Loading...
353-2000 RDA RESOLUTION NO. 353-2000 A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY (RDA), AUTHORIZING THE APPROPRIATION OF FUNDS, IN THE AMOUNT OF $134,090, TO BE PROVIDED FROM THE RDA, AND TO BE REIMBURSED FROM THE GENERAL OBLIGATION BONDS WHEN SAME BECOME A V AILABLE, FOR ADDITIONAL SERVICES TO BE PERFORMED BY THE FIRM OF ROBERT A. M. STERN ARCHITECTS, TO COMPLETE THE DESIGN AND PERFORM CONSTRUCTION ADMINISTRATION ON THE COLLINS PARK PORTION OF THE CULTURAL CAMPUS PROJECT. WHEREAS, on September 23, 1998, the Mayor and City Commission adopted Resolution No. 98- 22904, authorizing the Mayor and City Clerk to execute an Agreement with the firm of Robert A. M. Stern Architects (Stern) for the Architectural and Engineering Design of a Regional Library; a Master Plan for Collins Park and the Cultural Campus Streetscape (the Project) (the Agreement); and WHEREAS, on January 6,1999, the Mayor and City Commission, authorized appropriation of the funding necessary to implement the Agreement with Stern for the Project; and WHEREAS, the Administration is requesting approval of Amendment No.3 in the amount of $134,090, to the Agreement, for the implementation of the Master Plan of the area previously approved by the Administration and the City Commission.; and WHEREAS, on November 2, 1999, the voters of Miami Beach approved the issuance of an approximately $92 Million General Obligation Bond (the Bonds) which included $1,800,000 for a complete renovation of Collins Park, and for the Streetscape surrounding the Cultural Campus, which includes the Regional Library, the Bass Museum and the Miami City Ballet building; and WHEREAS, the Administration is requesting that the $134,090 be appropriated from RDA funds to be reimbursed from the Bonds when same become available. NOW, THEREFORE, BE IT DUL Y RESOLVED BY THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY (RDA), that the Chairman and Members ofthe Redevelopment Agency, authorize appropriation of funds, in the amount of $134,090, to be provided by the RDA, and to be reimbursed from the General Obligation Bonds when same become available, for additional services to be performed by the firm of Robert A. M. Stern architects, to complete the design and perform construction administration on the Collins Park portion of the Cultural Campus project. PASSED and ADOPTED this ~ day of June, 2000. 1~ CHAIRMAN ~TEST: ~w.C{6 Pelt Llv,--- SECRETARY APPROVED A:.;;JO FORM & LANGUAGE & FOR EXECUTION F:\WORK\$ALL\CIIA 1 RANDlCUL TURALIRDARES02WPD AI} IM{)J,fL- ~ Gen~r'7. .~ .. 6 /, / mJ ( D~. ~lLt NO.'6( U4/1~ 'UU lo:~4 Rob\:rt A.M. Slern Architects lU:Konica ~hX 8bJo rHl, . rh~C. c 460 Wesl 34th Streel, New York, NY 10001 Tel 212 967 5100 Fax 212 967 55&8 April 14,2000 Jorge Chartrand, Construction Vlanager City of Miami Beach Deportment of Planning. & lon mg. 1700 Convention Ct::nter Drive Miami Beach, FL 33139 Rc: Miami Ueach Library llod Cultural Arts Campus, RAMSA #98011 Additional Services, Scope of Services for Collins Park, Collins Avenue P:irking Lot flnd Beachfront Park Landscape Design and Construction Dear Jorge: As per your request, wc are herchy suhm itllng a revised Addilional Services and j;ee Proposal in connection with lhe Collins Pnrk landscape design project for the Miami Reach Lihrary and Cullural Art.s Campus. Our Cce is based on the understanding that tile budget for the park project is $1,369,000. (Note that budgeting to date is based on 1999 rrices and do\:s not include \:scalation). Th\: Scope of Work for the Coil ins Park block between Park Avenue and Collins Avenue, and for the Collins Avenue Parklllg [A)l and adjacent Beachrront Park includes: the design of pedestrian paths. beach front p:Hking lot. f1lanted medians on Park A venue. and an irrigation system; selection ant.! location o1'lrc\:S, shrubs and ground covers; layoul of pedes Irian lighting. benches, and trash receptacles: design of special site elements, (pool. pergola and landscape wall adjacenllo beach); relocation or onsile monuments. This proposal is hased on lIw rollowing assumptions: A. We will develop and build upon the concept design wl1JCh our office has already completed and presented to the Miami LJeach Design ReView 13oard. (See u//uched). The Scope or Services includcs design of, and construction documents for: site iayout, grading and utilities, rlanling, irrigatio'l, Site detnils: monument relocntlon: obtaining necessary approvals and permits; and eooruinating our work with aprropriate city agencies. Bidding and negotiation of cOlltracts for construction, and construction administration services <Ire also ioeludell. All ol"thc aoov\: s\:rvlc\:s an: In addition to our basic scope 01" services whi;;h called for a Illuster plan fer [he district and complete construction documents Cor th\: Ljh~dry; t1~ey are also in Clddition to the str\:elscapc work covered under sc:pilriltc: ilgl'c<:l1\ents. B. The design of the Rotunda and assoeiat\:d planting is not lllcluded in this COnlmel. (See allachcd conccpt design for proposed limit of work), W\: would be picnscd to provide you with a separate proposal for this work. C. Neither locating ,wndard slgllagc 1101' deSIgning custom slgl1age ilre included III this rroposul. D. T:-1C construction of tile purk WOUld nol commence until tbe existing library IS dcmolished ill early 2002, suoscljuer:t to the completion ot"constructiun or~hc new librilry. We propo~c to commence work 6-8 months pnor to th\: anticIpated start of construction or lhc park. {'\~,r1Je.,lIli..""",i!lJ"'I"','''l'd riLe NO.(b( U4/1~ UU 10.00 Robert A.M Stern ArchiteclS ju.~onIGd rH^ ~o~o ,HI" 460 West 34th Street. New York, NY 1000 I TI.:I 212 967 5100 Fax 212 967 5588 April 14,2000 C, These lees are based on the previously-reviewed masterplan for Collins Park, the Collins Avenue parking lot and adjacenl beachfront park. Any significant changes to the existing design proposal, as requested by the Oversight Committee, DeSIgn Review Board Committee and Commission, Cullural Arts Council, Public Works 01' Parks Facilities will add additional design lime to lhe prolect, and will constitute additional services. F. Value engineering costs will constilute additional services. G. The City of Miami Beach will research and provide to LIS ail Miami l3each iocal codes urld standards which apply to and affect thiS project. H. The bid opening and evaluation of bids will be conducted and attended by the City of Miami Beach only. For a breakdown of the services which would be provided. see <luached Scope of Services. Our fee 1'01' this scope of work wO\i1d be based on a fixed 10% fee based on the construction budget for this project. AllY increase in the budget for this project, or any work requested of our tinn or our associmed subcunsultant firms which is beyond the basic scope of work and scope or services shall constitute "additional services" 1'01' which our fee will be adjusted. Total $ (Excluding Rcimbursuhh:s): $136,900. Reimbursable EX[1cnses: Rellnbursable cxpenses, which will be billed al our cust, will include other outsidc consultants, long distance telephone calls. facsimile transmission, lravel and accoml1lodatlons, printing and photocupying, photographic services, supplies and reproductiuns. CADD plotting services, modd supplies, and express mail or courier services Reimbursahles: (Not-To-F.xeccd) SI.J,OOO, A!termttivc Proposal You have <llso asked us 10 prepare separate proposals for Collins Park a:1d ['or the Collins AVe. Parking Lot and Adjacent Ekachfronl Park. Splitting up the overall project into lwo separate contracts would involve redundant administrative and reimbursable costs, and additional design costs based on rrc;paring construction documents for two proiects, includlng thl.: following: · processing and permitt:ng costs . project management ar:d consultant cool-ctinalioll costs .. uotillning ,.gency approvab .. prc;parinl,\ and rn.:senting plans to the City ( \...~~! !!fll\!lIrn",,\IlIIIlIl.:.1,{''': II po Raben A.:'1. Skrn i\rchltec:s C7 3:)t'd 460 Wcst34th Street, New York. NY 10001 Tel?'l?' '1675100 F,LX 212 9(i7 '))XX Apr:114.2000 P;].~c 3 .. projcct meetings. v<1lue engineering .. preparing :2 sepanltc bid pack<1gcs · the bid and conlr<lcl negotiation phase .. the constrl.lctilJn adminlstr<1tion phasc · reimblll'sable eXIKI1Ses (including :on!:\ dist<1ncc lelephone cal:s. hcslf1uk tran~l~lISSIOllS, travel anG <1ccoml1loda~ions. rrintil1g ilne! pl1olllUlflYI1;g, [lhotograpnlc r.1at::rlals. sup::;lics and re:lroJuc~illI1S, CAUl) plol:lng serVices, 1lI1d express r:1i1i: scrv'ces). The auditlon;)1 cost of preparing this project;}S tWO sepanllc COl1tr;JC:S would told I ~rrroximi\teiy S34,J50. ~Iease aJvi.'ic as to whether this proJcct will be completcc under one or two contr"dcts. The terms IJI' our hasic contr;}ct shall utherwise govern this agreement lrthis propOS;} I is acceptahle, rlease send us a letler to that etTect or sign and return a copy of this letter to us for \lur lilcs If you 11ave questions or need further inform:Jtlol1. :)ic~se Jon't hesllalL: to cail ,J\kx LlllllS or !ne. We [auk forwal'd:o your promot reSilOnse Slnc~re:y. Dawn F. Ililnclkr, R",\ ;\sSoCi,lte Read i1llt.l agreed 10: Dille: c:: .~:)8~:1 fJul,:ri.! ....,1(:' j.J~r;J,3 FI'ClI1i( (jarlll70 Jaime RorrcLi ?iJe nOII.OJ D!-!/dh ,\1, I.. ,"'!'I"""lIll,llc~':H'" "1,,1 : ~<'tj j ~E96 X~~ g~luo~:a! so: '21 CO, ~ ~ .. 7') <?::::,,_' O~l 3"1;::J rlLt. No.nS't U4/18 'UU 1:,:~:' IU:Konlca rh^ ~O~~ rHA' - . Scope of Ser~ices Desi2n of Collins Park and Collins Avenue Parking Lot Miami Beach Regional Library Design Phase Task Project Management Consul tant Coordination Research Miami Reach r ,ncal Codes and standards (i.e.: planning and zoning issLles, historic distrid issues) Site l,ayout & Materials Design [,ayout & Materials Details Planting Design Planting Details Preliminary Site Grading Irrigation Oesign Design Special Site Features (i,e. Ornamental Pool, Plaza, Pergola, Lanuscape Wall) Generate preliminary Estimate of Probable Construction Cost fur above work Outline Specilications Periodic Project Meetings Assemble & Produce Presentation Materials for City Design Review & Approval (Assumes 3 presentations in !\ilium; to DRLJ, DR!J Committee, and Oversight ('ommiftee) FILE No.787 04/19 '00 10:00 lU:Konlca rHX ~b~o rH^. Construction Document Phase Task Project Management Consultant Coordination Periodic Project Medings Site Removals Plans Slte Lnyout & Materials Plans Layout & Materials Details Site Grading & Drainage Plans Planting Plans Planting Details Lighting/I"::lcctril.:al Plans & Details [rrigation Plans & Details Atypical Plans and Dt::lails (i.e. Ornamental Pool, Plaza, Pergola, Landscape Wall) Final Estimate 0 f Probable Construction Cost Develop Final Specilications Assemble/Distribute Final Construction Documents Bid and Contract Negotiation Phase Task Attend Pre-Bid Conf. Kcspond to Bidders' fnquiries/Prcp. Addenda Prepare Con formed Construction Documents FILE No.787 U4/1~ 'UU 10:00 lU:Konlca rHX ~000 rHi\. rr-tUL- v Construction Administration Phase Task Shop Drw'g/Suhmillal Reviews & ^pprovals R.F.I. Responses Preconstr. Conference Site Visits (Including Substantial and Final Completion Inspections) Change Order Preparation Evaluation or Pay Requests Field Review hLt No.42b U4,.2U 'UU :::\::::>-3 (jj:,'.on,ca h";/\ 'jbjo r-h/\ . \\ \ , I \\'<. -""\ III ill'iil [~~' '<:', ~i%,'0:::~'J ~~\-&;, f-~"'''~~ I~~~-' t~~" ~~'~~ .~~!;~, t~~~~~ i.~~.0t\~~ ..-.-.,..----.--------- I - ,;:.j ~ J i I ... ~ I . f ~ " i \, ~ /~, ~ .' I ,-- - - ~'\ - ---;) - - -t 'i-t-:-<,3 0 !,;;Qk;1 !f:r"itL ,! JJI" .(...-~ r-:~~~'u::---' IIVj)(~JI\LJ~".'l"\~4' 4'j4' ~~)~)I' II,/'\~ I ,r;!) ,---,cJ~~.__A_-.<_;----~ I <:f\: ~.,~~,:\ i__~_~); ;'L 1 ~ i~~,'J n:;-. \ \ J'-J -'..J- _ - _ ,.. ~;l.'." ........~~ ~ _H?V:lI1......... _ -1/ . _ I ,~, ~v' ,...I I, 'I . . 1--- I _ s:'~_ rHI.JC c: ~ ~ I ~ I ~ ~ ~ ~ ~ I I I I I j i I i , i I I I ! I , ! Robert A.M. Stern Architects (...;; ...:I" '.. '.J ,.;;,-.-: - ~ k_ _T '- ::c - u... --' '-. ~, -. t .., . . ---. C'J --' '- ..;- "-~'.: ...,,- r--'- ..=.:> -l <:::J 1 460 West 34th Street, New York, NY 10001 Tel 212 967 5100 Fax 212 967 5588 Apri128,2000 Jorge Chartrand, Project Manager City of Miami Beach, Public Works Department 1700 Convention Center Drive Miami Beach, FL 33139 Via Fax: 305-673-7028 Re: Design Fees, Collins Park Dear Jorge: I am in receipt of your fax dated April 26, 2000 regarding outstanding fee discussions on our project. As you know, we have spent considerable effort and made significant concessions already regarding our fees, and request that you seek Council approval for the revised fees as we have submitted them. [will summarize each of the outstanding fee discussiC;!1? ~~, to \vhere 'V~ .:urrent sTand: 1. LibralY Redesign Fee: Our original fee proposal to you for the work needed to redesign parts of our building to accommodate the proposed project by Ron Bloomberg was for $87,500.00, Borrelli and Associates gave a detailed breakdown of the actual estimated time required to do the work. CMB responded with a reduction in the fee to $59,220. based on marking down the expected number of hours for each task. With all due deference to the City, we feel that our consultants are ill the best position at this pomt to understand in detail what is necessary to complete the reviSIOns. Nonetheless. we agreed to reduce our proposal to .'P6,640. a deduction to $10,360. from our original proposal. 2. Collins Park Master Plan Fee: Our original proposal to you for work at Collins Park, based on an hourly breakdown of the Scope as we understand it for the entire park (both blocks) was $160, 160.00. The City offered a fee of 10% at the construction cost for the project, which for the entire project would be $136,900.00 based on an overall project budget of $1.369,000.00. Please note that we have agreed in principal that estimated reimbursable expenses in the amount of$14.000.00 are not included in this fee. If the ,,,"ork is done separately for each of the two blocks, additional time, and therefore -r:,;;, is :-eq:1:r~c. Thi~ is d~le to the f~ct ~h~t :11~rge t:~~ c:fthe '.:est 'Jfthe pr~j~st:s tb~ time necessary to meet with the many groups with an interest in the Park, and to prepare documents for the many agencies that will need to review and approve the pbns. ThIS commitment of time does not diminish significantly if we were to design only one block, instead of both. As we stated in our letter to you on April 14, we anticipate an additional cost of $34.350.00 would be needed to complete both phases if done independently. For the west portion only, we would prorate that fee, so that the fee for the west block only would be $99.200.00 + [(99,200/136,900) x 34,350.00] = $124.090.00, plus approximately $10,000.00 in reimbursable expenses, A Limited Liabiliry Partnership Robert A.M. Stern Architects 460 West 34th Street, New York, NY 10001 Tel 212 967 5100 Fax 2129675588 Jorge Chartrand Re: Design Fees, Collins Park April 28, 2000 Page 2 3. Streetscape Phase II Fee We will complete Bid Negotiation and Construction Administration Fee Phase II of the Streetscape project, for the $9,000 you have suggested, but will not include any reimbursable expenses from other phases within this project, as had previously been requested by CMB. We are attaching our own fee analysis for the project, indicating that a fee of $23,370.00 would be appropriate for the scope as we understand it. Ple:i<;e call me to discuss this matter further. Sincerely, (~rf Alexander P. Lamis, AlA Partner APLlbjg cc: Robert A.M. Stern Rob Buford Dawn Handler Jaime Borrelli, B-+-A Mayra Diaz-Buttacavoli, CMB N:\2000gncr\04-00\ClnsPrkDesignFeesA28.wpd A Limired Liability Parrnership Miami Beach Redevelopment Agency 1700 Convention Center Drive Miami Beach, Florida 33139 Telephone: (305) 673- 7295 Fax: (305) 673- 7772 REDEVELOPMENT AGENCY MEMORANDUM NO. 2000- 3 q- June 7, 2000 TO: Chairman and Members of the Miami Beach Redevelopment Agency Lawrence A. Levy Q.~f"() Executive Dire~ A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY (RDA), APPROPRIATING FUNDS, FOR AMENDMENT NO.3, IN THE AMOUNT OF $134,090, FROM CITY CENTER TAX INCREMENT FUNDS TO THE ARCHITECTURAL AND ENGINEERING DESIGN AGREEMENT WITH ROBERT A. M. STERN ARCHITECTS, FOR THE CULTURAL CAMPUSIREGIONAL LIBRARY PROJECT, FOR ADDITIONAL SERVICES TO COMPLETE THE DESIGN AND PERFORM CONSTRUCTION ADMINISTRATION ON THE COLLINS PARK PORTION OF THE PREVIOUSLY APPROVED MASTER PLAN. FROM: SUBJECT: ADMINISTRA TION RECOMMENDATION: Adopt the Resolution. FUNDING: Funding will be provided by the City Center Redevelopment Agency (RDA) and reimbursed from the General Obligation Bond Fund for the streetscape when it becomes available. ANALYSIS: On September 23, 1998, the Mayor and City Commission adopted Resolution No. 98-22904, authorizing the Mayor and City Clerk to execute an agreement with the firm of Robert A. M. Stem Architects (Stem) for the architectural and engineering design of a Regional Library, a 400-space Parking Garage and a Master Plan for Park and Streetscape Improvements in the area surrounding Collins Park. Agenda Item 3:1) S()urli J)()I~t= Vedevel()pment I)lstrict Date ~-I-OO On November 2, 1999, the voters of Miami Beach approved the issuance of approximately $92 million in General Obligation (GO) Bonds. The proposed and recommended improvements included $1,800,000 for a complete renovation of Collins Park, and for the Streetscape surrounding the Cultural Campus, which includes the Regional Library, the Bass Museum and the Miami City Ballet building. The Administration is now requesting appropriation of the funding, in the amount of $134,090, for Amendment No.3 to the agreement with Stem, and, for the implementation of the Master Plan of the area previously approved by the Administration and the City Commission. Funding will be borrowed from the RDA and returned from the GO Bond when it becomes available. The scope of work includes the complete redesign of the Collins Park area West of Collins A venue, including construction documents and construction administration for new landscape, irrigation, pathways, a decorative fountain, grading, utilities, and existing monument relocation. The fee also includes a not to exceed amount of $10,000 for reimbursable expenses. The design of the area East of Collins Park is not included in this amendment. It will be presented at a later date when further information on the overall parking needs of the area is available and decisions are made on the location of a parking garage in the vicinity. The Chairman and Members of the Redevelopment Agency should adopt the resolution appropriating funding, in the amount of $134,090, for Amendment No.3 to the Stem agreement, for the design of the West portion of Collins Park as proposed in the Master Plan previously approved. The funding will be provided by the Redevelopment Agency to be reimbursed from the General Obligation Bond Fund when it becomes available. ~L~ ~~~!~~~RAL\S~RNRDAl.WPD Attachments