Loading...
340-20000 RESO Incomplete RESOLUTION NO. 340-2000 A RESOLUTION OF THE CHAIRMAN AND THE MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING AMENDMENT NO.4 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT-TO-EXCEED $22,500.00, FOR SURVEYING, PREPARATION OF CONSTRUCTION DOCUMENTS, AND PERMITTING SERVICES FOR THE EXPANSION OF THE PARKING LOT AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETSCAPE PROJECT WHEREAS, on January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an Agreement with Kimley-Hom and Associates, Inc. (the Agreement), to provide professional engineering and landscaping architectura1 services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, staffhas negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not-to-exceed fee, in the amount of$389,IOO, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a noHo-exceed fee, in the amount of $103,800, including surveying, Master Plan design, preparation of bidding and construction documents, and permitting for the Washington Avenue extension, as required by the Portofino Settlement Agreement; and WHEREAS, on October 20,1999, the RDA approved Amendment No, 3, which included a not-to-exceed fec;in the amount of $70,925, for a Phase II survey, including geo-technical studies, aerial photos and other expenses; and WHEREAS, the expansion of South Pointe Park's existing parking lot will allow the connection of the lot with the driveway entrance provided into South Pointe Park, as specified within the Phase I construction documents; and WHEREAS, the modified lot will provide twenty-two (22) additional metered parking spaces, to a total of sixty-eight (68) metered parking spaces; and WHEREAS, the modifications of the current layout will start from a point approximately 600 feet east of the construction of the Washington Avenue extension; and WHEREAS, all improvements will be fully coordinated with public utility companies and governmental agencies, as required; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents are about to be completed and the construction bid package is expected to be issued within thirty days; and WHEREAS, due to the short time frame to incorporate the lot's expansion design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.4 to the Agreement; and WHEREAS, the proposed not-to-exceed fee for the expansion of the existing parking lot at South Pointe Park is $22,500.00, with the following defined tasks: Survey - $4,800.00; Preparation of Construction Documents - $10,450.00; Special Services - $4,750.00 (consisting of permitting -$2,500.00 and public meetings and presentations - $2,250.00); and Reimbursements - $2,500 (consisting of geo-technical studies - $1,500 and direct expenses - $1,000). NOW, THEREFORE, BE IT DULY RESOLVED BY THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY, that the Chairman and Members of the Miami Beach Redevelopment Agency herein approve the attached Amendment No.4 to the Agreement with Kimley-Hom and Associates, Inc., for professional engineering and landscaping services, in an amount not-to-exceed $22,500.00, for surveying, preparation of construction documents, and permitting services for the expansion of the parking lot at South Pointe Park; to be included as part of Phase I of the South Pointe Redevelopment area Streetscape project. PASSED and ADOPTED this 9th day of February, 2000. ~~ CHAIRMAN ATTEST: ~~. faAck- APPROVED /tIS TO FORM & LANGU1.GE & FOR EXECunON SECRETARY LAL/CMC/AR \\CH2\SYS\DDHP\SAU.\Alexandra\South Pointe\Kimley Hom\ContraCt\KHA PLAD4 RDAReso.doc 1i ft!..AiR..J- ~ ~/1f7) _ prnenllqanClf Dale General Counsel 'Miami Beach Redevelopment Agency 1700 Convention Center Drive. Miami Beach, FI. 33139 http:\\ci.miami-beach.fl.u. ~. Telephone (305) 673-7193 Facsimile (305) 673-7772 REDEVELOPMENT AGENCY MEMORANDUM NO. 00 ~ 10 DATE: February 9, 2000 TO: Chairman and Members of the Miami Beach Redevelopment Agency FROM: Lawrence A. Levy ~ Executive Director SUBJECT: A RESOLUTION OF mE CHAIRMAN AND THE MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY APPROVING , AMENDMENT NO.4 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., APPROVED UNDER RESOLUTION NO. 314-99 FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES IN AN AMOUNT NOT-TO-EXCEED $22,500.00 FOR SURVEYING, PREPARATION OF CONSTRUCTION DOCUMENTS, AND PERMITfING SERVICES FOR THE EXPANSION OF THE PARKING LOT AT SOUTH POINTE PARK; TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETSCAPE PROJECT ADMINISTRATIVE RECOMMENDATION Adopt the Resolution. ANALYSIS On January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an Agreement with Kimley- Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping architectural services for design of street improvements in the South Pointe Redevelopment Area (the Project), The RDA Staff negotiated a not-to-exceed fee of $170,760 for the preparation of the fmal Master Plan and opinion of probable cost for the entire Project. The scope of services included in the initial phase of work consisted of data collection and a review of existing documents resulting in the preparation of a Master Plan and surveying for the Phase I improvements. AGENDA ITEM 3 is DATE '2..-9-00 On May 26, 1999, the RDA approved Amendment No.1, which included a not-to-exceed fee in the amount of$389,100 for the preparation of construction documents, permitting and bidding services for Phase I. On May 26, 1999, the RDA approved Amendment No.2, which included a not-to-exceed fee in the amount of $103,800 including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington Avenue extension, as required by the Portofino Settlement Agreement. On October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925 for Phase II survey, including geo-technical studies, aerial photos and other expenses. The expansion of South Pointe Park's existing parking lot will allow the connection of the lot with the driveway entrance provided into South Pointe Park, as specified within the Phase I construction dQcuments. The modified lot will provide twenty-two (22) additional metered parking spaces, to a total of sixty-eight (68) metered parking spaces. The modifications of the current layout will start from a point approximately 600 feet east of the construction of the Washington Avenue extension. All improvements will be fully coordinated with the public utility companies and govemmental agencies, as required. In order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents are about to be completed and the construction bid package is expected to be issued within thirty days. Due to the short time frame to incorporate the lot's expanded design into the Phase I construction documents, it is recommended that these plans will be completed and issued as Amendment No.4 to the Agreement. The proposed not-to-exceed fee for the expansion of the existing Parking lot at South Pointe Park is $22,500.00 with the following defined tasks: Survey - $4,800.00; Preparation of Construction Documents - $10,450.00, Special Services - $4,750.00 (consisting of permitting - $2,500.00 and public meetings and presentations - $2,250.00); and Reimbursements - $2,500.00 (consisting of geo- technical studies - $1,500.00 and direct expenses - $1,000.00). The Administration recommends that the Chairman and the Members of the Miami Beach Redevelopment Agency approve Amendment No.4 to the Agreement with Kimley-Hom and Associates, Inc., for professional engineering and landscaping services, in an amount not-to-exceed $22,500.00, for surveying, preparation of construction documents, and permitting services for the expansion of the parking lot at South Pointe Park; to be included as part of Phase I of the Project. ~ LAL/~/AR~ . P;IDDHP\SALL~PoIrQOOmlqrHanl\CoaUadlkHAPl..AtufU)AMalMI.doc; RESOLUTION NO. 2000-23795 A RESOLUTION OF mE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.4 TO THE AGREEMENT BETWEEN mE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES, IN AN AMOUNT NOT-TO-EXCEED $22,500.00, FOR SURVEYING, PREPARATION OF CONSTRUCTION DOCUMENTS, AND PERMITTING SERVICES FOR THE EXPANSION OF THE PARKING LOT AT SOUTH POlNTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POlNTE REDEVELOPMENT AREA STREETSCAPEPROJECT WHEREAS, on January 20,1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an Agreement with Kimley-Hom and Associates, Inc. (the Agreement), to provide professional engineering and landscaping architectural services for design of street improvements in the South Pointe Redevelopment Area (the Project); and WHEREAS, staffhas negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project; and WHEREAS, the scope of services included in the initial phase of work consisted of data collection and a review of existing documents, resulting in the preparation of a Master Plan and surveying for the Phase I improvements; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.1 to the Agreement, which included a not-to-exceed fee, in the amount of$389,1 00, for the preparation of construction documents, permitting and bidding services for Phase I; and WHEREAS, on May 26, 1999, the RDA approved Amendment No.2 to the Agreement, which included a not-to-exceed fee, in the amount of $1 03,800, including surveying, Master Plan design, preparation of bidding and construction documents, and permitting for the Washington Avenue extension, as required by the Portofmo Settlement Agreement; and WHEREAS, on October 20, 1999, the RDA approved Amendment No, 3, which included a not-to-exceed fee, in the amount of $70,925, for a Phase II survey, including geo-teclmical studies, aerial photos and other expenses; and WHEREAS, the expansion of South Pointe Park's existing parking lot will allow the connection of the lot with the driveway entrance provided into South Pointe Park, as specified within the Phase I construction documents; and WHEREAS, the modified lot will provide twenty-two (22) additional metered parking spaces, to a total of sixty-eight (68) metered parking spaces; and WHEREAS, the modifications of the current layout will start from a point approximately 600 feet east of the construction of the Washington Avenue extension; and WHEREAS, all improvements will be coordinated the public utility companies and governmental agencies, as required; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents are about to be completed and the construction bid package is expected to be issued within thirty days; and WHEREAS, due to the short time frame to incorporate the lot's expansion design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.4 to the Agreement; and WHEREAS, the proposed not-to-exceed fee for the expansion of the existing parking lot at South Pointe Park is $22,500.00, with the following defined tasks: Survey - $4,800.00; Preparation of Construction Documents - $10,450.00; Special Services - $4, 750.00 (consisting of permitting -$2,500.00 and public meetings and presentations - $2,250.00); and Reimbursements - $2,500.00 (consisting of geo-technical studies - $1,500.00 and direct expenses - $1,000.00), NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein ratifY the attached Amendment No.4 to the Agreement with Kimley-Hom and Associates, Inc., for professional engineering and landscaping services, in an amount not-to- exceed $22,500.00, for surveying, preparation of construction documents, and permitting services for the expansion of the parking lot at South Pointe Park; to be included as part of Phase I of the South Pointe Redevelopment area Streetscape project. PASSED and ADOPTED this 9th day of February, 2000, 14 MAYOR ATTEST: J &W-t ( Pa4-~ APPROVED AS TO FORM & lANGUAGE & FOR EXECUTION CITY CLERK 4~eiL , C' v 1-/rcv !)"',, LAL/CMC/AR \\CH2\SYS\DDt!N,ALLWexandra\Soulh Poiote\Kimlr:y Hcn\ContrKt\KHA Pl.AD4 RDAReso.doc CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER ORIVE MIAMIBEACH, FLORIDA 33139 http:\\ci.miamiebeach.fl.us COMMISION MEMORANDUM NO. Izq-oo DATE: February 9, 2000 TO: Mayor Neisen O. Kasdin and Members of the City Commission FROM: Lawrence A. Levy ~ City Manager ~\\. SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF mE CITY OF MIAMI BEACH RATIFYING AMENDMENT NO.4 TO THE AGREEMENT BETWEEN THE MIAMI BEACH REDEVELOPMENT AGENCY AND KIMLEY -HORN AND ASSOCIATES, INC., APPROVED UNDER RESOLUTION NO. 99-23073 FOR PROFESSIONAL ENGINEERING AND LANDSCAPING SERVICES IN AN AMOUNT NOT- TO-EXCEED $22,500.00 FOR SURVEYING, PREPARATION OF CONSTRUCTION DOCUMENTS, AND PERMITTING SERVICES FOR THE EXPANSION OF THE PARKING LOT AT SOUTH POINTE PARK: TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETSCAPE PROJECf ADMINISTRATIVE RECOMMENDATION Adopt the Resolution, . ANALYSIS On January 20, 1999, the Chairman and Members of the Miami Beach Redevelopment Agency (RDA) authorized the Executive Director and RDA Staff to negotiate an Agreement with Kimley- Horn and Associates, Inc. (the Agreement), to provide professional engineering and landscaping architectural services for design of street improvements in the South Pointe Redevelopment Area (the Project). The RDA Staff negotiated a not-to-exceed fee of $170,760 for the preparation of the final Master Plan and opinion of probable cost for the entire Project. The scope of services included in the initial phase of work consisted of data collection and a review of existing docwnents resulting in the preparation of a Master Plan and surveying for the Phase I improvements. AGENDA ITEM-.BJ...E. DATE 2.-CJ ..00 On May 26, 1999, the RDA approved Amendment No.1, which included a not-to-exceed fee in the amount of $389, I 00 for the preparation of construction documents, permitting and bidding services for Phase 1. On May 26, 1999, the RDA approved Amendment No.2, which included a not-m-exceed fee in the amount of $103,800 including surveying, Master Plan design, preparation of bidding and construction documents and permitting for the Washington Avenue extension, as required by the Portofino Settlement Agreement. On October 20, 1999, the RDA approved Amendment No.3, which included a not-to-exceed fee in the amount of $70,925 for Phase II survey, including gea-technical studies, aerial photos and other expenses. The expansion of South Pointe Park's existing parking lot will allow the connection of the lot with the driveway entrance provided into South Pointe Park, as specified within the Phase I construction documents. The modified lot will provide twenty-two (22) additional metered , parking spaces, to a total of sixty-eight (68) metered parking spaces. The modifications of the current layout will start from a point approximately 600 feet east of the construction of the Washington Avenue extension. All improvements will be fully coordinated with the public utility companies and governmental agencies, as required. In order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents are about to be completed and the construction bid package is expected to be issued within thirty days. Due to the short time frame to incorpomte the lot's expanded design into the Phase I construction documents, it is recommended that these plans will be completed and issued as Amendment No, 4 to the Agreement. The proposed not-to-exceed fee for the expansion of the existing Parking lot at South Pointe Park is $22,500.00 with the following defined tasks: Survey - $4,800.00; Preparation of Construction Documents - $10,450.00, Special Services - $4,750.00 (consisting of permitting - $2,500.00 and public meetings and presentations - $2,250.00); and Reimbursements - $2,500.00 (consisting of gee-technical studies - $1,500.00 and direct expenses - $1,000.00). The Administration recommends that the Mayor and City Commission mtity Amendment No.4 to the Agreement with Kimley-Hom and Associates, Inc. for professional and engineering services, in an amount not-to-exceed $22,500.00, for surveying, preparation of construction documents, and permitting services for the expansion of the parking lot at South Pointe Park; to be included as part of Phase I of the Project. LAUC~b~'~ '\CH2\SYS\DDHP\SALLWexanch\SQudt PoiDtc\Kim~ Ham\Cootract\KHA PLAD4 CMBMemoJioc AMENDMENT NO.4 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE', MIAMI BEACH REDEVELOPMENT AGENCY, FLORIDA AND KIMLEY-HORN AND ASSOCIATES, INC., FOR PROFESSIONAL ENGINEERING AND LANDSCAPE ARCmTECTURAL SERVICES, FOR SURVEYING, PREPARATION OF CONSTRUCTION DOCUMENTS, AND PERMITTING SERVICES FOR THE EXPANSION OF THE PARKING LOT AT SOUTH POINTE PARK, TO BE INCLUDED AS PART OF PHASE I OF THE SOUTH POINTE REDEVELOPMENT AREA STREETSCAPEPROJECT This Amendment No.4, dated as of fCt,(I.I~fIA.J '1 ,2000, to that certain Professional Services Agreement (Agreement), dated February 17, 1999, by and between the Miami Beach Redevelopment Agency (RDA) and Kimley-Hom and Associates, Inc. (Consultant). RECITALS WHEREAS, the Agreement provides for the preparation of the final Master Plan for the South Pointe Redevelopment Area Project; and WHEREAS, this Amendment No. 4 to the Agreement provides for surveying, preparation of construction documents, and permitting services for the expansion of the parking lot at South Pointe Park; to be included as part of Phase I of the South Pointe Redevelopment area Streetscape project; and WHEREAS, the expansion of South Pointe Park's existing parking lot will allow the connection of the lot with the driveway entrance provided into South Pointe Park, as specified within the Phase I construction documents; and WHEREAS, the modified lot will provide twenty-two (22) additional metered parking spaces, to a total of sixty-eight (68) metered parking spaces; and WHEREAS, the modifications of the current layout will start from a point approximately 600 feet east of the construction of the Washington Avenue extension; and WHEREAS, all improvements will be fully coordinated with public utility companies and governmental agencies, as required; and WHEREAS, in order to meet the time schedule prepared as part of the Master Plan, the Phase I construction documents are about to be completed and the construction bid package is expected to be issued within thirty days; and WHEREAS, due to the short time frame to incorporate the lot's expansion design into the Phase I construction documents, it is recommended that these plans be completed and issued as Amendment No.4 to the Agreement; and 1. RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.4. 2. MODIFICATIONS The Agreement is amended as follows: Exhibit "A", entitled "Scope ofServicesfFee", is amended to add the work attached hereto and incorporated herein as Exhibit "A-4". Exhibit "C", entitled "Schedule", is amended to add the schedule attached hereto and incorporated herein as Exhibit "C-4". 3. OTHER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The RDA and Consultant ratify the terms of the Agreement, as modified by this Amendment No.4. IN WITNESS WHEREOF, the parties hereto have caused this 1bird Amendment to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: APPROVN!~'~EACH REDEVELOPMENT AGENCY FORM & LANGUAGE ,1 . ~ & FOR ElCECUllON tll!1l \u~~~~~. ?/;!!; m CHAIRMAN SEAL ATTEST: CONSULTANT: KIMLEY-HORNAND ASS Q).,J ~ Q <<-- By: SECRETARY VICE-PRESIDENT \\CH2\SYS\DDHP\SAlLWcxandra\South Pointe\Kimley Hom\Contract\KHA PLAD4 Amendment.doc ... ~=n Kimley-Horn and Associates, Inc. South Pointe Park, January 18,2000, Page 1 Exhibit "A- 4 " SCOPE OF SERVICES Task 1 - Field Survey Kimley-Hom and Associates will provide the following survey services: I. Ground control (horizontal) will be established within the existing parking lot. The centerline of the parking lot will be established based upon the physical centerline of said parking lot. 2. A bench level run will be perfonned and a benchmark will be set within the park. The elevation of the benchmark will reference local Miami Bay Datum. This benchmark will be set outside the limits of construction (where possible), and referenced by station and offset to the centerline of construction. 3. A field topography survey (survey points only) will be perfonned along the centerline of the proposed parking lot extension, approximately 50 feet south of the north property line of the park. This extends to a point approximately 600 feet east of the cel)terline construction of the Washington A venue extension. The survey limits are to a point 10 feet beyond the right-of-way (along Washington Avenue) and approximately 75 feet to either side of the parking lot centerline. A DTM will be developed for the project area. A topographic plan sheet will be developed for the pedestrian promenade area (in areas where there is no Raster image). 4. The location, pipe size, rim and invert elevations will be obtained for accessible drainage structures and gravity flow sewers within the project area. Confined space entry surveys of structures will not be performed. 5. The above ground (surface) utilities associated with underground utilities (such as valves, meters, fire hydrants, etc.) will be located. This work does not include obtaining title infonnation and identifying easements. Task 2 - Construction Documentation The plan set will include the following: 1. Plan and profile sheets for the extension ofthe existing parking lot. One sheet will be prepared overlaying the existing Raster imagery and supplemental survey box mapping. This sheet will be prepared at a scale of)" = 40' (based upon))" x 17"- sized plan sheet). 2. A typical section plan sheet: This sheet will include one typical section for the entrance road and the existing parking lot extension. . ",._n 1Il.......c_' ~ Kimley-Horn and Associates, Inc. South Pointc Park. January 18,2000, Page 2 3. Revisions to the existing drainage system that will include construction notes and details. We will determine drainage requirements for both water quantity and quality, provide final hydraulic design calculations, design the layout of the inlet/pipe/exfiltration trench, and prepare the permit applications, as required by permitting agency. Kimley-Hom will use the hydraulic calculations to establish the systems' pipe invert elevations to avoid as many of the existing utilities as possible. Our geotechnical sub-consultant will provide only sub-surface investigation and testing information to KHA necessary for use in designing the drainage system. 4. Existing utility information, as obtained during survey data collection and the information provided by the respective utility owners, will be added to the plans. 5. Signing and Pavement marking plans - This information will be shown on one plan sheet information. These sheets will be prepared at a scale of I" ; 40' (based upon II" x 17"-sized plan sheets). 6. Landscape Horizontal Control Plans - These sheets will be prepared at a scale of I" ; 40' (11" x 17") and will detail the location oflandscape materials. 7. Electrical Plans - These sheets will be prepared at a scale of 1" = 40" (11" x 17") and will identify necessary control equipment as well as electrical service point locations. These sheets will identify existing and relocated street light poles, their lighting circuit, mounting height and wattage as well as the coded notes for the wiring schematic. Additional light poles will only be added to provide a safe area and are considered temporary due to future park master plan improvements. 8. Hardscape, Softscape, and Electrical Details - Details required for implementation ofthe design. 9. Lighting Service Point details. Task 3 - Permitting KHA will prepare permit applications with supporting documentation reports, computations, etc., for the owner's signature and subsequent transmittal to relative governmental agencies (as required) including: 1. DERM for storm water management system. 2. Coordination with Florida Power and Light Company and BellSouth for service locations. Task 4 - Public Meetings and Presentations Our proposal includes preparation and attendance at the following meetings: I. Design Plan review with City staff. ~=n Kimley-Horn and Associales, Inc. South Pointe Park. January 18,2000, Page 3 2. Up to four coordination meetings with City staff and other consultants associated with the South Pointe Park Master Plan Improvements. Additional Services Upon your authorization, we will provide any additional services that may be required beyond tbose described in Task I through 4. These services may include but are not limited to such items as the following: . Preparation of right of way acquisition sketches or descriptions. . Significant redesigns of the drainage system to meet additional DERM requirements. . Providing construction phase services. . Making traffic counts or 'mdertaking other traftic related analysis. . Traffic signal plans. . Cross-sections. . Site contamination assessment. COMPENSATION We will provide the services described in Tasks I through 4 for the lump sum amounts (not including direct expenses) outlined below. Task Descrintion Lumn Sum Fee 1 Survey ......................................................................................... 54,800.00 Basic Services 2 Construction Documentation ................................................ $10,450.00 Specialty Services 3 Permitting .................................................................................. 52,500.00 4 Public Meetings and Presentations .......................................... 52,250.00 Reimbursements Geotechnical .............................................................................. 51,500.00 Direct Expenses ........................................................................ 51,000.00 Total ....................................................................................................522,500.00 ~=n Kimley-Horn and Associates, Inc. South Pointe Park, January 18, 2000. Page 4 Exhibit "C-4" SCHEDULE We will provide the services outlined in task I through 4 in accordance with a mutually agreeable time frame between the City and Kimley-Horn to coincide with the South Pointe Phase I submittals. S:\SMfNGONE\Word Oocs\South Pointe\contracts\park lot expansion.doc