Loading...
98-22756 RESO RESOLUTION NO. 98-22756 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE FIRST AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND URBAN RESOURCE GROUP (URG) FOR ARCHITECTURAL/ENGINEERING SERVICES FOR THE VENETIAN CAUSEWAY MASTER PLAN, IN AN AMOUNT NOT TO EXCEED $130,000, FOR LAND SURVEYING SERVICES; AND AUTHORIZING AN INCREASE IN THE APPROPRIATION TO WORK ORDER 2127 FROM THE WATER AND SEWER ENTERPRISE FUND WHEREAS, pursuant to RFLI No. 40-95/96 for Professional Landscape Architectural! Engineering Services for Master Planning for the Venetian Causeway and Perimeter Roads, on November 20, 1996, the Mayor and City Commission authorized the execution of an Agreement with Urban Resource Group (URG), as the top ranked proposer, in the initial amount of $101,500, for the preparation of a Master Plan for improvements on the Venetian Causeway and perimeter roads (Agreement); and WHEREAS, the Agreement also provides for the preparation of construction documents upon completion of the Master Plan; and WHEREAS, the Master Plan has been completed and a survey of the project area is required as an initial step in preparing the construction documents; and WHEREAS, the cost for performing the survey is an amount not to exceed $130,000; and WHEREAS, funding, in the amount of $130,000 is available from the Water and Sewer Enterprise Fund to be reimbursed by future storm water bonds, future water and sewer bonds and other sources. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Clerk are herein authorized to execute the attached First Amendment to the Agreement between the City of Miami Beach and Urban Resource Group (URG) for Architectural!Engineering Services for the Venetian Causeway Master Plan, in an amount not to exceed $130,000, for land surveying services; and that an increase in the appropriation to Work Order 2127, from the Water and Sewer Enterprise Fund, is also herein authorized. Passed and adopted this 3rd day of June ~fl ,1998. Mayor APPROVED AS TO FORM & lANGUAGE & FOR EXECUTION ATTEST: jkr Pt1A~ City Clerk F\WORK\$ALLIKASL YNlAGENDA \ VENSURRES f4~.!-. ~ ~ITY OF MIAMI BEACH :ITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 ttp:\\cLmiami-beach. fl. us COMMISSION MEMORANDUM NO. ~ TO: Mayor Neisen O. Kasdin and Members of the City Co DATE: June 3, 1998 FROM: Sergio Rodriguez City Manager SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, AUTHORIZING AN AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND URBAN RESOURCE GROUP (URG) FOR ARCHITECTURAL/ ENGINEERING SERVICES FOR THE VENETIAN CAUSEWAY MASTER PLAN, IN AN AMOUNT NOT TO EXCEED $130,000, FOR LAND SURVEYING SERVICES AND AUTHORIZING AN INCREASE IN THE APPROPRIATION TO WORK ORDER 2127 FROM THE WATER AND SEWER ENTERPRISE FUND ADMINISTRATION RECOMMENDATION: Adopt the Resolution. BACKGROUND: On November 20, 1996, the City Commission authorized the execution of an agreement with Urban Resource Group (URG) for the preparation of a master plan for improvements on the Venetian Causeway and perimeter roads. Following several neighborhood workshop meetings with residents of the islands, URG has developed a master plan for recommended improvements on the Venetian Causeway and perimeter roads. The improvements contained in the master plan include reconfiguration and reconstruction of the roadway, rehabilitation and upgrades to the water, sanitary sewer and storm drainage systems and beautification elements such as paving and landscaping along the causeway and perimeter roads. As part of this effort, the electric, telephone and cable companies have prepared engineering cost estimates for the underground conversion of existing overhead distribution facilities. The master plan was presented to the Finance and Citywide Projects Committee on April 7, 1998. The committee recommended that the City proceed with the.survey for the project. The committee's report was accepted by the City Commission at the April 15, 1998 commission meeting. Additionally, this project is included in the Capital Improvements Program (CIP). Approval of the project and funding will be addressed when the City Commission takes action in relation to individual projects in the CJP. AGENDA ITEM C.ltJ Ip- 3-qa DATE Commission Memorandum - June 3, 1998 URG Contract -Venetian Causeway Survey Page 2 The proposed improvements are recommended to be implemented in two phases. Phase I addresses improvements to the Venetian Causeway and is recommended to be constructed while the western entrance of the causeway is closed and the west bascule bridge is under construction. The total estimated cost for Phase I can be up to $8 million. Phase II addresses improvements on Belle Isle, Rivo Alto, DiLido and San Marco Islands and the total estimated cost for this phase of the project can be up to $23 million. The City is pursuing funding from the Metropolitan Planning Organization and other sources to help pay for the causeway improvements. ANAL YSIS: The survey is required as the initial step in proceeding with the preparation of construction documents. The survey will encompass the entire project area and includes the causeway as well as the islands. The cost to perform the survey is an amount not to exceed $130,000. Funding is available from the Water and Sewer Enterprise Fund and will be reimbursed by future stormwater bonds, future water and sewer bonds and other sources, including funding from Miami-Dade County for this project. CONCLUSION: Approval of the Resolution will allow for the survey for the project area which is needed in order to develop construction documents. ~~~~,:,~t;^,~""W';U' AMENDMENT No.1 TO AGREEMENT BETWEEN CITY OF MIAMI BEACH AND URBAN RESOURCE GROUP (URG) FOR ARCHITECTURAL/ENGINEERING SERVICES FOR THE VENETIAN CAUSEWAY MASTER PLAN This First Amendment, dated as of :J U "'8 3 (l/), 1998, to that certain Agreement, dated February 13, 1997, by and between the City of Miami Beach, Florida (City) and Urban Resource Group (Consultant) (Agreement). WHEREAS, the Agreement provides for the preparation of a Master Plan for improvements on the Venetian Causeway and perimeter roads; and WHEREAS, the Agreement also provides for the preparation of construction documents upon completion of the Master Plan; and WHEREAS, the Master Plan has been completed and a survey of the project area is required as an initial step in preparing construction documents; and 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this First Amendment. 2. MODIFICATIONS The Agreement is amended as follows: a. Exhibit "A," entitled Scope of Services/Compensation, is amended to add the following at the end of Exhibit "A": Field Survey The Consultant will coordinate with the City of Miami Beach to obtain available survey information. The Consultant will place and locate up to twelve aerial targets within the proiect area. Targets will be placed as required by Southern Resources Mapping. Inc. for their use in providing Raster aerial imagery. Actual aerial photography will be submitted and negotiated within the construction documentation phase. Baseline/center line - The FDOT's baseline will be re-established along the Venetian Causeway (approx. 6400') from the east end of San Marco Island (approx. sta 92+00) to the east end of Belle Island (approx. sta 156+00). Ground control for the four islands: San Marino. Di Lido. Rivo Alto and Belle Islands. will be established by running a traverse around each island. Permanent ground control points (40) will be established for each traverse for later recovery and use by the contractor during the construction of the project. A centerline of construction for each roadway (approx. 19.500') will be calculated. Bench Levels - A bench level run will be made through the four islands and sixteen permanent bench marks will be established within the limits of the project. These bench marks will be established outside the limits of construction. were possible. and will be referenced to the proposed center line of construction by station and offset. Roadway Cross Sections - Existing roadway cross sections will be taken at 100' intervals for roadways on all four islands as well as the FDOT baseline of survey. Three cross sections. at locations as determined by the engineer. will be taken on each of the five spoil islands located within the limits of the project. Supplemental elevations will be obtained at the right of way line along the approximate centerline of each driveway and at 5 feet into accessible driveways on private property Drainage Survey - The location. size. rim and invert elevations will be obtained for accessible drainage structures. side drains. cross drains and out falls within the project limits. Utilities - The Horizontal location on the above ground features associated with the existing underground utilities will be located. This would include valves. meter boxes. manholes. utility poles and splice boxes. Underground information would be limited to obtaining invert elevations on the existing gravity flow sewer system. All survey work will be performed using Miami Beach Datum. All finalized digital survey information shall be delivered to the City in a format that will enable this information to be automatically loaded into the City's Geographic Information System. Compensation for Field Survey services shall be a lump sum amount of one hundred and thirty thousand dollars ($130.000). b. Exhibit "B," entitled Time of Completion, is amended to add the following at the end of Exhibit "B": The Survey shall be delivered within 120 (one hundred and twenty) working days from Notice to Proceed. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended, as modified by this First Amendment. IN WITNESS WHEREOF, the parties hereto have caused this First Amendment to be executed in their names by their duly authoriz officials as of the date first set forth above. ATTEST: -~y~ City Clerk, Robert Parcher ..v-- APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION 111.~ I Ai1orn€f' '~~ SEAL CONSULTANT: URBAN RESOURCE GROUP. Byj~~ ATTEST: CORPORATE SEAL ~"".... 1": R~f't, R-p~ ~~~ Print Name and Title