HomeMy WebLinkAboutContract for South Shore Community Center Hispanic Center HVAC Renovation
,
cf?t'b6 - / t,..2 Sf P
7/~? C7(;
,
SOUTH SHORE COMMUNITY CENTER
HISPANIC CENTER
HV AC RENOVATION
QUOTATION #V A-QT15M-006
QUOTATION DUE: NOVEMBER 16th, 2006
CITY CLERK
Brad A. Judd, Property Management Director
City of Miami Beach - Property Management Division
1245 Michigan Avenue
Miami Beach, FL 33139
QUOTE NO: V A-QTl5M-006
DATE: 11/16/06
CITY OF MIAMI BEACH
1
CQ
.
CITY OF MIAMI BEACH
1700 CONVENTION CENTER ORIVE, MIAMI BEACH, FLORIDA 33139
http:\\miamibeachfl.gov
Telephone (305) 673-7000
Facsimile (305) 673-7650
QUOTA nON NO: V A-QT15M-006
SOUTH SHORE COMMUNITY CENTER
HISPANIC CENTER, HVAC RENOVATIONS
Description: Contractor shall furnish and install three (3) chilled water fan coil units. Contractor
shall furnish and install HV AC equipment, duct work, controls, electrical, plumbing, crane, duct
smoke detector, engineering drawings and permits necessary to successfully complete the work.
Scope of Work: The Contractor shall furnish and install three chilled water fan coil units in the
second floor front offices. Contractor shall furnish the new air conditioning units, controls,
electrical, plumbing, crane, duct smoke detector, engineering drawings and permits necessary to
successfully complete the work. All work shall be completed according to Florida Building Code
and all other applicable codes, and in a manner consistent with Industries standards. Any waiver
of Permit fees shall be solely determined by the Building Department. Contractor shall verifY
tonnage and voltages. Contractor shall verifY that new units comply with outside air requirements
as outlined by ASHRAE and any other guidelines applicable to the work being performed. The
City shall not supply any current engineering drawings or heat load calculations.
Contractors submitting quotes should examine the site and all current plans and specifications
and base their quotation on existing field conditions, scope of work, and the proposed
renovations. FailUl'e to do so will not be considered justification for additional charges after
the contract is awarded.
The Contractor awarded this contract must be able to pull any/all required permits no later than
one (1) weeks after the contract is executed and approved.
The successful Contractor will be required to furnish General and Automobile Liability insurance
in the respective amounts of $1,000,000 (and include the City of Miami Beach, Florida, as
additional insured on the certificate); current Occupational License; and copy of a current State
of Florida Contractor License.
Quotations will be received until 3:00 p.m. on the November 14, 2006, at the following
address: City of Miami Beach I>roperty Management Division, 1245 Michigan Avenue,
Miami Beach, Fl. 33139.
QUOTE NO: V A-QTtSM-006
DATE: 11/16/06
CITY OF MIAMI BEACH
2
.
The City of Miami Beach reserves the right to accept any Quote deemed to be in the best interest
. of the City. The City of Miami Beach may reject any and all Quotes.
Brad A. Judd, RPA, FMA, CGC
Director, Property Management Division
QUOTE NO: V A-QTtSM-006
DATE: 11/16/06
CITY OF MIAMI BEACH
3
.
.
SOUTH SHORE COMMUNITY CENTER
HISPANIC CENTER, HVAC RENOVAnONS
QUOTAnON NO: VA-QT15M-006
1.0 GENERAL CONDlnONS
1.1 SEALED QUOTAnON:
Original copy of Quotation Form as well as any other pertinent documents must be ITtumed
in order for a Quote to be considered for award. All Quotes are subject to all conditions
specified in this Quotation document.
The completed Quotation Form must be submitted in a sealed envelope clearly marked to the
attention of: City of Miami Beach Property Management Hirectol', 1245 Michigan
Avenue, Miami Beach, Florida 33139, Quotation Forms submitted by fax (305-673-
7650) will also be accepted,
1.2 EXECUnON OF QUOTE:
Quote must contain a manual signature of an authorized representative in the space provided
on the Quotation Form. Failure to properly sign the Quotation Form shall invalidate same
and it shall NOT be considered. All Quotes must be completed in pen and ink or
typewritten. No erasures are permitted. If a correction is necessary, draw a single line
through the entered figure and enter the corrected figure above it. Corrections must be
initialed by the person signing the quote. Any illegible entries, pencil bids or corrections not
initialed will not be tabulated. The original Quote CANNOT be changed or altered in any
way. Altered Quotes will not be considered.
1.3 NO QUOTE SUBMITTED:
Ifnot submitting a quote, respond by returning the enclosed Quotation Form questiOlmaire,
and explain the reason. Repeated failure to not quote without sufficient justification may be
cause for removal of a Contractor's name from the City's quote mailing list.
1.4 PRICES QUOTED:
Deduct trade discounts and quote firm net prices. Give both unit price and extended total,
when requested. Prices must be stated in units of quantity specified in the Quotation
specifications. In case of discrepancy in computing the amount of the Quote, the UNIT
PRICE quoted will govern. All prices must be F.O.B. destination, freight prepaid (lll1less
otherwise stated in Special Conditions). Discounts for prompt payment. Award, ifmade, will
be in accordance with terms and conditions stated herein. Each item must be quoted
separately and no attempt is to be made to tie any item or items in with any other item or
items. Cash or quantity discounts offered will not be a consideration in determination of
award of Quote(s).
QUOTE NO: V A-QTlSM-006
DATE: Ilfl6/06
CITY OF MIAMI BEACH
4
1.5
TAXES:
The City of Miami Beach is exempt from all Federal excise and State taxes. State Sales Tax
and Use Certificate Number is 23-09-329871-54C.
.
1.6 MISTAKES:
Contractors submitting quotes are expected, and solely responsible for examining the
specifications, delivery schedules, quotation prices and extensions and all instmctions
pertaining to supplies and services. Failure to do so will be at the Contractor's risk.
1.7 CONDlnON AND PACKAGING:
It is understood and agreed that any item offered or shipped as a result of this Quote shall be
the latest new and current model offered (most current production model at the time of this
Quote). All containers shall be suitable for storage or shipment, and all prices shall include
standard commt~rcial packaging.
1.8 UNDERWRITERS' LABORATORIES:
Unless otherwise stipulated in the Quotation documents, all manufactured items and
fabricated assemblies shall be Underwriters Laboratories listed or re-examination listing
where such has been established by Underwriters Laboratories for the item(s) offered and
furnished.
1.9 WAIVER OR REJECTION OF QUOTAnONS:
The City of Miami Beach reserves the right to waive irregularities or technicalities in Quotes
or to reject all Quotes or any part of a Quote as it deems necessary in the best interest of the
City.
1.10 EQUlV ALENTS:
If Contractor offers makes of equipment or brands of supplies other than those specitied in
the Quotations Documents, he must so indicate in its Quote. Specific article(s) of
equipment/supplies shall conform in quality, design and construction with all published
claims of the manufacturer.
Brand Names: Catalog numbers, manufacturers' and brand names, when listed, are
informational guides as to a standard of acceptable product quality level only and should not
be construed as an endorsement or a product limitation of recognized and legitimate
manufacturers. Contractors shall formally substantiate and verify that product(s) offered
conform with or exceed quality as listed in the specifications.
Contractor shall indicate on the Quotation Form the manufacturer's name and number; if
quoting other than the specified brands, and shall indicate ANY deviation from the Quotation
specifications as listed. Other than specified items offered requires complete descriptive
technical literature marked to indicate detail(s) conformance with sp(,cifications and MUST
BE INCLUDED WITH THE QUOTE. NO QUOTES WILL BE CONSIDERED
WITHOUT THIS DATA,
Lacking any written indication of intent to quote an alternate brand or model number, the
Quote will be considered as having included and taken into account compliance with the
QUOTE NO: V A-QTlSM-006
DATE: 11/16/06
CITY OF MIAMI BEACH
5
,
specifications as listed in the Quotation documents.
.
1.11 NON-CONFORMANCE TO CONTRACT CONDITIONS:
Items may be tested for compliance with specifications. Items delivered, not conforming to
specifications may be rejected and returned at Contractor's expense. Those items not
delivered as per delivery date in Quote may be purchased on the open market. Any increase
in cost may be charged against the Contractor. Any violation ofthese stipulations may also
result in Contractor's name being removed from the City's vendor list.
1.12 SAMPLES:
Samples of items, when required, must be furnished at Contractor's sole cost and expense.
Contractors will be responsible for the removal of all samples furnished within thirty (30)
days after Quote opening. All samples will be disposed of after thirty (30) days. Each
individual sample must be labeled with Contractor's name. Failure of Contractor to either
deliver required samples or to clearly identifY samples may be reason for rejection of the
Quote. Unless otherwise indicated, samples should be delivered to the attention of: City of
Miami Beach Property Management Director, 1245 Michigan Avenue, Miami Beach,
Florida 33139,
1.13 DELIVERY:
Unless actual date of delivery is specified (or if specified delivery cannot be met), show
number of days (in calendar days) required to make delivery after receipt of purchase order,
in space provided. Delivery time may become a basis for making an award. Delivery shall
be within the normal working hours of the City, Monday through Friday, excluding holidays.
1.14 AWARDS:
When deemed to be in the best interest of the City of Miami Beach, the City reserves the
right to reject all Quotes or any portion of any Quote as it deems necessary; to accept any
item or group of items unless qualified by the Contractor; to acquire additional quantities at
prices quoted on the Quotation Form unless additional quantities are not acceptable, in which
case the Quotation Form must be noted "QUOTE IS FOR SPECIFIED QUANTITY ONLY".
1.15 INSPECTION, ACCEPTANCE & TITLE:
Inspection and acceptance will be at destination unless otherwise provided. Title to/or risk of
loss or damage to all items shall be the responsibility of the Contractor until acceptance by
the City unless loss or damage resulting from the sole negligence by the City. If the materials
or services supplied to the City are found to be defective or not conform to Quotation
specifications, the City reserves the right to cancel the order upon written notice to the
Contractor and return product at Contractor's expense.
1.16 PAYMENT:
Payment will be made by the City after the items have been received, inspected, and fowld to
comply with Quote specifications, free of damage or defect and properly invoiced.
1.17 DISPUTES:
In case of any doubt or difference of opinion as to the items to be furnished hereunder, the
QUOTE NO: V A-QTlSM-006
DATE: 1lf16/06
CITY OF MIAMI BEACH
6
. decision of the City shall be final and binding on all parties.
1.18 LEGAL REQUIREMENTS:
Federal, State, County and City laws, ordinances, rules and regulations that in any manner
affect the items covered herein apply. Lack of knowledge by the Contractor will in no way
be a cause for relief from responsibility.
1.19 PATENTS & ROYALTIES:
The Contractor, without exception, shall indemnifY and save harmless the City of Miami
Beach, Florida, its officers, employees, agent, and contractors, from liability of any nature or
kind, including, without limitation, cost and expenses for, or on account of, any copyrighted,
patented, or unpatented invention, process, or article manufactured or used in the
performance of the Contract, including its use by the City of Miami Beach, Florida. If the
Contractor uses any design, device or materials covered by letters, patent, or copyright, it is
mutually understood and agreed, without exception, that the Quote price shall include all
royalties or cost arising from the use of such design, device, or materials in any way involved
in the work.
1.20 OSHA:
The Contractor warrants that the products supplied to the City shall conform in all respects to
the standards se:t forth in the Occupational Safety and Health Act (OSHA) of 1970, as
amended, and the failure to comply with this condition will be considered as a breach of
contract. Any fines levied because of inadequacies to comply with these requirements shall
be borne solely by the Contractor.
1.21 SPECIAL CONDITIONS:
Any and all Special Conditions that may vary from the General Conditions of this Quotation
shall take precedence.
1.22 ANTI-DISCRIMINATION:
Contractor certifies that he/she is in compliance with the non-discrimination clause contained
in Section 202, Executive Order 11246, as amended by Executive Order 11375, relative to
equal employment opportunity for all persons without regard to race, color, religion, sex or
national origin.
1.23 AMERICAN WITH DISABILITIES ACT:
Call (305) 673-7490NOICE to request material in accessible format; sign language
interpreters (five days in advance when possible), or information on access for persons with
disabilities. For more information on ADA compliance please call the Heidi Johnson Wright
at the Public Works Department at (305)673-7080.
1.24 QUALITY:
All materials used for the manufacture or construction of any supplies, materials or
equipment covered by this Quotation shall be new. The items quoted must be new, the: latest
model, of the best quality, and highest grade workmanship.
1.25 LIABILITY, INSURANCE, LICENSES AND PERMITS:
Where Contractor is required to enter or go onto City of Miami Beach property to deliver
QUOTE NO: V A-QTlSM-006
DATE: 11116106
CITY OF MIAMI BEACH
7
materials or perform work or services as a result of this Quotation, the Contractor will
assume the full duty, obligation and expense of obtaining all necessary licenses, permits and
insurance and assure all work complies with all applicable Miami- Dade County and City of
Miami Beach Building Code requirements and the Florida Building Code, all as may be
amended. The Contractor shall be liable for any and all damagcs or loss to the City
occasioned by negligence of the Contractor, its subcontractors, or any other persons the
Contractor has designated in the completion of the Contract as a result of its Quote.
1.26 PERFORMANCE BONDS, CERTIFICATES OF INSURANCE:
Upon acceptance of Quote, the City will require the successful Contractor to submit a
performance bond and certificates of insurance in the anlount specified in the Special
Conditions.
1.27 DEFAULT:
Failure or refusal of a Contractor to execute a Contract upon award, or withdrawal of a Quote
before such award is made, may result in forfeiture of that portion of any surety required
equal to liquidated damages incurred by the City thereby, or where surety is not required,
failure to execute a Contract, as described above, may be grounds for removing the
Contractor from the City's vendor list.
1.28 CANCELLATION:
In the event any of the provisions of this Quote and/or the Contract are breached by the
Contractor, the Property Management Director shall give written notice to the Contractor
stating the deficiencies, and unless such deficiencies are corrected within ten (10) days,
recommendation will be made for immediate cancellation. Additionally, the City reserves
the right to terminate any Contract resulting from this Quotation at any time and for any
reason, upon giving thirty (30) days prior written notice to the other party.
1.29 BILLING INSTRUCTIONS:
Invoices, unless otherwise indicated, must show purchase order numbers and shall be
submitted in DUPLICATE to the attention of: City of Miami Beach I'roperty Management
Division, 1245 Michigan Avenue, Miami Beach, Florida 33139.
1.30 NOTE TO VENDORS DELIVERING TO THE CITY OF MIAMI BEACH:
Receiving hours are Monday through Friday, excluding holidays, from 8:30 A.M. to 5:00
P.M.
1.31 SUBSTITUTIONS:
The City WILL NOT acceptsubstitute shipments of any kind. Contractors are expected to
fumish the brand quoted in their Quote. Any substitute shipments will be returned at the
Contractor's expense.
1.32 FACILITIES:
The City reserves the right to inspect the Contractor's facilities at any time with reasonable
prior notice.
QUOTE NO: V A-QTlSM-1J06
DATE: lllI6106
CITY OF MIAMI BEACH
8
1.33 QUOTE TABULATIONS:
Contractors desiring a copy of the quote tabulation may request same by enclosing a self-
addressed stamped envelope with the quote.
1.34 CLARIFICATION AND ADDENDA TO QUOTE SPECIFICATIONS:
Any Contractor contemplating submitting a Quote who is in doubt as to the true meaning of
the specifications or other provisions in the Quotation documents, must submit to the
attention of: City of Miami Beach Property Management Director, 1245 Michigan
Avenue, Miami Beach, Florida, 33139 (or fax (305)673-7650), at least two (2) calendar
days prior to scheduled Quote opening, any written request for clarification and/or
interpretation.
All such requests must be made in writing and the Contractor submitting the request will be
responsible for its timely delivery and/or fax transmission.
Any clarification and/or interpretation of the Quote, if made, will be made only by written
Addendum duly issued by the City of Miami Beach Property Management Director. A
copy of such Addendum shall be sent by mail or facsimile to each Contractor receiving the
Quotation documents. In the event of conflict with the original Quotation documents,
Addendum shall govem to the extent specified. Subsequent Addendum shall govern over
prior Addendum only to the extent specified. The Contractor shall be required to
acknowledge receipt of Addendum by signing in the space providcd on the Quotation Form.
Failure to acknowledge Addendum may deem a Quote non-responsive; provided, however,
that the City may waive this requirement when in its best interest. The City will not be
responsible for any clarifications or interpretations made verbally.
1.35 DETERMINATION OF QUOTE AWARD:
The City shall award the Quote to the lowest and best Contractor. Tn determining the
lowest and best Contractor, in addition to price, there shall be considered the following:
a. The ability, capacity and skill of the Contractor to perform the contract.
b. Whether the Contractor can perform the work within the time specified,
without delay.
c. The character, integrity, reputation, judgment, experience and efficiency of the
Contractor.
d. The quality of performance of previous contracts.
e. The previous and existing compliance by the Contractor with laws and
ordinances relating to the work.
1.36 ADDITIONAL CONSlDERA TIONS .FOR DETERMINATION OF QUOTE AWARD:
1) Pre-award inspection of the Contractor's facility may be made prior to the execution ofa
Contract. Quotes will only be considered from firms which are regularly engaged in the
business of providing the goods and/or services as described in the Quotation documents.
Contractors must be able to demonstrate a good record of performance for a reasonable
period of time, and have sufficient financial support, equipment and organization to insure
QUOTE NO: V A-QTlSM-006 CITY OF MIAMI BEACH
DATE: 11116106 9
that they can satisfactorily execute the work if awarded a Contract under the terms and
conditions herein stated. The terms "equipment and organization" as used herein shall be
construed to mean a fully equipped and well established company in linc with the best
business practices in the industry and as determined by the City of Miami Beach.
2) The City may consider any evidence available regarding the financial, technical and other
qualifications and abilities of a Contractor, including past performance (experience) with the
City in making the quote award in the best interest of the City.
3) The Property Management Director may require Contractors to show proofthat they have
been designated as authorized representatives of a manufacturer or supplier which is the
actual source of supply. In these instances, the City may also require material information
from the source of supply regarding the quality, packaging, and characteristics of the
products to be supplies to the City through the designated representative. Any conflicts
between this material information provided by the source of supply and the information
contained in the Contractor's Quote may render the Quote non-responsive.
4) The City may review the Contractor's record of performance to ensure that the Contractor
is providing sufficient financial support, equipment and organization as prescribed in this
Quotation documents.
1.37 ASSIGNMENT:
The Contractor shall not assign, transfer, convey, sublet or otherwise dispose ofthe contract,
including any or all of its right, title or interest therein, or his or its power to execute such
contract to any person, company or corporation without the prior written consent of the City.
1.38 LAWS, PERMITS AND REGULATIONS:
The Contractor shall obtain and pay for all licenses, permits and inspection fees required for
this Project; and shall comply with all laws, ordinances, regulations and building code
requirements applicable to the work contemplated herein.
1.39 SPOT MARKET PURCHASES:
It is the intent of the City to purchase the items specifically listed in the Quotation documents
from the Contractor. However, items that are to be Spot Market Purchased may be
purchased by other methods, (i.e. Federal, State or local contracts).
1.40 ELIMINATION FROM CONSIDERATION: This Quote shall not be awarded to any
person or firm which is in arrears to the City upon any debt, taxes or contracts which are
defaulted as surety or otherwise upon any obligation to the City.
1.41 ESTIMATED QUANTITIES:
Estimated quantities or estimated dollars, if provided, are for City guidance only. No
guarantee is expressed or implied as to quantities or dollars that will be used during the
Contract period. The City is not obligated to place any order for a given amount subsequent
to the award of this Quote. Estimates are based upon the City's actual needs andJor usage
during a previous contract period. The City, for purposes of determining the successful
QUOTE NO: V A-QTlSM-006
DATE: 11116106
CITY OF MIAMI BEACH
10
Contractor meeting specifications, may use said estimates in reaching a decision.
1.42 COLLUSION:
Quotes from related parties: Where two (2) or more related parties each submit a Quote,
such Quotes shall be presumed to be collusive. The foregoing presumption may be rebutted
by presentation of evidence as to the extent of ownership, control and management of such
related parties in the preparation and submittal of such Quotes. Related parties shall mean, in
this case, respondents to this Quotation, or the principals thereof which have a direct or
indirect ownership interest in another respondent for the same Quotation, or in which a
parent company or the principals thereof have a direct or indirect ownership interest in
another respondent for the same Quote. Quotes found to be collusive shall be rejected.
Respondents who have been found to have engaged in collusion shall be considered non-
responsive, and may be suspended or debarred, and any contract resulting from collusive
bidding may be terminated for default.
1.43 DISPUTES:
In the event of a conflict between the documents, the order of priority of the documents shall
be as follows:
. The Contract resulting from the award of this Quotation (if applicable); then
· Addenda released for this Quotation, with the latest Addendum taking precedence;
then
· The Quotation; then
· Contractor's Quote in response thereto.
1.44 REASONABLE ACCOMMODATION:
In accordance with Title II of the Americans with Disabilities Act, any person requiring an
accommodation at the Quotation opening because of a disability must contact Heidi Johnson
Wright at the Public Works Department at (305) 673-7080.
1.45 GRA TUlTIES:
Contractors shall not offer any gratuities, favors, or anything of monetary value to any
official, employee, or agent of the City, for the purpose of influencing consideration of this
Quotation.
1.46 SIGNED QUOTE CONSmERED AN OFFER:
The signed Quote shall be considered an offer on the part of the Contractor, wbich om~r shall
be deemed accepted upon approval by the City, In case of default on the part of the
successful Contractor, after such acceptance, the City may procure tile items or services from
other sources and hold the Contractor responsible for any excess cost occasioned or incurred
there by.
1.47 TIE QUOTES:
In accordance with Section 287.087, Florida Statutes, regarding identical tie quotes,
preference will be given to Contractors certifYing that they have implemented a Drug Free
Workplace Program. A certification form will be required at that time.
QUOTE NO: V A-QT1SM-006
DATE: I1116106
CITY OF MIAMI BEACH
II
1.48 PUBLIC ENTITY CRIMES (PEC):
A person or affiliate who has been placed on the convicted vendor list following a conviction
for public entity crimes may not submit a bid on a contract to provide any goods or services
to a public entity, may not submit a bid on a contract with a public entity for the construction
or repair of a public building or public work, may not submit bids on leases of real property
to public entity, may not be awarded or perform work as a contractor, supplier, sub-
contractor, or consultant under a contract with a public entity, and may not transact business
with any public entity in excess of the threshold amount provided in Sec. 287.017, Florida
Statutes, for CA TEGOR Y TWO for a period of 36 months from the date of being placed on
the convicted vendor list.
QUOTE NO: V A-QTlSM-006
DATE: 11/16106
CITY OF MIAMI BEACH
12
SOUTH SHORE COMMUNITY CENTER
HISPANIC CENTER, HV AC RENOVATIONS
QUOTATION NO: V A-QT15M-006
2,0 SPECIAL CONDITIONS
2,1 PURPOSE:
The purpose of this Quotation is to award a contract, by means of sealed quotes, to a
qualified Contractor, for the HISPANIC CENTER HV AC RENOVATIONS, as specified
in the Quotation Form.
2.2 METHOD OF AWARD:
Award of this Contract will be made to the lowest responsive, responsible and best
Contractor whose Quote will be in the best interest ofthe City of Miami Beach.
2.3 PAYMENT:
Payment will be made upon final completion of this Project. The City will pay the Contract
price, minus any liquidated damages and/or other damages, upon final completion and
acceptance.
2.4 [Intentionally Omitted]
2,5 INSURANCE AND INDEMNIFICATION:
(See Check List for applicability to this Contract)
The Contractor shall be responsible for its work and every part thereof, and for all materials,
tools, appliances and property of every description, used in connection with this Project. It
shall specifically and distinctly assume, and does so assume, all risks of damage or injury to
property or persons used or employed on or in connection with the work and of all damage or
injury to any person or property wherever located, resulting from allY action or operation
under the contract or in connection with the work. It is understood and agreed that at all times
the Contractor is acting as an independent contractor.
The Contractor, at all times during the full duration of work under this Contract, including
extra work in connection with this Project, shall meet the following requirements:
Maintain Worker's Compensation and Employer's Liability Insurance to meet the statutory
requirements of the State of Florida.
Maintain Comprehensive General Liability Insurance in amounts prescribed by the City (see
check list for specific insurance limits) to protect the Contractor and the interests of the City
against all risks ofinjury to persons (including death) or damage to property wherever located
resulting from any action or operation under the contract or in connection with the work. This
policy is to provide coverage for premises/operations, independent (:ontractor, broad form
QUOTE NO: V A-QTlSM-006
DATE: tll16106
CITY OF MIAMI BEACH
13
property damage, products/completed operations and contractual liability.
Maintain Automobile Liability Insurance including Property Damage covering all owned,
non-owned or hired automobiles and equipment used in connection with the work.
Maintain any additional coverage required by the City's Risk Manager as indicated on the
Insurance Check List.
Name the City of Miami Beach, Florida, as an additional insured on all liability policies
required by this Contract. When naming the City of Miami Beach as an additional insured,
the Contractor's insurance companies must agree and will endorse the policies to state that the
City will not be liable for the payment of any premiums or assessments. A copy of the
endorsement(s) naming the City of Miami Beach, Florida, as an additional insured is required
and must be submitted to the City's Risk Manager.
No change or cancellation in insurance shall be made without thirty (30) days wTitten notice to
the City's Risk Manager.
All insurance policies shall be issued by companies authorized to do business under the laws
of the State of Florida and these companies must have a rating of at least B+: VIol' better per
Best's Key Rating Guide, latest edition.
Original signed certificates of insurance, evidencing such coverages and endorsemeuts, as
required herein, shall be filed with and approved by the City's Risk Manager before work is
started. The certificate must state Quote Number and Title. Upon expiration of the required
insurance, the Contractor must submit updated certificates of insurance for as long a period as
any work is still in progress.
It is understood and agreed that all policies of insurance provided by the Contractor are
primary coverage to any insurance or self-insurance the City of Miami Beach possess'~s that
may apply to a loss resulting from the work performed in this Contract.
All policies issued to cover the insurance requirements herein shall provide full coverage from
the first dollar of exposure. No deductibles will be allowed in any policies issued on this
contract unless specific safeguards have been established to assure an adequate fund for
payment of deductibles by the insured and approved by the City's Risk Manager.
The liability insurance coverage shall extend to and include the following contractual
indemnity and hold harmless agreement. The proceeding indemnity and hold harmless
agreement shall apply to any and all claims and suits other than claims and suits arising out of
the sole and exclusive negligence of the City of Miami Beach, its officers, agents, and
employees, as determined by a court of competent jurisdiction:
"The Contractor hereby agrees to indemnify and hold harmless the City of Miami
Beach, a municipal corporation, its officers, agents, and employees from all claims for
bodily injuries to the public in and up to the amount of $1,000,000.00 for each
QUOTE NO: V A-QTlSM-006 CITY OF MIAMI BEACH
DATE: 11116106 14
occurrence and for all damages to the property of others in and up to the amount of
$1,000,000.00 for each occurrence per the insurance requirement under the
specifications including costs of investigation, all expenses of litigation, including
reasonable attorney fees and the cost of appeals arising out of any such claims or suits
because of any and all acts of omission or commission of any by the contractor, his
agents, servants, or employees, or through the mere existence of the Project under
contract" .
The Contractor will notify its insurance carrier without delay of the existence of the indemnity
and hold harmless agreement contained within this Contract, and furnish a copy of the said
agreement to its insurance agent and carrier.
The Contractor will obtain and maintain contractual liability insurance in adequate limits for
the sole purpose of protecting the City of Miami Beach under the preceding indemnity and
hold harmless agreement from any and all claims arising out of the contract.
The Contractor will also be responsible for securing and maintaining policies of
subcontractors. All policies shall be made available to the City upon demand. Compliance by
the Contractor and its subcontractors with the foregoing requirements as to carrying insurance
and furnishing copies of the insurance policies shall not relieve the Contractor and its
subcontractors of their liabilities and obligations under any section or provisions of the
Contract. Contractor shall be as fully responsible to the City for the acts and omissions of its
subcontractor, and of persons employed by them, as it is for acts and omissions of persons
directly employed by it.
Insurance coverage required in the Quotation document and Insurance checklist shall be in
force throughout the Contract term. Should any Contractor fail to provide acceptable evidence
of current insurance within seven (7) days of receipt of written notic(~ at any time during the
Contract term, the City shall have the right to consider the Contract breached, thus justifying
the termination thereof.
If Contractor cannot meet the insurance requirements, alternate insurance coverage, at the sole
discretion of the City and satisfactory to the City's Risk Manager, may be considered.
QUOTE NO: V A-QTlsM-006
DATE: 11116106
CITY OF MIAMI BEACH
15
XXX 1.
XXX 2.
XXX 3.
XXX 5.
XXX 7.
XXX 8.
XXX 9.
INSURANCE CHECK LIST
Workers' Compensation and Employer's Liability per the Statutory limits of the state of
Florida.
Comprehensive General Liability (occurrence form), limits ofliability $ 1.000,000.00
per occurrence for bodily injury property damage to include Premisesl Operations;
Products, Completed Operations and Contractual Liability. Contractual Liability and
Contractual Indemnity (Indemnity and hold harmless endorsement exactly as written in
"insurance requirements" of specifications).
Automobile Liability - $1,000,000 each occurrence - owned/non-owned/hired
automobiles included.
4.
Excess Liability - $
.00 per occurrence to follow the primary coverages.
The City must be named as and additional insured on the liability policies; and it must
be stated on the certificate.
6.
Other Insurance as indicated:
_ Builders Risk completed value
_ Liquor Liability
_ Fire Legal Liability
_ Protection and Indemnity
_ Employee Dishonesty Bond
Other
$
$
$
$
$
$
.00
.00
.00
.00
.00
.00
Thirty (30) days written clillcellation notice required.
Best's guide rating B+:VI or better, latest edition.
The certificate must state the quote number and title
CONTRACTOR INSURANCE STATEMENT:
I hereby acknowledge and agree to insurance requirements contained in the Quotation documents,
and hereby agree to provide the City with evidence of all required insurance coverage, to be included
in the Quote.
-b~ ~f\MI ~~
Print Namel Title
OTE NO: V A-QTlsM-006
DATE: 11/16106
CITY OF MIAMI BEACH
16
2.6 CONTACT PERSON:
For any additional information regarding the specifications and requirements ofthis Project,
inquires should be made in writing to the attention of: City of Miami Beach Property
Management Director, 1245 Michigan Avenue, Miami beach, II/orida, 33139, OJ' by fax
at (305) 673-7650,
2,7 SAMPLES:
The Contractor shall provide upon request, a complete and accurate sample ofthe product(s)
which it proposes to furnish.
2,8 BID, PERFORMANCE AND PAYMENT BOND:
Not required on this Project.
2.9 LIQUIDATED DAMAGES:
The Contractor agrees to pay the City liquidated damages in the amount of$200 per calendar
day beyond the thirty (30) day substantial completion date specified in the Contract.
2.10 WARRANTY:
The Contractor will be required to warranty all work performed. Thc work performed by
replacing all glass doors and windows in the building will require a minimum manufacturer
warranty of one (1) years on the product, and one (1) year on workmanship or installation of
material.
2.11 REFERENCES (PROVIDE 4 REFERENCES; PLEASE SEE PAGE 25)
2.12 COMPLETE PROJECT REQUIRED:
The Quotation documents, and the specifications described herein, outline the various items
or classes of work required, enumerating or defining the extent of same necessary, but the
City's failure to list any items or classes under scope of the several sections shall not relieve
the Contractor from furnishing, installing or performing such work where required by any
part of these specifications, or necessary to the satisfactory completion of the Project.
2,13 FACILITY LOCATION:
The South Shore Community Center building is located at 833 Meridian Avenue, Miami
Beach, Fl33139
2.14 CONTRACTOR QUALIFICATIONS:
In order for Quotes to be considered, Contractors must submit with their Quote evidence that
they are qualified to satisfactorily perform the specified work. Evidence shall include all
information necessary to certify that the Contractor: maintains a pemlanent place of business
and office in the South Florida area; has technical knowledge and practical experience in the
type of equipmcnt required for work on the Project; has available the organization and
qualified manpower to do the work; has adequate financial status to meet the financial
obligations incident to the work; has not had just or proper claims pending against him or his
QUOTE NO: V A-QT1sM-006
DATE: 11116106
CITY OF MIAMI BEACH
17
.
work; and has provided scope of work to similar size projects as the Project outlined herein.
The evidence will consist of listing of work that has been providcd to public and private
sector clients, (ie. nature of work and number of similar projects completed within the last
three (3) years).
2,15
COMPLETE INFORMATION REQUIRED ON QUOTATION FORM:
All Quotes must be submitted on the formes) attached in the Quotation documents and all
blanks filled in. To be considered a valid bid, the ORIGINAL AND ONE COPY of the
Quotation Form and all required submittal information must be returned, properly completed,
in a sealed envelope as outlined in the Section 1.1 of General Conditions.
QUOTE NO: VA-QTlsM-006
DATE: 11116/06
CITY OF MIAMI BEACH
18
Section 3
MEASUREMENT AND PAYMENT
3.1 Measurement of Quantities - All work completed under this Contract shall be
measured by the Property Management Director, according to United States Standard Measures. All
measurements shall be taken horizontal or vertical, except for paving surfaces, which will be taken
along the actual surface of the pavement. No allowance shall be made for surfaces laid over a greater
area than authorized or for material moved from outside of slope-stakes and lines shown on the
Plans, except where such work is done upon written instructions of the Property Management
Director.
3.2 Scope of Payments - It is understood and agreed that the Contractor shall receive and
accept the prices and rates, as herein specified, in full payment for furnishing all materials, labor,
equipment, and tools, and for performing all the work contemplated and embraced in the Quotation
documents and the specifications herein, also for all loss or damage arising out ofthe nature of the
work aforesaid, or from the action of the elements or for any unforeseen difficulties or obstructions
which may arise or be encountered in the prosecution of the work, until its final acceptance as
hereinafter provided for, and also for all risks of every description and all expenses incurred by or in
consequence of the suspension or discontinuance of the work as herein provided for, or for any
infringement of patent, trademark, or copyright, and for the completion ofthe work in accordance
with the Quotation documents, the specifications, and Contract.
3.3 Payment and Compensation for Altered Quantities -When alterations in plans or
quantities of work not requiring supplemental agreements as herein before provided for are ordered
and performed, the Contractor shall a(:cept payment in full at the contract unit price for the actual
quantities of work done; no allowance will be made for anticipated profits; increased or decreased
work involving supplemental agreements shall be paid for as stipulated in such agreement.
3.4 Force Account Work - All extra work done on a "Force Account" basis shall be
performed by such labor, teams, tools, and equipment as may be specified by the Property
Management Director, and will be paid for in the following manner:
(a) For all labor, teams, and foremen in direct charge of the specified operations, the
Contractor shall receive the current local rate of wages, to be agreed upon in writing before starting
such work, for every hour that said labor, teams, and foremen are actually engaged in such work, to
which shall be added an amount equal to fifteen (15) percent of the sum thereof which shall be
considered as full compensation for general supervision and the furnishing and repairing of small
tools and ordinary equipment used on the contract such as picks, hand shovels, plows, etc. In
addition to the above, the Contractor shall receive the actual cost for Social Security taxes,
unemployment insurance, and Workmen's Compensation insurance involved in such force account
work, based on the actual wages paid the said labor and foremen. No percentage will be added to the
cost of such taxes or insurance.
(b) For all mat<:rials used the Contractor shall receive the actual cost of such materials,
QUOTE NO: VA-QT1sM-006
DATE: 11116106
CITY OF MIAMI BEACH
19
delivered at the site, as shown by the original receipted bills, but no percentage shall be allowed on
the cost of such materials.
(c) For any special equipment or machinery, such as power driven rollers, tractors, trucks,
shovels, drills, concrete mixers, pumps, and hoists, also industrial railway equipment, crushers, etc.,
required for the economical performance of the work, the Property Management Director shall allow
the Contractor a reasonable rental price to be agreed upon in writing before such work is beglill, for
each and every hour that said special equipment is in use on the work, to which sum no percentage
shall be added.
The compensation as herein provided shall be received by the Contractor as payment in full
for extra work done on a force account basis.
The Contractor's representative and the Project Manager shall compare records of extra work
done on a force account basis at the end of each day. Copies of these records shall be made in
duplicate upon a form provided for this purpose by the Project Manager and signed by both the
Project Manager and the Contractor's representative, one copy being forwarded, respectively, to the
Property Management Director or authorized representative, and to the Contractor. All claims for
extra work done on a force account basis shall be submitted as hereinbefore provided by the
Contractor upon certified statements, to which shall be attached original receipted bills covering the
costs of and the freight c:harges and hauling on all materials used in such work, and such statements
shall be submitted to the Property Management Director on the current estimate of thc month in
which work was actually done.
3.5 Omitted Items - The City shall have the right to cancel the portions of the Contract
relating to the construction of any items therein by the payment to the Contractor of a fair and
equitable amount covering all items incurred prior to the date of cancellation or suspension of the
work by order of the Property Management Director.
3.6 Partial Payments - Ifthe work progresses according to Contract, the Contractor will be
paid monthly ninety (90) percent of the value of the work completed, and materials furnished by the
Contractor under these specifications, when such materials have been delivered, inspected, and
payments satisfactorily vouched for to the Property Management Director, provided the materials, in
the judgment of the Property Management Director, are such as will probably be incorporated in the
work within thirty (30) days; ten (10) per cent of the amount due being reserved until a final
settlement after the completion of the work. Contractor shall provide PARTIAL RELEASE OF
LIENS with each application for payment.
It is understood and agreed that the City may also deduct from any estimate, either partial or
final, the amount of any unsatisfied claim against the Contractor for labor, materials, teams,
equipment and/or other things as elsewhere provided herein.
Should any defective work or material be discovered previous to the final acceptance, or
should a reasonable doubt arise previous to the final acceptance as to the integrity of any part of the
completed work, the estimate and payment for such defective or questioned work shall not be
QUOTE NO: V A-QTlsM-006
DATE: 11/16106
CITY OF MIAMI BEACH
20
allowed until the defect has been remedied and causes for doubt removed. The monthly payments
shall be approximate only, and all partial estimates and payments shall be subject to correction in the
final estimate and payment. If the total amount of the retained percentage of the contract is greatly in
excess of the uncompleted portion ofthe Contract the City, may allow the Contractor a portion of the
suspended payment, provided that the City shall at all times retain an amount sufficient to enable it to
complete the uncompleted work in the contract and liquidate unsatisfied claims.
3.7 Acceptance and Final Payment - Whenever the work provided for under this Contract
shall have been completely performed on the part of the Contractor, and all parts of the work have
been approved by the Property Management Director, according to the Contract, and all trash,
debris, equipment, and other things used in the construction removed from the site of the
construction and from the adjoining land, after final inspection as provided herein, Contractor shall
certifY such fact to the Property Management Director in writing, recommending the acceptance of
the work.
The amount of the final payment, less any sums that may have been deducted or retained
under the provisions of this Contract, will be paid to the Contractor within thirty (30) days after the
final payment has been approved by the Property Management Director, provided that the Contractor
has furnished to the City a sworn affidavit to the effect that all bills are paid and no suits are pending
in connection with the work done under this Contract. Upon this final payment the City shall be
released from all liability whatever growing out of this Contract.
No final payment shall be made without the submittal of the following documents: the
FINAL RELEASE OF LIEN, LETTER OF FINAL COMPLETION (or LETTER OF FINAL
ACCEPTANCE) from the Contractor.
QUOTE NO: VA-QTlsM-006
DATE: 11116106
CITY OF MIAMI BEACH
21
SOUTH SHORE COMMUNITY CENTER
HISPANIC CENTER, HV AC RENOV A TlONS
QUOT ATlON NO: V A-QT15M-006
Quotation Form (Page 1 of 2)
Contractor shall furnish and install three (3) chilled water fan coil units. Contractor shall furnish
and install HV AC equipment, duct work, controls, electrical, plumbing, crane, duct smoke
detector, engineering drawings and permits necessary to successfully complete the work.
Scope of Work: The Contractor shall fumish and install three chilled water fan coil units in the
second floor front offices. Contractor shall furnish the new air conditioning units, controls,
electrical, plumbing, crane, duct smoke detector, engineering drawings and permits necessary to
successfully complete the work. All work shall be completed according to Florida Building Code
and all other applicable codes, and in a manner consistent with Industries standards. Any waiver
of Permit fees shall be solely determined by the Building Department. Contractor shall verifY
tonnage and voltages. Contractor shall verifY that new units comply with outside air requirements
as outlined by ASHRAE and any other guidelines applicable to the work being performed. The
City shall not supply any current engineering drawings or heat load calculations.
OUOTE
LUMP SUM
I) Chilled water fans coils
$ dSgOG.~
TOTAL
$ Q5~()C).--.
QUOTE NO: V A-QTlsM-006
DATE: 11116106
CITY OF MIAMI BEACH
22
SOUTH SHORE COMMUNITY CENTER
HISPANIC CENTER, HV AC RENOVATIONS
QUOTATION NO: VA-QT15M-006
Quotation Form (Page 2 of 2)
PROMPT PAYMENT DISCOUNT: (i.e., 2%/10;1 %/20)
ANY LETTERS, ATTACHMENTS, OR ADDITIONAL INI?ORMATION TO BE
CONSIDERED PART OF THE QUOTE MUST BE SUBMITTED IN DUPLICATE.
SUBMITTED BY: ~~I'\ Rnho....
COMPANY NAME: 1'-'\
SIGNED:
m authorized to execute this QUOTE and
g firm)
Contractors must acknowledge receipt of Addendum (if applicable).
Amendment No.1:
Insert Date
Amendment No.2:
Insert Date
NAMEITITLE (Print):---.lD..~ \\'f\r\CJ-....
ADDRESS: ~Q.\ g'=f- ~lIJ II ~ ~ ~.clS
I
CITY/STATE: ~funl FL- ZIP::?i30t S-
J
TELEPllONE NO, .::p5" / 'i: d.'" - ~COJ,
FACSIMILE NO: . ..3:>6 ~~;).S - 1lc.CJ+-
QUOTE NO: VA-QTlsM-006
DATE: 11/16106
CITY OF MIAMI BEACH
23
SOUTH SHORE COMMUNITY CENTER
HISPANIC CENTER, HV AC RENOV A nONS
QUOTA nON NO: V A-QT15M-006
CHECK LIST
To ensure that your Quote is submitted in conformance with the Quotation documents, please verifY
th h fill' h b d db' d . d
at t e o owmg Items ave een complete an su mltte as reqUIre .
X Original and one copy of Quotation documents (including Quotation Form
and all submittal information)
General Conditions Section 1.1
Special Conditions Section 2.15 --
X Execution of Quote
General Conditions Section 1.2
EquivalentslEqual Prodluct
General Condition Section 1.1 0
Insurancl~ and Indemnification (including Insurance Chccklist)
X General Condition Section 1.27
Special Conditions Section 2.5
BidlPerformance Bond (if applicable)
General Condition Section 1.27
Special Conditions Section 2.11
X Warranty
Special Conditions Section 2.13
Product/Catalog Information
X References
Special Conditions (Page 25)
X Bidder Qualifications
Special Conditions Section 2.17
X Contractor's Questionnaire
(Page 26)
QUOTE NO: V A-QT1sM-006
DATE: 11116106
CITY OF MIAMI BEACH
24
SOUTH SHORE COMMUNITY CENTER
HISPANIC CENTER, HVAC RENOVATIONS
QUOTATION NO: V A-QT15M-006
CUSTOMER REFERENCE LISTING
Contractor shall furnish the names, addresses, and telephone l1lunbers of a minimum of four (4) firms
or government organizations for which the Contractor is currently performing or has performed
similar work.
1)
Company Name 11\, C4i,~ fuv-;'-t~1'-Cl.-f
Address --8.aJ N W . -=\ s-+.
Contact Person/Contract Amount fY\~ 1J 0 1/ (J c.L t 3 g-l?j 0 DO
Telephone Number ,3c~ ju,tj-t-S;);}-=t
I
Company Name J-11 ~ flo~'3 Ag'<./1-U1
Address t"S 1:=. U. Sit. .
Contact Person/Contract AmounteD L ~ fjvffiS()Jn ~s- 0, aiTe)
Telephone Number Bo6"/ 'i?f? - q ---:r#
Company Name St, Lua e..-
Address _:;;)3co V;r~ Ave
Contact Person/Contract Amount
2)
3)
4)
Telephone Number "il cl. / ~'~... {i 3'3
.
Company Name 71J. ~ s Ih/crl1tch~jJ _
Address ,3~ 0 ,,(;111 1Yl.6Ya../7 73/vd4i-20Q
Contact Person/Contract Amount ......)Ohfl ~~./f
q<;;Lj /-I21-'16)J()
I
Telephone Number
QUOTE NO: V A-QTISM-006
DATE: 11116106
CITY OF MIAMI BEACH
25
CONTRACTOR'S QUESTIONNAIRE
NOTE:
Information supplied in response to this questionnairc is subject to verification
by the City. Inaccurate or incomplete answers may be grounds for
disqualification from consideration for award of this Quotation.
Submitted to City of Miami Beach, Floriqa:. OSJ '
By mOvaXv\ YYV {" 1'0vfl.-.t ( (,l,.d ",~~Y\/I (Q...:) ~J
.
PrincipaIOffice-Lp\ ~'::t tJ W Jl0 '-~~ H"'d--~.mlq,mLfL ~O/S-
H h . . b . b' N1Nh/JJ,.,;c~ d
ow many years as your organIzatIOn een 111 uS1l1ess as it ~C~ntractor un er your present
business name? ll.i;-r..4
Does your organization have current oGcupationallicenses entitling it to do the work contemplated in
this contract? \1 e~ CL.. _1.- YlII A . I. ~ (]
r VlcICIUf~C()...Y
State of Florida occupational license - state type and ~umber: b~ '5 =J- ~L/)~~
Dade County certificate of competency - state type and number: <If ~ f? <I-~~
City of Miami Beach occupational license - state type and number:
AI//1'
,
Include copies of above licenses and certificates with proposal.
How many years experience in similar work has your organization had?
(A) As a..Qeneral Contractor t2 f? Y t'Ar:.S
/71.t.d.. .
(B) As a Sub-Contractor ~O y t'.t:J..I':S
(C) What contracts has your organization completed? (use separate sheet's if necessary)
j-Contract Amt
'f~tlOn
Have you ever had a contract terminated (as prime contractor or sub-contractor, under existing
company name or nother company name) due to failure to comply with contractual
specifications?
If so, where and why?
Crtvs of Work When comPleted'ftame/Address~wne~ 11 io .)
t /tf. ~ " JUJo..l. 2..lJO c:, " t'iS$ li-iw Oyt.tLj/ ') OQj+~
Has any officer or partner of your organization ever failed to complete a construction contract
handled in his own nanle?, J
/V'{)
QUOTE NO: V A-QTl5M-006
DATE: 11116106
CITY OF MIAMI BEACH
26
If so, state name of individual, name of owner, and ri/on thereof
Nfl
I
In what other lines of business are you financially intereXdungaged?
. I
Give references as to experience, ability, and financial standing ~ aif ~-d.
What eqilfe1 do you o~n I that is available -Zr the proposed work and where located?
/S IX. ~ / fJU ad~/ 1nu '/6, l-t)fL{P~I-()?W.fJ..
What bank or banks have
be awarded to you?
ged t~ do business with during the COlll'se of the contract should it
0...
Please list the names and addresses of the subcontractors to be used for the portions of the work
listed below.
AI 1ft
, v I
I HEREBY CERTIFY that the above answers are true and correct.
~
\
<)
Print Nameffitle
QUOTE NO: V A-QTlSM-006
DATE: 1I116106
CITY OF MIAMI BEACH
27
CONTRACT FOR QUOTATlON NO. VA-QTl5M-006
.
THIS CONTRACT made this day of 20, A.D. between the
CITY OF MIAMI BEACH, a Florida municipal corporation, hereinafter called the City, which
term shall include its successors and assigns, and
Master MechanicaL Services,
hereinafter called the Contractor, which term shall include its heirs, successors and assigus, party of
the other part.
WITNESSETH that the said Contractor for the consideration and compensation herein agreed to be
paid and the said City in consideration of the Project to be done by said Contractor pursuant to City
QUOT ATlON NO, V A-QTl5M-006 and entitled "SOUTH SHORE COMMUNITY CENTER,
HISPANIC CENTER HV AC RENOV A TlONS" (also referred to as "the work" or "the Project"),
do hereby mutually agree as follows:
1. This Contract shall extend to and be obligatory upon said City, its successors and assigns,
and upon said Contractor and its, successors and assigns. Neither this Contract nor any part
thereof nor any part of the work herein contemplated, shall be assigned or sublet, nor shall
any sums of money provided to be paid to said Contractor be assigned by said Contractor
without the prior written consent of the City.
2. City of Miami Beach Quotation NO. V A-QTl5-006 and Contractor's Quote in response
thereto, are hereby referred to and made a part of this Contract and the terms and
conditions set forth therein and, except when in direct conflict with this written Contract,
are made a part hereof as if copied herein. If a conflicts exist between the Quotation and
Contractor's response thereto, and this Contract, the priority of documents shall be as set
forth in Section 1.45 of the Quotation documents.
3. The Contractor shall commence work within seven (7) days of the issuance of a Notice to
Proceed from the City and shall construct and complete in a good and workmanlike manner
the materials herein referred to, strictly in accord herewith the following:
3.1 Unless there is a change in the scheduling of the Project which is approved by the
Property Management Director, the Contractor shall be substantially completed
with the work within thirty (30) calendar days from the issuance ofthe Notice to
Proceed, and completed and ready for final payment within sixty (60) calendar
days after the issuance of said Notice.
QUOTE NO: VA-QT1SM-006
DATE: llfl6/06
CITY OF MIAMI BEACH
28
3.2 Damages - City and Contractor recognize that the City will suffer direct financial loss
if work is not completed within the Contract times specified in Paragraph 3.1. The
parties also recognize the delays, expense and difficulties involved in proving in a
legal or arbitration preceding the actual loss suffered by City if the work is not
completed on time, and therefore time is of the essence. Accordingly, instead of
requiring any such proof Contractor agrees to forfeit and pay City as liquiidated
damages for delay (but not as a penalty) the amount of Two Hundred Dollars
($200.00) for each calendar day that expires after the Contract Time specified in
Paragraph 3.1 for Substantial Completion until the work is substantially complete.
After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete
the remaining work within the Contract Time, Contractor shall pay Owner Two
Hundred Dollars ($200,00) for each calendar day that expires after the time
specified in Paragraph 3.1 for completion and readiness for final payment.
These amounts represent a reasonable estimate of City's expenses for extended
delays and for inspection, engineering services and administrative costs associated
with such delay.
4. Contractor shall furnish all implements, machinery, equipment, transportation, tools,
materials, supplies labor, and other things necessary to the execution and completion of the
work, nothing being required of the City except that it may, at its expense, supervise such
work and enter upon and inspect the same at all reasonable times.
5. If any dispute arises between the City and said Contractor with reference to the meaning or
requirements of any part of this Contract and they cannot agree, the more stringent
requirements shall govern as determined by the City, through its Property Management
Director.
6. If the Contractor shall complete the work herein contemplated in a good and workmanlike
manner within the time herein specified and in accord herewith, the said City shall pay to the
Contractor the Contract sum in accordance with the conditions of the Contract. The City, by
allowing Contractor to continue with said construction after the time for its completion
hereinbefore stated shall not be deprived of the right to exercise any option in this Contract
nor shall it operate to alter any other term of this Contract.
7. Prior to commencing any work on the Project, the Contractor shall file Insurance Certificates,
as required in the Quotation documents, and they must be signed by a Registered Insurance
Agent licensed in the State of Florida and approved by the City's Risk Manager.
8. All documents shall be executed satisfactorily to the City and until required bonds (if
applicable) and Insurance Certificates have been filed and approved, this Contract shall not
be deemed effective.
9. City shall pay Contractor for performance of the work in accordance with the Quotation
documents in current funds at the lump sum or unit prices presented in the Quotation
documents and Contractor's response there to, as attached to this Contract. The parties
expressly agree that the Contract price is a stipulated sum except with regard to the items in
the Quote which are subject to unit prices.
QUOTE NO: VA-QTlSM-006
DATE: 11116106
CITY OF MIAMI BEACH
29
10. GOVERNING LAW AND EXCLUSIVE VENUE:
.
This Agreement shall be governed by, and construed in accordance with, the laws of the State
of Florida, both substantive and remedial, without regard to principles of conflict of laws.
The exclusive venue for any litigation arising out of this Agreement shall be Miami-Dade
County, Florida, ifin state court, and the U.S. District Court, South,'rn District of Florida, if
in federal court. BY ENTERING INTO THIS AGREEMENT, the Citv AND
Contractor EXPRESSLY WAIVE ANY RIGHTS EITHER PARTY MAY HAVE
TO A TRIAL BY JURY OF ANY CIVIL LITIGATION RELATED TO, OR ARISING OUT
OF, THIS AGREEMENT.
11. This Contract, and all attachments hereto, comprises the entire agreement between City and
Contractor, to this Agreement.
12. The Contract may only be amended, modified or supplemented as provided in the General
Conditions.
IN WITNESS WHEREOF the City has caused this contract to be signed by the Mayor ofthe City
of Miami Beach, Florida and its corporate seal to be affixed, attested by the City Clerk ofthe City of
Miami Beach, and the said Contractor has caused this Agr ent to be signed it its name.
I BEACH
David Dermer
]~~r f~~
City Clerk Robert Parcher
ATTEST:
/~
CONTRACTOR
~
ature of President or
tborized Representative
J;/?"i ;:; aaCt
Print Namerritle
-.b~h. ~ r'\f\CI. ?~~\J..y:t
Print Name/Title '
QUOTE NO: VA-QTlSM-006
DATE: 11116106
CITY OF MIAMI BEACH
30
APPROVED AS TO
FORM & LANGUAGE
d~
~
~CORD_ CERTIFICATE OF LIABILITY INSURANCE OP ID T~ DATE (MMIDD/YYYYI
MASTE 2 1l/17/D6
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
Kahn-Carlin & Company, Inc. HOLDER. THIS CERTIFICATE DOES NOT AMEND. EXTEND OR
3350 S. Dixie Highway ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Miami FL 33133-9984
Phone:3D5-446-2271 Fax:305-448-3127 INSURERS AFFORDING COVERAGE NAIC#
INSURED - !INSURER A: ._----~_.. - ..._.__._.~----_.- f----- -".~~
Nautilus Insurance Compan~_._
--~
~SURER B: >FCCI Mutual Insurance Co
.__._-~~-_._- --~-
Master Mechanical seLfices,Inc i INSURER C -----~~
f----~ -----------------------
6187 NW 167th Stre"t H-25 LINSURER 0 _.
Miami FL 33015 , -------------.-..
I INSURER E
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTVVlTHSTANOING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT VV1TH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED Ol~
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE 13EEN REOUCED BY PAID CLAIMS
NSl< ~~~~ ._~ II'D~1f~i;;~rJffi~~r IPgk!fEYI~M;brg,~~q~ r------------- -~-~_._-- -------
LTR TYPE OF INSURANCE POLICY NUMBER LIMITS
~NERAL LIABILITY EACH OCCURRENCE __ $ 5,000,000
A X COMMERCIAL GENERAL LIABILITY NC551482 08/01/06 08/01/07 lJl\NfJ\GmE~ $ 300,000
~:?ES (Eao~~urence)
I CLAIMS MADE ~ OCCUR MED EXP (Anyone person) $ 10,000 -
~- - I~_RSONAL & A~V INJURY .!.~L!l00.1 000 __
I- GENERAL AGGREGATE '5,000,000
.---- ------ ---._~--~---
~l'L AGG~nE LIMIT APPlS PER PRODUCTS - COMP/or AGG !..,~oq.!~9.Q.._~___
~,--,--------------
POLICY ~~8T lOC i
~TOMOBILE LIABILITY I COMBINED SINGLE LIMIT $
ANY AUTO (Eaaccident)
I-- ------_..~~~.__..
f-~ ALL OWNED AUTOS BODILY INJURY
I(perpers~_____ $
SCHEDULED AUTOS
I-- .--- ~...._-----
HIRED AUTOS
I I-- ~ILY INJURY $
- NON-OWNED AUTOS (peraCcide~____._._.. ~ ..._~..._--
~-
-- ~-~ PI~OPERTY DAMAGE $
(Per accident)
~RAGE LIABILITY AUTO QNL Y - EA ACCIDENT $
--_._---_.._~
ANY AUTO OTHER THAN EA ACC !._----
-'--'--
AUTO ONLY AGG $
~ESSIUMBRELLA LIABILITY ~~::~,~.CCURRENCE $
OCCUR D CLAIMS MADE AGGREGATE $
-------~ -------
I I $
R DEDUCTIBLE I r====,-,:::==--==
RETENTION $ I $
WORKERS COMPENSATION AND ~J:C.!E;'~Y lIMI!iLj"~
EMPLOYERS' LIABiLiTY -------
B ANY PROPRIETORfPARTNERIEXECUTIVE 53760 03/14/06 03/14/07 ~"' EACH ACCIDENT $ 500000
OFFICERfMEMBER EXCLUDED? I EL DISEASE - EA EMPLOYEE $ 500000
~~~tI1is~~bOV~s16~s below I E.l. DISEASE - POUCY LIMIT $ 500000
OTHER
DESCRIPTION OF OPERATIONS I LOCATIONS IVEHICLES I EXCLUSIONS ADOEO BY ENDORSEMENT I SPECIAL PROVISIONS
Project: South Shore Community Center, HVAC Renovation, #VA-QT15M-006
Certificate Holder is named as additional Insured with respects to General
Liability.
CERTIFICATE HOLDER
MIAM-05
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POliCIES BE CANCELLED ElEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WtLL ENDEAVOR TO MAIL ~L DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBliGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
Ci ty of Miami Beach
Property Management
1245 Michigan Avenue
Miami Beach FL 33139
~RE~~.W
ACORD 25 (2001/08)
@ACORD CORPORATION 1988
.
.
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED. the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rigllts to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s). authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
ACORD 25 (2001/08)
,
.
Governmental References
Miami Dade Housing Agency
Contact: Mario Novoa
1401 NW 7th Street
Miami, FL 33125
Tel.: 305/644-5227
Fax: 305/644--5103
City of Miami Beach
Contact: Viviana
1245 Michigan Ave.
Miami Beach, FL 33139
Tel.: 305/673-7000 X2968
Fax: 305/673-7650
Hialeah Housing Authority
Attn: Celi Ervensum
75 East 6th Street
Hialeah, FL 33010
Tel.: 305/888-9744
Fax: 305/887-8738
,
.
CONSTRUCTION REFERENCES
PASS International
350 Jirn Moran Blvd., Suite 200
Deerfield Beach, FL
Tel.: 954/421-9000
Fax: 954/421-5808
Miami Gardens Square One
150 NW 183rd Street
Miami Gardens, FL 33169
Tel.: 305/586-7613
Fax: 305/653-1960
Miami Dade Housing Agency
1401 NW yth Street
Miami, FL 33125
Tel.: 305/644-52.27
Fax: 305/644-5103
Brodson Construction
167 NE 39th Street
Miami, FL 33137
Tel.: 305/576-9909
Fax: 305/576-9902
SBS Construction
P.O. Box 780849
San Antonio, TX 78278
Tel.: 210/479-5662
Fax: 210/479-5749
City of Miami Beach
1245 Michigan Ave.
Miami Beach, FL 33139
Tel.: 305/673-7000 X2968
Fax: 305/673-7650
Hialeah Housing Authority
75 East 6th Street
Hialeah, FL 33010
Tel.: 305/888-9744
Fax: 305/887-8738
idasler Mechanicai Services. Inc. 6187 NW 167'" St" II-:?5. Miami. I,'L :;:~Oi:J
RECENTLY COMPLETED PROJECTS
Contract Amount Job Name
Miami Gardens Square One $334,203.00 T ootsies
150 NW 183rd Street
Miami Gardens, FL 33169
Miami Dade Housing Agency $572,160.00 Moody Village
1401 NW th Street.
Miami, FL 33125
Pass Construction $178,886.00 Flamingo Resort
350 Jim Moran Blvd., Ste. 200 Residence
Deerfield Beach, FL
Pass Construction $ 64,286.00 Fram Fed Ex/
350 Jim Moran Blvd., Ste. 200 Stonegate Bank
Deerfield Beach, FL
City of Miami Beach $ 48,321.00 Fire Station #1
1245 Michigan Ave.
Miami Beach, FL 33139
SBS Construction $129,629.00 Public Storage
P.O. Box 780849
San Antonio, TX 78278
Master Mech,ltlical Services. In,~'. 6187 NIN 167'" . H
ll1:. VI. ;l;.'U!j