RESOLUTION NO. 2006-26172
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, APPROVING AND OFFICIALLY ADOPTING THE
BASIS OF DESIGN REPORT (BODR) FOR THE SOUTH POINTE PHASE III,
IV AND V, NEIGHBORHOOD-12 RIGHT-OF-WAY IMPROVEMENT PROJECT.
WHEREAS, the South Pointe Phase III, IV and V, Neighborhood 12, Right-of-Way
Improvement Project includes improvements to the stormwater collection and disposal system,
water distribution system, roadway resurfacing, streetscape, landscape, traffic calming, pedestrian
lighting and linkages within the right-of-way (the Project); and
WHEREAS, the Project limits are bounded by Ocean Drive to the east and Alton Road to the
west, and include: 1 st Street, between Alton Road and Ocean Drive; Commerce Street, from Alton
Road to Washington Avenue; Ocean Drive and Ocean Court, from 5th Street to South Pointe Drive;
Collins Avenue and Collins Court, from 5th Street to South Pointe Drive; South Pointe
Drive/Biscayne Street, from Alton Road to eastern street end; Alton Road, from 5th Street to South
Pointe Drive; Jefferson Avenue, between South Pointe Drive and 1 st Street; 1 51 Street, from Alton to
Jefferson Avenue; and Commerce Street; and
WHEREAS, the Project budget is currently estimated at $9.7 Million, for streetscape
improvements; $2 Million for water improvements; and $6.4Million for stormwater improvements; all
for a total of $18.1 Million; and
WHEREAS, on November 25, 2003, the City Commission authorized the issuance of
Request for Qualifications (RFQ) No. 08-03/04 for Professional Engineering, Urban Design, and
Landscape Architecture Services for the Project; and
WHEREAS, on February 17, 2004, responses to the RFQ were received; the Selection
Committee was convened on July 13, 2004, ranked the responding firms, and Chen & Associate
(C&A) was the top ranked firm; and
WHEREAS, on September 8, 2004, the City Commission approved Resolution No. 2004-
25664. authorizing negotiations with C&A; and
WHEREAS, on May 18, 2005, the City Commission authorized the execution of an
Agreement with C&A to provide engineering, urban design, architecture. services for the planning.
design, bid and award. and construction administration phases of the Project; and
WHEREAS, on June 10, and 17, 2005. the Project kick-off meeting with various City
Departments, and Site Reconnaissance visit were held, respectively; and
WHEREAS, on October 5. 2005. a Visioning Session was held with all the relevant City
Departments; and
WHEREAS, on November 28.2005, Community Design Workshop NO.1 was held, and
residents and business owners supported the recommended plan presented by C&A; and
WHEREAS, the Administration presented the draft BODR for the Project as an informational
item during the April 3, 2006 General Obligation Bond Oversight Committee meeting; and
WHEREAS, the BODR was also presented as an informational item at the April
10,2006 Historic Preservation Board (HPB) meeting; and
WHEREAS, consensus was achieved at the aforementioned meetings. including additional
feedback from City staff, and
WHEREAS, staff from the various City Departments has been involved in the planning
process from the Project inception, and no changes to the recommended plan in the BODR are
anticipated; and
and
WHEREAS, the final BODR, with Departmental input. will be the basis for the improvements;
WHEREAS, the current schedule calls for completion of the Design Phase of the Project in
2007; and
WHEREAS, the Administration recommends approval ofthe South Pointe Phase III, IV and
V, Neighborhood-12, Right-of-Way Improvement Project Basis of Design Report (BODR). as
submitted; and .
WHEREAS, by approving this BODR the City will officially end the planning phase and
proceed to the design phase of the Project.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and
officially adopt the Basis of Design Report (BODR) for the South Pointe Phase III, IV and V
Neighborhood-12 Right-of-Way Improvement Project.
PASSED and ADOPTED this 11th day f p i
,2006.
ATTEST:
!ZIvut t f Afr~
CITY CLERK
Robert Parcher
APPROVED AS TO
FORM & LANGUAGE
& FOR EXECUTION
T:\AGENOA\2006\apr1106\Regular\S-SPROA III, IV, V-02-03112006 BOOR Reso.doc
(Lj~ 7 -() r..
Date
COMMISSION ITEM SUMMARY
Condensed Title:
A Resolution of the Mayor and City Commission of the City of Miami Beach, Florida, approving and
officially adopting the Draft Basis of Design Report (BODR) for the South Pointe Redevelopment Area
RDA Phase III, IV, and V Nei hborhood-12 Ri ht-of-Wa 1m rovement Pro'ect.
Ke Intended Outcome Su orted:
To ensure well designed quality Capital Projects.
Issue:
Shall the City Commission adopt the Basis of Design Report for the South Pointe Phase III, IV and V
Nei hborhood-12 Pro'eel?
Item Summary/Recommendation:
On November 25. 2003, the City Commission authorized the issuance of a Request for Qualifications
(RFQ) for engineering, urban design, and landscape architecture services for the design of Right-of-
Way (ROW) Infrastructure Improvements for the South Pointe Phase III, IV and V Right-of-Way
Neighborhood Improvement (Project). Responses to the RFQ were received on February 17, 2004. On
May 18, 2005, the City authorized the negotiation of an Agreement with the top ranked firm of Chen &
Associates, for the planning, design, bid and award, and construction administration phases of the
Project. The Notice to Proceed was issued on September 8, 2005.
The Project Kick-off meeting was held on June 17, 2005 and CDW No.1 was held on November 28,
2005. Residents and business owner feedback showed support for the Recommended Plan presented
by Chen & Associates. Based on the consensus achieved at the aforementioned meetings and
additional feedback from City staff, a draft BODR was prepared and circulated to City Departments for
review in March, 2006.
Although the Project has no General Obligation (GO) Bond Funding, the Administration presented the
Project Draft Basis of Design Report (BODR) as an informational item during the April 3, 2006 GOBOC
meeting. The BODR was also presented to the Historic Preservation Board (HPB) on April 1 0,2006.
By approving the BODR, the City will officially end the planning process for the Project, accept the design
concept contained therein, and the Administration will be able to proceed with the design development,
biddinQ and award, and construction phases of the Proiect.
Advisory Board Recommendation:
I N/A
Financial Information:
Source of
Funds:
D
aSPI
Financial Impact Summary:
Ci Clerk's Office Le islative Trackin
Carla Dixon Ext. 6264
m
~
AGENDA ITEM
DATE
'"
R7c..
1(-1 /,.tl~
~
MIAMI BEACH
City of Miomi Beach, 1700 Convention Center Drive, Miami Beach, Flarida 33139, www.miamibeachfl.gov
COMMISSION MEMORANDUM
FROM:
Mayor David Dermer and Membe~s f the City Commission
Jorge M. Gonzalez. City Manager. U- ~
April 11, 2006
A RESOLUTION OF THE MAYOR AND CITY COMMISSION Of THE CITY Of
MIAMI BEACH, fLORIDA, APPROVING AND OFfiCIALLY ADOPTING THE
BASIS Of DESIGN REPORT (BODR) fOR THE SOUTH POINTE
REDEVELOPMENT AREA (RDA) PHASE III, IV AND V, NEIGHBORHOOD 12,
RIGHT-Of-WAY IMPROVEMENT PROJECT.
TO:
DATE:
SUBJECT:
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
BACKGROUND
The Scope of the project includes improvements to the stormwater collection and disposal
system, water distribution system, roadway resurfacing, and streetscape enhancements such as
additional landscaping, traffic calming installations, additional pedestrian lighting, and enhanced
pedestrian linkages.
The Project limits are bounded by Ocean Drive to the east and Alton Road to the west, and
include: 1 st Street, between Alton Road and Ocean Drive; Commerce Street, from Alton Road to
Washington Avenue; Ocean Drive and Ocean Court, from 5th Street to South Pointe Drive;
Collins Avenue and Collins Court, from 5th Street to South Pointe Drive; South Pointe
Drive/Biscayne Street, from Alton Road to Eastern street end; Alton Road, from 5th Street to
South Pointe Drive; Jefferson Avenue, between South Pointe Drive and 1 st Street; 151 Street,
from Alton to Jefferson Avenue; Commerce Street and other adjacent alleys, roadways, and
rights of way.
The Project Budget is as follows:
Improvement Type Allocated Funds
Streetscape Improvements............ .................................................................... $9,700,000
Water Improvements............. ...... ....................................................................... $2,000,000
Stormwater Improvements................................................................................. $6.400.000
Total Funded Improvements $18,100,000
City Commission Memorandum - So. Pointe 5treetscape III, IV, V RDA ROW Improvement Project BODR
April 11, 2006
Page 2 of2
On November 25, 2003, as part of the City's Right-of-Way (ROW) Infrastructure Improvement
Program, the City Commission authorized the issuance of a Request for Qualifications for
engineering, urban design, and landscape architecture services needed for the planning, design, bid
and award, and construction administration of the South Pointe Redevelopment Area Phase III, IV,
and V, Neighborhood Right-of-Way Improvement Project.
On January 15, 2004, (RFQ) No. 08-03/04 was issued, on February 17, 2004, eight responses were
received, and on July 13, 2004, the Evaluation Committee met to discuss the qualifications of the
eight (8) firms. The Committee "short listed" the proposals and invited four of the eight firms to
make presentations. At the end of presentations and deliberations, Chen and Associates (C&A),
was ranked as the number one firm by the Evaluation Committee.
On September 8, 2004, the City Commission approved Resolution No. 2004-25664, authorizing
negotiations with C&A. Negotiation sessions were held and an agreement was reached on the
required scope of services and C&A's fee to perform the required scope of work previously outlined.
On May 18, 2005, the City Commission authorized the execution of an Agreement between the City
of Miami Beach and C&A to provide the aforementioned services for the Project.
The project planning process has followed the standard Neighborhood Right-of-Way (ROW)
Infrastructure Improvement Project sequence, from Project Kick-off meeting to Community Design
Workshops (CDW). The Kick-off Meeting with other City Departments was held on June 10, 2005,
and the Site Reconnaissance was held on June 17, 2005. A Visioning Session followed with all
relevant City Departments on October 5, 2005. CDW NO.1 was held on November 28, 2005. Input
from CDW No. 1 was analyzed and since no material comments were presented and resident and
business owner feedback showed support for the Recommended Plan presented by C&A, the CIP
team directed Chen & Associates to move forward with the preparation of the Basis of Design
Report (BODR).
The South Pointe Streetscape Improvements Project is completely funded by the South Pointe
Redevelopment Agency (RDA) Tax Increment Financing (TIF) Funds, and has no General
Obligation (GO) Bond Funding components. However, as part of the Administration's commitment
to keeping the GO Bond Oversight Committee informed on the projects outside the Committee's
purview, the Administration presented the Draft BODR for the Project as an informational item
during the April 3, 2006 meeting. The BODR was also presented as an informational item during
the April 1 0, 2006 Historic Preservation Board (HPB) meeting.
Based on the consensus achieved at the aforementioned meetings and additional feedback from
City staff, a BODR was prepared and submitted for circulation to City Departments for review. Since
staff from the various City Departments has been involved in the Planning Process from its
inception, no changes to the Recommended Plan in the BODR are anticipated. The finalized BODR
with Departmental input will be the basis for the improvements. The current project schedule calls
for completion of the Design Phase in 2007.
CONCLUSION
The Administration recommends approval of the South Pointe Redevelopment Area (RDA) Phase
III, IV and V, Neighborhood 12 Right-of-Way Improvement Project BODR as submitted. By
approving the BODR, the City will officially end the planning phase for this project and accept the
design concept contained therein. The Administration will be able to proceed with the design
development, construction documents, bidding and award, and construction phases of the project.
T:\AGENOA\2006\apr1106\Regular\S-SPROA III, IV, V-02-03112006 BOOR Memo.doc
A COPY OF THE BASIS OF DESIGN REPORT (BOOR) FOR THE
CITY OF MIAMI BEACH
RIGHT OF WAY INFRASTRUCTURE IMPROVEMENTS PROGRAM
SOUTH POINTE PHASES III, IV & V
IS AVAILABLE FOR REVIEW IN THE CITY CLERK'S OFFICE
1 ST FLOOR OF CITY HALL