Loading...
HomeMy WebLinkAbout348-2000 RDA RESOLUTION NO. 348-2000 A RESOLUTION OF THE CHAIRMAN AND THE MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AMENDMENT NO. 5 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., DATED FEBRUARY 17TH, 1999, FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT- TO-EXCEED $8,500.00 FOR DESIGN, COORDINATION AND PREPARATION OF CONSTRUCTION DOCUMENTS FOR TWO MONUMENT IDENTIFICATION SIGNS AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENTAREASTREETSCAPEPROJECT WHEREAS, on January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley-Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, staff has negotiated a not-to-exceed fee of$170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not -to-exceed fee, in the amount of $3 89,100, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of$103,800, including surveying, Master Plan design, preparation of bidding and construction documents, and permitting for the Washington Avenue extension, as required by the Porto fino Settlement Agreement; and WHEREAS, on October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925, for a Phase II survey, including geo-technical studies, aerial photos and other expenses; and WHEREAS, on February 9, 2000, the RDA approved Amendment No.4, which included a not-to-exceed fee in the amount of $22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents were completed last March, the construction bid is currently underway, and the contract is estimated to be awarded by late May; and WHEREAS, due to the short time frame to incorporate the South Pointe Park's identification signage design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.5 to the Agreement; and WHEREAS, the design will include two monument signs: a primary sign at the Washington Avenue median, just south of Biscayne Street, and a secondary sign at the southeast corner of Washington Avenue and South Pointe Park entry road; and WHEREAS, all improvements will be fully coordinated with the Park's design, as required; and WHEREAS, the signs will also reference the Smith & Wollensky Restaurant, located in the Park, for which the restaurant owner has agreed to fund the construction hard costs associated with this Project; and WHEREAS, the proposed not-to-exceed fee for the design of two monument signs at South Pointe Park is $8,500.00 with the following defined tasks: Schematic Design - $2,500.00; Design Development - $1,800.00; Construction Documents - $3,300.00; Public Meetings and Presentations - $550.00; and Reimbursements - $350.00. NOW, THEREFORE, BE IT DULY RESOLVED BY THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY, that the Chairman and Members of the Miami Beach Redevelopment Agency herein approve the attached Amendment No.5 to the Agreement with Kimley-Horn and Associates, Inc., dated February 17th, 1999, for professional engineering and landscaping services, in an amount not-to-exceed $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park; to be included as part of phase I of the South Pointe Redevelopment Area streetscape project. PASSED and ADOPTED this 10th day of May, 2000. ~A CHAIRMAN A yry:ST: 1(-l)~?S ~tlLe,--- APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION SECRETARY F:\DDHP\$ALLWexandraISouth PointelKimley HornlContractlKHA SW ADS RDAReso.doc ... 1;/2-6/ jJ/ Dot. ~=r~ South Poilltc Sigllagc, April 17,1000, Pagt.: I Kimley-Horn and Associates, Inc. Exhibit "A 5" SCOPE OF SERVICES Task 1 - Schematic Design Phase 1. This phase includes those services necessary to prepare concept drawings and other documents illustrating the general scope, scale and relationship of the project components. We will review applicable local ordinances, and review the Client's design and budget criteria to establish the project program and design objectives. We will provide three monument sign concepts for the median sign, which will represent low, medium and high cost options. The schematic design concepts will be presented via elevation/cross-sections and plan graphics and will address the following: a. b. Project entry signage and special features; Landscape plantings; Landscape and feature lighting; Design criteria established by the Client, Owner. Comments from the Smith and Wollensky Restaurant Group c. d. e. ~\ / 2, We will participate in one schematic design review with the RDA and planning department staff for the purpose of reviewing the schematic level design effort. 3. We will attend one meeting with representatives from the Smith and W ollensky Restaurant Group for the purpose of reviewing the schematic level design drawings. 4. Preparation of an Opinion of Probable Cost. Task 2 - Design Development Phase 1. This phase includes the design development of schematic level designs approved by the Client and a revised budget, based on the funding agreement between the City of Miami Beach and The Smith and Wollensky Restaurant Group. 2. Those elements included in this phase will be those listed in the schematic design phase and the preparation of the secondary monument sign design development drawings based on the approved schematic design and revised budget ~-.,. ~-,. , South Pointe Signage, April 17, 2000. Page 2 Kimley-Horn and Associates, Inc. 3. Design development will incorporate input received during the schematic design workshop and will include an additional Client meeting to review design development level drawings. 4. We will prepare design development plans for review by the Client. This submittal will include the design development plans and revised graphics for both monument signs, 5. Preparation of an opinion of probable construction costs. Task 3- Construction Document Phase 1. This phase includes those designated services necessary to prepare further drawings, specifications and related documents setting forth in detail the requirements for construction of the project and for contracting for construction from the approved design development documents. This phase is specifically limited the preparation of construction documents for 2 monument signs and associated landscaping, irrigation and lighting as described within Task 1 and 2. Construction document plans will generally consist of the following sheets: a. Signage plans/elevations and details b. Landscape plans and supporting specifications c. Irrigation specifications and details d. Lighting fixture specifications and electrical notes. e. Electrical conduit layout revision and circuitry (as required) Task 4 - Public Meetings and Presentations Our proposal includes the attendance/presentation of the improvements at one coordination meeting with City staff, The Smith and Wollensky Restaurant Group and other consultants associated with the South Pointe Park Master Plan Improvements. ADDITIONAL SERVICES Upon your authorization, we will provide any additional services that may be required beyond those described in Task 1 through 4. These services may include but are not limited to such items as the following: · Preparation of computer images depicting the proposed monument signs from specified views. ~=r' SOllth Pointe Signage. April 17,2000. Page J Kimley-Horn and Associates, Inc. · Design of addition monument signs · Attendance of additional meeting (beyond those listed in task 1-4) COMPENSA nON We will provide the services described in Tasks 1 through 4 for the lump sum amounts (not including direct expenses) outlined below. Task Description Lump Sum Fee Basic Services 1 Schematic Design ................................................................. $2,500.00 2 Design Develo p men t ............................................................ $1,800.00 3 Construction Documents .................................................... $3,300.00 4 Public Meetings and Presentations .......................................$550.00 Reimbursements Direct Expenses ........ ................ ....... ........... ........................... $350.00 T o.tal . ....... ........ ........... ... ........................... .... ................................... $8,500.00 SCHEDULE We will provide the services outlined in task 1 through 4 in accordance with a mutually agreeable time frame between the City and Kimley-Horn to coincide with the South Pointe Phase I construction. S:\SMINGONE\ Word Docs\South Pointc\contracts\spointe park signage.doc Miami Beach Redevelopment Agency 1700 Convention Center Drive, Miami Beach, FI. 33139 http:\\ci.miami-beach.fl.us Telephone (305) 673-7193 Facsimile (305) 673-7772 REDEVELOPMENT AGENCY MEMORANDUM NO. 00- 32 DATE: May 10,2000 TO: Chairman and Members of the Miami Beach Redevelopment Agency FROM: Lawrence A. Levy ~ Executive Director JiIltJ SUBJECT: A RESOLUTION OF THE CHAIRMAN AND THE MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AMENDMENT NO. 5 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT-TO-EXCEED $8,500.00 FOR DESIGN, COORDINATION AND PREPARATION OF CONSTRUCTION DOCUMENTS FOR TWO MONUMENT IDENTIFICATION SIGNS AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETS CAPE PROJECT ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. ANALYSIS On January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley- Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project). The RDA staff negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a Master Plan and surveying for the Phase I improvements. Agenda Item 36 Date 5 ~ 10 - 0 () On May 26, 1999, the RDA approved Amendment No.1, which included a not-to-exceed fee in the amount of $389,100 for the preparation of construction documents, permitting and bidding services for Phase I. On May 26, 1999, the RDA approved Amendment No.2, which included a not-to-exceed fee in the amount of $103,800 including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington Avenue extension, as required by the Porto fino Settlement Agreement. On October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925 for Phase II survey, including geo-technical studies, aerial photos and other expenses. On February 9, 2000, the RDA approved Amendment No.4, which included a not-to-exceed fee in the amount of$22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park. In order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents were completed last March, the construction bid is currently underway, and the contract is estimated to be awarded by late May. Due to the short time frame to incorporate the South Pointe Park's identification signage design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.5 to the Agreement. The design will include two monument signs: a primary sign at the Washington Avenue median, just south of Biscayne Street, and a secondary sign at the southeast comer of Washington A venue and South Pointe Park entry road. All improvements will be fully coordinated with the Park's design, as required. The signs will also reference the Smith & Wollensky Restaurant, located in the Park, for which the restaurant owner has agreed to fund the construction hard costs associated with this Project. The proposed not-to-exceed fee for the design of two monument signs at South Pointe Park is $8,500.00 with the following defined tasks: Schematic Design Design Development Construction Documents Public Meetings and Presentations Reimbursements $2,500.00 1,800.00 3,300.00 550.00 350.00 The Administration recommends that the Chairman and the Members of the Miami Beach Redevelopment Agency approve Amendment No.5 to the Agreement with Kimley-Hom and Associates, Inc., for professional engineering and landscaping services, in an amount not-to-exceed $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park, to be included as part of phase I of the South Pointe Redevelopment Area streetscape project. LAL/&e/AR ~ qw F:\DDHP\$ALLlAlexandraISouth Point.lKiml.y HomlContractlKHA SW ADS ROAM.mo.doc RESOLUTION NO. 2000-239 t6 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.5 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., DATED FEBRUARY 17m, 1999, FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES IN At'l AMOUNT NOT-TO-EXCEED 58,500.00 FOR DESIGN, COORDINATION AND PREPARATION OF CONSTRUCTION DOCUMENTS FOR TWO MONUMENT IDENTIFICA TION SIGNS AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETS CAPE PROJECT WHEREAS, on January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley-Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, staff has negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan 'and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not-to-exceed fee, in the amount of $3 89, 1 00, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of $1 03,800, including surveying, Master Plan design, preparation of bidding and construction documents, and permitting for the Washington A venue extension, as required by the Portotlno Settlement Agreement; and WHEREAS, on October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925, for a Phase II survey, including geo-technical studies, aerial photos and other expenses; and WHEREAS, on February 9,2000, the RDA approved Amendment No.4, which included a not-to-exceed fee in the amount of$22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan. the Phase I construction documents were completed last March. the construction bid is currently underway, and the contract is estimated to be awarded by late May: and WHEREAS, due to the short time frame to incorporate the South Pointe Park's identification signage design into the Phase I construction documents. it is recommended that these plans be completed and issued as Amendment No.5 to the Agreement; and WHEREAS, the design will include two monument signs: a primary sign at the Washington A venue median, just south of Biscayne Street and a secondary sign at the southeast comer of Washington Avenue and South Pointe Park entry road: and WHEREAS, all improvements will be fully coordinated with the Park's design, as required; and WHEREAS, the signs will also reference the Smith & Wollensky Restaurant, located in the Park, for which the restaurant owner has agreed to fund the construction hard costs associated with this Project; and WHEREAS, the proposed not-to-exceed fee for the design of two monument signs at South Pointe Park is $8,500.00 with the following defined tasks: Schematic Design - $2,500.00; Design Development - $1,800.00; Construction Documents - $3,300.00; Public Meetings and Presentations - $550.00; and Reimbursements - $350.00. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein ratity the attached Amendment No.5 to the Agreement with Kimley-Hom and Associates, Inc., dated February 17m, 1999, for professional engineering and landscaping services, in an amount not-to-exceed $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park: to be included as part of phase I of the South Pointe Redevelopment Area streetscape project. PASSED and ADOPTED this 10th day of May, 2000. ~11 " MAYOR ATTEST: \ I', '\ \ Ii If/..' (\ K_,:' ,) \,. \., , .; I " 1/ {(L ClL---- ;\PPROVED I~ TO FORJ\1 & L?.NGUAf...;E & ~OR EXECUTICN CITY CLERK F:' DDHPlSALLlAloxandra\Sollth Pointo' Kimloy Hom\ContractlKHA SW AD5 CMBReso.doc ;;1 I) '\ f 1./' !:J1C J '" . I , ~t: f.-( ~C ~ .it.. , mfW (Iii (, /I~~ ) 'I ~,' b V I O.:'j'i'G ~-n .......... - , ~ Kimley-Horn and Associates, Inc. 'I(JIIIII P'llllk ~1c.:11;1t;~. .\prtl ,~ ~:)IIiJ:' \:..:'~ I Exhibit "A S., SCOPE OF SERVICES Task 1 - Schematic Design Phase I . Th is phase i nc I udes those serv ices necessary to prepare conc;;pt drawings and other documents illustrating the general scope. scale and re lationsh i p of the project com ponents \Ve wi II rev ie~v appl icab Ie local ordi nances, and rev iew the Client's design and budget criteria to esmblish the project program and design objectives. We will provide three monument sign concepts for the median sign, ~vhich will represent low, medium and high CC\"")ptions. The schematic design concepts ~vill be presented v la elevation/cross-sections and plan graphics and will address the following: a. Project entry signage and special features: b. Landscape plantings; c. Landscape and feature lighting; d. Design criteria established by the Client, OViIler. e. Comments from the Smith and Wollensky Restaurant Group .., We will participate in one schematic design review with the RDA and planning department staff for the purpose of reviewing the schematic level design effort, 3. We will attend one meeting with representatives from the Smith and W ollensky Restaurant Group for the purpose of reviewing the schematic level design drawings. 4. Preparation of an Opinion of Probable Cost. Task 2 - Design Development Phase t. This phase includes the design development of schematic level designs approved by the Client and a revised budget, based on the funding agreement between the City of Miami Beach and The Smith and \Vollensky Restaurant Group. ~ Those elements included in this phase will be those listed in the schematic design phase and the preparation of the secondary monument sign design development draviings based on the approved schematic design and revised budget ~-n ~-,. , Slllill1 POlitte ')1L:!l.I~e, ,,\onl I ~ :rjCO, Pat;c 2 Kimley-Horn and Associates, Inc. .J. Design development will incorporate input received during the schematic design workshop and will include an additional Client meeting to review design development level drawings. -+. We will prepare design development plans for review by the Client. This submittal \vill include the design development plans and revi::itd graphics for both munumelH signs. ). Preparation of an opinion of probable construction costs. Task 3- Construction Document Phase 1. This phase includes those designated services necessary to prepare further drawings, specifications and related documents setting forth in detail the requirements for construction of the project and for contracting for construction from the approved design development documents. This phase is specifically limited the preparation of construction documents for 2 monument signs and associated landscaping, irrigation and lighting as described within Task I and 2. Construction document plans will generally consist of the following sheets: a. Signage plans/elevations and details b. Landscape plans and supporting specifications c. Irrigation specifications and details d. Lighting fixture specifications and electrical notes. e. Electrical conduit layout revision and circuitry (as required) Task 4 - Public Meetings and Presentations Our proposal includes the attendance/presentation of the improvements at one coordination meeting with City staff. The Smith and Wollensky Restaurant Group and other consultants associated with the South Pointe Park .\laster Plan Improvements. ADDITIONAL SERVICES Upon your authorization. we will provide any additional services that may be required beyond those described in Task I through 4. These services may include but are not limited to such items as the following: · Preparation of computer images depicting the proposed monument signs from specified views. ~=r~ Kimley-Horn and Associates, Inc. :)otlth ()olllte Si!;na~c. April 17, 2000, P:lL:t:: .; · Design of addition monument signs · Attendance of additional meeting (beyond those listed in task 1--+) COMPE:\fSA nON \Ve will provide the services described in Tasks 1 through :+ for the lump sum amounts (not including direct expenses) outlined below Task Description Lump Sum Fee Basic Services 1 Sche ma tic Des ig n ........................... ....................... .............. $2,500.00 2 Design Developme n t ............................................................ $1,800.00 3 Construction Docu men ts .................................................... $3,300.00 4 Public Meetings and Presentations .......................................$550.00 Reimbursements Direct Ex pe nses .. ... ...... .............. ............................... ............. $350.00 Total . .......... .............. ............ ......... ............................ ........ ........ ...... $8,500.00 SCHEDULE We will provide the services outlined in task 1 through 4 in accordance with a mutually agreeable time frame between the City and Kimley-Hom to coincide with the South Pointe Phase I construction. S:\SMfNGONE\ Word Docs\S'lUth Pllintc'contmcts\spointc park signagc.doc ~!TY OF MIAMI BEACH ,fY HALL 1700 CONVENTION CENTER DRIVE MIAMIBEACH, FLORIDA 33139 tp:\\ci.miami-beach. fl. us - -. COMMISION MEMORA.NDUM NO. '3l 3;: - 0 Q DATE: May 10,2000 TO: Mayor Neisen O. Kasdin and Members of the City Commission FROM: Lawrence A. Levy ~ City Manager SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO. 5 TO T.fIE AGREEMENT BETWEEN THE MIAt"iI BEACH REDEVELOPMENT AGENCY AND KIMLEY -HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES IN AN AMOUNT NOT -TO-EXCEED $8,500.00 FOR DESIGN, COORDINATION AND PREPARATION OF CONSTRUCTION DOCUMENTS FOR TWO MONUMENT IDENTIFICATION SIGNS AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETS CAPE PROJECT ADMINISTRJ\ TIVE RECOMMENDATION Adopt the Resolution. ANALYSIS On January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley- Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project). The RDA staff negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a Master Plan and surveying for the Phase I improvements. AGENDA ITEM e.rG, DATE 5-IO-Du On May 26, 1999, the RDA approved Amendment No.1, which included a not-to-exceed fee in the amount of $389, 1 00 for the preparation of construction documents, permitting and bidding services for Phase I. On May 26, 1999, the RDA approved Amendment No.2, which included a not-to-exceed fee m the amount of $103,800 including surveying, Master Plan design, preparation of bidding -and construction documents and permitting for the Washington A venue extension, as required by the Portofino Settlement Agreement. On October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925 for Phase II survey, including geo-technical studies, aerial photos and other expenses. On February 9, 2000, the RDA approved Amendment No.4, which included a not-to-exceed fee in the amount of$22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park. In order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents were completed last March, the construction bid is currently underway, and the contract is estimated to be awarded by late May. Due to the short time frame to incorporate the South Pointe Park's identification signage design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.5 to the Agreement. The design will include two monument signs: a primary sign at the Washington Avenue median, just south of Biscayne Street, and a secondary sign at the southeast corner of Washington Avenue and South Pointe Park entry road. All improvements will be fully coordinated with the Park's design, as required. The signs will also reference the Smith & Wollensky Restaurant, located in the Park, for which the restaurant owner has agreed to fund the construction hard costs associated with this Project. The proposed not-to-exceed fee for the design of two monument signs at South Pointe Park is $8,500.00 with the following defined tasks: Schematic Design Design Development Construction Documents Public Meetings and Presentations Reimbursements $2,500.00 1,800.00 3,300.00 550.00 350.00 The Administration recommends that the Mayor and City Commission ratify Amendment No.5 to the Agreement with Kim1ey-Hom and Associates, Inc. for professional and engineering services, in an amount not-to-exceed $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park, to be included as part of phase I of the South Pointe Redevelopment Area streetscape project. LAL/C~/ AR \VV~~ \\CH2\SYSIDDHP\SALL\Alexandra\South P~intelKimley HomlContract\KHA SWAD5 CMBMemo.doc AMENDMENT NO.5 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPE ARCHITECTURAL SERVICES, FOR DESIGN, COORDINATION AND PREPARATION OF CONSTRUCTION DOCUMENTS FOR TWO MONUMENT SIGNS AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETSCAPE PROJECT This Amendment No.5, dated as of ~1JfJ1 /0 , 2000, to that certain Professional Services Agreement (Agreement), ~ebruary 17, 1999, by and between the Miami Beach Redevelopment Agency (RDA) and Kimley-Hom and Associates, Inc. (Consultant). RECITALS WHEREAS, the Agreement provides for the preparation of the final Master Plan for the South Pointe Redevelopment Area Project; and WHEREAS, this Amendment No.5 to the Agreement provides for design, coordination and preparation of construction documents for two monument signs at South Pointe Park, to be included as part of Phase I of the South Pointe Redevelopment Area Streetscape Project; and WHEREAS, the design will include two monument signs: a primary sign at the Washington Avenue median, just south of Biscayne Street; and a secondary sign at the southeast comer of Washington Avenue and South Pointe Park entry road; and WHEREAS, all improvements will be fully coordinated with the Park's design, as required; and WHEREAS, the signs will also reference the Smith & W ollensky Restaurant, located in the Park, for which the restaurant owner has agreed to fund the construction hard costs associated with this Project. 1. RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.5. 2. MODIFICATIONS The Agreement is amended as follows: Exhibit "A", entitled "Scope of Services/Fee", is amended to add the work attached hereto and incorporated herein as Exhibit "A-5". 3. OTHER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The RDA and Consultant ratify the terms of the Agreement, as modified by this Amendment No. 5. IN WITNESS WHEREOF, the parties hereto have caused this Fifth Amendment to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: MIAMI BEACH REDEVELOPMENT AGENCY j&4cf frk~ Lf~ By: 1~ SECRETARY CHAIRMAN ATTEST: CONSUL T ANT: ~. KIMLEY-HORN AND ~ By: VICE-PRESIDENT F:\DDHP\$ALL\AlexandraISouth PointelKimley HomlContractlKHA PLAD5 Amendment.doc APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION ~~ ~=r' South [)oi111t.: Sigt1dl~L:, /\pri! \7, ~()()(j. P;lblC I Kimley-Horn and Associates, Inc, Exhibit "A 5" SCOPE OF SERVICES Task 1 - Schematic Design Phase I. This phase includes those services necessary to prepare concept drawings and other documents illustrating the general scope, scale and relationship of the project components. We will review applicable local ordinances, and review the Client's design and budget criteria to establish the project program and design objectives. We will provide three monument sign concepts for the median sign, which will represent low, medium and high co:;t options. The schematic design concepts will be presented via elevation/cross-sections and plan graphics and will address the following: a. Project entry signage and special features; b. Landscape plantings; c. Landscape and feature lighting; d. Design criteria established by the Client, Owner. e. Comments from the Smith and Wollensky Restaurant Group ..., We will participate in one schematic design review with the RDA and planning department staff for the purpose of reviewing the schematic level design effort. 3. We will attend one meeting with representatives from the Smith and W ollensky Restaurant Group for the purpose of reviewing the schematic level design drawings. 4. Preparation of an Opinion of Probable Cost. Task 2 - Design Development Phase 1. This phase includes the design development of schematic level designs approved by the Client and a revised budget, based on the funding agreement between the City of Miami Beach and The Smith and Wollensky Restaurant Group. 2, Those elements included in this phase will be those listed in the schematic design phase and the preparation of the secondary monument sign design development drawings based on the approved schematic design and revised budget -. ~=r~ >.,outh POint!.:: Sigll;l~(:, \pril 17. ~()(}(). Pagt,,; '2 Kimley-Horn and Associates, Inc, 3. Design development will incorporate input received during the schematic design workshop and will include an additional Client meeting to review design development level drawings. 4. We will prepare design development plans for review by the Client. This submittal will include the design development plans and revised graphics for both monument signs. 5. Preparation of an opin ion of probable construction costs. Task 3- Construction Document Phase 1. This phase includes those designated services necessary to prepare further drawings, specifications and related documents setting forth in detail the requirements for construction of the project and for contracting for construction from the approved design development documents. This phase is specifically I im ited the preparation of construction documents for 2 monument signs and associated landscaping, irrigation and lighting as described within Task I and 2. Construction document plans will generally consist of the following sheets: a. Signage plans/elevations and details b. Landscape plans and supporting specifications c. Irrigation specifications and details d. Lighting fixture specifications and electrical notes. e. Electrical conduit layout revision and circuitry (as required) Task 4 - Public Meetings and Presentations Our proposal includes the attendance/presentation of the improvements at one coordination meeting with City stalf. The Smith and Wollensky Restaurant Group and other consultants associated with the South Pointe Park Master Plan Improvements. ADDITIONAL SERVICES Upon your authorization, we will provide any additional services that may be required beyond those described in Task I through 4. These services may include but are not limited to such items as the following: · Preparation of computer images depicting the proposed monument signs from specified views. "",-n .......... - ,. ~ "';''1l1l1l''l]llh'': SIl:.ll;\~~,\pnl I:, 20()(), [):l!.':t:.J Kimley-Horn and Associates, Inc, · Design of addition monument signs · Attendance of additional meeting (beyond those listed in task 1-4) COMPE~SA TlO~ We will provide the services described in Tasks I through -1- for the lump sum amounts (not including direct ex.penses) outlined below. Task Description Lump Sum Fee Basic Services Sc h e ma tic Des ign ....................... ............................... ........... $2 ,500.00 2 Design Developmc n t ............................................................ $1,SOO.OO 3 Co nstructio n Docu men ts .................................................... $3,3 00. 00 4 Pu blic Meetings and Presentations ....................................... $550.00 Reimbursements Direct Ex pe nses ..................................................................... $350.00 To ta I ................................................................................................ $8,500.00 SCHEDULE We will provide the services outlined in task I through 4 in accordance with a mutually agreeable time frame between the City and Kimley-Horn to coincide with the South Pointe Phase I construction. S:\SMI~GONE\\VlJrJ Docs\Soulh Pointc\contracts\spointc park signagc.doc