET TO DADE BOULEVARD. WHEREAS, Resolution No. 2001-24374, dated May 16, 2001, authorized the City to submit an application to the Metropolitan Planning Organization (MPO), under the State of Florida's year 2002-03 County Incentives Grant Program (CIGP), for improvements to traffic signal heads/pavement markings, in order to provide protected left-tun movements at the intersections of Alton Road with Sth-11th-1Sth-161h Streets and Dade Boulevard; and WHEREAS, the grant has been awarded at $140,000, being $70,000 in CIGP funds, and $70,000 in local funds, as required by the grant program; and WHEREAS, sufficient Concurrency Mitigation funds have been collected from new development projects adjacent to Alton Road, in an effort to mitigate further impacts on this. traffic-intensive corridor, match the grant funds, and implement one additional Municipal Mobility Plan-recommended project; and WHEREAS, it is essential that the City enter into a tri-party agreement (FOOT-County- City) in order to receive, via the reimbursement method, the State funds available for the purposes of this grant. WHEREAS, the project will include a final design/construction inspection phase at $40,000; modification of pavement markings/and construction at $100,000; and , WHEREAS, the City will hire Post Buckley Schuh & Jernigan, Inc. (PBS&J) to perform final design and construction inspection services at $40,000, as authorized by the City Vendor List, Resolution No. 2001-24406, dated June 6, 2001; and WHEREAS, after final design/construction plans are completed, the City will issue requests for proposals (RFP) for the project's construction phase, which is estimated to cost $100,000; and . WHEREAS, both State and City funds need to be appropriated for the above- mentioned purposes. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute a County Incentive Grant Program Agreement (CIGP..JPA) with the Florida Department of Transportation and Miami- Dade County, in the amount of $140,000; being $70,000 in CIGP grant funds, and $70,000 in Concurrency Mitigation-South Beach funds, as previously authorized by Resolution No. 2001-24374, dated May 16, 2001; and further appropriate both the grant and Concurrency Mitigation funds for the final design and implementation of traffic signal head/intersection improvements on Alton Road, from 8th Street to Dade Boulevard. PASSED AND APPROVED this the 20th 2002. ATTEST: ~tr~ CITY CLERK APPROVED AI TO 'OAM & LANGUAGI a FOR EXECUTION F:\WORK\STRA\AMELlA\FDOl'.JPA-CIGPMemo.doc Page 1 of 1 Johnson, Amelia From: Fakie, Elie Sent: Tuesday, December 20,20052:56 PM To: Johnson, Amelia Cc: Beckmann, Fred; Alvarez, Mike - Public Works Subject: Alton Road Signal Modification 8th, 11th, 15th and 16th Proposal and Fees Attachments: ContractorProposal Report-Category. pdf Amelia, Following are the details for the cost of the above referenced project for a total of $194,731.62. JOC contractor: Contingency: Subtotal: Gordian Group: Total $160,272.94 $ 32.054.59 $192,327.53 $ 2.404.09 $194,731.62 See attached proposal 20% Contingency 1.5% of the proposal ($160,272.94) Also attached is the detailed proposal from PASS International. Duration of the job will follow. Thanks Elie December 20, 2005 Contractor Proposal Report. Category ~ Job Order Construction Services Loe# - 124.00.PW.14-o3/04 Alton Road Signal Modification 8th, 11th, 15th, 16th Street City of Miami Beach Date: December 20,2005 Project No.: Project Name: 124.00.PW.14-03/04 Alton Road Signal Modification 8th, 11th, 15th, 16th Street Sect. Item Mod. UOM Decriptlon Line Total December 20, 2005 Page 1 of 3 Subtotal for N Category - Not Entered 01352 4021 01352 4021 01352 4021 01352 4021 01352 4031 01352 4031 01352 4031 01352 4031 01550 6002 01560 7121 01560 7130 01560 7144 01560 7321 01560 7330 HR Off-Duty Law Enforcement Officer Quantity 40.00 Unit Price 33.35 x Factor 1.1039 1,472.60 Installation x HR Off-Duty Law Enforcement Officer -----.-.---.----..-------.-.--...--".- Quantity 40.00 Unit Price 33.35 Line Total 128,597.50 1,472.60 Total 1,472.60 x Factor Total 1.1039 1,472.60 1,472.60 Installation x HR Off-Duty Law Enforcement Officer Quantity 40.00 Unit Price 33.35 x Factor 1.1039 = Installation x HR Off-Duty Law Enforcement Officer Quantity 40.00 Unit Price 33.35 x Factor 1.1039 = 1,447.43 Installation x HR Flagman For Traffic Control Quantity 80.00 Unit Price 16.39 x Factor 1.1039 = Installation x HR Flagman For Traffic Control Quantity 80.00 Unit Price 16.39 x Factor 1 .1039 = 1,447.43 Installation x HR Flagman For Traffic Control Quantity 80.00 Unit Price 16.39 x Factor 1.1039 = 1,447.43 Installation x HR Flagman For Traffic Control Total 1,472.60 1,472.60 Total 1,472.60 Total 1,447.43 1,447.43 Total 1,447.43 Total 1,447.43 Quantity 80.00 x Factor 1.1039 = -----.--.------..------------.---.-.--....-----.-----.--'-----'------ Total 1,447.43 Unit Price 16.39 Installation x CLF Danger Tape Quantity 200.00 Unit Price 4.37 x Factor 1.1039 = 2,285.07 Installation x MO Type B Flasher (High Intensity) --....--.-.------.--.---...------.-.-------- Quantity Unit Price 30.00 x 69.00 964.81 Total 964.81 Installation x Factor Total 1.1039 = 2,285.07 1,457.15 MO Type II Traffic Control Barricade, 2' Wide x 3' High, 2Reflectorized Rails Each Side Quantity 30.00 x Factor 1 .1039 = ---------------_._~-_._,._~--_. ------...--.--.------.--.-------------- -----.---...------ Total 1,457.15 Unit Price 44.00 Installation x DAY No-Parking Barricade Quantity 30.00 Unit Price 0.25 x Factor 1 .1039 = 2,207.80 Installation x MO Portable Message Board Quantity 1.00 Unit Price 2,000.00 x Factor 1.1039 = 1,192.21 Installation x MO Temporary Traffic Sign (Up To 3'x3') Installation Quantity 30.00 x Factor 1.1039 = Unit Price 36.00 x 8.28 Total 8.28 Total 2,207.80 Total 1,192.21 December 20, 2005 Page 2 of 3 Subtotal for No Item Entered 31,675.44 Project Proposal Total 160,272.94 This work order proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding of the line totals and sub-totals. December 20, 2005 Page 3 of 3