337-2000 RDA
RESOLUTION NO. 337-2000
A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE MIAMI
BEACH REDEVELOPMENT AGENCY APPROVING AND AUTHORIZING
THE CHAIRMAN AND SECRETARY TO EXECUTE AN AGREEMENT
WITH FLORIDA POWER AND LIGHT AND 226 OCEAN DRIVE, LTD., AS
OWNER OF THE PROPERTY LOCATED AT 225 COLLINS A VENUE/ 226
OCEAN DRIVE, TO PROVIDE UNDERGROUND UTILITIES ON OCEAN
COURT, BETWEEN SECOND AND THIRD STREETS, FOR AN AMOUNT
NOT-TO-EXCEED $37,383.00; OF WHICH $17,636.50 IS TO BE PAID BY
THE MIAMI BEACH REDEVELOPMENT AGENCY, AND $19,746.50 IS TO
BE PAID BY 226 OCEAN DRIVE, LTD., PURSUANT TO THE SCOPE OF
WORK SET FORTH IN THE SOUTH POINTE STREETSCAPE MASTER
PLAN
WHEREAS, funding has been appropriated from South Pointe Tax Increment Funds for the
South Pointe Streetscape Master Plan (Master Plan); and
WHEREAS, funding for Phase I of the Master Plan, in the amount of $3,800,000, was
appropriated at the September 23, 1998, Miami Beach Redevelopment Agency (RDA) meeting;
and
WHEREAS, the Master Plan requires that the overhanging utility lines at streets with an ocean
view (those located east of Collins Avenue) be placed underground; and
WHEREAS, this scope of work is to be performed in preparation for the road improvement work
on each street; and
WHEREAS, Phase I of the Master Plan includes the improvements on W ashington Avenue, from
the south edge of Fifth Street to South Pointe Park, and on Third Street, from Michigan Avenue
to Ocean Drive; and
WHEREAS, within the scope of work for Phase I, existing utility lines crossing Third Street need
to be placed underground; and
WHEREAS, this work is expected to be performed within the next 120 days; and
WHEREAS, in coordination meetings with representatives of Florida Power and Light (FPL),
226 Ocean Drive, Ltd., as owner of the property located at 225 Collins Avenue1226 Ocean Drive,
is proposing to partially fund and place the utility lines crossing its proposed development site
underground; and
WHEREAS, the site iJ located between Second and Third Streets, and between Ocean Drive and
Collins Avenue, and the affected utility lines run through Ocean Court, the alley; and
WHEREAS, in the Master Plan, Ocean Court is part of Phase IV and, consequently, estimated
to commence within 18 to 24 months; and
WHEREAS, however, the Engineering Department ofFPL has estimated the cost of placing the
electrical lines underground at both locations (Ocean Court and Third Street) and, by performing
the work at the same time, achieve economies of scale; and
WHEREAS, FPL has submitted a guaranteed estimate of the total cost of this scope for a total
amount not-to-exceed $37,383.00; and
WHEREAS, based on the above, the Administration recommends that the RDA and 226 Ocean
Drive, Ltd. share the cost of the proposed underground placement of the electrical utility lines
from north of Third Street to south of Second Street.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Chairman and
members of the Miami Beach Redevelopment Agency herein approve and authorize the Chairman
and Secretary to execute an Agreement with Florida Power and Light and 226 Ocean Drive, Ltd.,
as owner of the property located at 225 Collins A venue/226 Ocean Drive, to provide underground
utilities on Ocean Court, between Second and Third Streets, for an amount not-to-exceed
$37,383.00; of which $17,636.50 is to be paid by the Miami Beach Redevelopment Agency, and
$19,746.50 is to be paid by 226 Ocean Drive, Ltd., pursuant to the scope of work set forth in the
South Pointe Streetscape Master Plan.
PASSED AND ADOPTED this .12th of January, 2000.
1/11
CHAIRMAN
ATTEST:
if //
riLLct(' rOA C{LLl,-
SECRETARY
APPROVED AS TO
FORM & LANGUAGE
& FOR EXECUTION
/'1JI ~t~l~
Redevelopment Agency
Geneml Counsel
2- -I Y-(JI.J
Date
LAL/CMC/MDS/RM/CAH/ AR
F:\DDHPlSALLlAlexandraISouth PointelKimley HornlF,P.LIKHA FPL Relocation RDARes02,doc
mami Beach Redevelopment Agency
;ITY HALL 1700 CONVENTION CENTER DRIVE MIAMIBEACH, FLORIDA 33139
'ttp: \\cLmiami-beach. fl. us
REDEVELOPMENT AGENCY MEMORANDUM NO. 00,3>
Chairman and Members of the Board
of the Miami Beach Redevelopment Agency
FROM: Lawrence A. Levy I \\\/
Executive Director ~
DATE: January 12, 2000
TO:
SUBJECT: A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE MIAMI
BEACH REDEVELOPMENT AGENCY APPROVING AND AUTHORIZING
THE CHAIRMAN AND SECRETARY TO EXECUTE AN AGREEMENT
WITH FLORIDA POWER AND LIGHT AND 226 OCEAN DRIVE, LTD., AS
OWNER OF THE PROPERTY LOCATED AT 225 COLLINS A VENUE/ 226
OCEAN DRIVE, TO PROVIDE UNDERGROUND UTILITIES ON OCEAN
COURT, BETWEEN SECOND AND THIRD STREETS, FOR AN AMOUNT
NOT-TO-EXCEED $35,273.00; ONE HALF OF WInCH ($17,636.50) IS TO BE
P AID BY THE MIAMI BEACH REDEVELOPMENT AGENCY AND ONE
HALF BY 226 OCEAN DRIVE, LTD., PURSUANT TO THE SCOPE OF
WORK SET FORTH IN THE SOUTH POINTE STREETSCAPE MASTER
PLAN
ADMINISTRATIVE RECOMMENDATION:
Adopt the Resolution.
FUNDING:
Funding has been appropriated from South Pointe Tax Increment Funds for the South Pointe
Streetscape Master Plan (Master Plan). Funding for Phase I, in the amount of$3,800,000, was
appropriated at the September 23, 1998, Miami Beach Redevelopment Agency (RDA) meeting.
ANALYSIS:
The Master Plan requires that the overhanging utility lines at streets with an ocean view (those
located east of Collins A venue) be placed underground. This Scope of Work is to be performed
in preparation for the road improvement work on each street.
AGENDA ITEM 36
DATEI-12-CXJ
Phase I of the Master Plan includes the improvements on Washington A venue, from the south
edge of Fifth Street to South Pointe Park, and on Third Street, from Michigan Avenue to Ocean
Drive. Within the scope of work for Phase I, existing utility lines crossing Third Street need to
be placed underground. This work is expected to be performed within the next 120 days.
In coordination meetings with representatives of Florida Power and Light (FPL), a private
developer, 226 Ocean Drive, Ltd., as owner of the property located at 225 Collins A venue/226
Ocean Drive, is proposing to partially fund and place the utility lines crossing its proposed
development site underground. The site is located between Second and Third Streets, and
between Ocean Drive and Collins Avenue, and the affected utility lines run through Ocean Court,
the alley.
In the Master Plan, Ocean Court is part of Phase IV and, consequently, estimated to commence
within 18 to 24 months. However, the Engineering Department ofFPL has estimated the cost of
placing the electrical lines underground at both locations (Ocean Court and Third Street) and, by
performing the work at the same time, achieve economies of scale. FPL has submitted a
guaranteed estimate of the total cost of this scope for a total amount not-to-exceed $35,273.
Based on the above, the Administration recommends that the RDA and 226 Ocean Drive, Ltd.
share the cost of the proposed underground placement of the electrical utility lines from north of
Third Street to south of Second Street.
CONCLUSION:
The Administration recommends that the Chairman and the Members of the Miami Beach
Redevelopment Agency approve and authorize the Chairman and the Secretary to execute an
Agreement with Florida Power and Light and 226 Ocean Drive, Ltd., as owner of the property
located at 225 Collins A venue/226 Ocean Drive, to provide underground utilities on Ocean Court,
between Second and Third Streets, for an amount not-to-exceed $35,273.00; one half of which
($17,636.50) is to be paid by the Miami Beach Redevelopment Agency and one half by 226
Ocean Drive, Ltd., pursuant to scope of work set forth in the South Pointe Streetscape Master
Plan.
(}}Cc.. ~ ~ .
LAL/CMC/MDS;RM;CAH/ A~-- \
\\CH2ISYSIDDHPISALLlAlexandraISouth PoinrelKimley HomlKHA FPL Relocation CMBMemo.doc
RESOLUTION NO.
2000-23458
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA RATIFYING THE MIAMI BEACH
REDEVELOPMENT AGENCY'S (RDA) ACTION APPROVING AN
AGREEMENT AMONG THE RDA, THE FLORIDA POWER AND LIGHT
AND 226 OCEAN DRIVE, LTD., AS OWNER OF THE PROPERTY
LOCATED AT 225 COLLINS A VENUE/226 OCEAN DRIVE, TO PROVIDE
UNDERGROUND UTILITIES ON OCEAN COURT, BETWEEN SECOND
AND THIRD STREETS, FOR AN AMOUNT NOT-TO-EXCEED $37,383.00;
OF WHICH $17,636.50 IS TO BE PAID BY THE MIAMI BEACH
REDEVELOPMENT AGENCY, AND $19,746.50 IS TO BE PAID BY 226
OCEAN DRIVE, LTD., PURSUANT TO THE SCOPE OF WORK SET
FORTH IN THE SOUTH POINTE STREETS CAPE MASTER PLAN
WHEREAS, funding has been appropriated from South Pointe Tax Increment Funds for the
South Pointe Streetscape Master Plan (Master Plan); and
WHEREAS, funding for Phase I of the Master Plan, in the amount of $3,800,000, was
appropriated at the September 23, 1998 Miami Beach Redevelopment Agency (RDA) meeting;
and
WHEREAS, the Master Plan requires that the overhanging utility lines at streets with an ocean
view (those located east of Collins Avenue) be placed underground; and
WHEREAS, this scope of work is to be performed in preparation for the road improvement work
on each street; and
WHEREAS, Phase I of the Master Plan includes the improvements on Washington Avenue, from
the south edge of Fifth Street to South Pointe Park, and on Third Street, from Michigan A venue
to Ocean Drive; and
WHEREAS, within the scope of work for Phase I, existing utility lines crossing Third Street need
to be placed underground; and
WHEREAS, this work is expected to be performed within the next 120 days; and
WHEREAS, in coordination meetings with representatives of Florida Power and Light (FPL),
226 Ocean Drive, Ltd., as owner of the property located at 225 Collins Avenue/226 Ocean Drive,
is proposing to partially fund and place the utility lines crossing its proposed development site
underground; and
WHEREAS, the site is located between Second and Third Streets, and between Ocean Drive and
Collins A venue, and the affected utility lines run through Ocean Court, the alley; and
WHEREAS, in the Master Plan, Ocean Court is part of Phase IV and, consequently, estimated
to commence within 18 to 24 months; and
WHEREAS, however, the Engineering Department of FPL has estimated the cost of placing the
electrical lines underground at both locations (Ocean Court and Third Street) and, by performing
the work at the same time, achieve economies of scale; and
WHEREAS, FPL has submitted a guaranteed estimate of the total cost of this scope for a total
amount not-to-exceed $37,383.00; and
WHEREAS, based on the above, the Administration recommends the RDA and 226 Ocean
Drive, Ltd. share the cost of the proposed underground placement of the electrical utility lines
from north of Third Street to south of Second Street.
NOW, THEREFORE, BE IT DUL Y RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission herein ratify the Miami Beach Redevelopment Agency's (RDA) action in approving
an Agreement among the RDA, FPL and 226 Ocean Drive, Ltd., as owner of the property located
at 225 Collins A venue/226 Ocean Drive, to provide underground utilities on Ocean Court,
between Second and Third Streets, for an amount not-to-exceed $37,383.00; of which $17,636.50
is to be paid by the Miami Beach Redevelopment Agency, and $19,746.50 is to be paid by 226
Ocean Drive, Ltd., pursuant to the scope of work set forth in the South Pointe Streetscape Master
Plan.
PASSED AND ADOPTED this 12th day of January, 2000.
14
MAYOR
ATTEST:
<<(LOA r fc.u eLe\;\
CITY CLERK
}\?PROVED A5 TO
fORiV\ & L~~IGUAGE
~ -j"OR EXECUT~ON
_t
LAL/CMC/MDSIRM/CAH/ AR
/k. ., ~/~ IittL
~
(' r~ ~.}tr~,:,~rr'WJ\i
..~ . I
. Y '/)
l-- - I~ t v
DGkt
F:IDDHPlSALLlAlexandralSouth PoinlelKimley HomlF.P,LIKHA FPL Relocation CMBRes02,doc
;ITY OF MIAMI BEACH
TY HALL 1700 CONVENTION CENTER DRIVE MIAMIBEACH, FLORIDA 33139
~p:\\ci. miami-beach. fl. us
COMMISION MEMORANDUM NO.
~ 3-co
TO: Mayor Neisen O. Kasdin and
Members of the City Commission
FROM: Lawrence A. Levy ~
City Manager
DATE: January 12,2000
SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH RATIFYING THE MIAMI BEACH REDEVELOPMENT
AGENCY'S (RDA) ACTION IN APPROVING AN AGREEMENT AMONG
THE RDA, FLORIDA POWER AND LIGHT AND 226 OCEAN DRIVE, LTD.,
AS OWNER OF THE PROPERTY LOCATED AT 225 COLLINS
A VENUE/226 OCEAN DRIVE, TO PROVIDE UNDERGROUND UTILITIES
ON OCEAN COURT, BETWEEN SECOND AND THIRD STREETS, FOR AN
AMOUNT NOT -TO-EXCEED $35,273; ONE HALF OF WHICH ($17,636.50)
IS TO BE PAID BY THE MIAMI BEACH REDEVELOPMENT AGENCY
AND ONE HALF BY 226 OCEAN DRIVE, LTD., PURSUANT TO THE
SCOPE OF WORK SET FORTH IN THE SOUTH POINTE STREETS CAPE
MASTER PLAN
ADMINISTRATIVE RECOMMENDATION:
Adopt the Resolution.
FUNDING:
Funding has been appropriated from South Pointe Tax Increment Funds for the South Pointe
Streetscape Master Plan (Master Plan). Funding for Phase I, in the amount of $3,800,000 was
appropriated at the September 23, 1998 Miami Beach Redevelopment Agency (RDA) meeting.
ANALYSIS:
The Master Plan requires that the overhanging utility lines at streets with an ocean view (those
located east of Collins Avenue) be placed underground. This Scope of Work is to be performed
in preparation for the road improvement work on each street.
AGENDA ITEM
DATE
RlB
/....,2...()()
Phase I of the Streetscape Project includes the improvements on Washington Avenue, from the
south edge of Fifth Street to South Pointe Park, and on Third Street, from Michigan A venue to
Ocean Drive. Within the scope of work for Phase I, existing utility lines crossing Third Street
need to be placed underground. This work is expected to be performed within the next 120 days.
In coordination meetings with representatives of Florida Power and Light (FPL), a private
developer, 226 Ocean Drive, Ltd., as owner of the property located at 225 Collins A venue/226
Ocean Drive, is proposing to partially fund and place the utility lines crossing its proposed
development site underground. The site is located between Second and Third Streets, and
between Ocean Drive and Collins A venue, and the affected utility lines run through Ocean Court,
the alley.
In the Master Plan, Ocean Court is part of Phase IV and, consequently, estimated to commence
within 18 to 24 months. However, the Engineering Department of FPL has estimated the cost of
placing the electrical lines underground at both locations (Ocean Court and Third Street) and, by
performing the work at the same time, achieve economies of scale. FPL has submitted a
guaranteed estimate of the total cost of this scope for a total amount not-to-exceed $35,273.
Based on the above, the Administration recommends that the RDA and 226 Ocean Drive, Ltd.
to share the cost of the proposed underground placement of the electrical utility lines from north
of Third Street to south of Second Street.
CONCLUSION:
The Administration recommends that the Mayor and City COmniission of the City of Miami
Beach ratify the Miami Beach Redevelopment's (RDA) action in approving an Agreement among
the RDA, Florida Power and Light and 226 Ocean Drive, Ltd., as owner of the property located
at 225 Collins A venue/226 Ocean Drive, to provide underground utilities on Ocean Court,
between Second and Third Streets, for an amount not-to-exceed $35,273.00; one half of which
($17,636.50) is to be paid by the Miami Beach Redevelopment Agency, and one half by 226
Ocean Drive, Ltd., pursuant to the scope of work set forth in the South Pointe Streetscape Master
Plan.
.~'c fQfPo ~
LALlCMCIMDSIRM/CAHI AR .
\\CH2\SYSIDDHP\SALLlAlexandra\South Pointe\Kimley Hom\KHA FPL Relocation CMBMemo.doc
.~~..... -
UNDERGROUND FACUlTIES CONVERSION AGREEMENT
This Agreement, made and entered into this 9 th day of February, 2000, by and between the Miami Beach
Redevelopment Ntency and 226 Ocean Drive Limite4 (hereinafter called the Applicants) and Florida Power &
liRht Companv, a. corporation organized. under the laws of the State of Florida (herein:1fter called FPL) is for the
provision of underground electric distribution facilities by FPL in place of certain. existing overhead electric
distribution facilities pursuant to the Applicants' request for such facilities. In consideration of me premises,
covenants and agreemcuts set forth herein, FPL and the Applicants agree as follows:
1. The ApplicantS shall pay FPL a Conuibution-in-Aid--ofCoDStIUction (CIAC) in the amount oiS 37.383.00.
with $17.636.50 to be paid by the Miami Beach Redevelopment Agency and $19746.50 to be paid by 226
Ocean Drive Limited. The cost is valid until July 3.2000.
2. PUmJant to this Agreement, the Applicants agree to comply with and abide by the requirements, terms, ilDd
conditions of FPL' s Electric Tariff. as those req'!LremelIt", tenns ~J.ld conditions are set forth in said Tariff.
3. Upon compliance with the requirementS, terms anl~ c.onmoolU ofFPL's Electric Tariff, and this Agreement,
FPL will proceed in a timely manner with the convemon of the existing overl1ead distribution lines 10 an
underground configwation in accordance with the construction dmwings and specifications set forth in
Attachments A and B hettOf. Note that the FPL overhead distribution lines will be removed between the
poles number I through 4 as shown on Attaehment A, but that all poles and overhead service laterals, except
'. at location number 2, will remain. The Applicants arc responsible for making arrangements with the other
utilities on the poles if they would like their &.cilities removed or placed underground.
4_ 226 Ocean~Drive Limited. as the owner of22:S Collins Avenue, must provide FPL with::L recorded
easement, at the owner's expense, for the pad-mounted transformers, handhole, and underground ducts
necessary for the convtaion of the lines to undeliIound, as shown on AttaChment B. They also must
artange for the conversion of the ovcthead scrvice entrance at 221 Collins Avenue to underground at their
expensc.
5. The City of Miami Beach Public Works Department shall issue FPL a permit to do the neccssary work that
is within the City Right-ofWay.
6. Failure by the Applicants to comply with any of the requirements. terms, or conditions of this Agreement or
FPL.s Electric Tariff shall result in termination of this Agreement. The Applicant(s) may tcrminate this
Agreement without cause and for their convenience at any time prior to the start of constrUction, and the
ClAC paid by the Applicants will be refunded to the Applicams, provided however, that the refund of the
ClAC shall be offsct by any cosrs incurred by FPL in performing under the agreement up to the date of
tcrmination_
,. This Agreement is not assignable.
IN WITNESS WHEREOF, FPL and the Applicants have executed this Agreement for the provision of electric
underground distribution facilities to be effective as ofthc date fiat above written. .
APPLICANT -Miami Beadt APPLlCANT-226 OCCllIl Drive Ltd. FPL
-....tt_ . rC\ .
Slgn~~ JIll/- Slgn~~/-) -Signed ~ ~~
Name Neisen Kasdin.,.1 Mayor Name~lLJ H Cn.) j VJ Lut~ame LE 5l-t 'T) k-h ~
ATTEST:RObe~.. b ~tle '1J\C~ ~r'r)lU?Nt;;tl. SJI.?'r01So-r
D<1tc_ ~~I~MC\lRON>a(c: ()\ \ (. \ C() Date ~OD
A. tI' /fJ);..Ji--- 2 - (6- f>.:)
TOTAL P. 02
;0
r~
:s
Vl
f'l
CJ
ru
"-
'"
"-
ru
o
o
o
-<
o
^'
f'l
3:
o
<
(T)
"
o
r
f'l
J>
-<
o
o
n
ru
~~
~
i ~
P 'ii ~
Ii ~ ~ ~
~ ~ ~
R -<
i ~
C1
n
~ ~
<
,.,
;0
Vl
6
z
~
~
~
z
Vl
--,
J>
r"
0.
-
t::J
W f'l
J>
<J tel
I r~
J> CJ
V)
. r'l 0
U <
1"
< ;0
fTl :r:
f'l
;U J>
I t::J
f'l -'1
J>
tJ r1l
f'l
'1 t::J
r'1
Pl ;0
f'l 0
tJ
P1 z
;U f'l
Vl
3 STREET
I I I
T f r ,
I 1 I f"
. ("
. . + 1"
~ I I I z
I I CJ
I
w w -"
l\l -" C U
~ Z c c ,-
" CJ Z
J> r'1 Z CJ .::
:r: ^' tel
CJ J> C1 PI f'1 0
;U ;U LJ
3: Z ;0 Cl Gl CJ
D t::J D ;0 ;U
c :r: c 0 D "U
D Z
Z r- t::J C C 0
-<f'l Z Z 0
tj tj ['1
-< Vl
;0 f'l -0 '1
(1
J> D ^' f'1
Z Z i f'l
Vl tj
'1 tj J> f'1
D J> ;U ;U
;0 ^' -<
3: --< n
f'l Cl J>
^' n J> OJ
Vl OJ 0
J> '" (rr
-'1 UJ P'I Vl
0 0 Vl
I~
;u Vl Z
0 z
.0 Z ()
f'l Cl D
Z t::J 0 Z
Z n
tj C Cl ;u
Cl ;u r'1
rrr ---l f'l -,
0
-< -I r-1
J> PI
r--,
UJ "1 Z
J> Z Cl
Z Cl J>
^ J> Vl
Vl "1
f'l t::J
CJ
tj
t:J C
C Cl
Cl -j
-,
:'" W ru
!1l
V') 4 g ~ ~
~ ~ Orl i
-< J> J>
1> f'1 (/) (,/) -i
~ ~ l> ~ ~
l>~--1Pi_
~ ~ ill ~ g
Z n (/) t::J
..... t::J 0;;0 rrJ
tt1 ~ r- rl (/)
(..? C:C fO
'1 Z ~.
o z V) ;:u
;u 0 . fTl
---l ---l t::J
CJ :r:
rr1 Z r'l 'I
~ n 0
p ~ ;ti;;u
V') t::j 1> ---l
r'1 Z I
o Vl f'l
"1 J> 'I
Z 0 "U
<-<;OJ>
o .-- ~ t::J
;0';;03:
^ 0 (/) 0
J>~l>~
Z ;0-<
tj to r-l
--< ---l
f'l Z ;0
1> tI1 (T1 l>
V'Jrrlp1Z
r'1 r t::I VJ
3:r(Tl'l
f'l tj 0
Z (I) ;0
--I 0 --I 3:
C 0 f'l
J> ---l ;u
--I :r: (/) (/)
o IT')"
~ ~ ~
(1 f'l Z
J> tj
--l -; I r
~ ~ P R
f'l
f'l
X J>
~Z
~t:1
Z
C1
'"
ru
Ul
n
o
o
o
Z
(I)
J>
<
~
J>
-~
-i
J>
n
I
3:
f'l
Z
-i
J>
OJ
C
P
tel
Z
co
(I)
Z
o
-<
['1
I'l Vl r f:. t!.J
~~gr
g:S~Q
~~~V)
~-<
~C:ru~
t:lf\J---l
n~~~
~n~M
-IODV)
o r- r
;0 Arrl]>
g ;;U Z t::: ~
o (/).......
< E3:~D
J> (I) C <
r -IWt::Jjrl
o _--lr1~
.." Z tl.1;::u f'l
VJI'1P1J>
:i J;: 3: t::l
r-l r=B~~
ru Zr'1;o
o ~;;~<
< ";u n
(Tl ~ M z ~
~ Z t:1
I'l t:t --l~--l
J> IOtjD
t:1 ~ c~ ~
f1lG--I~
r-lD~
;u Z
Gl ^' '
~~Q
~ ~ ~~
t:::j r'l -u
J> -<
---l:il>
2~-l
(I) -0
d~
~!11
^'
Vl
---l
;0
J>
Z
'1
o
;u
3:
f'l
^'
(I)
J>
---l
ru
"
-<
:r:
'l~
;oVl
D",
3:;0
oJ>
O~
ClZ
~Gl
~'l
DO
Z;o
f'l
-<(I)
o _~
:",i
J>
-<
f'l
w
toru C>
~ r~ i
n tJ I
D el:r:
0 .~
0 el
Z
~ w rv
to:r:w 0
r~ , 0
n tJell
D 0I~ CJ
0 ... n
r- I f'l
Z 4, -i f'l J>
Vl ;U Z
I X
J> >-<
I z VJ tJ
ru I V) ~ ;u
0 I '1
U1 'I'
n I
D )
0
0
z
Vl
0'
3:f'l ~
J>X
z>-<
STREET IV)
2 o-i
rz
f'l Gl
wo-"'ww
1
"'II'~.v fTl
PI ~ r'l
r'l""Ur.,t:;:1
t1<VJr'l
~n~;;u
t::1C~ri
VJCl ;:u
nc 3:
~~ ~
.::'" -<
~ Q
--1 ^'
n Vl
:r:
"1
Vl
fll ,)
rv ;u
Ul U
-u
nu
DV)
rf'l
rtJ
Z
V)
Vi
-<
o
;0
r-l
3:
o
<
IT'
o
<
f'1
;0
:r:
r-l
J>
t::J
'1
"U
r
r-
Z
r-l
(I)
z
Vl
-<
J>
r
0.
W,ww
'lUl]>'l
~~~6
~~B~
;0 ['1
8C~~
(/)[;1 ^'
~j ~ ~
Vl^' J>
.::t::J
~
n
:r:
"1
Vl
l'
I
Z I fll
(I) I IV"O
-< ,. U';u
I 0
0 D I U<J
0 n 00
C1 ('1 I 1'1 V)
c J> I J>f'l
--< Z I., ZtJ
(I)
<<1 n I tJ
J>;Q -I I ;u
CD I
r<1
---lD t
Vl
f'1 I lA)
t:J 0
I ~
I
r
I
I
'I'
---R-f--\.I-
'"
'"
J>
l:j
,.,
Z
'"
D
<
'"
^'
I
P1
l>
CJ
'1
,rr
,.,
l:j
'"
^'
0'"
<0
"'c
"'i"!
~Pl
l>",
tel,.,
'll>
",'"
"'",
t::lz
~l:j
o
~
;0
r-l
3:
o
<
r-l
J>
o
o
o
<
f'l
;0
:r:
r-l
J>
CJ
'1
f'l
r-l
t::J
f'l
;u
J>
Z
CJ
V')
,.,
n
o
Z
CJ
J>
;0
--<
o
Z
r-l
(I)
-0
o
r
r-l
-<
o
"U
o
r
f'l
:'"
N
~-"'-
0
"
fT1
1>
Z
ru n
ru 2' :-i
Ul
n
0
r-
,
~ <r:.
z I
C/) ~
1>
<
1"1
~
ru
....
i
I
'"
X
;;;
:-l
'"
I
~
-------~-
w
o
i
I
ru
ru
~ N
n
0
,
,
~
Z
C/)
1>
<
fT1
.... UJ [U ,.. Z
0
CO :-lZ -1(/)r'1"n --i""UrO :-l
Z< DO IC:J>DC O;;U-C '"
t:J", "'tx:;lVlrV1 OZl/l 'fl
"'Al "':-l l::j-ir-t :J>-U"'-t
AlI "'Al -0- DO <O!"O
Cl", [TI C<ru~3: Ol/l 3:
All> <J[TI tdVj _,." ~[TI [TI
~@ gt::J rl/l 8a~B;U t::Jt::Jt::JAl
l>' n""~---i
Zl/l 0", Z :-l
t::J[TI [TIC iO OtjD CJ"1)_O
l>;o t::Jl/l [TI~"Cl" zrz
" l>;o
:-l:S OI o OC r:-lCl[TI
00 Z[TI ~~b~~ .......;oMr
p" !" Ol> 0
~ ;:II C[TI [TI ~B~~(;; :-lZl>O
l/ll> l>~ ~"ZJ> ,.,,,-.,,
~ j--l ~~ O::uruoI Ot:::l:-l
~ ~~:n?~ ;0 [TI
3:", l/lr 3:0
~ .. ~ ~ [TII\) [TI:-ll>
~ , ;o~ ~l/l t::Jt:Jr r ;oIr
9: ~ ~ ~ l/l t::J' l> O' [TIr
0 [TI" ~zR:i:J> <J;o
~ ! ! [TIO [TI l> -0
xr Oz <J [TI;o t::J"Al
<Jr "0 nrW rf'J l>0
[TI~ [TI OJ>'" ""n IO-o
ZZ :-ll/l ~-iD~~
i a l/ll/l ;0 :t>pD
< l>o -ttx:;l"-ft::1 z~l/l
p 'I ,., f":-l Z;o -<OOI(T1 t::J:-l'"
'" 0 l/l I~t:J
Ii ~ ~ I '10 " Dnrut::1 fl~<
,., '" O:-l r^~Or'1
a ~ p [TI ;oI [TI~l>
'=' 3:[TI ~ruz,,~ v>zri
li -i :I> 0 [TI;o t:j"'"UtD-tfTl
a :-i 0 ;0 J>J>fTlo3: l>:-l;o
~ :-i Z 0 -..ClJ>""-' ZI
~ c 1> < <J", [TIo Z t:jrl~
Cl '" l>l/l I:-l:-l
n " ;u t::J:-l W I t::Jl>t::J
0 I :-l ;u ro'l[TI~ CAl
~ Z 3: ['1 C Dr :< O",l/l
< fT1 t::J 0 :-ll>'"
i M Z :-l 'll> I l/l <
'" :-i :-i 0 Dr'l
V) 0 .~ 'lAl
0 Z
Z W l/l
"