Loading...
2000-23795 RESO RESOLUTION NO. 2000-23795 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.4 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT -TO-EXCEED $22,500.00, FOR SURVEYING, PREP ARA TION OF CONSTRUCTION DOCUMENTS, AND PERMITTING SERVICES FOR THE EXPANSION OF THE PARKING LOT AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETS CAPE PROJECT WHEREAS, on January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an Agreement with Kimley-Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping architectural services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, staffhas negotiated a not-to-exceed fee of$170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not-to-exceed fee, in the amount of$389,100, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of$103,800, including surveying, Master Plan design, preparation of bidding and construction documents, and permitting for the Washington A venue extension, as required by the Portofino Settlement Agreement; and WHEREAS, on October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee, in the amount of $70,925, for a Phase II survey, including geo-technical studies, aerial photos and other expenses; and WHEREAS, the expansion of South Pointe Park's existing parking lot will allow the connection of the lot with the driveway entrance provided into South Pointe Park, as specified within the Phase I construction documents; and WHEREAS, the modified lot will provide twenty-two (22) additional metered parking spaces, to a total of sixty-eight (68) metered parking spaces; and WHEREAS, the modifications of the current layout will start from a point approximately 600 feet east of the construction of the Washington Avenue extension; and WHEREAS, all improvements will be coordinated the public utility companies and governmental agencies, as required; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents are about to be completed and the construction bid package is expected to be issued within thirty days; and WHEREAS, due to the short time frame to incorporate the lot's expansion design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.4 to the Agreement; and WHEREAS, the proposed not-to-exceed fee for the expansion of the existing parking lot at South Pointe Park is $22,500.00, with the following defined tasks: Survey - $4,800.00; Preparation of Construction Documents - $10,450.00; Special Services - $4, 750.00 (consisting of permitting -$2,500.00 and public meetings and presentations - $2,250.00); and Reimbursements - $2,500.00 (consisting of geo-technical studies - $1,500.00 and direct expenses - $1,000.00). NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein ratify the attached Amendment No.4 to the Agreement with Kimley-Hom and Associates, Inc., for professional engineering and landscaping services, in an amount not-to- exceed $22,500.00, for surveying, preparation of construction documents, and permitting services for the expansion of the parking lot at South Pointe Park; to be included as part of Phase I of the South Pointe Redevelopment area Streetscape project. PASSED and ADOPTED this 9th day of February, 2000. f4 MAYOR ATTEST: -/&twr faL~ APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION CITY CLERK ~/)/w ~....,~,.~ LAL/CMC/AR \\CH2\SYS\DDHP\$ALLlAlexandra\South Pointe\Kimley Horn\ContractlKHA PLAD4 RDAReso.doc CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMIBEACH, FLORIDA 33139 http:\\ci.miami-beach.1l.us COMMISION MEMORANDUM NO. I 2 q -00 DATE: February 9, 2000 TO: Mayor Neisen O. Kasdin and Members of the City Commission FROM: Lawrence A. Levy J\J City Manager ~\ \. SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.4 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY -HORN AND ASSOCIATES, INC., APPROVED UNDER RESOLUTION NO. 99-23073 FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES IN AN AMOUNT NOT- TO-EXCEED $22,500.00 FOR SURVEYING, PREPARATION OF CONSTRUCTION DOCUMENTS, AND PERMITTING SERVICES FOR THE EXPANSION OF THE PARKING LOT AT SOUTH POINTE PARK; TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETS CAPE PROJECT ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. ANAL YSIS On January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an Agreement with Kimley- Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping architectural services for design of street improvements in the South Pointe Redevelopment Area (the Project). The RDA Staff negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a Master Plan and surveying for the Phase I improvements. AGENDA ITEM R 1 ~ DATE 2-'1...00 On May 26, 1999, the RDA approved Amendment No.1, which included a not-to-exceed fee in the amount of $389,100 for the preparation of construction documents, permitting and bidding services for Phase I. On May 26, 1999, the RDA approved Amendment No.2, which included a not-to-exceed fee in the amount of $103,800 including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington Avenue extension, as required by the Porto fino Settlement Agreement. On October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925 for Phase II survey, including geo-technical studies, aerial photos and other expenses. The expansion of South Pointe Park's existing parking lot will allow the connection of the lot with the driveway entrance provided into South Pointe Park, as specified within the Phase I construction documents. The modified lot will provide twenty-two (22) additional metered . parking spaces, to a total of sixty-eight (68) metered parking spaces. The modifications of the current layout will start from a point approximately 600 feet east of the construction of the Washington Avenue extension. All improvements will be fully coordinated with the public utility companies and governmental agencies, as required. In order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents are about to be completed and the construction bid package is expected to be issued within thirty days. Due to the short time frame to incorporate the lot's expanded design into the Phase I construction documents, it is recommended that these plans will be completed and issued as Amendment No.4 to the Agreement. The proposed not-to-exceed fee for the expansion of the existing Parking lot at South Pointe Park is $22,500.00 with the following defined tasks: Survey - $4,800.00; Preparation of Construction Documents - $10,450.00, Special Services - $4,750.00 (consisting of permitting - $2,500.00 and public meetings and presentations - $2,250.00); and Reimbursements - $2,500.00 (consisting of geo-technical studies - $1,500.00 and direct expenses - $1,000.00). The Administration recommends that the Mayor and City Commission ratify Amendment No.4 to the Agreement with Kimley-Hom and Associates, Inc. for professional and engineering services, in an amount not-to-exceed $22,500.00, for surveying, preparation of construction documents, and permitting services for the expansion of the parking lot at South Pointe Park; to be included as part of Phase I of the Project. LALlC~/AR~ . ~ \\CH2\SYS\DDHP\$ALL\Alexandra\South PointelKimley Hom\ContractlKHA PLAD4 CMBMemo.doc AMENDMENT NO.4 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THF. MIAMI BEACH REDEVELOPMENT AGENCY, FLORIDA AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPE ARCIDTECTURAL SERVICES, FOR SURVEYING, PREPARATION OF CONSTRUCTION DOCUMENTS, AND PERMITTING SERVICES FOR THE EXPANSION OF THE PARKING LOT AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETSCAPEPROJECT This Amendment No.4, dated as of k~{'J (U/u/.~ 9 , 2000, to that certain Professional Services Agreement ( Agreement), dated February 17, 1999, by and between the Miami Beach Redevelopment Agency (RDA) and Kimley-Hom and Associates, Inc. (Consultant). RECITALS WHEREAS, the Agreement provides for the preparation of the final Master Plan for the South Pointe Redevelopment Area Project; and WHEREAS, this Amendment No.4 to the Agreement provides for surveying, preparation of construction documents, and permitting services for the expansion of the parking lot at South Pointe Park; to be included as part of Phase I of the South Pointe Redevelopment area Streetscape project; and WHEREAS, the expansion of South Pointe Park's existing parking lot will allow the connection of the lot with the driveway entrance provided into South Pointe Park, as specified within the Phase I construction documents; and WHEREAS, the modified lot will provide twenty-two (22) additional metered parking spaces, to a total of sixty-eight (68) metered parking spaces; and WHEREAS, the modifications of the current layout will start from a point approximately 600 feet east of the construction of the Washington Avenue extension; and WHEREAS, all improvements will be fully coordinated with public utility companies and governmental agencies, as required; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents are about to be completed and the construction bid package is expected to be issued within thirty days; and WHEREAS, due to the short time frame to incorporate the lot's expansion design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.4 to the Agreement; and 1. RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.4. 2. MODIFICATIONS The Agreement is amended as follows: Exhibit "A", entitled "Scope of Services/Fee", is amended to add the work attached hereto and incorporated herein as Exhibit "A-4". Exhibit "C", entitled "Schedule", is amended to add the schedule attached hereto and incorporated herein as Exhibit "C-4". 3. OTHER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The RDA and Consultant ratify the terms of the Agreement, as modified by this Amendment No.4. IN WITNESS WHEREOF, the parties hereto have caused this Third Amendment to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: APpo ....l\1IAM.LBEACH REDEVELOPMENT AGENCY I\.OVi.:.L) A:;" I U FORM & LANGUAGE & FOR EXECUTION SECRETARY 2/yW: Drh ~ CHAIRMAN Q10 ~t - CONSULTANT: KIMLEY-HORNAND A~ATES, INC. / .~ ~ By: ,Dr/-- VICE-PRESIDENT SEAL ATTEST: SECRETARY \\CH2\SYSIDDHP\$ALL\Alexandra\South Pointe\Kimley Horn\Contract\KHA PLAD4 Amendment.doc JI'"_n ...... -, , Kimley-Horn and Associates, Inc. South Pointe Park. January 18, 2000, Page I Exhibit "A- 4 II SCOPE OF SERVICES Task 1 - Field Survey Kimley-Horn and Associates will provide the following survey services: 1. Ground control (horizontal) will be established within the existing parking lot. The centerline of the parking lot will be established based upon the physical centerline of said parking lot. 2. A bench level run will be performed and a benchmark will be set within the park. The elevation of the benchmark will reference local Miami Bay Datum. This benchmark will be set outside the limits of construction (where possible), and referenced by station and offset to the centerline of construction. 3. A field topography survey (survey points only) will be performed along the centerline of the proposed parking lot extension, approximately 50 feet south of the north property line of the park. This extends to a point approximately 600 feet east of the cel}terline construction of the Washington Avenue extension. The survey limits are to a point 10 feet beyond the right-of-way (along Washington Avenue) and approximately 75 feet to either side of the parking lot centerline. A DTM will be developed for the project area. A topographic plan sheet will be developed for the pedestrian promenade area (in areas where there is no Raster image). 4. The location, pipe size, rim and invert elevations will be obtained for accessible drainage structures and gravity flow sewers within the project area. Confined space entry surveys of structures will not be performed. 5. The above ground (surface) utilities associated with underground utilities (such as valves, meters, fire hydrants, etc.) will be located. This work does not include obtaining title information and identifying easements. Task 2 - Construction Documentation The plan set will include the following: 1. Plan and profi Ie sheets for the extension of the existing parking lot. One sheet will be prepared overlaying the existing Raster imagery and supplemental survey box mapping. This sheet will be prepared at a scale of 1" = 40' (based upon 11" x 17"- sized plan sheet). 2. A typical section plan sheet: This sheet will include one typical section for the entrance road and the existing parking lot extension. ~_r1I ~_r , Kimley-Horn and Associates, Inc. South Pointe Park. January 18.2000. Page 2 3. Revisions to the existing drainage system that will include construction notes and details. We will determine drainage requirements for both water quantity and quality, provide final hydraulic design calculations, design the layout of the inlet/pipe/exfiltration trench, and prepare the permit applications, as required by permitting agency. Kimley-Horn will use the hydraulic calculations to establish the systems' pipe invert elevations to avoid as many of the existing utilities as possible. Our geotechnical sub-consultant will provide only sub-surface investigation and testing information to KHA necessary for use in designing the drainage system. 4. Existing utility information, as obtained during survey data collection and the information provided by the respective utility owners, will be added to the plans. 5. Signing and Pavement marking plans - This information will be shown on one plan sheet information. These sheets will be prepared at a scale of I" = 40' (based upon II" x 17"-sized plan sheets). 6. Landscape Horizontal Control Plans - These sheets will be prepared at a scale of 1" = 40' (11" x 17") and will detail the location of landscape materials. 7. Electrical Plans - These sheets will be prepared at a scale of 1 " = 40" (11" x 17") and will identify necessary control equipment as well as electrical service point locations. These sheets will identify existing and relocated street light poles, their lighting circuit, mounting height and wattage as well as the coded notes for the wiring schematic. Additional light poles will only be added to provide a safe area and are considered temporary due to future park master plan improvements. 8. Hardscape, Softscape, and Electrical Details - Details required for implementation of the design. 9. Lighting Service Point details. Task 3 - Permitting KHA will prepare permit applications with supporting documentation reports, computations, etc., for the owner's signature and subsequent transmittal to relative governmental agencies (as required) including: 1. DERM for storm water management system. 2. Coordination with Florida Power and Light Company and BellSouth for service locations. Task 4 - Public Meetings and Presentations Our proposal includes preparation and attendance at the following meetings: I. Design Plan review with City staff. ~=n Kimley-Horn and Associates, Inc. South Pointe Park, January 18. 2000. Page 3 2. Up to four coordination meetings with City staff and other consultants associated with the South Pointe Park Master Plan Improvements. Additional Services Upon your authorization, we will provide any additional services that may be required beyond those described in Task 1 through 4. These services may include but are not limited to such items as the following: . Preparation of right of way acquisition sketches or descriptions. · Significant redesigns of the drainage system to meet additional DERM requirements. · Providing construction phase services. · Making traffic counts or undertaking other traftic related analysis. . Traffic signal plans. . Cross-sections. . Site contamination assessment. COMPENSATION We will provide the services described in Tasks 1 through 4 for the lump sum amounts (not including direct expenses) outlined below. Task Description Lump Sum Fee 1 S u rv ey .......... ................. .............. ................. ....... ...... .......... ........ $4,800.00 Basic Services 2 Construction Documentation ................................................ $10,450.00 Specialty Services 3 P e rmi tti II g ................................. ................ ....................... .......... $2,500.00 4 Public Meetings and Presentations .......................................... $2,250.00 Reimbursements Geo tech nical ................................................................ .............. $1,500.00 Direct Expenses ............. ......................... ............. ..................... $1,000.00 To tal .............................................................................. ...... ..... ........... $22,500.00 ~_n"" ~_r , Kimley-Horn and Associates, Inc. South Pointe Park. January t 8. 2000, Page 4 Exhibit IC_4" SCHEDULE We will provide the services outlined in task 1 through 4 in accordance with a mutually agreeable time frame between the City and Kimley-Hom to coincide with the South Pointe Phase I submittals. S:\SMINGONE\ Word Docs\South Pointe\contracts\park lot expansion.doc