This letter is to provide you with an update on the Concurrency Management SystermFu~s
and Expenditures to date. g ~
FROM:
Jorge M. Gonzalez, City Manager. ~ ~
December 15, 2006 0
DATE:
The Miami Beach Concurrency Management System is a mechanism used to measure the
impact of proposed development, redevelopment, or use intensification projects on public
services, including transportation. A project is considered to satisfy transportation
concurrency requirements when the traffic generated by such project does not exceed the
City adopted Level of Service (LOS) for the entire City roadway system.
In order to promote infill development or redevelopment within selected portions of urban
areas in a manner that supports the provision of more efficient mobility alternatives, including
public transit, the City created Transportation Concurrency Management Areas (TCMAs)
and Transportation Area Zones (TAZs) in accordance with Florida law. The TCMAs and
T AZs were made part of the City's Concurrency Management System Program.
When a determination is made that the required public facility such as the transportation
capacity will not be available to support the proposed development or redevelopment within
the T AZ or TCMA, the developer may propose to provide the additional transportation
capacity to support the development or to secure a positive concurrency determination by
paying a concurrency mitigation fee.
A schedule of concurrency mitigation fees and methodology used to arrive at these fees was
approved by City Commission under Resolution # 2000-23874. Two different fee schedules
were adopted, as follows:
~
1. Concurrency Statement Fees (administrative fees), which are funding the operation,
maintenance, and update of the Automated Concurrency System and MMP, along
with the salaries of added staff for the Transportation / Concurrency Division.
2. Transportation Concurrency Mitigation Fees, which are divided into three (3)
Transportation Concurrency Management Areas (TCMAs) - North, Middle, and
South Beach TCMAs. Mitigation fees are calculated based on additional trips
generated by the development/redevelopment project. The cost per trip was
developed based the cost of the projects specified in the original Municipal Mobility
Plan. The total cost for projects for each geographic area was then divided by the
anticipated number of trips to be generated from future development to arrive at a
cost per trip for each geographic area. This was then applied to each development
that added trips to the network. Each geographic area of the City has a specific cost
per trip as follows:
~
c;::)
C)
c:r-
o
,."
n
;0
ill
(")
iTl~
-
-<
m
o
North Beach
Middle Beach
South Beach
$1,841.54
$2,783.30
$2,015.16
Concurrency mitigation fees are deposited in specific accounts for each geographic area
and subsequently appropriated by Resolution of the City Commission for the implementation
of specific projects.
As an element of the concurrency mitigation program the City developed the Municipal
Mobility Plan (MMP). The MMP provides a bank of transportation capacity enhancement
projects throughout the different geographic areas of Miami Beach. Concurrency mitigation
funds are used to fully fund or partially fund MMP approved projects. Sixteen MMP projects
have been completed at a cost of $21,761,169, which constitutes 45% of the entire bank of
projects. (See Exhibit A)
In addition the City is formally engaged in two Master Plan studies -- the Coastal
Communities Transportation Master Plan (CCTMP) and the Coastal Communities Transit
Study (CCTS). The former analyzes traffic patterns and is geared to provide solutions to the
current traffic and transportation challenges impacting the barrier islands. The latter, on the
other hand a joint venture between the City and Miami Dade Transit, evaluates travel
patterns of transit users, with the intent to consolidate routes and achieve overall system
efficiency. Both plans will produce short, mid, and long term solutions to transportation and
mass transit issues within the coastal communities and both are anticipated to generate a
new bank of projects.
From program inception to date the Concurrency Management System has collected
$8,296,772.94 in mitigation funds. The expenditures to date total $3,748,036.00 resulting in
a net available balance of $4,548,736.94 (Exhibit B). More specifically net available fund
balances by area are as follows:
Collected Expenditures Balance
North 967,738.10 13,844.00 953,894.10
Middle 1,946,379.64 62,000.00 1,884,379.64
South 5,382,655.20 2,857,288.00 2,525,367.20
Subtotal 8,296,772.94 2,933,132.00 5,363,640.94
CityWide 814,904.00
Total 8,296,772.94 3,748,036.00 4,548,736.94
Total Mitigation Funds Collected
Total Expenditures
Net Available Mitiaation Funds
8,296,772.94
3.748.036.00
4,548,736.94
Most of the mitigation funds have been allocated to support transit related projects and or
operations. From 2000 to 2005, the Concurrency Mitigation funds were used to fund
Electrowave operational expenditures, for a total amount of $1,469,905. Since 2005,
mitigation funds have been allocated to partially fund the operational expenditures of the
South Beach Local, for a total amount of $900,914.
Other funds that have been funding transit initiatives along with Concurrency Mitigation
funds are People's Transportation Plan (PTP) and Federal funds.
Please feel free to contact me if you have any questions or concerns.
~/vm
F:\work\$ALL\(1) EMPLOYEE FOLDERS\LUCY LLOPIS\L TC\L TC concurrency funds.doc
COMPLETED
MMP Agency in Estimated
Proi. # Proiect Charqe Proiect Status Proiect Cost
3 Harding Avenue Safety Project. 88th-75th Strs. FDOT Construction underway, to be completed in 1,461,477
Januarv 2006
4 Biscayne Elem. School Circulation Safety CITY Project completed by PW in 2000. 158.000
Imorovs.
5 Indian Crk/71 st SUDickens Intersect.lmprovs. FOOT Improvements completed by FDOT in 2000. 128,421
13 La Gorce/Pine Tree Traffic Calming COUNTY Project completed in 2000 with RIF & City 1,860.000
funds
14 Alton Road Improvements, 63rd to 43rd Strs. FDOT Proiect comoleted in March 2005 3.786,229
19 43rd St./Alton Road Intersection Improvements FDOT Project completed in 2001 604,499
21 Indian Ck.Dr.l41st St Intersection Improvements CITY Dual left-turn was implemented in 2001 68,500
23 41 st Street Streetscape/Pedestrian Crossings CITY Project completed in 2000 2.500.000
24 Alton Road Improvements. 41 st St. to Michigan FDOT Project completed in March 2005 2,666,616
27 Meridian/Dade Bridge and Intersection Improvs. FDOT Bridge replaced / project completed in 1999 3.366,652
28 Alton Rd at 20th & Sunset Dr. Intersection COUNTY Completed in 2002 with RIF funds 182.000
Imnrovements
29 Alton Rd/Dade Blvd. Intersect.lmprovs/Left-turn COUNTY Completed in July 2004 with RIF funds 121.500
31 17th SUAlton Rd. Intersection Improvements CITY Completed in 2002 w/Concurrency Mitigation 98.000
funds
37 Washington Ave. Improvements/Enhancmts. CITY Project completed in 2006 12.169.888
38 Alton Road at 5th Street Intersection Improvs, CITY Project completed in 2005 by developer per
westbound dual left turns) development aqreement.
41 SB Atlantic Greenwav (Beachwalk-Phase I) CITY Proiect completed in April 2005. 4.500,000
43 Ocean Drive Operational Improvements CITY Proiect completed in 2004 259,275
Sub-total 33,931.057
CONSTRUCTION
MMP Agency in Estimated
Proi. # Project Charge Project Status Project Cost
Ili1a1an CreeK Drive CapaCity linprovemimts from - .- .~=-... >
7 63rd Street to 68th Street FDOT Combined with Project # 11 below. TBD
10 NBRC/Atlantic Greenway (beach bike/ped CITY In approval process with Florida Department 4.126,000
facility) from 75th Street to 64th Street of Transportation to begin construction
Flyover demolition completed. The Indian
63rd St.at Indian Creek At-Grade Improvements. Creek Drive Improvements and 63rd Street
11 63rd-68th Street Resurfacing. plus 63rd Street FDOT Bridge Rehabilitation are under construction 14.700.000
Bridge Rehabilitation by FDOT. These projects are planned to be
finished on June 19, 2007.
42 South Pointe Streetscape/Pedestrian Access CITY Phase I completed; Phase II at 60% Design; 23,000.000 '
(CIP Project) Phases 111. IV.V in Planning (June 05-0ct 06)
~-,..
Sub-total 41.826,000
DESIGN
MMP Agency in Estimated
Prof. # Project Charoe Proiect Status Proiect Cost
North Shore Neighborhood ROW Improvements Design-build contract on-going. Design
2 Traffic Calming (CIP) CITY phase: Aug.2005 thru Jan.2007. Currently 12,229.972
desiqn at 60%
17 Nautilus Neighborhood Calming (CIP) CITY Design-build documents at 30%. Contract 29.821,647
under neqotiation, final cost pendinq.
26 Dade Blvd at 23rd Street Bridge & Intersection COUNTY Design is at 60% 3,600.000
Alignment (Utilizing RIF District 8 funds)
35 Flaminoo Neiqhborhood Calmino/Enhancs CITY 90% Desiqn plans. 86,269.130
33 16th Street Operationallmprovs/Enhancs. CITY Final report under review. In negotiations for 8.000,000
desiqn project
Collins 5th-15th Streets project. presently at
36 Collins Ave Milling & Resurfacing CITY 30% design. Proj.is 100% funded by FDOT in 2,721.695
2010-11
Sub.total 142.642,444
PLANNING
MMP Agency in Estimated
Proi. # Proiect Charae Proiect Status Proiect Cost
Planning, Design and Engineering (PD&E)
FDOT/ 2007-09, construction 2010. The FDOT
6 Normandy Dr/71st St. Milling & Resurfacing CITY project includes only road milling & 2,000,000
resurfacing. Liveable Comm. study
comoleted by FDOT at City reouest.
Planning conceptual schematics were
25 Indian Creek Trail/ Greenway (CIPl CITY completed for a pilot project from 23rd to 26th TBD
Streets. Design or construction funding is not
available
Kimley-Horn has been engaged for the
Planning, Design and Engineering 2007-
34 Alton Road Reconstruction, 5th St-Michigan FDOT 2009. New geotechnical report completed by 6,000,000
FDOT City selected Alternative "B"
Reconstruction. Capacity Improvements on
8th, 11th, 15th, 16th Streets are finished.
39 Bav Link Transit Corridor COUNTY Proiect on hold.
40 South Beach Transit Facilities CITY City has yet to determine/approve an 4,900,000
appropriate site for this facility
Sub-total 12,900,000
NOT STARTED
MMP Agency in Estimated
Proi.# Proiect Charae Proiect Status Pro'ect Cost
The Indian Creek Drive Improvements and
63rd Street Bridge Rehabilitation projects are
Collins Ave. Commercial Loading Regulation under construction by FDOT. Estfmated
9 Program, between 63rd Street and 72nd Street CITY completion respectively, February 2007 and TBD
June 2007. The City has provided additional
resources to enforce parking regulations and
assist with traffic management along Collins
Avenue from 63rd Street to 72nd Street
Yet unfunded for planning and design. Partly
funded for construction in 2007-08. The Eden
Roc and the Fontainebleau Hotels have
Middle Beach Atlantic Grenwy (beach bike/ped.) agreed to replace the existing boardwalk with
15 from 64th Street to 44th Street (20 blocks) CITY at-grade beachwalk behind their properties. 5.500,000
The City will also enter into an agreement
with the Eden Roc for the construction of a
beachwalk behind the City parking lot at 46th
Street
16 47th Str. OperationallmprovmtsJ Traffic CITY Yet to be funded by City. TBD
Calming
Includes land acquisition, seawall
30 West Avel17 StIOade Intersect. Reconfiguration CITY construction. and new bridge over Collins 4,500,000
Canal.
Miami Beach (CIP)/Miami/County have
32 Venetian Cswy Bike/Ped/GreenwaylEnhancs. CITY entered into an agrement for MDC to 2,800,000
implement project
Sub-total 12,800,000
EXHIBIT B
Below is the information requested as of September 30, 2006.
Funds that have been collected by TCMA's are as follows.
Mitigation Administrative Parks/Rec
North $ 967,738.10 $ 51,935.00 $ 80,329.25
Middle $1,946,379.64 $ 38,400.00 $ 51,546.06
South $5,382,655.20 $252,283.00 $150,934.25
Total $8,296,772.94 $342,618.00 $282,809.56
Funds that have been collected by calendar year are as follows.
Calendar Year Mitigation Administrative Parks/Rec
2000 $ 858,685.39 N/A N/A
2001 $1,102,665.60 $ 16,714 .54 $ 375.00
2002 $1,243,996.57 $ 88,845.00 $ 16,290.00
2003 $1,939,290.01 $ 91,985.00 $ 45,798.81
2004 $ 746,963.01 $ 49,315.00 $ 31,497.50
2005 $1,029,986.13 $ 49,763.46 $ 66,058.56
2006 $1,375,186.23 $ 45,995.00 $ 122,789.69
Total $8,296,772.94 $342,618.00 $282,809.56
Funds that have been spent/appropriated by Commission approval are as
follows
North
Middle
South
All 3 TCMA's
$ 13,844.00
$ 62,000.00
$2,857,288.00
$ 814,904.00
Total Expenditures
$3,748,036.00
Total Mitigation Funds Collected
Total Expenditures
$8,296,772.94
$3,748,036.00
Net Available Mitigation Funds:
$4,548,736.94