Loading...
Amendment No. 4 AMENDMENT NO.4 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY, FLORIDA AND KIMLEY -HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPE ARCIDTECTURAL SERVICES, FOR SURVEYING, PREPARATION OF CONSTRUCTION DOCUMENTS, AND PERMITTING SERVICES FOR THE EXPANSION OF THE PARKING LOT AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETS CAPE PROJECT This Amendment No.4, dated as of k(1) (U(M~ 'I , 2000, to that certain Professional Services Agreement ( Agreement), dated February 17, 1999, by and between the Miami Beach Redevelopment Agency (RDA) and Kimley-Hom and Associates, Inc. (Consultant). RECITALS WHEREAS, the Agreement provides for the preparation of the final Master Plan for the South Pointe Redevelopment Area Project; and WHEREAS, this Amendment No.4 to the Agreement provides for surveying, preparation of construction documents, and permitting services for the expansion of the parking lot at South Pointe Park; to be included as part of Phase I of the South Pointe Redevelopment area Streetscape project; and WHEREAS, the expansion of South Pointe Park's existing parking lot will allow the connection of the lot with the driveway entrance provided into South Pointe Park, as specified within the Phase I construction documents; and WHEREAS, the modified lot will provide twenty-two (22) additional metered parking spaces, to a total of sixty-eight (68) metered parking spaces; and WHEREAS, the modifications of the current layout will start from a point approximately 600 feet east of the construction of the Washington Avenue extension; and WHEREAS, all improvements will be fully coordinated with public utility companies and governmental agencies, as required; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents are about to be completed and the construction bid package is expected to be issued within thirty days; and WHEREAS, due to the short time frame to incorporate the lot's expansion design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.4 to the Agreement; and 200(./ ,_ )... ?1C)J- 1. RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.4. 2. MODIFICATIONS The Agreement is amended as follows: Exhibit "A", entitled "Scope of Services/Fee", is amended to add the work attached hereto and incorporated herein as Exhibit "A-4". Exhibit "C", entitled "Schedule", is amended to add the schedule attached hereto and incorporated herein as Exhibit "C-4". 3. OTHER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The RDA and Consultant ratify the terms of the Agreement, as modified by this Amendment No.4. IN WITNESS WHEREOF, the parties hereto have caused this Third Amendment to be executed in their names by their duly authorized officials as of the date first set forth above. SECRETARY APpD ....MIAMLBEACH REDEVELOPMENT AGENCY ",OVi.:.L) A.::J I U FORM & LANGUAGE & FOR EXECUTION , f'f{ 2 I, )3)':: - ~ ATTEST: CHAIRMAN SEAL ATTEST: ~~t - CONSULTANT: KIMLEY-HORNAND A~ATES, INC. ~~ ~. By: /u~ &-- VICE-PRESIDENT SECRETARY IICH2I,SYS\DDHP\$ALL\AJexandraI,South PointelKimJey Homl,ContractlKHA PLAD4 Amendment.doc ~_n ~_r , Kimley-Horn and Associates, Inc, South Pointe Park, January 18, 2000, Page I Exhibit "A- 4 II SCOPE OF SERVICES Task 1 - Field Survey Kimley-Horn and Associates will provide the following survey services: 1. Ground control (horizontal) will be established within the existing parking lot. The centerline of the parking lot will be established based upon the physical centerline of said parking lot. 2. A bench level run will be performed and a benchmark will be set within the park. The elevation of the benchmark will reference local Miami Bay Datum. This benchmark will be set outside the limits of construction (where possible), and referenced by station and offset to the centerline of construction. 3. A field topography survey (survey points only) will be performed along the centerline of the proposed parking lot extension, approximately 50 feet south of the north property line of the park. This extends to a point approximately 600 feet east of the cel}terline construction of the Washington Avenue extension. The survey limits are to a point 10 feet beyond the right-of-way (along Washington Avenue) and approximately 75 feet to either side of the parking lot centerline. A DTM will be developed for the project area. A topographic plan sheet will be developed for the pedestrian promenade area (in areas where there is no Raster image). 4. The location, pipe size, rim and invert elevations will be obtained for accessible drainage structures and gravity flow sewers within the project area. Confined space entry surveys of structures will not be performed. 5, The above ground (surface) utilities associated with underground utilities (such as valves, meters, fire hydrants, etc.) will be located. This work does not include obtaining title information and identifying easements. Task 2 - Construction Documentation The plan set will include the following: I. Plan and profile sheets for the extension of the existing parking lot. One sheet will be prepared overlaying the existing Raster imagery and supplemental survey box mapping. This sheet will be prepared at a scale of I" = 40' (based upon 11" x 17"- sized plan sheet). 2. A typical section plan sheet: This sheet will include one typical section for the entrance road and the existink parking lot extension. ~-~ ~_r ~ Kimley-Horn and Associates, Inc, South Pointe Park, January 18, 2000, Page 2 3. Revisions to the existing drainage system that will include construction notes and details. We will determine drainage requirements for both water quantity and quality, provide final hydraulic design calculations, design the layout of the inlet/pipe/exfiltration trench, and prepare the permit applications, as required by permitting agency. Kimley-Horn will use the hydraulic calculations to establish the systems' pipe invert elevations to avoid as many of the existing utilities as possible, Our geotechnical sub-consultant will provide only sub-surface investigation and testing information to KHA necessary for use in designing the drainage system. 4. Existing utility information, as obtained during survey data collection and the information provided by the respective utility owners, will be added to the plans. 5. Signing and Pavement marking plans - This information will be shown on one plan sheet information. These sheets will be prepared at a scale of I" = 40' (based upon II" x I7"-sized plan sheets). 6. Landscape Horizontal Control Plans - These sheets will be prepared at a scale of 1 " = 40' (11" x 17") and wi II detail the location of landscape materials. 7. Electrical Plans - These sheets will be prepared at a scale of 1 " = 40" (11" x 17") and will identify necessary control equipment as well as electrical service point locations. These sheets will identify existing and relocated street light poles, their lighting circuit, mounting height and wattage as well as the coded notes for the wiring schematic. Additional light poles will only be added to provide a safe area and are considered temporary due to future park master plan improvements. 8. Hardscape, Softscape, and Electrical Details - Details required for implementation of the design. 9. Lighting Service Point details. Task 3 - Permitting KHA will prepare permit applications with supporting documentation reports, computations, ete,. for the owner's signature and subsequent transmittal to relative governmental agencies (as required) including: 1. DERM for storm water management system. 2. Coordination with Florida Power and Light Company and BellSouth for service locations. Task 4 - Public Meetings and Presentations Our proposal includes preparation and attendance at the following meetings: I. Design Plan review with City staff. ~=n Kimley-Horn and Associates, Inc, South Pointe Park. January 18, 2000, Page 3 2. Up to four coordination meetings with City staff and other consultants associated with the South Pointe Park Master Plan Improvements. Additional Services Upon your authorization, we will provide any additional services that may be required beyond those described in Task 1 through 4. These services may include but are not limited to such items as the following: · Preparation of right of way acquisition sketches or descriptions. · Significant redesigns of the drainage system to meet additional DERM requirements. · Providing construction phase services. · Making tr:.lffic counts or undertaking other traftic related analysis. . Traffic signal plans. . Cross-sections. . Site contamination assessment. COMPENSATION We will provide the services described in Tasks 1 through 4 for the lump sum amounts (not including direct expenses) outlined below. Task Description Lump Sum Fee 1 S u rv ey ...................... .............................................. ........... ....... .... $4,800.00 Basic Services 2 Construction Documentation ................................................. $10,450.00 Specialty Services 3 P e rmi tti Ilg ............... ..................................... ............ ...... .... ........ $2,500.00 4 Public Meetings and Presentations .......................................... $2,250.00 Reim bnrsements Gcotec h n ical .............................................................................. $1,500.00 Direct Expenses ........................................................................ $1,000.00 To ta I ..... .......... .................................................................... .......... ....... $22,500.00 ,........ ".. ......r J Kimley-Horn and Associates, Inc. South Poi ute Park. January 18, 2000, Page 4 Exhibit IC_4" SCHEDULE We will provide the services outlined in task 1 through 4 in accordance with a mutually agreeable time frame between the City and Kimley-Hom to coincide with the South Pointe Phase I submittals. S:ISMINGONEI Word DocslSouth Pointelcontractslpark lot expansion,doc