Loading...
LTC 313-2006 Status of Concurrency Management Funds lD MIAMI BEACH OFFICE OF THE CITY MANAGER NO. LTC # 313-2006 LETTER TO COMMISSION TO: Mayor David Dermer and Members of the City Commission C") -I -< C") r- rr-, __ ~ \Q, SUBJECT: Status of Concurrency Management Funds v> -,,' a ~. ." - This letter is to provide you with an update on the Concurrency Management SystermFu~s and Expenditures to date. g ~ FROM: Jorge M. Gonzalez, City Manager. ~ ~ December 15, 2006 0 DATE: The Miami Beach Concurrency Management System is a mechanism used to measure the impact of proposed development, redevelopment, or use intensification projects on public services, including transportation. A project is considered to satisfy transportation concurrency requirements when the traffic generated by such project does not exceed the City adopted Level of Service (LOS) for the entire City roadway system. In order to promote infill development or redevelopment within selected portions of urban areas in a manner that supports the provision of more efficient mobility alternatives, including public transit, the City created Transportation Concurrency Management Areas (TCMAs) and Transportation Area Zones (TAZs) in accordance with Florida law. The TCMAs and T AZs were made part of the City's Concurrency Management System Program. When a determination is made that the required public facility such as the transportation capacity will not be available to support the proposed development or redevelopment within the T AZ or TCMA, the developer may propose to provide the additional transportation capacity to support the development or to secure a positive concurrency determination by paying a concurrency mitigation fee. A schedule of concurrency mitigation fees and methodology used to arrive at these fees was approved by City Commission under Resolution # 2000-23874. Two different fee schedules were adopted, as follows: ~ 1. Concurrency Statement Fees (administrative fees), which are funding the operation, maintenance, and update of the Automated Concurrency System and MMP, along with the salaries of added staff for the Transportation / Concurrency Division. 2. Transportation Concurrency Mitigation Fees, which are divided into three (3) Transportation Concurrency Management Areas (TCMAs) - North, Middle, and South Beach TCMAs. Mitigation fees are calculated based on additional trips generated by the development/redevelopment project. The cost per trip was developed based the cost of the projects specified in the original Municipal Mobility Plan. The total cost for projects for each geographic area was then divided by the anticipated number of trips to be generated from future development to arrive at a cost per trip for each geographic area. This was then applied to each development that added trips to the network. Each geographic area of the City has a specific cost per trip as follows: ~ c;::) C) c:r- o ,." n ;0 ill (") iTl~ - -< m o North Beach Middle Beach South Beach $1,841.54 $2,783.30 $2,015.16 Concurrency mitigation fees are deposited in specific accounts for each geographic area and subsequently appropriated by Resolution of the City Commission for the implementation of specific projects. As an element of the concurrency mitigation program the City developed the Municipal Mobility Plan (MMP). The MMP provides a bank of transportation capacity enhancement projects throughout the different geographic areas of Miami Beach. Concurrency mitigation funds are used to fully fund or partially fund MMP approved projects. Sixteen MMP projects have been completed at a cost of $21,761,169, which constitutes 45% of the entire bank of projects. (See Exhibit A) In addition the City is formally engaged in two Master Plan studies -- the Coastal Communities Transportation Master Plan (CCTMP) and the Coastal Communities Transit Study (CCTS). The former analyzes traffic patterns and is geared to provide solutions to the current traffic and transportation challenges impacting the barrier islands. The latter, on the other hand a joint venture between the City and Miami Dade Transit, evaluates travel patterns of transit users, with the intent to consolidate routes and achieve overall system efficiency. Both plans will produce short, mid, and long term solutions to transportation and mass transit issues within the coastal communities and both are anticipated to generate a new bank of projects. From program inception to date the Concurrency Management System has collected $8,296,772.94 in mitigation funds. The expenditures to date total $3,748,036.00 resulting in a net available balance of $4,548,736.94 (Exhibit B). More specifically net available fund balances by area are as follows: Collected Expenditures Balance North 967,738.10 13,844.00 953,894.10 Middle 1,946,379.64 62,000.00 1,884,379.64 South 5,382,655.20 2,857,288.00 2,525,367.20 Subtotal 8,296,772.94 2,933,132.00 5,363,640.94 CityWide 814,904.00 Total 8,296,772.94 3,748,036.00 4,548,736.94 Total Mitigation Funds Collected Total Expenditures Net Available Mitiaation Funds 8,296,772.94 3.748.036.00 4,548,736.94 Most of the mitigation funds have been allocated to support transit related projects and or operations. From 2000 to 2005, the Concurrency Mitigation funds were used to fund Electrowave operational expenditures, for a total amount of $1,469,905. Since 2005, mitigation funds have been allocated to partially fund the operational expenditures of the South Beach Local, for a total amount of $900,914. Other funds that have been funding transit initiatives along with Concurrency Mitigation funds are People's Transportation Plan (PTP) and Federal funds. Please feel free to contact me if you have any questions or concerns. ~/vm F:\work\$ALL\(1) EMPLOYEE FOLDERS\LUCY LLOPIS\L TC\L TC concurrency funds.doc COMPLETED MMP Agency in Estimated Proi. # Proiect Charqe Proiect Status Proiect Cost 3 Harding Avenue Safety Project. 88th-75th Strs. FDOT Construction underway, to be completed in 1,461,477 Januarv 2006 4 Biscayne Elem. School Circulation Safety CITY Project completed by PW in 2000. 158.000 Imorovs. 5 Indian Crk/71 st SUDickens Intersect.lmprovs. FOOT Improvements completed by FDOT in 2000. 128,421 13 La Gorce/Pine Tree Traffic Calming COUNTY Project completed in 2000 with RIF & City 1,860.000 funds 14 Alton Road Improvements, 63rd to 43rd Strs. FDOT Proiect comoleted in March 2005 3.786,229 19 43rd St./Alton Road Intersection Improvements FDOT Project completed in 2001 604,499 21 Indian Ck.Dr.l41st St Intersection Improvements CITY Dual left-turn was implemented in 2001 68,500 23 41 st Street Streetscape/Pedestrian Crossings CITY Project completed in 2000 2.500.000 24 Alton Road Improvements. 41 st St. to Michigan FDOT Project completed in March 2005 2,666,616 27 Meridian/Dade Bridge and Intersection Improvs. FDOT Bridge replaced / project completed in 1999 3.366,652 28 Alton Rd at 20th & Sunset Dr. Intersection COUNTY Completed in 2002 with RIF funds 182.000 Imnrovements 29 Alton Rd/Dade Blvd. Intersect.lmprovs/Left-turn COUNTY Completed in July 2004 with RIF funds 121.500 31 17th SUAlton Rd. Intersection Improvements CITY Completed in 2002 w/Concurrency Mitigation 98.000 funds 37 Washington Ave. Improvements/Enhancmts. CITY Project completed in 2006 12.169.888 38 Alton Road at 5th Street Intersection Improvs, CITY Project completed in 2005 by developer per westbound dual left turns) development aqreement. 41 SB Atlantic Greenwav (Beachwalk-Phase I) CITY Proiect completed in April 2005. 4.500,000 43 Ocean Drive Operational Improvements CITY Proiect completed in 2004 259,275 Sub-total 33,931.057 CONSTRUCTION MMP Agency in Estimated Proi. # Project Charge Project Status Project Cost Ili1a1an CreeK Drive CapaCity linprovemimts from - .- .~=-... > 7 63rd Street to 68th Street FDOT Combined with Project # 11 below. TBD 10 NBRC/Atlantic Greenway (beach bike/ped CITY In approval process with Florida Department 4.126,000 facility) from 75th Street to 64th Street of Transportation to begin construction Flyover demolition completed. The Indian 63rd St.at Indian Creek At-Grade Improvements. Creek Drive Improvements and 63rd Street 11 63rd-68th Street Resurfacing. plus 63rd Street FDOT Bridge Rehabilitation are under construction 14.700.000 Bridge Rehabilitation by FDOT. These projects are planned to be finished on June 19, 2007. 42 South Pointe Streetscape/Pedestrian Access CITY Phase I completed; Phase II at 60% Design; 23,000.000 ' (CIP Project) Phases 111. IV.V in Planning (June 05-0ct 06) ~-,.. Sub-total 41.826,000 DESIGN MMP Agency in Estimated Prof. # Project Charoe Proiect Status Proiect Cost North Shore Neighborhood ROW Improvements Design-build contract on-going. Design 2 Traffic Calming (CIP) CITY phase: Aug.2005 thru Jan.2007. Currently 12,229.972 desiqn at 60% 17 Nautilus Neighborhood Calming (CIP) CITY Design-build documents at 30%. Contract 29.821,647 under neqotiation, final cost pendinq. 26 Dade Blvd at 23rd Street Bridge & Intersection COUNTY Design is at 60% 3,600.000 Alignment (Utilizing RIF District 8 funds) 35 Flaminoo Neiqhborhood Calmino/Enhancs CITY 90% Desiqn plans. 86,269.130 33 16th Street Operationallmprovs/Enhancs. CITY Final report under review. In negotiations for 8.000,000 desiqn project Collins 5th-15th Streets project. presently at 36 Collins Ave Milling & Resurfacing CITY 30% design. Proj.is 100% funded by FDOT in 2,721.695 2010-11 Sub.total 142.642,444 PLANNING MMP Agency in Estimated Proi. # Proiect Charae Proiect Status Proiect Cost Planning, Design and Engineering (PD&E) FDOT/ 2007-09, construction 2010. The FDOT 6 Normandy Dr/71st St. Milling & Resurfacing CITY project includes only road milling & 2,000,000 resurfacing. Liveable Comm. study comoleted by FDOT at City reouest. Planning conceptual schematics were 25 Indian Creek Trail/ Greenway (CIPl CITY completed for a pilot project from 23rd to 26th TBD Streets. Design or construction funding is not available Kimley-Horn has been engaged for the Planning, Design and Engineering 2007- 34 Alton Road Reconstruction, 5th St-Michigan FDOT 2009. New geotechnical report completed by 6,000,000 FDOT City selected Alternative "B" Reconstruction. Capacity Improvements on 8th, 11th, 15th, 16th Streets are finished. 39 Bav Link Transit Corridor COUNTY Proiect on hold. 40 South Beach Transit Facilities CITY City has yet to determine/approve an 4,900,000 appropriate site for this facility Sub-total 12,900,000 NOT STARTED MMP Agency in Estimated Proi.# Proiect Charae Proiect Status Pro'ect Cost The Indian Creek Drive Improvements and 63rd Street Bridge Rehabilitation projects are Collins Ave. Commercial Loading Regulation under construction by FDOT. Estfmated 9 Program, between 63rd Street and 72nd Street CITY completion respectively, February 2007 and TBD June 2007. The City has provided additional resources to enforce parking regulations and assist with traffic management along Collins Avenue from 63rd Street to 72nd Street Yet unfunded for planning and design. Partly funded for construction in 2007-08. The Eden Roc and the Fontainebleau Hotels have Middle Beach Atlantic Grenwy (beach bike/ped.) agreed to replace the existing boardwalk with 15 from 64th Street to 44th Street (20 blocks) CITY at-grade beachwalk behind their properties. 5.500,000 The City will also enter into an agreement with the Eden Roc for the construction of a beachwalk behind the City parking lot at 46th Street 16 47th Str. OperationallmprovmtsJ Traffic CITY Yet to be funded by City. TBD Calming Includes land acquisition, seawall 30 West Avel17 StIOade Intersect. Reconfiguration CITY construction. and new bridge over Collins 4,500,000 Canal. Miami Beach (CIP)/Miami/County have 32 Venetian Cswy Bike/Ped/GreenwaylEnhancs. CITY entered into an agrement for MDC to 2,800,000 implement project Sub-total 12,800,000 EXHIBIT B Below is the information requested as of September 30, 2006. Funds that have been collected by TCMA's are as follows. Mitigation Administrative Parks/Rec North $ 967,738.10 $ 51,935.00 $ 80,329.25 Middle $1,946,379.64 $ 38,400.00 $ 51,546.06 South $5,382,655.20 $252,283.00 $150,934.25 Total $8,296,772.94 $342,618.00 $282,809.56 Funds that have been collected by calendar year are as follows. Calendar Year Mitigation Administrative Parks/Rec 2000 $ 858,685.39 N/A N/A 2001 $1,102,665.60 $ 16,714 .54 $ 375.00 2002 $1,243,996.57 $ 88,845.00 $ 16,290.00 2003 $1,939,290.01 $ 91,985.00 $ 45,798.81 2004 $ 746,963.01 $ 49,315.00 $ 31,497.50 2005 $1,029,986.13 $ 49,763.46 $ 66,058.56 2006 $1,375,186.23 $ 45,995.00 $ 122,789.69 Total $8,296,772.94 $342,618.00 $282,809.56 Funds that have been spent/appropriated by Commission approval are as follows North Middle South All 3 TCMA's $ 13,844.00 $ 62,000.00 $2,857,288.00 $ 814,904.00 Total Expenditures $3,748,036.00 Total Mitigation Funds Collected Total Expenditures $8,296,772.94 $3,748,036.00 Net Available Mitigation Funds: $4,548,736.94