Loading...
357-2000 RDA RESOLUTION NO. 357-2000 A RESOLUTION OF THE CHAIRMAN AND THE MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AMENDMENT NO.6 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT-TO-EXCEED $216,930.00 FOR PROJECT CONSTRUCTION COORDINATION, FIELD REPRESENT ).nON, AND SHOP DRAWING REVISION FOR THE PHASE I CONSTRUCTION OF THE SOUTH POINTE STREETSCAPE IMPROVEMENTS PROJECT; AND APPROPRIATING THE CONTRACT AMOUNT FROM THE SOUTH POINTE TAX INCREMENT FUND WHEREAS, on January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley-Hom and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, staff has negotiated a not-to-exceed fee of$170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review. of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, c:. May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not-to-exceed fee, in the amount of$389,1 00, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of $1 03,800, including surveying, Master Plan design, preparation of bidding and construction documents, and permitting for the Washington A venue extension, as required by the Portofino Settlement Agreement; and WHEREAS, on October 20, 1999, the RDA approved Amendment No.3 to the Agreement, which included a not-to-exceed fee in the amount of $70,925, for a Phase II survey, including geo-technical studies, aerial photos and other expenses; and WHEREAS, on February 9, 2000, the RDA approved Amendment No. 4 to the Agreement, which included a not-to-exceed fee in the amount of $22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Poink Park for its connection with the driveway entrance provided into Park; and RESOLUTION NO. 2000-23998 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.6 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT-TO-EXCEED $216,930.00 FOR PROJECT CONSTRUCTION COORDINATION, FIELD REPRESENTATION, AND SHOP DRAWING REVISION FOR THE PHASE I CONSTRUCTION OF THE SOUTH POINTE STREETS CAPE IMPROVEMENTS PROJECT; AND APPROPRIATING THE CONTRACT AMOUNT FROM THE SOUTH POINTE TAX INCREMENT FUND WHEREAS, on January 20,1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley-Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, staffhas negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not-to-exceed fee, in the amount of$389,1 00, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of$1 03,800, including surveying, Master Plan design, preparation of bidding and construction documents, and permitting for the Washington Avenue extension, as required by the Porto fino Settlement Agreement; and WHEREAS, on October 20, 1999, the RDA approved Amendment No.3 to the Agreement, which included a not-to-exceed fee in the amount of $70,925, for a Phase II survey, including geo-technica.! studies, aerial photos and other expenses; and WHEREAS, on February 9, 2000, the RDA approved Amendment No.4 to the Agreement, which included a not-to-exceed fee in the amount of $22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park; and '. WHEREAS, on May 10, 2000, the RDA approved Amendment No.5 to the Agreement, which included a not-to-exceed fee in the amount of $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park, to be included as part of phase I of the South Pointe Redevelopment Area streetscape project; and WHEREAS, on June 28, 2000, the RDA approved the execution of a construction contract with Atlantic Civil, Inc. to perform the construction of Phase I of the South Pointe Streetscape Improvements; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, the Phase I construction, estimated to last approximately twelve (12) months, is about to commence; and WHEREAS, during the construction of the Project, Kimley-Hom and Associates, Inc. will provide the Redevelopment Agency regular periodic input regarding the interpretation of plans; and WHEREAS, the proposed not-to-exceed fee for project construction coordination, field representation, and shop drawing revision for the Phase I construction of the Project, is $216,930.00 with the following defined tasks: Construction Phase Services, including but not-limited-to shop drawing revision and construction and field representation and coordination - $203,930.00; Additional Public Meetings and Presentations, if required - $5,500.00; and Reimbursements - $7,500.00. NOW, THEREFORE, BE IT DULY RESOLVED BY THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY, that the Chairman and Members of the Miami Beach Redevelopment Agency herein approve the attached Amendment No.6 to the Agreement with Kimley-Hom and Associates, Inc., dated June 2m, 2000, for professional engineering and landscaping services, in an amount not-to-exceed $216,930.00 for project construction coordination, field representation, and shop drawing revision for Phase I construction of the South Pointe Streetscape Improvements Project; and appropriate the contract amount from the South Pointe Tax Increment Fund PASSED and ADOPTED this 12th day of July, 2000. 1t/IA CHAIRMAN ~r ~(U~ APPROVED AS TO FORM & LANGUAGE & FOR EXECunON SECRETARY 1~CY 7-ir Gene",' Counsel \\CH2\SYS\DDHP\$ALLWexandra\South Pointe\Kimley Hom\Contract\KHA AD6PIC RDAReso.doc Miami Beach Redevelopment Agency 1700 Convention Center Drive, Miami Beach, Fl. 33139 http:\\ci.miami-beach.f1.us Telephone (305) 673-7193 .!}csimile (305) 673-7772 REDEVELOPMENT AGENCY MEMORANDUM NO. 00- qJS DATE: July 12, 2000 TO: Chairman and Members of the Miami Beach Redevelopment Agency FROM: SUBJECT: A RESOLUTION OF THE CHAIRMAN AND THE MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AMENDMENT NO.6 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT-TO-EXCEED $216,930.00 FOR PROJECT CONSTRUCTION COORDINATION, FIELD REPRESENTATION, AND SHOP DRAWING REVISION FOR THE PHASE I CONSTRUCTION OF THE SOUTH POINTE STREETSCAPE IMPROVEMENTS PROJECT; AND APPROPRIATING THE CONTRACT AMOUNT FROM THE SOUTH POINTE TAX INCREMENT FUND. ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. ANAISSIS On January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley- Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of street improvements in the South Pointe Redevelopment Area (the Project). The RDA staff negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a Master Plan and surveying for the Phase I improvements. On May 26, 1999, the RDA approved Amendment No.1, which included a not-to-exceed fee in the amount of $389, I 00 for the preparation of construction documents, permitting and bidding services for Phase 1. AGENDA ITEM 36 DATE ,-(2.-Du On May 26, 1999, the RDA approved Amendment No.2, which included a not-to-exceed fee in the amount of $103,800 including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington Avenue extension, as required by the Porto fino Settlement Agreement. On October 20, 1999, theRDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925 for Phase II survey, including geo-technical studies, aerial photos and other expenses. On February 9, 2000, the RDA approved Amendment No.4, which included a not-to-exceed fee in the amount of$22,500 for survey, construction documentation, permitting services and geo-technical studies to modifY the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park. . On May 10,2000, the RDA approved Amendment No.5, which included a not-to-exceed fee in the amount of $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park, to be included as part of phase I of the South Pointe Redevelopment Area streetscape project. On June 28, 2000, the RDA approved the execution of a construction contract with Atlantic Civil, Inc. to perform the construction of Phase I of the South Pointe Streetscape Improvements. In order to meet the time schedule prepared as part of the Master Plan, the Phase I construction, estimated to last approximately twelve (12) months, is about to commence. During the construction of the Project, Kimley-Horn and Associates, Inc. will provide the Redevelopment Agency regular periodic input regarding the interpretation of plans. The proposed not-to-exceed fee for project construction coordination, field representation, and shop drawing revision for the Phase I construction of the Project, is $216,930.00 with the following defined tasks: Construction Phase Services (including but not-limited-to shop drawing revision and construction progress meeting/field representation and coordination) Additional Meetings (if required, representation at additional meetings) Reimbursable Expenses $203,930.00 5,500.00 7,500.00 The Administration recommends that the Chairman and the Members of the Miami Beach Redevelopment Agency approve Amendment No. 6 to the Agreement with Kimley-Horn and Associates, Inc., for professional engineering and landscaping services, in an amount not-to-exceed $216,930.00 for project construction coordination, field representation, and shop drawing revision for Phase I construction of the South Pointe Streetscape Improvements Project; and appropriate the contract amount from the South Pointe Tax Increment Fund. LAL/dfcIPDW~ B~""""1Sooth Poi."IK;mloy HomlConin<tIKHA AD6PIC RDMkmo.,", WHEREAS, on May 10, 2000, the RDA approved Amendment No.5 to the Agreement, which included a not-to-exceed fee in the amount of $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park, to be included as part of phase I of the South Pointe Redevelopment Area streetscape project; and WHEREAS, on June 28, 2000, the RDA approved the execution of a construction contract with Atlantic Civil, Inc. to perform the construction of Phase I of the South Pointe Streetscape Improvements; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, the Phase I construction, e<timated to last approximately twelve (12) months, is about to commence; and WHEREAS, during the construction of the Project, Kimley-Hom and Associates, Inc. will provide the Redevelopment Agency regular periodic input regarding the interpretation of plans; and WHEREAS, the proposed not-to-exceed fee for project construction coordination, field representation, and shop drawing revision for the Phase I construction of the Project, is $216,930.00 with the following defined tasks: Construction Phase Services, including but not-limited-to shop drawing revision and construction and field representation and coordination - $203,930.00; Additional Public Meetings and Presentations, if required - $5,500.00; and Reimbursements - $7,500.00. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein ratify the attached Amendment No.6 to the Agreement with Kimley-Hom and Associates, Inc., dated June 2711>, 2000, for professional engineering and landscaping services, in an amount not-to-exceed $216,930.00 for project construction coordination, field representation, and shop drawing revision for Phase I construction of the South Pointe Streetscape Improvements Project; and appropriate the contract amount from the South Pointe Tax Increment Fund. PASSED and ADOPTED this 12th day ofJuly, 2000. 1J/JII , MAYOR ATTEST: e1LUA1f P(lftClUj\ APFROVED ,1.5 TO FORM & LANGUAGE ~ FOR EXECUTtON CITY CLERK 1kti~ 7- 5'r/l/ Daic F:\DDHP\$ALLWexandra\South Pointe\Kimley Hom\Contract\KHA SW ADS CMBReso.doc CITYOF MIAMI BEACH ;ITY HALL 1700 CONVENTION CENTER DRIVE MIAMtBEACH, FLORIDA 33139 lttp:\\ci.miami.beach. fl. us COMMISION MEMORANDUM NO. r5s -00 DATE: July 12, 2000 TO: Mayor Neisen O. Kasdin and Members of the City Commission Lawrence A~LeVY ~ City Manage A RESOLU ON OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.6 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AlVIOUNT NOT -TO-EXCEED $216,930.00 FOR PROJECT CONSTRUCTION COORDINATION, FIELD REPRESENTATION, AND SHOP DRAWING REVISION FOR THE PHASE I CONSTRUCTION OF THE SOUTH POINTE STREETS CAPE IMPROVEMENTS PROJECT; AND APPROPRIATING THE CONTRACT AlVIOUNT FROM THE SOUTH POINTE TAX INCREMENT FUND. FROM: SUBJECT: ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. ANALYSIS On January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA staff to negotiate an agreement with Kimley- Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping services for design of sIreet improvements in the South Pointe Redevelopment Area (the Project). The RDA staff negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a Master Plan and surveying for the Phase I improvements. On May 26, 1999, the RDA approved Amendment No.1, which included a not-to-exceed fee in the amount of $389, 1 00 for the preparation of construction documents, permitting and bidding services for Phase I. AGENDA ITEM r2ir DATE ,-/2 -0 D On May 26, 1999, the RDA approved Amendment No.2, which included a not-to-exceed fee in the amount of $103,800 including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington Avenue extension, as required by the Porto fino Settlement Agreement. On October 20,1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925 for Phase II survey, including geo-technical studies, aerial photos and other expenses. On February 9, 2000, the RDA approved Amendment No.4, which included a not-to-exceed fee in the amount of $22,500 for survey, construction documentation, permitting services and geo-technical studies to modify the existing parking lot located at South Pointe Park for its connection with the driveway entrance provided into Park. On May 10,2000, the RDA approved Amendment No.5, which included a not-to-exceed fee in the amount of $8,500.00 for design, coordination and preparation of construction documents for two monument identification signs at South Pointe Park, to be included as part of phase I of the South Pointe Redevelopment Area streetscape project. On June 28, 2000, the RDA approved the execution of a construction contract with Atlantic Civil, Inc. to perform the construction of Phase I of the South Pointe Streetscape Improvements. In order to meet the time schedule prepared as part of the Master Plan, the Phase I construction, estimated to last approximately twelve (12) months, is about to commence. During the construction of the Project, Kimley-Horn and Associates, Inc. will provide the Redevelopment Agency regular periodic input regarding the interpretation of plans. The proposed not-to-exceed fee for project construction coordination, field representation, and shop drawing revision for the Phase I construction of the Project, is $216,930.00 with the following defined tasks: Construction Phase Services (including but not-limited-to shop drawing revision and construction progress meeting/field representation and coordination) Additional Meetings (if required, representation at additional meetings) Reimbursable Expenses $203,930.00 5,500.00 7,500.00 The Administration recommends that the Mayor and City Commission ratify Amendment No.6 to the Agreement with Kimley-Horn and Associates, Inc., for professional engineering and landscaping services, in an amount not-to-exceed $216,930.00 for project construction coordination, field representation, and shop drawing revision for Phase I construction of the South Pointe Streetscape Improvements Project; and appropriate the contract amount from the South Pointe Tax Increment Fund. IWV ~ LALlCMCIPDW/AR F:\DDHP\$ALLWcxandra\South Pointc\Kimley Hom\Contract\KHA AD6PIC CMBMemo.doc ~ AMENDMENT NO.6 . TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPE ARCHITECTURAL SERVICES, FOR PROJECT CONSTRUCTION COORDINATION, FIELD REPRESENTATION, AND SHOP DRAWING REVISION FOR THE PHASE I CONSTRUCTION OF THE SOUTH POINTE STREETSCAPE IMPROVEMENTS PROJECT This Amendment No.6, dated as of l' u. i~ I ')-- > 2000, to that certain Professional Services Agreement (Agreement), dated ebruary 17, 1999, by and between the Miami Beach Redevelopment Agency (RDA) and Kimley-Horn and Associates, Inc. (Consultant). RECITALS WHEREAS, the Agreement provides for the preparation of the final Master Plan for the South Pointe Redevelopment Area Streetscape Improvements Project (the "Project"); and WHEREAS, this Amendment No.6 to the Agreement provides for project construction coordination, field representation, and shop drawing revision for the Phase I construction of the Project; and WHEREAS, the Consultant will review the shop drawings submitted by the contractor for materials to be utilized for the construction of the Project; and WHEREAS, the Consultant will copy the shop drawings to the City for filing; and WHEREAS, the Consultant will provide representation, throughout the duration of the Project, at weekly construction progress meetings, with the intent to resolve questions that may arise from the plans; and WHEREAS, the Consultant will provide field representation throughout the duration of the Project, for the pUl1Xlse of providing observation of material and procedure testing; layout and materials for paving, lighting, irrigation; and review of the landscape materials for conformity with the plans and specifications; and WHEREAS, the Consultant's field representation will consist of an average of sixteen (16) hours/week for a site inspector and six (6) hours/week for project manager/engineer and associated clerical time, with reports based on the site observations of the construction work will be provided; and WHEREAS, the Consultant will provide coordination services through the interpretation of plans; the response to the requests for information (RFls) submitted by the Contractor; the review of change orders, requests for payments, and as-built drawings, as prepared by the Contractor; and the preparation of a preliminary and final punch list. . 1. RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.6. 2. MODIFICATIONS The Agreement is amended as follows: Exhibit "A", entitled "Scope of Services/Fee", is amended to add the work attached hereto and incorporated herein as Exhibit "A-6". 3. OrnER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The RDA and Consultant ratify the terms of the Agreement, as modified by this Amendment No.6. IN WITNESS WHEREOF, the parties hereto have caused this Fifth Amendment to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: APPROVED~ BEACH REDEVELOPMENT AGENCY FORM & LANGUAGE & fOR EXECUTION 11'V1 ~rf(lf(b;u~ -,/nJ/Y' R8dMl men! AoetlCf ~ SECRETARY C;.,,'Q! ':-0'.'0'", CHAIRMAN ATTEST: CONSULTANT: KIMLEY-HORN AND A ,INC. By: VICE-PRESIDENT \\CH2\SYS\DDHP\$ALLWcxandra\South Pointe\Kimlcy Hom\Contract\KHA AD6PIC Amendment.doc . ~=n Kimley-Horn and Associates, Inc. Construction Phase SelVices . Phase I . June 27, 2000, Page I Exhibit "A. 6" SCOPE OF SERVICES Task 1 - Construction Phase Services The intent of these services is to provide regular, periodic input to the City regarding interpretations of the plans. The fee budget associated with this task is based upon 52- week (12-month) construction duration. If the final acceptance ofthe project extends to a period beyond 52 weeks. through no fault of the consultant, additional service fees shall be required. 1.1 Shop Drawing Review We will provide services to review shop drawings as submitted by the contractor for materials to be utilized for construction of the project. Shop drawings will be copied to the City for filing. 1.2 Progress Meetings We will provide representation at weekly construction progress meetings. The intent of our attendance is to resolve questions that may arise regarding the plans. 1.3 Field Representation We will provide limited field representation throughout the duration of the construction, for the purpose of providing observation of testing (such as densities for base materials, pressure testing and the provision of necessary documentation to permitting agency of the watermains), layout and materials for paving, lighting, irrigation and review of the landscape materials for conformity with the plans and specifications. Field representation will consist of an average of 16 hours/week for a site inspector, 6 hours/week for project manager/engineer and associated clerical time. Reports, based on our site observations of the construction work, will be provided. The Consultant shall not be responsible for the means, methods, techniques, sequences, or procedures of construction selected by Contractor(s) or the safety precautions and programs incident to the work ofContractor(s). The Consultant's efforts will be directed toward providing the Client with a greater degree of confidence that the completed work of Contractor(s) will conform to the Contract Documents. The Consultant shall not be responsible for the failure ofContractor(s) to perform the work in accordance with the Contract Documents. The Consultant shall not have the authority or responsibility to stop the work of any contractor. During such visits and on the basis of on-site observations, the Consultant shall keep the Client informed of the progress of the work, shall endeavor to provide some protection for the owner against defects and deficiencies in such work, and may disapprove or reject work if it fails to ~=n Kimley.Horn and Associates, Inc. Construction Phase Services. Phase I , June 27. 2000, Page 2 conform to the Contract Documents. The Consultant shall perform the observations in accordance with the standard of care of the profession at the time of service. 1.4 Coordination The Consultant shall provide interpretation of plans, response to RFls submitted by the Contractor. review of change orders prepared by Contractor, review of as- built drawings prepared by Contractor, one preliminary and one final punch list, and review of contractors request for payments. Additional Services Upon your authorization, we will provide any additional services that may be required beyond those described in Task 1. These services may include but are not limited to such items as the following: . Attending progress meetings beyond the limits outlined within the contract documents . Reviewing substantially different and alternative construction methods and materials for "Or Equal" qualification . Field Representation beyond the limits outlined within the contract documents SCHEDULE We will provide the services outlined in Task I in accordance with the time frame outlined within the contract documents for the South Pointe Streetscape Improvements- Phase I. COMPENSA nON We will provide the scope of services as described as outlined below. Lumv Sum Amount Task 1 Construction Phase Services ............................... $ 203,930 Additional Services Meetings (above those described in the basic scope of services) 10 @ an average of $550/meeting ..................... $ 5,500 Reimbursable expenses ............... ........................................ $ 7,500 U:\ Word Docs\South Pointe\contracts\2phasc I ceiscope.doc