2007-26506 Reso RESOLUTION NO. 2007-26506 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER PERTAINING TO THE RANKING OF PROPOSALS PURSUANT TO REQUEST FOR PROPOSALS (RFP) NO. 02-06/07, FOR CONSTRUCTION COST ESTIMATING, SCHEDULING AND CLAIMS ANALYSIS SERVICES, ON AN AS- NEEDED BASIS, FOR THE CITY OF MIAMI BEACH; AND FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE PROFESSIONAL SERVICES AGREEMENTS UPON COMPLETION OF SUCCESSFUL NEGOTIATIONS WITH ANY OR ALL OF THE FOLLOWING FOUR (4) FIRMS: 1) POST BUCKLEY SCHUH AND JERNIGAN (PBS&J); 2) THE BOSCH GROUP, INC.; 3) CMS-CONSTRUCTION MANAGEMENT SERVICES, INC.; AND 4) FAITHFUL GOULD. WHEREAS, the City has been using the Construction Manager at Risk project delivery method, where cost estimating services would be a necessary and allied component in order to verify the accuracy of the architect and construction manager's construction cost estimates, and would provide City departments (such as CIP and Public Works) with an independent professional opinion as to cost, which would be invaluable in negotiating a Guaranteed Maximum Price (GMP); and WHEREAS, on October 11, 2006, the Mayor and City Commission approved the issuance of Request for Proposals (RFP) No. 02-06/07 for Construction Cost Estimating, Scheduling and Claims Analysis Services, On An As Needed Basis, for the City of Miami Beach; and WHEREAS, RFP No. 02-06/07 was issued on October 12, 2006, with an opening date of November 28, 2006; a pre-proposal conference was held on October 26,2006; and WHEREAS, five (5) proposals were received in response to the RFP, from the following firms: · CMS-Construction Management Services, Inc.; · Faithful Gould; · The Bosch Group, Inc.; · Post Buckley Schuh and Jernigan (PBS&J); · Urban Engineers; and WHEREAS, an Evaluation Committee was appointed by the City Manager via Letter to Commission (LTC) No. 293-2006, consisting of the following individuals: · Mario Gonzalez-Pola, Senior Capital Projects Coordinator; · Graciela Escalante, Senior Capital Projects Coordinator; · Fernando Vazquez, City Engineer, Public Works; · Mike Alvarez, Assistant Director, Public Works; · Rosa Bramchtein, Leadcership Academy Alumni; · Lucero Levy, President Home Owner's Association; Biscayne Point; and WHEREAS, on December 13, 2006, the Committee convened and discussed the qualifications and credentials, as well as various options in ranking all five (5) responsive firms; and WHEREAS, the Committee, at the end of the ranking of the five (5) proposers, unanimously decided to invite all proposers to provide a presentation followed by a question and answer session; and WHEREAS, the Committee reconvened on January 16, 2007; all five proposers were provided time for a brief presentation followed by a question and answer session; and WHEREAS, upon completion of all presentations and question and answer sessions, all five (5) proposers were scored on the "Interview of Company Personnel" portion of the Evaluation Criteria, and the score for this item was then added to the other Evaluation Criteria items, and all scores were tabulated and presented to the Committee for their final ranking and recommendation; and WHEREAS, upon the evaluation of the tabulated scores, taking into consideration the Past Performance and Experience of all interviewed firms, and the amount of work that is envisioned to be provided, the Committee unanimously recommended the top four ranked firms as follows: 1) 1 st Ranked - Post Buckley Schuh and Jernigan (PBS&J); 2) 2nd Ranked - The Bosch Group, Inc.; 3) 3rd Ranked - CMS-Construction Management Services, Inc.; 4) 4th Ranked - Faithful Gould; and WHEREAS, the City Manager concurs with the Committee's recommendation. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the City Manager pertaining to the ranking of firms, and authorize the Administration to negotiate agreements, pursuant to Request for Proposals (RFP) No. 02-05/06, for Construction Cost Estimating, Scheduling and Claims Analysis Services, On An As-Needed Basis, for the City of Miami Beach; and further authorize the Mayor and City Clerk to execute Professional Services Agreements upon completion of successful negotiations with any or all of the following four (4) ranked firms: 1) Post Buckley Schuh and Jernigan (PBS&J); 2) The Bosch Group, Inc.; 3) CMS- Construction Management Services, Inc.; and 4) Faithful Go Id. / / PASSED and ADOPTED this 11th day of lAp il MAYOR APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION {; CITY CLERK T:\AGENDA\2007\apr11 07\Consent\RFP-02-06-07 - Cost Estimating Services-RESO.doc S 127/~7 Date COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Accepting The Recommendation Of The City Manager Pertaining To The Ranking Of Proposals Pursuant To Request For Proposals (RFP) 02-06/07for Construction Cost Estimating, Scheduling And Claims Analysis Services, On An As Needed Basis, For The City Of Miami Beach. Ke Intended Outcome Su orted: Ensure Well-Desi ned Quali Ca ital Pro'ects Issue: I Shall the City Commission authorize Professional Services Agreements to be issued? Item Summary/Recommendation: The City has begun using the CM at Risk Project delivery method. Cost Estimating Services would be a necessary and allied component necessary in order to verify the accuracy of the Architect's and Construction Manager's construction cost estimates and would provide City department such as CIP and Public Works with an independent professional opinion as to cost, which would be invaluable in negotiating a Guaranteed Maximum Price (GMP). In addition, due to the fluctuating current construction services market conditions, Cost Estimating Services available to the City via a rotational list, would facilitate the preparation and accuracy of CIP and Public Works budgets during planning, design and construction phases. The firms selected under this RFP would not only provide Cost Estimating Services but Scheduling and Claims analysis as well. Often, claims analysis is a necessary service on many of the City's design and construction projects. The ability in having scheduling and cost estimating firm(s) available on a rotating list to be used on an as-needed basis would enable the City to have independent firm(s) evaluate the validity of any given claim by analyzing the project(s) costs and schedules. It is the intent of the City of Miami Beach to select several firms under this RFP, which will be contacted on a rotational b~sis. This contract shall be for two (2) years, with two (2) optional renewal years at the City's discretion. The following four (4) firms are being recommended for award: 1 st Ranked - Post Buckley Schuh and Jernigan (PBS&J) 2nd Ranked -- The Bosch Group, Inc. 3rd Ranked - CMS-Construction Management Services, Inc. 4th Ranked - Faithful Gould APPROVE THE CITY MANAGER'S RECOMMENDATION Advisory Board Recommendation: I N/A Financial Information: Source of Amount Account Approved Funds: 1 I I 2 OSPI Total Financial Impact Summary: islative Trackin JMG nt City Manager stimating Services-SUMMARY.doc lt1 ... MIAMIBEACH AGENDA ITEM DATE C-7I t(-1/-D7 lt1 MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beoch, Florida 33139, www.miamibeochfl.gov COMMISSION MEMORANDUM FROM: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez, City Manager ~ April 11, 2007 0 U TO: DATE: SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER PERTAINING TO THE RANKING OF PROPOSALS PURSUANT TO REQUEST FOR PROPOSALS (RFP) NO. 02-06/07, FOR CONSTRUCTION COST ESTIMATING, SCHEDULING AND CLAIMS ANALYSIS SERVICES, ON AN AS-NEEDED BASIS, FOR THE CITY OF MIAMI BEACH; AND FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE PROFESSIONAL SERVICES AGREEMENTS UPON COMPLETION OF SUCCESSFUL NEGOTIATIONS WITH ANY OR ALL OF THE FOLLOWING FOUR (4) FIRMS: 1) POST BUCKLEY SCHUH AND JERNIGAN (PBS&J); 2) THE BOSCH GROUP, INC.; 3) CMS-CONSTRUCTION MANAGEMENT SERVICES, INC.; AND 4) FAITHFUL GOULD. FUNDING Funding for projects for these service agreements shall be determined by the user the department (CIP, Public Works), some of the funding for these services have been appropriated under each Capital project for FY 06/07, some project funding will need to be presented to the City Commission for approval. ADMINISTRATION RECOMMENDATION Execute Professional Services Agreements upon completion of Successful Negotiations with any or all of the four (4) firms. ANAL YSIS The City has begun using the CM at Risk Project delivery method. Cost Estimating Services would be a necessary and allied component necessary in order to verify the accuracy of the Architect's and Construction Manager's construction cost estimates and would provide City department such as CIP and Public Works with an independent professional opinion as to cost, which would be invaluable in negotiating a Guaranteed Maximum Price (GMP). In addition, do to the fluctuating current construction services market conditions, Cost Estimating Services available to the City via a rotational list, would facilitate the preparation and accuracy of CIP and Public Works budgets during planning, design and construction phases. The firms selected under this RFP would not only provide Cost Estimating Services but Scheduling and Claims analysis as well. Often, claims analysis is a necessary service on many of the City's design and construction projects. City Commission Memorandum - RFP-Cost Estimating Services Apri/11, 2007 Page 2 of 7 The ability in having scheduling and cost estimating firm(s) available on a rotating list to be used on an as-needed basis would enable the City to have independent firm(s) evaluate the validity of any given claim by analyzing the project(s) costs and schedules. This contract shall be for two (2) years, with two (2) optional renewal years at the City's discretion. SCOPE OF SERVICE: I. The Consultant(s) shall provide and/or perform cost estimating and schedule preparation and/or evaluation services for a variety of building construction projects for the City of Miami Beach. Such projects may include but not necessarily be limited to the design, construction, remodeling, renovation, repair, improvement, or extension of City Government facilities and buildings, appurtenant building structures, building systems, building sites, other public facilities and right-of-way neighborhood projects. II. The scope of such services, depending on the scope, size, complexity, and composition of each assigned project, will involve total projects or multi-disciplinary elements of right-of-way projects, building projects and other public facilities, including but not limited to, Construction Specifications Institute Division/Section elements: 1. General Requirements 2. Site Work 3. Cast-in-Place Concrete 4. Masonry 5. Metals 6. Wood and plastics 7. Thermal and moisture protection 8. Doors and windows 9. Finishes 10. Specialties 11. Equipment 12. Furnishings 13. Special construction 14. Conveying systems 15. Mechanical 16. Electrical 17. Systems These services may require the Consultant to prepare independent, objective, detailed cost estimates and/or schedules to be used by the City of Miami Beach for evaluating, negotiating, and otherwise resolving requests, payment applications, and claims made by construction contractors, and in determining the cost of changes in the work proposed by the City or required by unforeseeable or unanticipated circumstances. III Services The scope of such multi-disciplined services to be provided and/or performed by the Consultant for selected projects may include, but not necessarily be limited to, providing and/or performing such services or tasks as: City Commission Memorandum - RFP-Cost Estimating Services Apri/11, 2007 Page 3 of 7 A. Cost Estimating Involving: 1. Budgetary/ conceptual cost estimates for proposed Capital Improvement (CIP) Projects. 2. Budgetary/conceptual cost estimates for planned projects based on generally established project design concepts. 3. Estimates of cost based on project schematic drawings. 4. Estimates of cost based on project design development plans and specifications. 5. Estimates of cost based on final project construction plans and specifications or field survey of existing facilities. 6. Estimates of cost based on proposed changes to the final project construction plans and specification including additions, deletions, or alternative revisions thereto. 7. Evaluation and recommendations pertaining to proposals submitted or cost proposals made by contractors, subcontractors, equipment and material suppliers, and others pertaining to City of Miami Beach construction projects. 8. Evaluation and recommendations pertaining to contractors proposed Schedule of Values for use in establishing contract partial (progress) and final payment applications amounts. 9. Evaluation and recommendations pertaining to the dollar amounts contained in construction contractor's periodic applications for partial (progress) and final contract payments including the value of stored materials where applicable. 10. Estimates of cost based on an evaluation of alternative or substitute equipment, materials, or building systems proposed by contractors awarded City of Miami Beach construction contracts. 11. Comparative cost analysis of requests or claims for changes in contract compensation involving disputes, City-directed Change Orders, unforeseen conditions, changes in the work, and changes in the contract time period submitted by contractors employed on City of Miami Beach construction contracts. 12. In the event of proposed or actual litigation between the City of Miami Beach and contractors employed on City construction contracts, develop and provide expert witness testimony and related support documentation pertaining to claims for changes in contract compensation involving disputes, changes in the work, and/or changes in the contract time period. 13. Such other cost estimates pertaining to City of Miami Beach con~truction projects as the City may request. 14. Estimates to assist with any emergency work such as Hurricane Disaster relief efforts. City Commission Memorandum - RFP-Cost Estimating Services Apri/11, 2007 Page 4 of 7 B. Scheduling/ Schedule Evaluation Involving: 1. Budgetary/ conceptual schedule estimate for proposed Capital Improvement (CIP) and Public Works Projects. 2. Evaluation and recommendations based on construction schedules prepared and submitted by contractors awarded City construction contracts. 3. Evaluation and recommendations pertaining to potential changes in City construction contract time periods and work schedules involving proposed and/or actual changes in the contracted construction work. 4. Evaluation and recommendations pertaining to contractor's requests or claims pertaining to City-directed changes in work schedules, manpower requirements, and contract time period and change(s) in contract compensation possibly caused thereby. 5. Evaluation pertaining to the cause, effect, impact, and costs pertaining to unanticipated disruptions, delays, or lack of progress on contracted construction work and recommendations of alternative means of resolving and/or overcoming such problems. 6. Evaluation and otherwise monitor and critique and provide recommendations pertaining to contractors' proposed plan of work, work schedule, procurement schedule, shop drawing submittal schedule, subcontracting schedule, and the anticipated and actual progress related thereto. 7. In the event of proposed or actual litigation between the City and contractors employed on City construction contracts, develop and provide expert witness testimony and related support documentation pertaining to claims for changes in contract time and changes in contract compensation caused thereby. 8. Such other evaluations pertaining to the time periods for construction contracts, work schedules, work progress, work delays, and related issues as the City may request. C. Legal Support Services or Testimony: Provide advice and assistance to the City Attorneys' Office or other City divisions/ departments in support of resolving and/or defending claims made by the construction contractors or others against the City, including expert witness and legal testimony on matters relating to claims for damages and/or changes in construction contract compensation and time. IV. Authorization of Services: As individual projects are generated by the City, the Consultants will be provided with, or will participate in, the development of a general Scope of Services statement. This statement will provide the basis for the Consultant and the City's Project Manager to mutually develop a more detailed, comprehensive, Scope of Services. On the basis of such a Scope of Services, supplemented with a Consultant's Service Performance Schedule, the Consultant will prepare and submit for the City's consideration a detailed proposal covering the cost of the professional services and any other related costs involved for each assignment. City Commission Memorandum - RFP-Cost Estimating Services April 11 , 2007 Page 5 of 7 Upon (1) agreement as to the Scope of Services, (2) the acceptance of the Consultant's Service Performance Schedule, and (3) the approval by the City of the Consultant's proposal and fee, whether or not modified by negotiation, the Consultant will be authorized to proceed to provide and/or perform the agreed to services by the City's issuance of a written Delivery Order. EVALUATION PROCESS AND CONSULTANT SELECTION On October 11, 2006, the Mayor and City Commission approved the issuance of Request for Proposal (RFP) 02-06/07 for Construction Cost Estimating, Scheduling and Claims Analysis Services, on an as needed basis, for the City of Miami Beach. RFP No. 02-06/07 was issued on October 12, 2006 with an opening date of November 28, 2006. A pre-proposal conference was held on October 26,2006. Bid Net issued bid notices to 62 prospective proposers, resulting in 15 proposers requesting the RFP document. Additionally, the City uploaded the bid to RFP Depot who issued bid notices to 695 prospective proposers, resulting in 46 proposers requesting the RFP document. All bid notification attempts resulted in the receipt of the following five (5) proposals from: . CMS-Construction Management Services, Inc. . Faithful Gould . The Bosch Group, Inc. . Post Buckley Schuh and Jernigan (PBS&J) . Urban Engineers The City Manager via Letter to Commission (LTC) No. 293-2006, appointed an Evaluation Committee consisting of the following individuals: . Mario Gonzalez-Pola, Senior Capital Projects Coordinator; . Graciela Escalante, Senior Capital Projects Coordinator; . Fernando Vazquez, City Engineer, Public Works; . Mike Alvarez, Assistant Director, Public Works; . Rosa Bramchtein, Leadership Academy Alumni; . Lucero Levy, President Home Owner's Association; Biscayne Point On December 13, 2006, the Committee convened, Graciela Escalante, Senior Capital Projects Coordinator, and staff from the City's Procurement Division addressed the committee and provided general information on the scope of services. The Committee was also provided Evaluation Surveys and Risk Assessment Plans for all the firms being evaluated. The Committee also discussed the Selection Criteria, which was used to evaluate and rank the firms: 1. Qualifications of the Firm (10 points). 2. Qualifications of the Individuals (10 points). 3. Risk Assessment Plan for ensuring quality of work (25 points). 4. Past performance based on number and quality of the Performance Evaluation Surveys (25 points). 5. Interview of Company personnel (15 points). 6. Fee Proposal (15 points). The Evaluation Committee discussed all the Qualifications and Experience of each proposer as well as evaluated each Risk Assessment submitted. Additionally, the City's Procurement Division provided past performance surveys submitted to the City by clients of each of the proposers and each Evaluation Committee Member provided their scores for all the above selection criteria with only item no. 5 Interview of Company Personnel to be scored at a City Commission Memorandum - RFP-Cost Estimating Services Apri/11, 2007 Page 6 of 7 second scheduled Evaluation Committee meeting. At the end of the 1 st Evaluation Committee Meeting it was decided by all members that all 5 companies should be invited to provide a small presentation followed by a question and answer session. The Evaluation Committee reconvened on January 16, 2007, all five proposers were provided time for a brief presentation followed by a question and answers session. Upon completion of all presentation and answer sessions all 5 proposers were scored on item no. 5 "Interview of Company personnel" of the Selection Criteria. The score for this item was then added to the other selection criteria items and all scores were tabulated and presented to the Evaluation Committee for their final ranking and recommendation. Attached is the tabulated score for all Evaluation Committee Members: RFP-02-06/07 - CONSTRUCTION COST ESTIMATING, SCHEDULING AND CLAIMS ANAL YSIS SERVICES, ON AN AS-NEEDED BASIS, FOR THE CITY OF MIAMI BEACH Committee Member: Mario Fernando Graciela Mike Lucero Final Company Name Gonzalez-Pola Vazquez Escalante Alvarez Levy Ranking CMS-Construction Management 76 (4) 65.5 (1) 88 (3) 86 (3) 96 (2) 3 Services, Inc. Faithful Gould 83 (3) 46.5 (4) 85 (4) 67 (5) 97.5(1) 4 The Bosch Group, Inc. 85 (2) 63.5 (2) 90 (2) 90 (1) 89.5 (4) 2 Post Buckley Schuh and 91 (1) 63.5 (2) 91 (1) 89 (2) 95.8 (3) 1 Jernigan (PBS&J) Urban Engineers 76 (4) 52.5 (3) 82 (5) 71 (4) 88 (5) 5 Upon the evaluation of the tabulated scores and taking into consideration the Past Performance and Experience of all interviewed firms, and taking into consideration the amount of work that is envisioned to be provided under these service agreements, the Panel unanimously recommended that the top four ranked firms be recommended for award under this Request for Proposal. The top four ranked firms are as follows: 1) 1 sl Ranked - Post Buckley Schuh and Jernigan (PBS&J) 2) 2nd Ranked - The Bosch Group, Inc. 3) 3rd Ranked - CMS-Construction Management Services, Inc. 4) 4th Ranked - Faithful Gould As part of the Selection Criteria, the Evaluation Committee was presented past performance surveys which were sent to the City from each of the firm's clients who submitted proposals for this RFP. Following are some comments from clients of the firms being recommended for award under this RFP process. Company Name: Post Buckley Schuh & Jernigan (PBSJ) Reference from: Israel Rodriguez-Soto in reference to work provided to Broward County Public Schools Comments: "Excellent Service from both Tom and PBS&J." City Commission Memorandum - RFP-Cost Estimating Services Apri/11, 2007 Page 7 of 7 Company Name: Post Buckley Schuh & Jernigan (PBSJ) Reference from: Shari Lee in reference to work provided to Miami Dade Public Schools Comments: "Excellent response from the Consultant. Always delivers product on time no matter what it takes; has been known to work through the night and upon minimal notice when necessary." Company Name: The Bosch Group, Inc. Reference from: Tew Cardenas LLP Reference to work provided to: Miami-Dade County Public Schools Comments: "Each person at the Bosch Group performs work professionally and with excellent skills." Company Name: The Bosch Group, Inc. Reference from: Anouk Villegas, Esq. Reference to work provided to: MK Contractors, Inc. Comments: "Maria Bosch Group is extremely organized, methodical, precise and efficient in the execution of her work. I value her highly and recommend her, specifically, in the preparation of claims." Company Name: CMS-Construction Management Services, Inc. Reference from: Albert Poza Reference to work provided to: Miami-Dade County Public Schools Comments: "Very Good Response" Company Name: CMS-Construction Management Services, Inc. Reference from: Kirk Stetson Reference to work provided to: Palm Beach Community College Comments: "CMS staff's estimating abilities may be ranked very highly. Keith Emery's strength lies in his ability to assertively support the Owner with accurate costs and forecasti ng." Company Name: Faithful Gould. Reference from: Neil Poteet Reference to work provided to: City of Miami Comments: "Faithful Gould are performing exceptionally well on our program." Company Name: Faithful Gould Reference from: Dan Clayton Reference to work provided to: Reynolds, Smith and Hills, Inc. Comments: "RS & H utilizes F&G on numerous projects with consistently successful results." CONCLUSION The Administration recommends that the Mayor and City Commission adopt the attached resolution that accepts the recommendation of the City Manager pertaining to the ranking of proposals pursuant to Request for Proposals (RFP) No. 02-06/07, for Construction Cost Estimating, Scheduling and Claims Analysis Services, on an as-needed basis, for the City of Miami Beach; and further authorizes the Mayor and City Clerk to execute Professional Services Agreements upon completion of successful negotiations with any or all of the following four (4) firms: 1) Post Buckley Schuh and Jernigan (PBS&J); 2)The Bosch Group, Inc.; 3) CMS-Construction Management Services, Inc.; and 4) Faithful Gould. T:\AGENDA\2007\apr11 07\Consent\RFP-02-06-07 - Cost Estimating Services-MEMO.doc