Loading...
2000-23458 RESO RESOLUTION NO. 2000-23458 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA RATIFYING THE MIAMI BEACH REDEVELOPMENT AGENCY'S (RDA) ACTION APPROVING AN AGREEMENT AMONG THE RDA, THE FLORIDA POWER AND LIGHT AND 226 OCEAN DRIVE, LTD., AS OWNER OF THE PROPERTY LOCATED AT 225 COLLINS A VENUE/226 OCEAN DRIVE, TO PROVIDE UNDERGROUND UTILITIES ON OCEAN COURT, BETWEEN SECOND AND THIRD STREETS, FOR AN AMOUNT NOT-TO-EXCEED $37,383.00; OF WHICH $17,636.50 IS TO BE PAID BY THE MIAMI BEACH REDEVELOPMENT AGENCY, AND $19,746.50 IS TO BE PAID BY 226 OCEAN DRIVE, LTD., PURSUANT TO THE SCOPE OF WORK SET FORTH IN THE SOUTH POINTE STREETSCAPE MASTER PLAN WHEREAS, funding has been appropriated from South Pointe Tax Increment Funds for the South Pointe Streetscape Master Plan (Master Plan); and WHEREAS, funding for Phase I of the Master Plan, in the amount of $3,800,000, was appropriated at the September 23, 1998 Miami Beach Redevelopment Agency (RDA) meeting; and WHEREAS, the Master Plan requires that the overhanging utility lines at streets with an ocean view (those located east of Collins Avenue) be placed underground; and WHEREAS, this scope of work is to be performed in preparation for the road improvement work on each street; and WHEREAS, Phase I of the Master Plan includes the improvements on Washington Avenue, from the south edge of Fifth Street to South Pointe Park, and on Third Street, from Michigan Avenue to Ocean Drive; and WHEREAS, within the scope of work for Phase I, existing utility lines crossing 1bird Street need to be placed underground; and WHEREAS, this work is expected to be performed within the next 120 days; and WHEREAS, in coordination meetings with representatives of Florida Power and Light (FPL), 226 Ocean Drive, Ltd., as owner of the property located at 225 Collins Avenue/226 Ocean Drive, is proposing to partially fund and place the utility lines crossing its proposed development site underground; and WHEREAS, the site is located between Second and Third Streets, and between Ocean Drive and Collins Avenue, and the affected utility lines run through Ocean Court, the alley; and WHEREAS, in the Master Plan, Ocean Court is part of Phase IV and, consequently, estimated to commence within 18 to 24 months; and WHEREAS, however, the Engineering Department ofFPL has estimated the cost of placing the electrical lines underground at both locations (Ocean Court and Third Street) and, by performing the work at the same time, achieve economies of scale; and WHEREAS, FPL has submitted a guaranteed estimate of the total cost of this scope for a total amount not-to-exceed $37,383.00; and WHEREAS, based on the above, the Administration recommends the RDA and 226 Ocean Drive, Ltd. share the cost of the proposed underground placement of the electrical utility lines from north of Third Street to south of Second Street. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein ratify the Miami Beach Redevelopment Agency's (RDA) action in approving an Agreement among the RDA, FPL and 226 Ocean Drive, Ltd., as owner of the property located at 225 Collins A venue/226 Ocean Drive, to provide underground utilities on Ocean Court, between Second and Third Streets, for an amount not-to-exceed $37,383.00; of which $17,636.50 is to be paid by the Miami Beach Redevelopment Agency, and $19,746.50 is to be paid by 226 Ocean Drive, Ltd., pursuant to the scope of work set forth in the South Pointe Streetscape Master Plan. PASSED AND ADOPTED this 12th day of January, 2000. 19 MAYOR ATTEST: <<-e1,tlt( fatCLt\ CITY CLERK APPROVED AS TO FORM & LANGUAGE & FOR EXECUTiON LAL/CMC/MDS/RM/CAH/ AR F:\DDHP\$ALLlAlexandraISouth PointelKimley HomlF.P.LIKHA FPL Relocation CMBRes02.doc /7 ~/_lJtJw;L #f-Ci\,y. p..t"nf!)oY 2-----/ y~tJ 0 Date CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMIBEACH, FLORIDA 33139 http:\\ci.miami-beach.fl.us COMMISION MEMORANDUM NO. 43-00 TO: Mayor Neisen O. Kasdin and Members of the City Commission FROM: Lawrence 'A. Levy ~ City Manager DATE: January 12,2000 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING THE MIAMI BEACH REDEVELOPMENT AGENCY'S (RDA) ACTION IN APPROVING AN AGREEMENT AMONG THE RDA, FLORIDA POWER AND LIGHT AND 226 OCEAN DRIVE, LTD., AS OWNER OF THE PROPERTY LOCATED AT 225 COLLINS A VENUE/226 OCEAN DRIVE, TO PROVIDE UNDERGROUND UTILITIES ON OCEAN COURT, BETWEEN SECOND AND THIRD STREETS, FOR AN AMOUNT NOT -TO-EXCEED $35,273; ONE HALF OF WHICH ($17,636.50) IS TO BE PAID BY THE MIAMI BEACH REDEVELOPMENT AGENCY AND ONE HALF BY 226 OCEAN DRIVE, LTD., PURSUANT TO THE SCOPE OF WORK SET FORTH IN THE SOUTH POINTE STREETS CAPE MASTER PLAN ADMINISTRATIVE RECOMMENDATION: Adopt the Resolution. FUNDING: Funding has been appropriated from South Pointe Tax Increment Funds for the South Pointe Streetscape Master Plan (Master Plan). Funding for Phase I, in the amount of $3,800,000 was appropriated at the September 23, 1998 Miami Beach Redevelopment Agency (RDA) meeting. ANALYSIS: The Master Plan requires that the overhanging utility lines at streets with an ocean view (those located east of Collins Avenue) be placed underground. This Scope of Work is to be performed in preparation for the road improvement work on each street. AGENDA ITEM DATE RlB J....I2...()() Phase I of the Streetscape Project includes the improvements on Washington Avenue, from the south edge of Fifth Street to South Pointe Park, and on Third Street, from Michigan A venue to Ocean Drive. Within the scope of work for Phase I, existing utility lines crossing Third Street need to be placed underground. This work is expected to be performed within the next 120 days. In coordination meetings with representatives of Florida Power and Light (FPL), a private developer, 226 Ocean Drive, Ltd., as owner of the property located at 225 Collins A venue/226 Ocean Drive, is proposing to partially fund and place the utility lines crossing its proposed development site underground. The site is located between Second and Third Streets, and between Ocean Drive and Collins A venue, and the affected utility lines run through Ocean Court, the alley. In the Master Plan, Ocean Court is part of Phase IV and, consequently, estimated to commence within 18 to 24 months. However, the Engineering Department of FPL has estimated the cost of placing the electrical lines underground at both locations (Ocean Court and Third Street) and, by performing the work at the same time, achieve economies of scale. FPL has submitted a guaranteed estimate of the total cost of this scope for a total amount not-to-exceed $35,273. Based on the above, the Administration recommends that the RDA and 226 Ocean Drive, Ltd. to share the cost of the proposed undergroWld placement of the electrical utility lines from north of Third Street to south of Second Street. CONCLUSION: The Administration recommends that the Mayor and City COmniission of the City of Miami Beach ratify the Miami Beach Redevelopment's (RDA) action in approving an Agreement among the RDA, Florida Power and Light and 226 Ocean Drive, Ltd., as owner of the property located at 225 Collins A venue/226 Ocean Drive, to provide WldergroWld utilities on Ocean Court, between Second and Third Streets, for an amoWlt not-to-exceed $35,273.00; one half of which ($17,636.50) is to be paid by the Miami Beach Redevelopment Agency, and one half by 226 Ocean Drive, Ltd., pursuant to the scope of work set forth in the South Pointe Streetscape Master Plan. ~ vC- ~ \\MA.t\ LAL/CMC/MDSIRM/CAW AR ~~. IICH21SYSIDDHPlSALLlAlexandralSouth PointelKimley HomlKHA FPL Relocation CMBMemo.doc RESOLUTION NO. 337-2000 A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AND AUTHORIZING THE CHAIRMAN AND SECRETARY TO EXECUTE AN AGREEMENT WITH FLORIDA POWER AND LIGHT AND 226 OCEAN DRIVE, LTD., AS OWNER OF THE PROPERTY LOCATED AT 225 COLLINS A VENUE/ 226 OCEAN DRIVE, TO PROVIDE UNDERGROUND UTILITIES ON OCEAN COURT, BETWEEN SECOND AND THIRD STREETS, FOR AN AMOUNT NOT-TO-EXCEED $37,383.00; OF WHICH $17,636.50 IS TO BE PAID BY THE MIAl\1I BEACH REDEVELOPMENT AGENCY, AND $19,746.50 IS TO BE PAID BY 226 OCEAN DRIVE, LTD., PURSUANT TO THE SCOPE OF WORK SET FORTH IN THE SOUTH POINTE STREETSCAPE MASTER PLAN WHEREAS, funding has been appropriated from South Pointe Tax Increment Funds for the South Pointe Streetscape Master Plan (Master Plan); and WHEREAS, funding for Phase I of the Master Plan, in the amount of $3,800,000, was appropriated at the September 23, 1998, Miami Beach Redevelopment Agency (RDA) meeting; and WHEREAS, the Master Plan requires that the overhanging utility lines at streets with an ocean view (those located east of Collins Avenue) be placed underground; and WHEREAS, this scope of work is to be performed in preparation for the road improvement work on each street; and WHEREAS, Phase I of the Master Plan includes the improvements on W ashington Avenue, from the south edge of Fifth Street to South Pointe Park, and on Third Street, from Michigan Avenue to Ocean Drive; and WHEREAS, within the scope of work for Phase I, existing utility lines crossing Third Street need to be placed underground; and WHEREAS, this work is expected to be performed within the next 120 days; and WHEREAS, in coordination meetings with representatives of Florida Power and Light (FPL), 226 Ocean Drive, Ltd., as owner of the property located at 225 Collins Avenue/226 Ocean Drive, is proposing to partially fund and place the utility lines crossing its proposed development site underground; and WHEREAS, the site ;J located between Second and Third Streets, and between Ocean Drive and Collins Avenue, and the affected utility lines run through Ocean Court, the alley; and WHEREAS, in the Master Plan, Ocean Court is part of Phase IV and, consequently, estimated to commence within 18 to 24 months; and WHEREAS, however, the Engineering Department ofFPL has estimated the cost of placing the electrical lines underground at both locations (Ocean Court and Third Street) and, by performing the work at the same time, achieve economies of scale; and WHEREAS, FPL has submitted a guaranteed estimate of the total cost of this scope for a total amount not-to-exceed $37,383.00; and WHEREAS, based on the above, the Administration recommends that the RDA and 226 Ocean Drive, Ltd. share the cost of the proposed underground placement of the electrical utility lines from north of Third Street to south of Second Street. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Chairman and members of the Miami Beach Redevelopment Agency herein approve and authorize the Chairman and Secretary to execute an Agreement with Florida Power and Light and 226 Ocean Drive, Ltd., as owner of the property located at 225 Collins A venue/226 Ocean Drive, to provide underground utilities on Ocean Court, between Second and Third Streets, for an amount not-to-exceed $37,383.00; of which $17,636.50 is to be paid by the Miami Beach Redevelopment Agency, and $19,746.50 is to be paid by 226 Ocean Drive, Ltd., pursuant to the scope of work set forth in the South Pointe Streetscape Master Plan. PASSED AND ADOPTED this 12th of January, 2000. 1/11 CHAIRMAN ATTEST: /J il ~'ClLcd/ r ell C(LL',-- SECRETARY APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION I " , ~ /) I / / / I ' ./ i,/ /// t l{/c.,t~ Redevelopment Agency Geneml Counsel 2---IY-cI- Date LAL/CMC/MDS/RM/CAH/ AR F:\DDHPlSALLlAlexandra\South PointelKimley Hom\F,P,LIKHA FPL Relocation RDARes02,doc mami Beach Redevelopment Agency .~ITY HALL 1700 CONVENTION CENTER DRIVE MIAMIBEACH, FLORIDA 33139 ~ttp:\\ci.miami-beach. fl. us - REDEVELOPMENT AGENCY MEMORANDUM NO. 00 ~ 3 TO: Chairman and Members of the Board of the Miami Beach Redevelopment Agency FROM: Lawrence A. Levy I ~\ / Executive Director ~ DATE: January 12, 2000 SUBJECT: A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AND AUTHORIZING THE CHAIRMAN AND SECRETARY TO EXECUTE AN AGREEMENT WITH FLORIDA POWER AND LIGHT AND 226 OCEAN DRIVE, LTD., AS OWNER OF THE PROPERTY LOCATED AT 225 COLLINS A VENUE/ 226 OCEAN DRIVE, TO PROVIDE UNDERGROUND UTILITIES ON OCEAN COURT, BETWEEN SECOND AND THIRD STREETS, FOR AN AMOUNT NOT~TO-EXCEED $35,273.00; ONE HALF OF WInCH ($17,636.50) IS TO BE P AID BY THE MIAMI BEACH REDEVELOPMENT AGENCY AND ONE HALF BY 226 OCEAN DRIVE, LTD., PURSUANT TO THE SCOPE OF WORK SET FORTH IN THE SOUTH POINTE STREETSCAPE MASTER PLAN ADMINISTRATIVE RECOMMENDATION: Adopt the Resolution. FUNDING: Funding has been appropriated from South Pointe Tax Increment Funds for the South Pointe Streetscape Master Plan (Master Plan). Funding for Phase I, in the amount of $3,800,000, was appropriated at the September 23, 1998, Miami Beach Redevelopment Agency (RDA) meeting. ANAL YSIS: The Master Plan requires that the overhanging utility lines at streets with an ocean view (those located east of Collins A venue) be placed underground. This Scope of Work is to be performed in preparation for the road improvement work on each street. AGENDA ITEM :3 {S DATE /-12-00 Phase I of the Master Plan includes the improvements on Washington Avenue, from the south edge of Fifth Street to South Pointe Park, and on Third Street, from Michigan A venue to Ocean Drive. Within the scope of work for Phase I, existing utility lines crossing Third Street need to be placed underground. This work is expected to be performed within the next 120 days. In coordination meetings with representatives of Florida Power and Light (FPL), a private developer, 226 Ocean Drive, Ltd., as owner of the property located at 225 Collins A venue/226 Ocean Drive, is proposing to partially fund and place the utility lines crossing its proposed development site underground. The site is located between Second and Third Streets, and between Ocean Drive and Collins Avenue, and the affected utility lines run through Ocean Court, the alley. In the Master Plan, Ocean Court is part of Phase IV and, consequently, estimated to commence within 18 to 24 months. However, the Engineering Department of FPL has estimated the cost of placing the electrical lines underground at both locations (Ocean Court and Third Street) and, by performing the work at the same time, achieve economies of scale. FPL has submitted a guaranteed estimate of the total cost of this scope for a total amount not-to-exceed $35,273. Based on the above, the Administration recommends that the RDA and 226 Ocean Drive, Ltd. share the cost of the proposed underground placement of the electrical utility lines from north of Third Street to south of Second Street. CONCLUSION: The Administration recommends that the Chairman and the Members of the .Miami Beach Redevelopment Agency approve and authorize the Chairman and the Secretary to execute an Agreement with Florida Power and Light and 226 Ocean Drive, Ltd., as owner of the property located at 225 Collins A venue/226 Ocean Drive, to provide underground utilities on Ocean Court, between Second and Third Streets, for an amount not-to-exceed $35,273.00; one half of which ($17,636.50) is to be paid by the Miami Beach Redevelopment Agency and one half by 226 Ocean Drive, Ltd., pursuant to scope of work set forth in the South Pointe Streetscape Master Plan. (1~c.. ~ ~ . LALlCMCIMDStRM;CAHI A~-- \ \\CH2ISYSIDDHPlSALL\AlexandraISouth PoinlelKimley HomlKHA FPL Relocation CMBMemo.doe ----- UNDERGROUND FACILITIES CONVERSION AGREEMENT This Agrcr::ment, made and entered into this 9 th day of February, 2000, by and between the Miami Beach ~developmcnt~ency and 226 Ocean Drive Limitcq (hereinafter called the Applicants) and Florida Power & Light Companv, a corporation organized under the laws of the State of Florida (herein~er called FPL) is forme pro'lision of underground electric distribution facilities by FPL in place of certain existing overhead electric distribution facilities pursuant to the Applicants' request for such f.u:ilities. In consideration of the premises, covenants and agreements set forth herein, FPL and the Applicants agree as follows: 1. The Applicants shall pay FPL a Contribution-in-Aid--ofConstIUction (CIAC) in the amount oiS 37,383_00, with $17,636.50 to be paid by the Miami Beach Redevelopment Agency and $19746.50 to be paid by 226 Ocean Drive Limited. The cost is valid until July 3,2000. 2. Pursuant to this Agreement, the Applicants agree to comply with and abide by the requirements, teoos, and conditions ofFPL's Electric TlU'iff. as tho,e;e req"ireme1Jtc:, tenns i'..!ld conditions are set forth in said Tariff. 3. Upon compliance with the requirements, tenns an,: C01!C:iitions of FPL I sElectric T arifi, and this Agreement, FPL will proceed in a timely manner with the conversion of the existing overhead distribution lines to an underground configuzation in accordance with the construction drawings and specifications set forth in Attachments A and B hettOf. Note that the FPL overhead distribution lines will be removed between the poles number I through 4 as shown on AttaChment A. but that all poles and overhead service laterals, except at location number 2, will remain. The Applicants arc n:sponsible for making arrangements with the other utilities on the poles if they would like their tacilities n:moved or placed underground. 4. 226 Ocean~Drive Limited, as the owner of22j Collins Avenue, must provide FPL with::L recorded easement, at the owner's e.'"Cpcnse, for the pad-mounted transformers, handhole, and underground ducts necessary for the conversion of the lines to underground, as shown on Attachment B. They also must artange fer the conversion of the overhead service entrance at 221 Collins Avenue to underground at their e:ocpense. j. The City of Miami Beach Public Works Department shall issue FPL a permit to do the necessary work that is within the City Right.:ofWay. 6. Failure by the Applicants to comply with any of the requirements, terms, or conditions of this Agreement or FPL's Electric Tariff shall result in termination of this Agreement. The AppIicant(s) roilY tennina.te this Agreement without C4WSe and for their convenience at any time prior to the start of construction, and the ClAC paid by the Applicants will be refunded to the Applicants, provided however, that the refund of the CIAC shall be offsct by any COstS incurred by FPL in performing under the agreement up to the date of tenninarion. 7. This Agreement is not assignable. IN WITNESS WHEREOF, FPL and the Applicants have executed this Agreement for the provision of electric underground distribution facilities to be effective 41S of the date first above written. APPLICANT -~mi Be:u:h S::SDPmeo. JJ APPLlCANT-226 OcellJl Drive Ltd. FPL ~~~-~~ 7' Name Neisen Kasdin,Mayor Name..3:cli i}/2f nL(l7U(jJNarne ;' r ,f'.'. .j ATTEST: rlJU ,r C,;CL( ll~". ~tlc 1) ,Cy_' Va z- 'Sl1)5.,/'\J;- Title Pa ~~R& ecECUlloN>arc ;Q I 1 { , C () Date /[ if ifJftJi-- 2 - (6- 0,) lee 't--l DA-v'l ~ '3u~~ sm If )w I to TOTAL P. 02 ----_.._._-_._.~ ;u ''1 < W Pl C1 fU "- ~ "- fU CJ 0 0 -, 0 ^' fTl ~ 0 < fTl " 0 f- f'1 1> -; r 0 n fU ~~ ~ ! . ~ f, " H ~ ~ , /G /G N_ H H "'~ i n n H ~ i 0 < P "1 f'1 : ;0 l/ ~ I f'l Ii " CJ R -( ~ 0 g ~ C Cl . n ~ rx LJ Z ~ < , 8 PI ~ ;U Ii V1 > U < z '--"- - - , J> -J -,j J> (") T 3: '1 Z -J J> m._~___~_ I I I r r l' I I I 1- .L .L + . 1'1 Cl [lbIll I I I IT] I I I z t:J fU l- ce l^, (~J 'I 0; Z U 'u U C C f J> 'J ,', Z Z u ;u t::J Ll ": J> [:1 ('I f'l Ll :<: ,- AJ '" AJ U 0 t.:.J LJ (;) C) tJ c: T c::: '" ;.u Z U Z U l"1 '1J -( I- e) c:: c.: 1'1 u Z z ,- -, V] u u f" ;u r'l l' C) OJ 'r z u ;.0 /'1 V] <.. :i 1'/ '" U te) U ", 1> 1'1 ;u ;u ;u ;u 3: -< -< f" n n ;u J> V] n 1> tv J> UJ r'.- ''1 tv 1- PI U ,- "1 V] ;u /'1 V1 V] Z Z D -u z f) f" n z u u u z u C z f) ITI f) n ;u f- -, ;u r'1 -J f'1 ,-, J> -, 1'1 P1 "' PI f'l 1> Z Z Z n ^ n 1> 1> W V] f'1 1'1 U t:J U U C c n n -/ '-I !Jl :" W fV V> -, tej J".> f'l f'1 V] f- 1> f'] I C Z V) X f'1 LJ r- IT] W n -, -u ;u n r -J 1"1 'i ''1 < J> 1> ('1 "" 1> " Z n -J f'l -J "" V] -, V] fi ~ -J " 1"' f'l 1", " -I -I :<: 1'1 Vl n :i f'l 1> -J ;j I 1> (U '- Z Z 0 fU Z :<: -/ fU -J " t:J C1 1'1 1"'1 U1 f- n) --, z C/) c n fV :r -u -J l:J n t;1 C >- PI 0 UJ 0 0 ;u PI C/) n '0 f- f'l ,- V) -( V] C ITl LJ 0 0 f'1 ~1 0 r- /- V] ;u 3: LJ Z Z C fll "1 r ", J> ;u 0 C/) ~J 3: ;u Z Z t:J -J "I CJ W <:: u -I u < :<: r f'1 Z :1.: ", c :<: D -, '" -., Vl r- 1> n ,- c: < p r D -J V] tv f'l -I ;u -I C '" CJ f'1 ;u V> C1 1> -, "1 Z I "1 V> W '" f" 0 Z :1: fTl Vl "I -J -I f'1 1> -'1 ~, '1 1: J> :<: t:J z U " "1 f- n [J <:: -< ;u " [- D < V] D :<: C1 fU Z PI f'1 ;u <:: ITI w < C1 ;u ^ 0 ;u 3: [J c~ PI < ;u C/) 0 < ;u n 1> ^ C f'1 I '-I Z 1> Z ;u 1> f'l Z 1"1 C1 W ;u -, :1: z C1 Vl -< ['1 "1 C1 0 -J f'1 -J 1> :r -J ;u J> to Z ;u t;1 LJ 0 tj 0 C/) '" 1'1 1> r f'1 ;u f'1 f- f'1 Z -, !'1 c ;u 3: r C1 Vl ;u Z ['1 rTl f'1 ~1 J> C1 -, 3: Z V] C1 0 Z ('1 LJ ;:: -J 0 ;u ''1 ;u ,z C -J :<: LJ C1 ;u 1> -J 0 1'1 ;u ;u f'l -J I :u :<: 0 :<: fTl Vl V> f'1 C ~ X nl 0 ['1 ;<) z n ru ;u ;u V1 U f" Ul < I, 1'] 'u " l' 1> J> -, n 1> '" Z -J -J -J D t;1 I 1> f- -j -; :r r n 1> -J (- <. :r 0 LJ C -, Z f'1 f- (1 Vl f'l -I -0 C/) '" r..:J 0 x J> !V :<: ,- J> W Z 1', ITl < ;j u ;u 1""1 V1 Z C1 W S ,- t" Z (;l V) --; z :1: u -.,~ -I ",V> PI D tj V] 3:;;u 1- 1> 0 <: Oz ~C1 Ei ~1 Z 0 ;0 1'1 -I C/) CJ __, :" 3: 1> -J "I Vi -I U ;u ''1 3: n < 1"1 LJ < "1 ;0 I f'1 1> C1 ~, 'u r r Z f'1 '" 2 STREET '. ------------- LJ l:J rT] J> lj ---------_._-----~ 3 STREET -u :J: J> VJ I'f "~I ~z___ '" fl < "1 ;u :r: [., ], u . I] < 1'1 /U :1: 1'1 1> U -'1 1'1 ['1 l:J [11 ;U '1 1'1 PI t:J f'1 ;u z V] -J J> ,- f- c Z f'1 V] IU -U IU ;U UlO <J no OVl ,- f'1 'C! Z V> W C) W w't'ww ~";;UPl ~-u~~ ('1 <w ('1 ;;un-l;U "1 t.jC;;U-f C/) Glv} ~ nc 3: ':l> ;-~ "';\) Z t::t:J ~ ....... 0 ~ ~ jt; C/) z C/) --f J> ,- f- C1 C -< W o n f'1 J> Z n -j <" J>;Q cD r<J -jD V1 f'1 CJ !.'! " o r r Z wru rU' t:1 ' 02; Cl w o I :r ~ WIW rHL! t:1C11 C1I~ - C) . ,u C) D LJ C1 1'1 'Tl J> X L VJ l:J -J ;u n u r ,- Z V1 "-- fU () 1Jl n [) r f- Z Vl W wU' r' g2; -C1 :r 3: ['I J>X Z~ IV> o-J r~ fTlZ CI C1' CJ R/\/ -R7"-'vI- z V1 -, 1> (- ~~ w.t'ww --"1 Ul]> " ","X1rl Q<-o~~ PI V) r'1 ;UO--f;:U t:1C~-I WC1Vlg nc 3: ' 1> ~ ",,,, z :cU 1> ~-~ n I rl C/) tI f'1 " tj 1'1 Z t:J D < ('1 '" I 1'1 1> U "I 1'1 PI U ('I ;u DtI <D ~~ f!1Pl "", tj,...l T]" r'Jt:j ['1l'1 "'z :;]'" C) W ._~--~------~~-------. ru ru <J (J' ;0 D L:J -U no ,'1 VJ J> f'1 Zl:J LJ ;U ;u 1'1 3: 0 < r1 1> r r- CJ < f'1 ;u :r "1 J> C1 -., f'1 1'1 C1 1" ;u J> Z C1 '" f'1 n [J z t=I 1> ;0 -< r z 1"' V> -0 U ,- f'1 -f N u -0 0 r 'T] :" ..~......~-.... I\J I\J UI f) o \- , H Z Vl J> < 1'1 i'+_~, . U1 (,' '" I ill I 'U ~u ----i .. J>'" t:jJ> Z C/) ~l I UI IU ru -l> I- I - - - -. -- _.. -~- -- ) ~~ f r, II ,& "'sf ~ ; > N " " ~j ~~ < < ~~ -f--;: '---' i 0 < p .. 1'1 N '" il ~ :r '0 a ~ '" '" ii --, J> u -1 ~ c -I G1 J> co n 0 I z 3: < I'l 1'1 Z '" -j Vl (] \JJ z IU IU .~ Cl CJ , r-- Z Vl J> < 1'1 w o :i I o n 1'1 J> Z n -j u M x W ,-, ru I I>; N f" w ,u ~ Z 0 CD -<z -iV?f'l"'Tl0 -t""Urn -j z< DO IC:l>DC o;o-c fTl ~rrl fTlWV)rVl OZVl <:? OJ -j t:1-ir-t J>"'UfTl-i ",'" rl'" -0- DO <~."'j? ~~ ['1 C<iij<:3: oJ> -Url t:D~ _fTl 8M PI rV) 8o=1tiAJ t:;jt:1Cj;{} cL1 J>' n""~-l ZV) fr~ to Z -1 '-=' ['1 ^'J>D~D D"lJ_D J>'" ",C zrz Vl ~V)"'~2 ""'1 1>", -<5 OI r-iClPl nn zrl ~illbCl~ H;::O(T1r .'" n1> 0 crl r1 t:1n-{"U_ -1Z1>n V>J> J><: V)o.....;jV) YJ"z)> j-< ~~ o;:oruoI Ot::l-< ""'1 t::l' Z '" ['1 :<:JU V)r rl ..""'1 3:0 rlJU t::lt::l~ ~ rl -j J> ;u~ ~.'" ;uIr V) t:1 E;zR-i)> rlr n rl""'1 -u;u rlO rl rl AI 1> -U xr Oz -U rl", !:=' "1 ;u -ur ""'1n 8~!-'-'V)::i 1>0 rl~ rl In-U ZZ -<Vl ~-tD2?~ VlVl '" l>pD ['1 -t J>o -iw""'l-tt::l Z~Vl Z;u -<OOIrl t::1 -l rTJ 0 V) I~'" ""'10 .."Dnrut:1 pCj~ OJ o -j r ^ fTl C) f'l fTl "'I ~ru~.,,~ rl~J> 3: fq Vl Z r; n P"I ;U tj-OW-i""l 0 '" J>l>Mo3: J> --<'" z 0 -..C1p-T1rl ZI < -UOJ Pl n Z tj 1"""1 :r> r'l J>V) I_~-i Z '" ~ --j <..oj I_ t:1J>t=1 -l ;;U 00'1P15 C;;u r'l C n ['1 (,1 U n Dr -< -of 1> (""1 --1 ~l J> I V) .:: :-J a [] "1 0 Z ,~ ~I '" Vl ---~---_._--~----- ", .............