Loading...
2000-23916 RESO RESOLUTION NO. 2000-23916 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO. 5 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KlMLEY-HORN AND ASSOCIATES, INC., DATED FEBRUARY 17TH, 1999, FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES IN AN AMOUNT NOT -TO-EXCEED $8,500.00 FOR DESIGN, COORDINATION AND PREPARATION OF CONSTRUCTION DOCUMENTS FOR TWO MONUMENT IDENTIFICATION SIGNS AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETSCAPE PROJECT WHEREAS, on January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley-Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, staff has negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not-to-exceed fee, in the amount of $389, 1 00, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of $1 03,800, including surveying, Master Plan design, preparation of bidding and construction documents, and permitting for the Washington Avenue extension, as required by the Porto fino Settlement Agreement; and WHEREAS, on October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925, for a Phase II survey, including geo-technical studies, aerial photos and other expenses; and WHEREAS, on February 9, 2000, the RDA approved Amendment No.4, which included a not-to-exceed fee in the amount of$22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents were completed last March, the construction bid is currently underway, and the contract is estimated to be awarded by late May; and WHEREAS, due to the short time frame to incorporate the South Pointe Park's identification signage design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.5 to the Agreement; and WHEREAS, the design will include two monument signs: a primary sign at the Washington Avenue median, just south of Biscayne Street, and a secondary sign at the southeast comer of Washington Avenue and South Pointe Park entry road; and WHEREAS, all improvements will be fully coordinated with the Park's design, as required; and WHEREAS, the signs will also reference the Smith & W ollensky Restaurant, located in the Park, for which the restaurant owner has agreed to fund the construction hard costs associated with this Project; and WHEREAS, the proposed not-to-exceed fee for the design of two monument signs at South Pointe Park is $8,500.00 with the following defined tasks: Schematic Design - $2,500.00; Design Development - $1,800.00; Construction Documents - $3,300.00; Public Meetings and Presentations - $550.00; and Reimbursements - $350.00. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein ratify the attached Amendment No.5 to the Agreement with Kimley-Hom and Associates, Inc., dated February 1"fh, 1999, for professional engineering and landscaping services, in an amount not-to-exceed $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park; to be included as part of phase I of the South Pointe Redevelopment Area streetscape project. PASSED and ADOPTED this 10th day of May, 2000. ~1AYOR ATTEST: ~d f ~dL~ CITY CLERK APPROVED Jt.S TO FORM & LA.NGUAGE & FOR EXECUTtON F:\DDHP\$ALL\Alexandra\South PointelKimley Hom\ContractlKHA SW AD5 CMBReso.doc 1'1/:JF4tt C, rney 0~4v Date ...,...--n ......... - , , South I'oiule Sigllage, April 17.2000, I'''ge I Kimley-Horn and Associates, Inc. Exhibit "A 5" SCOPE OF SERVICES Task 1 - Schematic Design Phase I. This phase includes those services necessary to prepare concept drawings and other documents illustrating the general scope, scale and relationship of the project components. We will review applicable local ordinances, and review the Client's design and budget criteria to establish the project program and design objectives. We will provide three monument sign concepts for the median sign, which will represent low, medium and high cost options. The schematic design concepts will be presented via elevation/cross-sections and plan graphics and will address the following: a. Project entry signage and special features; b. Landscape plantings; c. Landscape and feature lighting; d. Design criteria established by the Client, Owner. e. Comments from the Smith and Wollensky Restaurant Group 2. We will participate in one schematic design review with the RDA and planning department staff for the purpose of reviewing the schematic level design effort. 3, We will attend one meeting with representatives from the Smith and W ollensky Restaurant Group for the purpose of reviewing the schematic level design drawings. 4. Preparation of an Opinion of Probable Cost. Task 2 - Design Development Phase I. This phase includes the design development of schematic level designs approved by the Client and a revised budget, based on the funding agreement between the City of Miami Beach and The Smith and Wollensky Restaurant Group. 2. Those elements included in this phase will be those listed in the schematic design phase and the preparation of the secondary monument sign design development drawings based on the approved schematic design and revised budget ~=n South Pointe Sign age. April 17. 2000. Page 2 Kimley-Horn and Associates, Inc. 3. Design development will incorporate input received during the schematic design workshop and will include an additional Client meeting to review design development level drawings. 4. We will prepare design development plans for review by the Client. This submittal will include the design development plans and revised graphics for both monument signs. 5. Preparation of an opinion of probable construction costs. Task 3- Construction Document Phase 1. This phase includes those designated services necessary to prepare further drawings, specifications and related documents setting forth in detail the requirements for construction of the project and for contracting for construction from the approved design development documents. This phase is specifically limited the preparation of construction documents for 2 monument signs and associated landscaping, irrigation and lighting as described within Task 1 and 2. Construction document plans will generally consist of the following sheets: '\./ a. Signage plans/elevations and details b. Landscape plans and supporting specifications c. Irrigation specifications and details d. Lighting fixture specifications and electrical notes. e. Electrical conduit layout revision and circuitry (as required) Task 4 - Public Meetings and Presentations Our proposal includes the attendance/presentation of the improvements at one coordination meeting with City staff, The Smith and Wollensky Restaurant Group and other consultants associated with the South Pointe Park Master Plan Improvements. ADDITIONAL SERVICES Upon your authorization, we will provide any additional services that may be required beyond those described in Task I through 4. These services may include but are not limited to such items as the following: · Preparation of computer images depicting the proposed monument signs from specified views. ~=r~ SOlllh Pointe Signage, April 17,2000, Page 3 Kimley-Horn and Associates, Inc. · Design of addition monument signs · Attendance of additional meeting (beyond those listed in task 1-4) COMPENSA nON We will provide the services described in Tasks 1 through 4 for the lump sum amounts (not including direct expenses) outlined below. Task Description Lump Sum Fee Basic Services 1 Schematic Design ................................................................. $2,500.00 2 Design Develo p men t ............................................................ $1,800.00 3 Construction Documents .................................................... $3,300.00 4 Public Meetings and Presentations .......................................$550.00 Reimbursements Direct Ex penses . .................................................................... $350.00 T'otal ................................................................................................ $8,500.00 SCHEDULE We will provide the services outlined in task 1 through 4 in accordance with a mutually agreeable time frame between the City and Kimley-Hom to coincide with the South Pointe Phase I construction. S:\SMINGONE\Word Docs\South Pointe\contracts\spointe park signage.doc CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMIBEACH, FLORIDA 33139 http:\\ci.miami-beach.fl.us COMMISION MEMORANDUM NO. "3l g - 0 a DATE: May 10, 2000 TO: Mayor Neisen O. Kasdin and Members of the City Commission FROM: Lawrence A. Levy ~ City Manager SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.5 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY -HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES IN AN AMOUNT NOT-TO-EXCEED $8,500.00 FOR DESIGN, COORDINATION AND PREP ARA TION OF CONSTRUCTION DOCUMENTS FOR TWO MONUMENT IDENTIFICATION SIGNS AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETSCAPE PROJECT ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. ANALYSIS On January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley- Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project). The RDA staff negotiated a not-to-exceed fee of$170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a Master Plan and surveying for the Phase I improvements. AGENDA ITEM ~-r6r DATE 5-10 -DD \ On May 26, 1999, the RDA approved Amendment No.1, which included a not-to-exceed fee in the amount of $389,100 for the preparation of construction documents, permitting and bidding services for Phase I. On May 26, 1999, the RDA approved Amendment No.2, which included a not-to-exceed fee in the amount of $103,800 including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the W ashington Avenue extension, as required by the Porto fino Settlement Agreement. On October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925 for Phase II survey, including geo-technical studies, aerial photos and other expenses. On February 9, 2000, the RDA approved Amendment No.4, which included a not-to-exceed fee in the amount of$22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park. In order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents were completed last March, the construction bid is currently underway, and the contract is estimated to be awarded by late May. Due to the short time frame to incorporate the South Pointe Park's identification signage design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.5 to the Agreement. The design will include two monument signs: a primary sign at the Washington Avenue median, just south of Biscayne Street, and a secondary sign at the southeast comer of Washington Avenue and South Pointe Park entry road. All improvements will be fully coordinated with the Park's design, as required. The signs will also reference the Smith & Wollensky Restaurant, located in the Park, for which the restaurant owner has agreed to fund the construction hard costs associated with this Project. The proposed not-to-exceed fee for the design of two monument signs at South Pointe Park is $8,500.00 with the following defined tasks: Schematic Design Design Development Construction Documents Public Meetings and Presentations Reimbursements $2,500.00 1,800.00 3,300.00 550.00 350.00 The Administration recommends that the Mayor and City Commission ratify Amendment No.5 to the Agreement with Kimley-Hom and Associates, Inc. for professional and engineering services, in an amount not-to-exceed $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park, to be included as part of phase I of the South Pointe Redevelopment Area streetscape project. LAL/C~/AR~~ \\CH2\SYSIDDHP\$ALLlAlexandra\South PointelKimley Hom\ContractlKHA SWAD5 CMBMemo.doc RESOLUTION NO. J~,3-2000 A RESOLUTION OF THE CHAIRl"IAN AND THE MEMBERS OF THE - . MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AMENDMENT NO.5 TO THE AGREEMENT BET\VEEN THE MIAMI BEACH REDEVELOPMENT AGENCY A:'iD KIMLEY-HORi'i AND ASSOCL.\TES, INC., DATED FEBRUARY 17TI1, 1999, FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN Al~ AMOUNT NOT- TO-EXCEED 58,500.00 FOR DESIGN, COORDINATION AND PREPARATION OF CONSTRUCTION DOCUMENTS FOR T\VO MONUMENT IDENTIFICATION SIGNS AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETSCAPE PROJECT WHEREAS, on January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley-Hom and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, staff has negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents. resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26. 1999, the RDA approved Amendment No.1 to the Agreement. which included a not-to-exceed fee, in the amOlmt of$389,100, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement. which included a not-to-exceed fee, in the amount of $1 03,800, including surveying, Master Plan design, preparation of bidding and construction documents, and permitting for the Washington A venue extension, as required by the Porto fino Settlement Agreement; and \VHEREAS, on October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925, for a Phase II survey, including geo-technical studies, aerial photos and other expenses; and WHEREAS, on February 9, 2000, the RDA approved Amendment No.4, which included a not-to-exceed fee in the amount of$22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park; and \VHEREAS, in order to meet the time schedule prepared as part of the Master Plan. the Phase I construction documents were completed last March, the construction bid is cu~tly underway, and the contract is estimated to be awarded by late May; and \VHEREAS, due to the short time frame to incorporate the South Pointe Park's identification signage design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.5 to the Agreement: and \VHEREAS, the design will include two monument signs: a primary sign at the Washington A venue median, just south of Biscayne Street, and a secondary sign at the southeast comer of Washington A venue and South Pointe Park entry road: and WHEREAS, all improvements will be fully coordinated with the Park's design, as required; and WHEREAS, the signs will also reference the Smith & Wollensky Restaurant, located in the Park, for which the restaurant O\VIJ.er has agreed to fund the construction hard costs associated with this Project; and WHEREAS, the proposed not-to-exceed fee for the design of two monument signs at South Pointe Park is $8,500.00 with the following defined tasks: Schematic Design - $2,500.00; Design Development - $1,800.00; Construction Documents - $3,300.00; Public Meetings and Presentations - $550.00; and Reimbursements - $350.00. NO\V, THEREFORE, BE IT DULY RESOLVED BY THE CHAIRiVL\N AND MEMBERS OF THE MIA1\H BEACH REDEVELOPMENT AGENCY, that the Chairman and Members of the Miami Beach Redevelopment Agency herein approve the attached Amendment No.5 to the Agreement with Kimley-Hom and Associates, Inc., dated February 1 Tn, 1999, for professional engineering and landscaping services, in an amount not-to-exceed $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park; to be included as part of phase I of the South Pointe Redevelopment Area streetscape project. PASSED and ADOPTED this 10th day of May, 2000. i F;.r4 1//11 CHAIRMAN ATTEST: r~' c C~\?5 /7 .( / ~ '/ ;. I , I" : '. ~ ~ '- v_. '""----,.. APPROVED f..s TO FORM & LANGUAGE & FOR EXECUTION SECRETARY F:'DDHI"SALL\AlexandrJISouth Poinre'Kimley Hom\CuntrJctlKHA SWAD5 RDARcso,doc i/~61t7/ . / Dat~ ~=r' '" lIlll1 II" IIII~) I:~ :1.1': \ :' I Kimley-Horn and Associates. Inc. Exhibit "A 5'/ SCOPE OF SERVICES Task 1 - Schematic Design Phase i. This phase: includ~s thos~ savic~s nec~ssary to prepare concept dravvings and otha documents illustrating the generJ.1 s..:upe. scale J.nd relationship of the project compon~nts. We will revievv app I icab Ie locll ord inances. and rev ievv the C I ienr' s design and budget criteria to establish the project program and design objectives. We will provide three monument sign concepts for the median sign, which will represent low, medium and high CCh options. The schematic design concepts will be presented v ia elevation/cross-sections and p Ian graph ics and vvi II address the following: a. Project entry signage and special features; b. Landscape plantings; c. Landscape and feature lighting; d. Design criteria established by the Client, Owner. e. Comments from the Smith and Wollensky Restaurant Group ') We vvill participate in one schematic design review vvith the RDA and planning department staff for the purpose of reviewing the schematic level design etTort. 3. We will attend one meeting with representatives from the Smith and \Vollensky Restaurant Group for the purpose of reviewing the schematic level design drawings. 4. Preparation of an Opinion of Probable Cost. Task 2 - Design Development Phase 1. This phase includes the design development of schematic level designs approved by the Client and a revised budget, based on the funding agreement between the City of Miami Beach and The Smith and Wollensky Restaurant Group. 7 Those elements included in this phase will be those listed in the schematic design phase and the preparation of the secondary monument sign design development drawings based on the approved schematic design and revised budget ~-r1I ....... - , , -';\lIlth P~)It\l'~ SII~!1;IL;''':. .\Dr,] l~. ":1)()I). ~1:1\.:~ = Kimley-Horn and Associates, Inc. J. Design development \vill incorporate input received during the schematic design workshop :.1nd \viil include:.1n additional Client meeting to review design development level drawings. 4. \Ve will prepare design development plans for review by t/1e Client. This submittal will include the design development plans ~lI1d revised graphics for both monument signs. "' Preparation of an opinion \)f probable construction costs. Task 3- Construction Document Phase t. This phase ii~cludes those designated services necessary to prepare further drawings. specifications and related documents setting forth in detail the requirements for construction of the project and for contracting for construction from the approved design development documents. This phase is specifically limited the preparation of construction documents for 2 monument signs and associated landscaping, irrigation and lighting as described within Task I and 2. Construction document plans will generally consist of the following sheets: a. Signage plans/elevations and details b. Landscape plans and supporting specifications c. Irrigation specifications and details d. Lighting fixture specifications and electrical notes. e. Electrical conduit layout revision and circuitry (as required) Task 4 - Public Meetings and Presentations Our proposal includes the attendance/presentation of the improvements at one coordination meeting with City staff, The Smith and Wollensky Restaurant Group and other consultants associated with the South Pointe Park Master Plan Improvements. ADDITIONAL SERVICES Upon your authorization, we will provide any additional services that may be required beyond those described in Task t through 4. These services may include but are not limited to such items as the following: · Preparation of computer images depicting the proposed monument signs from specified views. JIII""-n ...._r ~ Soulh Pflll11C SIl':ll;I\.':C. .., prd : ~. 20nO, il:ll.:c: Kimley'~orn and Associates, Inc. · Design ot' J.ddition monument signs · AttendJ.nce of additional meeting (beyond those listed in task 1--1-) COt\IPE:'I'Sr\ nON We will provide the services described in Tasks I through -+ for the lump sum amounts (not including: direct expenses) outlined belovv. Task Description Lump Sum Fee Basic Services 1 Schema tic Design ................................................................ 52 ,500.00 2 Design Develo p me n t............................................................ 51,800.00 3 Cons tru ctio n Docu me n ts .................................................... $3,300.00 4 Public Meetings and Presentations .......................................$550.00 Reimbursements Di rect Ex penses ....... ...... .................. ...................................... 5350.00 Total ................................................................................................ 58,500.00 SCHEDULE We will provide the services outlined in task I through 4 in accordance with a mutually agreeable time frame between the City and Kimley-Horn to coincide with the South Pointe Phase I construction. 5\SivllNGONE\\\i,Jr(j Docs\South Pointe\contracts\spointe park signage.doc Miami Beach Redevelopment Agency 1700 Convention Center Drive, Miami Beach. FI. 33139 http:\\ci.miami-beach.fl.us Telephone (305) 67:i.-]193 Facsimile (305) 673-7772 REDEVELOPMENT AGENCY MEMOR;.\NDUM No.OO-32 DATE: May 10,2000 TO: Chairman and Members of the Miami Beach Redevelopment Agency FROM: Lawrence A. Levy ~ Executive Director i :) SUBJECT: A RESOLUTION OF THE CHAlRi"IAN AND THE ME~IBERS OF TfIE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING A.l\1ENDMENT NO.5 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORl'i AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT-TO-EXCEED $8,500.00 FOR DESIGN, COORDINATION AND PREPARATION OF CONSTRUCTION DOCUMENTS FOR TWO MONUMENT IDENTIFICATION SIGNS AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETS CAPE PROJECT ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. ANAL YSIS On January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley- Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project). The RDA staff negotiated a not-to-exceed fee of $170.760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a Master Plan and surveying for the Phase I improvements. Agenda Item 2S b Date 5 - \ 0 - 0 U On ]\fay 26, 1999, the RDA approved Amendment No.1, which included a not-to-exceed fee in the amount of $389, 1 00 for the preparation of construction documents, permitting and bidding services for Phase 1. On May 26, 1999, the RDA approved Amendment No.2, which included a not-to-exceed fee in-the amount of $103,800 including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington A venue extension, as required by the Porto fino Settlement Agreement. On October 20. 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925 for Phase II survey, including geo-technical studies, aerial photos and other expenses. On February 9, 2000, the RDA approved Amendment No.4, which included a not-to-exceed fee in the amount of$22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park. In order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents were completed last March, the construction bid is currently underway, and the contract is estimated to be awarded by late May. Due to the shon time frame to incorporate the South Pointe Park's identification signage design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.5 to the Agreement. The design will include two monument signs: a primary sign at the Washington Avenue median, just south of Biscayne Street, and a secondary sign at the southeast comer of Washington Avenue and South Pointe Park entry road. All improvements will be fully coordinated with the Park's design, as required. The signs will also reference the Smith & Wollensky Restaurant, located in the Park, for which the restaurant owner has agreed to fund the construction hard costs associated with this Project. The proposed not-to-exceed fee for the design of two monument signs at South Pointe Park is $8,S00.00 with the following defined tasks: Schematic Design Design Development Construction Documents Public Meetings and Presentations Reimbursements $2,500.00 1.800.00 3,300.00 550.00 350.00 The Administration recommends that the Chairman and the Members of the Miami Beach Redevelopment Agency approve Amendment No.5 to the Agreement with Kimley-Hom and Associates, Inc., for professional engineering and landscaping services, in an amount not-to-exceed $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park, to be included as part of phase I of the South Pointe Redevelopment Area streetscape project. LALlCifilb A~ \'o~ ~ F-\DDHP'SALL\Alexandra\South Pointe\Kimley Hom\Contract\KHA SW AD5 RDAMemo.doc AMENDMENT NO.5 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPE ARCHITECTURAL SERVICES, FOR DESIGN, COORDINATION AND PREPARATION OF CONSTRUCTION DOCUMENTS FOR TWO MONUMENT SIGNS AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETSCAPE PROJECT , This Amendment No.5, dated as of ~ I (i , 2000, to that certain Professional Services Agreement (Agreement), dated ebruary 17, 1999, by and between the Miami Beach Redevelopment Agency (RDA) and Kimley-Hom and Associates, Inc. (Consultant). RECITALS WHEREAS, the Agreement provides for the preparation of the final Master Plan for the South Pointe Redevelopment Area Project; and WHEREAS, this Amendment No.5 to the Agreement provides for design, coordination and preparation of construction documents for two monument signs at South Pointe Park, to be included as part of Phase I of the South Pointe Redevelopment Area Streetscape Project; and WHEREAS, the design will include two monument signs: a primary sign at the Washington Avenue median, just south ofBiscayne Street; and a secondary sign at the southeast comer of Washington Avenue and South Pointe Park entry road; and WHEREAS, all improvements will be fully coordinated with the Park's design, as required; and WHEREAS, the signs will also reference the Smith & W ollensky Restaurant, located in the Park, for which the restaurant owner has agreed to fund the construction hard costs associated with this Project. 1. RECITALS No.5. The above recitals are true and correct and are incorporated as a part of this Amendment 2. MODIFICATIONS The Agreement is amended as follows: Exhibit "A", entitled "Scope of ServiceslFee", is amended to add the work attached hereto and incorporated herein as Exhibit "A-5". 3. OTHER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The RDA and Consultant ratify the terms of the Agreement, as modified by this Amendment No.5. IN WITNESS WHEREOF, the parties hereto have caused this Fifth Amendment to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: MIAMI BEACH REDEVELOPMENT AGENCY Jncut PU{ dL~ By: 191 SECRETARY CHAIRMAN ATTEST: CONSULTANT: /I KIMLEY -HORN AND ASSOOI ,~ By: VICE-PRESIDENT F:\DDHP\$ALLlAlexandra\South PointelKimley Horn\ContracllKHA PLAD5 Amendment.doc APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION 1t1il:/fRAjf ~ (y'ifl) Doh c=r~ Kimley-Horn and Associates, Inc. ')lltltl1l'll;I\!C ,\ic:.ILIL:l', :\pril 1:, :()()(J, P:l~C I Exhibit "A 5'/ SCOPE OF SERVICES Task 1 - Schematic Design Phase I. This phase includes those services necessary to prepare concept dr~l\vings and other documents illustrating the general scope. scale and relationship of the project components. We will revie\v applicable local ordinances, and review the Client's design and budget criteria to establish the project program and design objectives. We will provide three monument sign concepts for the median sign, which will represent low, medium and high co~t options. The schematic design concepts will be presented via elevation/cross-sections and plan graphics and will address the following: a. Project entry signage and special features; b. Landscape plantings; c. Landscape and feature lighting; d. Design criteria established by the Client, Owner. e. Comments from the Smith and Wollensky Restaurant Group '") We will participate in one schematic design review with the RDA and planning department staff for the purpose of reviewing the schematic level design effort. 3. \Ve will attend one meeting with representatives from the Smith and Wollensky Restaurant Group for the purpose of reviewing the schematic level design drawings. 4. Preparation of an Opinion of Probable Cost. Task 2 - Design Development Phase I. This phase includes the design development of schematic level designs approved by the Client and a revised budget based on the funding agreement between the City of Miami Beach and The Smith and Wollensky Restaurant Group. '") Those elements included in this phase will be those listed in the schematic design phase and the preparation of the secondary monument sign design development drawings based on the approved schematic design and revised budget ~=r~ Kimley-Horn and Associates, Inc. \()lllil il()IIII~ Si:.:rloH.:i..:.\pnl I ~ ~()()(). P:l!.!t; ~ J. Design development will incorporate input received during the schematic design workshop and will include an additional Client meeting to review design development level drawings. 4. We vvill prepare design development plans for review by the Client. Th is subm ittal wi II inc lude the design deve lopment plans and revised graphics for both monument signs. 5. Preparation of an opinion of probable construction costs. Task 3- Construction Document Phase 1. This phase illcludes those designated services necessary to prepare further drawings, specifications and related documents setting forth in detail the requirements for construction of the project and for contracting for construction from the approved design development documents. This phase is specifically limited the preparation of construction documents for 2 monument signs and associated landscaping, irrigation and lighting as described within Task I and 2. Construction document plans will generally consist of the following sheets: a. Signage plans/elevations and details b. Landscape plans and supporting specifications c. Irrigation specifications and details d. Lighting fixture specifications and electrical notes. e. Electrical conduit layout revision and circuitry (as req u ired) Task 4 - Public Meetings and Presentations Our proposal includes the attendance/presentation of the improvements at one coordination meeting with City stan: The Smith and vVollensky Restaurant Group and other consultants associated with the South Pointe Park Master Plan Improvements. ADDITIONAL SERVICES Upon your authorization, vve will provide any additional services that may be required beyond those described in Task I through 4. These services may include but are not limited to such items as the following: · Preparation of computer images depicting the proposed monument signs from specified vit.:ws. ~=r~ ')\luth P(lillll.; Siglla);~. Apnl 17, 20()() , ra~c.; Kimley-Horn and Associates, Inc. · Design of addition monument signs · Attendance of additional meeting (beyond those listed in task 1-4) COMPENSA TION We will provide the services described in Tasks 1 through 4 for the lump sum amounts (not including direct expenses) outlined below. Task Description Lump Sum Fee Basic Services 1 Sc hematic Design ................................................................. $2,500.00 2 Design Develo p men L........................................................... $1,800.00 3 C onstructio n Docu men ts .................................................... $3,300.00 4 Pu blic Meetings and Presentations ....................................... $550.00 Reimbursements Direct Ex pe nses ..................................................................... $350.00 To tal ................................................................................................ $8,500.00 SCHEDULE We will provide the services outlined in task 1 through 4 in accordance with a mutually agreeable time frame between the City and Kimley-Horn to coincide with the South Pointe Phase I construction. SISMINGONEIWoru DocslSolllh Pointclcontractslspointe park signage.doc