RESOLUTION NO. 2006-26147
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI
BEACH, FLORIDA, RATIFYING THE SELECTION OF WIDELL INC. FOR THE
EMERGENCY REPAIRS TO THE VENETIAN CAUSEWAY WATER MAIN, IN THE
AMOUNT OF $195,000.
WHEREAS, a 30" transmission water main that delivers potable water to the City
splits into two 16" ductile iron transmission water mains; and
WHEREAS, in order to clear the Biscayne Bay, those two 16" transmission water
mains are secured to Bridge No. 874461 and Bridge No. 874463 with hangers underneath
the north side and the south side of said Bridges; and
WHEREAS, during Hurricane Wilma, two sail boats hit one of the 16"
transmission water mains on the south side of the above referenced Bridges, causing
holes and structural damage to three sections of pipe, damage to the hangers, and
misalignment of the pipe; and
WHEREAS, the 16" transmission water main on the south side had to be shut
down causing the system to run at half capacity; and
WHEREAS, this reduction in capacity created a situation in which a contractor
had to be hired by the Public Works Department, on an emergency basis, to replace the
pipes, damaged hangers and bolts, realign the pipes, and restore the system to its original
condition; and
WHEREAS, sections of the transmission water main that are secured with
hangers to Bridge No. 874481, located between Belle Isle and Purdy Avenue, had some
damaged hangers that had to be replaced, and the misaligned pipes had to be re-aligned;
and
WHEREAS, the Public Works Department obtained bids from two different
contractors, Ric-Man International, Inc., at $557,520, and Widell, Inc., at $195,000; and
WHEREAS, Public Works selected Widell, Inc. as the lowest bidder, and added a
contingency of $14,000 for unforeseen conditions, for a total amount of $209,000; and
WHEREAS, there were no unforeseen conditions, and the final cost of this
emergency repair was $195,000.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission hereby ratify the selection of Widell Inc. for the emergency repairs to the
Venetian Causeway Water Main, in the amount f $195,000.
CITY CLERK
Robert Parcher
APPROVED NJ TO
FORM & LANGUAGE
& F EXECUTION
~~
City Alto ~ Date
PASSED AND ADOPTED THIS 8th DAY OF
A1Jl:6 fa;t~
F:\CLER\$ALL\KERRY\Venetian Water Main Reso.doc
COMMISSION ITEM SUMMARY
Condensed Title:
A Resolution Ratifying a Contract to Widell, Inc. for the Emergency Repairs to the Venetian
Causeway Water Main in the amount of $195,000.
Ke Intended Outcome Su orted:
Ensure Well Maintained Infrastructure.
Issue:
Shall the Commission Ratify the Contract to Widell, Inc. for the repair of the 16" water main.
Item Summa IRecommendation:
During Hurricane Wilma two sail boats hit the 16" transmission water main on the south side of the
bridges located between San Marco and San Marino Islands causing holes and structural damage to
three sections of pipe, damage to the hangers and misalignm~DtQUhe pipe. The 16" transmission water
main had to be shut down causing the system to operate arhalf capacity.
In order to correct this reduction in capacity which creat~: an emergency condition, the Public Works
Department asked selected contractors to provide cost proposals to complete the emergency repairs.
Public Works selected Widell's proposal at $195,000 as the lowest proposal and added a contingency of
$14,000 for unforeseen conditions, for a total amount of $209,000. There were no unforeseen conditions
and the final cost was $195,000.
the Resolution.
Advisory Board Recommendation:
I N/A
Financial Information:
Source of Amount Account Approved
Funds: 1 $195,000.00 Public Works Account No.
425-9411-000343
D 2
3
4
aSPI Total $195,000.00
Financial Impact Summary:
Ci Clerk's Office Le islative Trackin
Gus Lopez, ext. 6641
Assistant City Manager
City Manager
RC
JMG
T:\AGENDA\2006\mar0806\consent\Venetian Water Main SUMMARY.doc
m
~
MIAMI BEACH
AGENDA ITEM C 7 P
DATE .~-f/-Oh
lD
MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
COMMISSION MEMORANDUM
TO: Mayor David Dermer and Members of the City Commission
FROM: Jorge M. Gonzalez, City Manager '\ ~
DATE: March 8, 2006 U
SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI
BEACH, FLORIDA, RATIFYING THE SELECTION OF WIDELL INC. FOR THE
EMERGENCY REPAIRS TO THE VENETIAN CAUSEWAY WATER MAIN, IN THE
AMOUNT OF $195,000.
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
FUNDING
$195,000
Public Works Account 425-9411-000343
KEY INTENDED OUTCOME SUPPORTED
Ensure Well Maintained Infrastructure
ANAL YSIS
A 30" transmission water main that delivers potable water to the City of Miami Beach via the
Venetian Causeway, splits into two 16" ductile iron transmission mains. In order to clear the
Bay those two 16" transmission mains are secured to bridge #874461 and bridge #874463
with hangers underneath the north side and the south side of the bridges. Those bridges
are located between San Marco Island and San Marino Island.
During Hurricane Wilma two sail boats hit the 16" transmission water main on the south side
of the above referenced bridges causing holes and structural damage to three sections of
pipe, damage to the hangers and misalignment of the pipe. The 16" transmission water
main had to be shut down causing the system to operate at half capacity.
In order to correct this reduction in capacity which created an emergency condition, the
Public Works Department asked selected contractors to provide cost proposals to complete
the emergency repairs. The scope of work included: replacement of damaged pipes,
replacement of damaged hangers and bolts, realign the pipes, and restore the system to its
original state so it performs as was designed to do.
Also, sections of the transmission water-main that are secured with hangers to bridge
#874481 located between Belle Isle and Purdy Avenue had some damaged hangers that
had to be replaced and the misaligned pipes had to be re-aligned.
T:\AGENDA\2006\mar0806\consentWenetian Water Main MEMO.doc
Venetian Causeway Water Main Emergency Repairs
Commission Memorandum
March 8, 2006
Page 2 of 2
The Public Works Department obtained proposals from two different contractors, Ric-Man
International, Inc. at $557,520 and Widell, Inc. at $195,000. Public Works selected Widell,
Inc. as the lowest bidder and added a contingency of $14,000 for unforeseen conditions, for
a total amount of $209,000. There were no unforeseen conditions encountered in the repair
and the resulting bill was $195,000.
CONCLUSION
The Administration recommends that the Mayor and City Commission of the City of Miami
Beach, Florida, adopt the attached resolution herein ratifying the contract to Widell, Inc. for
the emergency repairs to the Venetian Causeway water main, in the amount of $195,000.
'WIDELL, INC.
(954) 587-0520 _AX 587-6653
~inteti11f c?~ttuetion
Slate Corlllled
Sewage Treatment Wcrl(S
Water Treatment Wor~s
SubSlructure Construc!lol'1
5365 STIRLING ROAD
FT, LAUDERDALE. Fl 33314
December 13, 2005
VIa Mall Bl'1d Fax 3051873-7028
City of Miami Beach
Public Works Department
Attn: Mr. Mike Alvarez
clo Mr Elie Fakie
Re: City of Miami Beach
Venetian Causeway Watermain
Repairs at the Bridge Crossings
Request for ProlJosal t{Ula.&~NE
vJ\"L.M.A
-
Pursuant to your Request for Proposal for repairs to the Venetian Causeway Watermain at the Bridge Crossings.
we are pleased to provide the following proposal based on our interpretation of the work to be performed.
Dear Mr. Alvarez;
Venetian Causeway Watemaln Repairs
1) Bridge 674461: Replace and adjust two (2) pipes.. ..... .... .... ........., ..... ..$49,000.00
2) Bridge 874483: Replace one (1) pipe and adjust two (2) pipes...."......... $74,000,00
3) Bridge 874481: Adjust three (3) locations of sag........ ....."...................$72,000.00
The terms of the Proposal Bre as fOllows:
1. All DI pipe and fitting material necessary for repairs wil' be furnished by the City of Miami Beach, Public
Wof1(s Department.
2. Worle will be performed during normal work hours.
3. Worle will begin after January 1,2006 and will be completed by March 1, 2006
4. We have not included any finish painting and/or touchup painNng of the existing piping. Our
Subcontractor, Southland Painting Corp., can quote the painting upon request.
5. A detailed breakdown can be furnished upon request for bilJlng purposes.
6. Widell, Inc. resefV9S our rights for additional time and associated compensation to complete the work
once the full extent of the project is known.
If the Owner is interested in pursuing this Proposal, we request that you prepare a Purchase Order for the
work.
cc: File
1IS:L[)"to CMB rc V~nCln esw}' Propos:!1 0:1 120:1
SAFETV ~A.S
Sewage Treatrnenl Works
Waler Trealmenl WorkS
SubstruC lure Construction
(954) 587~0520 _AX 587~6853
!!nrin2etintj f2(J11jttucticwt
WIDELL, INC.
Slale Carll/led
5365 STIRLING ROAD
FT LAUDERDALE, FL 333U
INVOICE
Via Facsimile 305-673-7028 & MaH
Bill To: City of Miami Beach
Publics Works Department
Attn: Mike Alvarez
Re: Venetian Causeway Watermain
Repairs at the Bridge Crossing
DATE
02127/06
JOB NO.
INVOICE NO.
PAGE NO.
672
06-02
1 OF 1
Quanti Price Total
Venetian Causeway
1 Lot Wamrmain Repairs
1 Bridge 874461 $ 49,000.00 $ 49.000.00
1 Bridge 874463 $ 74.000.00 $ 74,000.00
1 Bridge 874481 $ 72,000.00 $ 72.000.00
TOTAL $
Work Completed 01/24/06
Terms
Net 30
Sub-Total
$195,000.00
Tax
T eta I Amount Due
$195,000.00
cc:
File. Field. Chrono, Accounting
SMerv PAYS