2000-23958 RESO RESOLUTION NO. 2000-23958 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.3, IN THE AMOUNT OF $134,090, TO THE PROFESSIONAL SERVICES AGREEMENT FOR ARCHITECTURAL AND ENGINEERING SERVICES WITH ROBERT A. M. STERN ARCHITECTS FOR THE CULTURAL CAMPUS/REGIONAL LIBRARY PROJECT, FOR ADDITIONAL SERVICES TO COMPLETE THE DESIGN AND PERFORM CONSTRUCTION ADMINISTRATION ON THE COLLINS PARK PORTION OF THE PREVIOUSLY APPROVED MASTER PLAN. WHEREAS, on September 23, 1998, the Mayor and City Commission adopted Resolution No. 98- 22904, authorizing the Mayor and City Clerk to execute an Agreement with the firm of Robert A. M. Stern Architects (Stern) for the Architectural and Engineering Design of a Regional Library; a Master Plan for Collins Park and the Cultural Campus Streetscape (the Project) (the Agreement); and WHEREAS, on January 6, 1999, the Mayor and City Commission, authorized appropriation of the funding necessary to implement the Agreement with Stern for the Project; and WHEREAS, the Administration is requesting approval of Amendment No.3 to the Agreement, in the amount of $134,090, for the implementation of the Master Plan of the area previously approved by the Administration and the City Commission.; and WHEREAS, on November 2, 1999, the voters of Miami Beach approved the issuance of an approximately $92 Million General Obligation Bond (the Bonds) which included $1,800,000 for a complete renovation of Collins Park, and for the streetscape surrounding the Cultural Campus, which includes the Regional Library, the Bass Museum and the Miami City Ballet building; and WHEREAS, the Administration is requesting that the $134,090 be appropriated from RDA funds to be reimbursed from the Bonds when same become available NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission approve and authorize the Mayor and City Clerk to execute Amendment No.3, in the amount of $134,090, to the Professional Services Agreement for Architectural and Engineering Services with Robert A. M. Stern Architects for the Cultural Campus/Regional Library Project, for additional services to complete the design and perform construction administration on the Collins Park portion of the previously approved Master Plan. PASSED and ADOPTED this ~ day of June, 2000. 1IlJ MAYOR. f :1tuA c~ APPROVED AS TO FOR.,,,, & LAJ'..JGUAGE & FOR EXECUTION FIWORKI$ALLICHATRANDlCUL TURALISTRNRES IWPD 1J{~~ ~ Robl:rl A.M. Stern Arch ilecls 460 Wl:st 34th Street, New York, NY 10001 Tcl212 9675100 Fax 212 967 5588 April 14,2000 Jorge Chartrand, Construction Manager City or Miami Beach Department of Planning & 7.on ing 1700 Convention Ct:ntl:r Drive Miami Beach, FL 33139 Rc: Miami UCllch Library nnd Culturul Arts Campus, RA:\'lSA #9801 1 Additional Services, Seope of Scrvices for Collins Pllrk. Collins Avenuc Parking Lot Rnd BClIchfront Park Landscape Oesign and Construction Dear Jorge: As per your request, we arc hereby submittmg <l revised Additional Services and l,'ee Proposal in connection with the Collins Park landscape design project for the Miami Reach Library and Cultural Art.~ Campus. Our fee is based on tl:e unders:anding that the budget for the park projec: is S 1.369,000 (Note that budgeting to date is based on 1999 rriccs and does not include escalation). The Scope of Work for Ihe Collins Park block between Park Avenue and Collins A venue, and for the Collins ^ 'venue Parklllg Lot and adjacent Beachrront Park includes: the design of pedestrian paths, beach front parking 101, rlanted medians on Park A venue. and an irrigation system; sclcction anJ location orlrccs. shrubs and ground covers; layout of pedestrian lighting. benches, and trash receptacles; design of special site elements, (pool, pergola and landscapc walt adjacent lo beach); relocation of' on,itc monuments. This proposal is based on the following assumptions: A. We will deyelop and build upon the (;oncept design which our office has already completed and presented 10 the Miami L\each Design Review 13oard. (See I.Illuched). The Scope or Services includes d(;sign of, and construction documents 1'01': sitc layout, grading and utilities, planting, irrigation. s:te derails; monumell! relocarion; obtaining necessary approvals and permits; anJ coordinating our work with appropriate city agencies. Bidding and negotiation of contracts for construction, imd cOll5truction administration services ,He also included. All of thc abov!.: serviccs are in addition to our basic scope of ~ervices which called for a master plan for the Jislrj<:[ and (;omplete construellon documents for the Lihrary; they are also in addition to the stn:elscapc work (;()vcn:d under separnte agreements. A. The design of the Rotunda and associnted planting is not lllcluded ill this contracl. (Set: attached concl:pt dcsign for proposed limit of work). We wuuld be plc<lscd to provide you With a separate proposal for this work. C. Neither locating slnndard slgnage liar designing custom signage Me included In this proposal. D. The construction of tile park wOldd nul commence until the existing library is dcmolished ill early 2()()2, subseljuent to the completion of COll5lructiun oflhc new libmry. We propos\: to commence work 6-8 mOllths prior (0 thc anticipated start of construction or thl: park. f' '.....,llle:.",itt..,IIIlilli...,"'..' IOI',J Robert A.M. Stern Architects 460 West 34th Street. New York, NY 1000 I Tel 212 967 5100 Fax 212 967 5588 April 14.2000 E. These fees are based on the previously-reviewed mastcrplan for Collins Park. the Collins Avenue parking lot and adjaccnt beachfron[ park. Any signilic<lnt changes to the existing design proposal. as n:quested by the Oversight Committee. DCSIi~,:1 Review Board Committee and Commission. Cultural Arts Council. Public Works or Parks Facilities will add additional designtiml: to the project. and will constitute additional services. F. Value engineering costs will constilute additionuJ services. G. The City of Miami Beach will research and providc to us ail Miami 8cach local codes and standards which apply to and affect this project. 1-1, The bid opening and cvalutltioll of bids will be conducted and attended by the City of Miami Beach only For a breakdown of the scrvices which would be provided. see attachcd Scope of Services, Our fee lor this scope of work would be based on a fixed 10% fee based 011 the construction budgel for th is proJect. Any increase in the budget for tbis project. or any work requ<:slcd of our tinn or our associated subcunsultant IIrms which is beyond the basic scope of work and scope or services shall constitute "additional services" 1'01' which our ree will be adjusted. Total S (Excluding Reimbllrsahl~s): $136,900. Reimbursable Exnenses: Reimbursable expenses. which will be billed al our cost. will include olher outside consultants, long distance telephone calls. facsimile transmission, travel and accommodations. printing and photocopying, photographic services, supplies and reproductions. Ct\[)[) plotting services. model supplies. and express !nail or courier services. Rcirnbursahles: (Not-To-F:xcccd) SI../,OOO. Alternative Proposal You have also asked us to prepare separate proposals for Collins Park a:ld {or the Collins Ave. Parking l.ot and Adjacent lkachfront Park. Splitting up the llverall project inlo two sepal'llte contracts would involve redundant adm In istrativc and reimbursable costs, and additional design costs based on preparing construction documents ror lwo projects. inc!udlng the lollowing: · processing and permitt:ng costs , project management ar.d consultant cool'dinalioll costs . ohtillning agency approvab . pr~paring anJ presenting plans to the Ciry '- \r..~~ r'!lr~hltll""'llllhlfi:"'.t,,, \\plJ Rob~n A.\-l. Sl.:l'n ^rcl1ltec:s C7 3~tjd 460 Wcst 34th Street. New York. NY 10001 Tel 212 1)67 51UO F,l)( 212 967 S5XX Apl':1 14.2000 Pagc J << proj-,:cl ml:ctings. vnlue enginccring · preparing :2 separate bid pilckngc5 · the bid ilnd conlrac[ ncgulialion phasc << thl: constr1lction auminlstrntior. phast: <<rl:imhursable eX:JCr1S<':S (including :on:; dIStilJ1C:: lcl<.:phonc ca!:s. t;1cslmil<.: lran.'I~l lSSlolls.trav<.:1 ilnd accommodations, prillli:lg illle! phO[IH.:Of1YI1;g. pholOgrnpnlc r.'1a[-':I":als. SlIi):)lies and rl::lrodul:~inI1S. CAUD plul::ng s<.:rYlCCS, ilnd exprl:ss r.lili: st:ry:ces). Thl: addition;)1 cost of preparing this project ns two separ,lll: contracts would tOld I arrroxil1li\tcly 534.350. ""ease auyise as to whether this project will be completcc: unl..ll:r one or twu COlltl"1.l.Crs. The terms 1)/' our hasic cOlltrnct shall ulhcrwise govern this agr':l::n~nt Ii'lhis proposnl is acecplahle. please send us a il:lterto that effect or sign and 1'(~!LJrIl J (;Opy of this letter:o us for lJur :jll'.~ lfyoul1ilve qUl'StIOIlS or ne.:d further ini'l1I'matloll. pic:Jsl: dOll't hesitall: to cad Alex LlllllS or :ne. We look forward ',0 your prom::Jt response. Sinc(;~c!y. [)awr. F.. ) lanelkr, R~.,\ i\.",Si)t;i,lte Read illlU agre::d [0: Uak: C~. :{,)~e:1 UlIicrr.! .-\ .1.:" I.J:rl!.i Fl'al~~ (jamno jaimc Rorrcllj ;:'ile: ()1iO 1101 U!-!ldh . ,1,.1, j'II,'~'hll"'" '''l.Ile,',",,,; q IMl : ~<tt:J SO:9t OQ, 3~/70 8SL'oN 311:J 9E96 X~:J 3Jluo~:QI - . Scope of Services Desi2n of Collins Park and Collins Avenue Parkin2 Lot Miami Beach Re2ional Library Design Phase Task Project Management Consultant Coordination Research Miami Reaeh r ,oeal Codes and standards (i.e.: plannlng and zoning isslles. historic district issues) Site Layout & Materials Design r ,ayout & Materials Ddails Planting Design Planting Derails Preliminary Site Grading. I rrigatioll Oesi gn Design Special Sile Features (i.e. Ornamental Pool, Plaza, Pergola. Landscape Wall) Generate preliminary Estimate of Probable Construction Cost for above work Outline Specifications Pcliodic Project Meetings Assemble & Produce Presentation Materials for City Design Review & Approval (Assumes 3 presenlatiot1.\. in Ivliami to DRlJ, DRlJ Committee, and Oversixhl Committee) Construction Document Phase Task Project Management Consultant Coordination Periodic Project Meetings Sile Removals Plans Site Layout & Materials Plans Layout & Materials Details Site Grading & Drainage Plans Planting Plans Planting Details Lighting/Electrical Plans & Details Irrigation Plans & Details Atypical Plans and Ddails (i.e. Ornamental Pool, Plaza. Pergola, Landscape Wall) Final Estimate 0 f Probable Construction Cost Develop i"inal S peei Iicali ons Assemble/Distri bute Fi nal Construction Documents Bid and Contract Negotiation Phase Task Attend Pre-Bid Conf. Respond to Bidders' Inquiries/Prep. Addenda Prepare Conlorrlllxl Construction Documents Construction Administration Phase Task Shop Drw'g/SuhmiLLal Reviews & ^pprovals R.F.I. Responses Prel:onstr. Conference Site Visits (Including Substantial und Final Completion Inspections) Change Order Preparation Evaluation or Pay Requests Field Review ~'sj I : <t;':, : ", \j' ~'~~~~ ~i<'\l~'\d k\~~~,t, !;z?;'z\1 ~~~~"~"'"~",,,,,,",,,\,,,,;, I:"~'~:"'"'''' 1 ',~~'><>,~;.. ,,:-:'$.";.,\'~":.~~:':...; ',', '~',;:' .-', ,~,"'X\0''''''' "'~~ ,\\~~~~".~ 1 ,':r": " I.'" ':"'~l~~~~iS'.~~~~;""" ~' ' ~ ", ',,'\ "- \, "'. \ "-" \\ \ . I .c.1 ','" ", LA>: ,-,", ,:' ~ l v , . J ::: ~'~i i ", ,.( " , ."~,,, " ,~ ,,' ;,~ ~~1; , , ~'~; I ~:I. I s%~~ I ',:. I ~., ~': i y ; , 1--- , -L::..J. - -.-. ." ---. - ~ I ~ t ~ \} ~ II II I I I I ' I i I i I I ! I , I Robert A.M. Stern Architects <:..;.. ....::r .. <:" '.J - '""..- '-' 1..- _7 '-- - ....... :-~~ .. .- n.. .- - .:.J " ; ---.. ) ~ ~- . , , ('''} -: -.... : - ~- . . '- , ..;- " ~~ .l .' ~;:.,.. r--- .:::> -.J :::::> I :., 460 West 34th Street, New York. NY 1000\ Tel 2\2 967 5100 fJ,x 2\29675588 April 28. 2000 Jorge Chartrand, Project Manager City of Miami Beach, Public Works Department \ 700 Convention Center Drive Miami Beach, FL 33139 Via Fax: 305-673-7028 Re: Design Fees, Collins Park Dear Jorge: I am in receipt of your fax dated April 26. 2000 regarding outstanding fee discussions on our project. As you know, we have spent considerable effort and made significant concessions already regarding our fees. and request that you seek Council approval for the revised fees as we have submitted them. I will summarize each of the outstanding fee cliscussir::!1? ~s !o whtO're we current STand: 1. LibralY Redesign Fee: Our original fee proposal to you for the work needed to redesign parts of our building to accommodate the proposed project by Ron Bloomberg was for $87.500.00. Borrelli and Associates gave a detailed breakdown of the actual estimated time required to do the work. eMB responded with a reduction in the fee to $59.220. based on marking down the expected number of hours for each task. With all due deference to the City. we feel that our consultants are ill the best position at this pomt to understand in detail what is necessary to wmplete the reviSIOns. Nonetheless. we agreed to reduce our proposal to $76.640. a deductIOn to $10.360. from our original proposal. 2. Collins Park Master Plan Fee: Our original proposal to you for work at Collins Park. based on an hourly breakdown of the Scope as we understand it for the entire park (both blocks) was $160.160.00. The City offered a fee of 10% at the construction cost for the project. which for the entire project would be $136,900.00 based on an overall project budget of $1,369,000.00. Please note that we have agreed in principal that estimated reimbursable expenses in the amount of$14.000.00 are not included in this fee. lfthe work is done separately for each of the two blocks, additional time. and therefore t~~, is :eq~:!"~c. Thi~ is d~.le to the f~ct !h~t :J. l~rge t:::l:-+ of the t.:ast of the pr~je':t :s the time necessary to meet with the many groups with an interest in the Park. and to prepare documents for the many agencies that will need to review and approve the plans. This commitment of time does not diminish significantly if we were to design only one block, instead of both. As we stated in our letter to you on April 14, we anticipate an additional cost of $34,350.00 would be needed to complete both phases if done independently. For the west portion only, we would prorate that fee, so that the fee for the west block only would be $99,200.00 + [(99,200/136,900) x 34,350.00] = $124,090.00, plus approximately $10,000.00 in reimbursable expenses. A Limited Liability Partnership Robert A.M. Stern Architects "IoU West j4th ~treet, New York, NY 10001 lei 21L ';)0/ )lUU t'ax LIL ';JO! ))00 Jorge Chartrand Re: Design Fees, Collins Park April 28, 2000 Page 2 3. Streetscape Phase II Fee We will complete Bid Negotiation and Construction Administration Fee Phase II of the Streetscape project, for the $9.000 you have suggested, but will not include any reimbursable expenses from other phases within this project, as had previously been requested by CMB. We are attaching our own fee analysis for the project, indicating that a fee of $23,370.00 would be appropriate for the scope as we understand it. Ple;,;~e call me to discuss this matter furtr.er. Sincerely, (~c;L Alexander P. Lamis, AlA Partner APLlbjg cc: Robert A.M. Stem Rob Buford Dawn Handler Jaime Borrelli, B+A Mayra Diaz-Buttacavoli, CMB N,\2000gncr\04-00\ClnsPrkDesignFeesA28.wpd A Limited Liability Parrnership CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER ORIVE MIAMI BEACH, FLORIOA 33139 COMMISSION MEMORANDUM NO. .9.-C;- cg -c:o TO: Mayor Neisen O. Kasdin and DA TE: June 7, 2000 Members of the City Commission Lawrence A. Levy G~ City Managey A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING THE FUNDS FOR AND APPROVING AMENDMENT NO.3, IN THE AMOUNT OF $134,090, TO THE ARCHITECTURAL AND ENGINEERING DESIGN AGREEMENT WITH ROBERT A. M. STERN ARCHITECTS, FOR THE CULTURAL CAMPUSIREGIONAL LIBRARY PROJECT, FOR ADDITIONAL SERVICES TO COMPLETE THE DESIGN AND PERFORM CONSTRUCTION ADMINISTRA TION ON THE COLLINS PARK PORTION OF THE PREVIOUSLY APPROVED MASTER PLAN. FROM: SUBJECT: ADMINISTRA TION RECOMMENDATION: Adopt the Resolution. FUNDING: Funding will be provided by the City Center Redevelopment Agency (RDA) and reimbursed from the General Obligation Bond Fund for the Streetscape when it becomes available. ANAL YSIS: On September 23, 1998, the Mayor and City Commission adopted Resolution No. 98-22904, authorizing the Mayor and City Clerk to execute an agreement with the firm of Robert A. M. Stem Architects (Stem) for the architectural and engineering design of a Regional Library, a 400-space Parking Garage and a Master Plan for Park and Streetscape Improvements in the area surrounding Collins Park. On November 2, 1999, the voters of Miami Beach approved the issuance of approximately $92 million in General Obligation (GO) Bonds. The proposed and recommended improvements included $1,800,000 for a complete renovation of Collins Park, and for the Streetscape surrounding the AGENDA ITEM C-/L ro-,-n~ DATE Cultural Campus, which includes the Regional Library, the Bass Museum and the Miami City Ballet building. The Administration is now requesting approval of Amendment No.3, in the amount of $134,090, to the agreement with Stem, and appropriation of the funding, for the implementation of the Master Plan of the area previously approved by the Administration and the City Commission. The scope of work includes the complete redesign of the Collins Park area West of Collins A venue, including construction documents and construction administration for new landscape, irrigation, pathways, a decorative fountain, grading, utilities, and existing monument relocation. The fee also includes a not to exceed amount of $10,000 for reimbursable expenses. The design of the area East of Collins Park is not included in this amendment. It will be presented at a later date when further information on the overall parking needs of the area is available and decisions are made on the location of a parking garage in the vicinity. It is recommended that the Mayor and City Commission adopt the resolution approving Amendment No.3, in the amount of $134,090, to the Stem agreement, and appropriate the funds, for the design of the West portion of Collins Park as proposed in the Master Plan previously approved. Funds will be provided by the Redevelopment Agency to be reimbursed from the General Obligation Bond Fund for Collins Park whe it becomes available. ~ Attachments Amendment No.3, dated June 7 ,2000, to Standard Form of Agreement between Owner and Architect 1997 Edition (AlA 8141-1997) between Owner, The City of Miami Beach, and Architect, Robert A.M. Stern Architects; In accordance with the Agreement, dated as of January 16, 1999 The Owner has made the following revisions to the description of the Project: The fees for additional services for the design of the Portion of Collins Park to the west of Collins Avenue, in Miami Beach shall be based on the following scope of services: Design Phase: Project Management, Consultant Coordination, Obtaining City Approvals, Preliminary Site Plans, (including Layout and Materials, Planting, Site Grading, Irrigation, Special Site Features), Preliminary Estimate of Probable Construction Cost, Outline Specifications, Project Meetings, Assembly and Production of Presentation Materials for City Design Review and Approval. Construction Documents: Project Management, Consultant Coordination, Project Meetings, Final Plans and Details, (including Layout and Materials. Planting, Site Grading and Drainage, Irrigation, Lighting/Electrical, Special Site Features), Final Estimate of Probable Construction Cost, Final Specifications, Assembly and Distribution of Final Construction Documents. Bid and Contract Negotiation: Attend Pre-Bid Conference, Respond to Bidders' Inquiries/Prepare Addenda, Prepare Conformed Construction Documents. Construction Administration: Shop Drawing/Submittal Reviews and Approvals, R.F.I. Responses, Preconstruction Conference, Site Visits, (including Substantial and Final Completion Inspections). Change Order Preparation, Evaluation of Pay Requests. Field Review. The following adjustment shall be made in the Architect's compensation: The Architect's compensation for Basic Architectural/Engineering Services for the Project shall be increased by $134,090.00, based on the above scope of services. All other provisions ofthe Agreement shall remain in full force and effect. This Amendment entered into as of the day and year first written above. Owner-Architect Agreement Standard Addendum, miamaddlserv3.wpd Pagel June 12, 2000 Owner By: Ne;"n Ka'd;n,w." JL4lLVlf P (wl~--/ Robert Parcher, City Clerk Owner-Architect Agreement Standard Addendum, miamaddlserv3.wpd Architect By: ~ Alex Lamis, Partner Ie: 1M y F i I cslm iacontramcndmcntslm iamaddl scrv 3. wpd APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION 1JI1!!f-- ~~~oJ Page2 June 12.2000