"EXHIBIT I" TO CONSTRUCTION MANAGER AT RISK AGREEMENT
Normandy Shores Clubhouse Addition Demolition GMP AMENDMENT # II-A
THIS GMP AMENDMENT, made and entered into as of this tfl day of /t'JlkI, ~7 '
,
("GMP Amendment") amends that certain Agreement between Owner, the CITY OF MIAMI
BEACH, FLORIDA (also, City) and Construction Manager, COASTAL CONSTRUCTION OF
MONROE INC., COASTAL CONSTRUCTION COMPANY (hereinafter Construction Manager or
CM @ Risk ), made as of the 10th day of May 2006, for the following described Project:
Normandy Shores Golf Course -Clubhouse
Demolition of Additions, for documents dated 2/14/07
2499 Biarritz Drive, Miami Beach Florida
WHEREAS, the Owner and the Construction Manager have agreed to amend the
Agreement in the manner set forth herein.
NOW, THEREFORE, in consideration of the mutual promises and covenants contained
herein, in the Agreement and the other Contract Documents and for such other good and
valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Owner
and the Construction Manager do hereby agree as follows:
1. This GMP Amendment is executed in connection with, and is deemed to be part of the
Agreement and the Contract Documents. Wherever the terms of this GMP Amendment 11- A and
the terms of the Contract Documents are in conflict, the terms of this GMP Amendment 11- A
shall govern and control. The terms used herein, unless otherwise defined in this GMP
Amendment, shall have the meanings ascribed to them in the Contract Documents.
2. The following are hereby incorporated into the Contract Documents and made
part thereof:
a. The drawings listed on Attachment I, attached hereto, which drawings
are made a part of the Contract Documents by this reference (the
"Drawings"); and
b. The specifications listed on Attachment II, attached hereto, which
specifications are made a part of the Contract Documents by this
reference (the "Specifications"); (N/A) and
c. Those documents listed on Attachment III, Additional Contract
Documents, refer to the executed pre-construction services agreement
for reference.
d. Those documents listed on Attachment IV, Construction Manager
proposal and Qualifications and Assumptions, attached hereto, are made
a part of the Contract Documents by this reference.
e. The Scope of the Work for the Project, as described in Attachment I is
hereby incorporated into the Work.
f. The date of Commencement for the construction of Project shall be one
week following the last date of execution of this amendment by the
parties hereto (the "Date of Commencement").
g. The Construction Manager shall achieve Substantial Completion of the
Work for this Project no later than 24 Business days from the Date of
Commencement (the "Contract Time", and final completion not later than
2 days from the date of Substantial Completion. Failure to meet either
the Substantial Completion or Final Completion dates shall be a material
breach of this Agreement.
h. The Guaranteed Maximum Price for the Project, is hereby guaranteed by
the Construction Manager not to exceed the sum of $87,150.00 (the
"Project GMP Amendment Phase II-A"), based upon the entire Scope
of the Work as described in the Contract Documents, including, but not
limited to, the Drawings and the Specifications, subject only to additions
and deductions by Contract Amendment(s) or Construction Change
Directive, as provided in the Contract Documents. The GMP is more
particularly itemized in the Schedule of Values prepared in accordance
with the terms of the Agreement, which Schedule of Values is attached
hereto as Attachments VI and made a part of the Contract Documents
by this reference. Included in the Schedule of Values and specifically
identified herein, the Contingency included in the Guaranteed Maximum
Price is the amount of $4,111.00.
i. The Construction Manager shall provide Commercial General Liability
Insurance, Automobile Liability Insurance, and Worker's Compensation
Insurance in compliance with the provisions of Article II, Insurance and
Bonds of the General Conditions of the Contract for Construction.
j. The Construction Manager shall provide the Public Construction
Payment Bond and the Public Construction Performance and Guarantee
Bond, in compliance with the provisions of Article II, Insurance and
Bonds of the General Conditions of the Contract for Construction.
k. Locations for utilities will be determined by the Construction Manager, at
the execution of GMP Amendment Phase II-A, and all existing utility
connections will be capped as noted in the qualifications and
Assumptions statement.
I. The Construction Manager's on site management and supervisory
personnel for this Project shall be set forth herein, and incorporated as
Attachment VII to this Agreement.
m. To the extent that the Owner has authorized the Construction Manager
@ Risk, in writing, to perform the Work for this Project with the
Construction Manager's @Risk own forces, the salary and wage
schedule for the Construction Manager's personnel performing such
portion of the Work, agreed upon by the City and the Construction
Manager, shall be as set forth on Attachment III & IV attached hereto,
and is made a part of the Contract Documents by this reference. The
Construction Manager @ Risk warrants and represents that the salary
and wage schedule includes comparable market rates (including any and
all benefits, contributions and insurance) charged by the Construction
Manager @ Risk for comparable contracts to other business and
individuals for similar services, and that such rates are not higher than
the standard paid for this Project.
n. Though the project has a short duration and limited scope a project
schedule will be provided as Attachment V. Also refer to date of
commencement and "contract time" items "f' and "9" of this agreement.
o. Except as expressly provided herein above all of the terms, conditions,
covenants, agreements and understandings contained in the Contract
Documents shall remain unchanged and in full force and effect, and the
same hereby expressly ratified and confirmed by the Owner and
Construction Manager @ Risk.
p. This exhibit I GMP Amendment Phase II-A may be executed in several
counterparts, each of which shall be deemed an original but all of which
shall constitute one and the same instrument.
IN WITNESS WHEREOF, the parties have affixed their signatures, effective on the date
first written above.
FOR CITY:
CITY OF MIAMI BEACH
ATTEST:
BY~ ~~ By
City Clerk
~
City Manager
/
C/
FOR CONSTRUCTION
MANAGER AT-RISK:
COASTAL CONSTRUCTION OF MONROE INC., D/B/A
COASTAL CONSTRUCTION COMPANY
Florida Contractor License: CGCB08060
ATTEST:
By iL lJ.e)u~--
Secretary
By:
~".e:
IcE;J II tcl.UVl'l fh--
J~~
Print Name
Print Name
ATTACHMENT I
ATTACHMENT II
ATTACHMENT III
ATTACHMENT IV
ATTACHMENT V
ATTACHMENT VI
ATTACHMENT VII
CONTRACT DOCUMENTS:
Approved Normandy Shores Addition Demolition plan
As Amendment Phase IIA
CONTRACT DOCUMENTS:
PLANS - 2/14/2007
SPECIFICATIONS- N/A
CONTRACT DOCUMENTS:
General AND Supplementary Conditions
See Executed Pre-Construction Services Agreement
CONTRACT DOCUMENTS:
Coastal Construction Proposal and Qualifications and Assumptions
CONTRACT DOCUMENTS:
Construction Schedule
SCHEDULE OF VALUES
Attachment III - General Conditions
Attachment IV Demolition Proposal
ON SITE PERSONNEL
Management And Supervisory
Drawinl! No.
N/A
I-l
A2-1
A2-2
A2-3
A3-1
Attachment I
fa Coastal
Normandy Shores Golf Course
Miami Beach, Florida
Description
Club House - Selective Oemolition
Cover Page
Index of Drawings
Floor Plan Demo
Reflected Ceiling Plan Demo
Roof Plan Demo
Elevations Demolition
Coastal
Plan Dated Received Date
02-14-2007 02-15-2007
02-14-2007 02-15-2007
02-14-2007 02-15-2007
02-14-2007 02-15-2007
02-14-2007 02-15-2007
02-14-2007 02-15-2007
Attachment
I I I
ECoastal
1
4
MONTHS
WEEKS
GENERAL CONDITIONS DETAIL
TOTAL
Cost Code Category Description Quantity Unit 10,545
PRECONSTRUCTION COST
80103 Labor Estimating F 0 lS -
80103 Material Plan Reproduction ;:- 0 lS -
80631 Material Renderings 0 lS -
80730 Sub Scheduling Consultant 0 LS -
PERMITS
80025 Building Perm~ 0 lS -
80025 Subcontractor Perm~s 0 lS -
80030 Perm~ Exped~ing 0 lS -
80105 Inspections - Overtime 0 lS -
CONSUL TANT f PROFESSIONAL FEES
80090 Sub Professional Fees 0 lS -
80100 Sub Arch~ect Fees 0 lS -
80100 Sub Engineer Fees 0 lS -
80105 Sub Inspection Fees 0 lS -
80340 Sub Partnering 0 lS -
80750 Sub Survey Crew 0 lS -
FIELD SUPERVISION
80124 Labor Cons!. Manager I Gen. Super 0 weeks -
80125 Labor General Superintendent F 0 weeks -
80126 labor Area Supt. - StructuraVM.E.P. F 0 weeks -
80127 Labor Area Sup!. - Finish F 0 weeks -
80120 labor Foreman 4 weeks 4,945
PROJECT ENGINEERING I COORDINATION
80130 Labor Project Engineer - Field Office F 0 weeks -
PROJECT MANAGEMENT
80157 labor Project Executive F 0 weeks -
80150 labor Project Manager F 0 weeks -
80131 labor Ass!. Project Manager 0 weeks -
80154 labor Purchasing F 1 weeks 1,731
CONTRACT ADMINISTRATION
80173 labor Field OffICe Receptionist 0 weeks -
80175 labor Contract Administrator - Field F 0 weeks -
80175 labor Contract Administrator - Office F 1 weeks 545
80176 labor Accounting - Clerical F 4 weeks 1,090
80177 labor Accounting - Manager F 4 weeks 762
Page 1 of 5
IE Coastal
Attachment
I I I
1
4
MONTHS
WEEKS
GENERAL CONDITIONS DETAIL
TOTAL
Cost Code Category Description Quantity Unit 10,545
FINER POINTS COORDINATION
80181 labor Finer Points Coordinator 0 weeks -
80660 Material Owne~s Manuals F 0 unrts -
80515 Material Office Supplies F 0 units -
80678 Material Postage F 0 units -
HEALTH INSURANCE
80200 labor Employee Heanh Insurance F 200 Hours -
GENERAL LABOR
80251 labor Carpenter F 0 weeks -
80251 labor General laborer F 0 weeks -
80250 labor Permanent Elevator Operators ( 2 Each) F 0 weeks -
80250 labor Elevator Operators - Overtime 0 weeks -
80808 labor Hoist Operator - Straight Time (2 Each) F 0 months -
80808 labor Hoist Operator - Overtime (2 Each) F 0.0 months -
TRAVEL & ENTERTAINMENT
80325 Material Travel 0 weeks -
80330 Material Top Out Party F 0 lS -
80335 Material Meals F 1 weeks 50
80350 Material living Expenses 0 weeks -
TEMPORARY ROADS
80355 Sub Temporary Road Installation 0 lS -
80356 Sub Traffic Maintenance & Cleaning 0 lS -
80357 Sub Traffic Control 0 weeks -
TEMPORARY SANITARY FACILITIES
80376 Material Trailer Holding Tanks F 0 months -
80375 Material Portable Toilets (3 each) F 0 months -
TEMPORARY POWER
80400 Material FPL Temporary F 0 LS -
80400 Material Electrical Service - Tower Crane F 0 lS -
80400 Material Electrical Service - Hoist F 0 lS -
80400 Material Trailer Consumption F 0 months -
80400 Material Site Consumption F 1.0 months 500
80400 Material Hoist Consumption F 00 months -
80401 Material Start-up Power (BY OWNER) 0 months -
TEMPORARY WATER
80425 Material Potable Water Service F 1 months 150
80425 Material Pool Fill F 0 lS -
Page 2 of 5
ECoastal
Attachment
I I I
1
4
MONTHS
WEEKS
GENERAL CONDITIONS DETAIL
TOTAL
Cost Code Category Description Quantity Unit 10,545
TEMPORARY PHONE' RADIOS
80450 Material Phone System F () LS -
80451 Material Phone, Local F 0 months -
80451 Material Phone, Long Distance F 0 months -
80452 Material Mobile Phone Usage total F 0 months -
80510 Material Radios 0 lS -
80452 Material Radio / Phone Maintenance ,- 1 months 50
TEMPORARY PROTECTION
80480 Material Temp Protection of Completed Work F 0 units -
80480 Material Temp Protect of Elevator Cabs 0 EA -
80525 Material Temporary Storage 0 months -
SECURITY
80475 Sub Fence Rental 0 lS -
80225 Sub Security (BY OWNER) 0 weeks -
SITE OFFICE & SUPPLIES
80502 Material Trailer Setup and Removal F 0 lS -
80501 Material Trailer Rental F 0 months -
80500 Material Furnishings F 0 lS -
80500 Material Pest Control F 0 months -
80500 Material TOM Materials F 0 lS -
80505 Material Computer/Printer F 0 lS -
80506 Material Office Machines (fax, refrig, etc) F 0 lS -
80515 Material Office Supplies F 0 months -
80580 Material Copy Machines' Rental/ Maintenance F 0 months -
80625 Material Project Signage F 0 lS -
80678 Material Courier F 0 months -
80678 Material Postage / Fed Ex F 0 months -
DRINKING WATER
80650 Material Water Coolers F 0 lS -
80650 Material Bottled & Cups F I months 75
PHOTO'S & DRAWINGS
80630 Material Photos - Aerials F 0 months -
80630 Material Photos - Progress F 0 months -
80632 Material Video Taping 0 months -
80575 Material Blueprints (BY OWNER) F 0 lS -
80576 Material As-Buitt Drawings F 0 lS -
80576 Material Datum Line Drawings F 0 lS -
SCHEDULING I EXPEDITION
80580 Material Software - SuretracklExpedition F 0 LS -
80730 Sub Scheduling - Outside Consutting Service 0 months -
Page 3 of 5
Ii Coastal
Attachment
I I I
1
4
MONTHS
WEEKS
GENERAL CONDITIONS DETAIL
TOTAL
Cost Code Category Description Quantity Unit 10,545
80675 STORM PROTECTION. By Owner -
SAFETY
80676 l& M Safety Rails l & M F 0 floors .
80676 l& M Interior Openings l & M F 0 floors -
80676 Sub Temporary Fire Standpipe System F (] floors .
80676 l& M Sidewalk Protection 0 lS -
80677 Material First Aid Kits F 0 lS -
80677 Material Safety Signs F 0 lS -
80677 Sub Training F 0 lS -
80677 Sub Inspections 0 months -
80129 labor Safety Director F 0 weeks -
\jEHICLES
80700 Material Automobiles F 0 months .
80700 Material Trucks F 1 months 554
80700 Material Fuel F 1 months 69
80700 Material Tolls F 1 months 23
ON & OFF SITE PARKING
80770 Material Off S~e Parking (BY OWNER) 0 LS -
80770 Material Off S~e Staging (BY OWNER) 0 lS -
80770 Sub Transportation To / From S~e (BY OWNER) 0 lS .
80770 Sub Transportation On S~e 0 lS -
80225 Sub Police Officer 0 lS .
CRANES
80805 Material Tower Crane 0 months -
80805 Material Mobile Crane F 0 months -
80805 labor Operator. Overtime 0 hours .
80805 Material Extended Rental F 0 months -
EQUIPMENT
80806 labor Heavy Equipment - Clean Up 0 days -
80806 labor Concrete Pumps 0 days -
HOISTING
80807 Material Hoist Rental F 0 months .
80807 Material Mobilization/Setup/Climbs Concrete Base F 0 lS -
80807 Material Concrete Base F 0 lS -
80807 Material Gates & landings F 0 floors -
80807 Material Service Calls F 0.0 months -
80807 Material Intercom F 0 lS -
SMALL TOOLS
80810 Material Small Tools / Rental F 0 LS -
80500 Material Raingear! Hardhats F 0 LS -
Page 4 of 5
E Cc)astal
Attachment
I I I
1
4
MONTHS
WEEKS
GENERAL CONDITIONS DETAIL
TOTAL
Cost Code Category Description Quantity Unit 10,545
HOUSEKEEPING
80830 Material Dumpster Pulls F 0 units -
80830 Material Trash Chute F 0 Floors -
80830 Material Trash Chute Screen Enclosure 0 lS -
80830 Material Bulk Trash Hauling F 0 months -
80825 Labor Clean-up Structural Phase F 0 months -
80825 labor Clean-up Finishing Phase C' 0 months -
FINAL CLEANING
80835 Sub Common Areas F 0 lS -
80835 Sub Rough Clean Un~s F 0 un~s -
80835 Sub Final Clean Un~s F 0 units -
80835 Sub Touch-up Un~s F 0 un~s -
PUNCH OUT j CLOSEOUT
80835 labor Punch Out - Common Areas F 0 lS -
80635 labor Punch Out - Un~s - 2 man crew F 0 un~s -
80635 Material Materials F 0 units -
TOTAL GENERAL CONDITIONS 10,545
WAR RAN TY, TESTING & QUALITY ASSURANCE
WARRANTY
80890 Labor Warranty Manager F 0 lS -
80890 Material Miscellaneous Materials F 0 un~s -
80890 labor Customer Service - 2 service reps F 0 weeks -
TESTING & QUALITY ASSURANCE
80776 Sub Mock Ups 0 lS -
80600 Sub Soil Testing (BY OWNER) 0 lS -
80725 Sub Concrete Testing (BY OWNER) 0 lS -
80875 Sub Window Testing 0 lS -
80875 Sub Water Test 0 lS -
80875 Sub Professional Monitoring & Reviews F 0 months -
80875 Sub Professional Survey I Eng. Report F 0 lS -
TOTAL WARRANTY, TESTING & QUALITY -
TIME & PERCENTAGE ANALYSIS
10,545
HARD CONSTRUCTION COST
$ 63,801
2,636
PERCENTAGE OF GCs
16.53%
10,545
Page 5 of 5
Attachment
IV
4/13/2007
10:25 AM
E CC)ast;11 Normandy Shores
Miami Beach, Florida
March 30, 2007
Plans Dated: 2.14.2007
PHASE II A - SELECTIVE DEMOLITION
3.30.07 $/SF
Cost Budget Area
Code Item Description 87,150 9,736
2000 SITEWORK
2110 Demolition 51,550 529
2610 Fences & Gates 2,751 0.28
1 ,0081f for 4 weeks
2831 Site Utilities Allowance 500 0.05
Disconnect mains and new temp water.
54,801 5.63
6000 CARPENTRY
6100 Rough Carpentry 5,500 0.56
Plywood all openings
6200 Roof Repiars Allowance 2,500 0.26
Repairs at new areas only.
8,000 0.82
9000 FINISHES
9100 Terrazzo Restoration Sample 500 0.05
Restore 1 Oxl 0 section of terrazzo
9900 Misc. Painting 500 0.05
Paint all new plywood
1,000 0.10
SUBTOTAL 63,801 6.55
General Conditions 10,545 1.08
80215 Gen. Liability Insur Prem 1.5% 1,145 0.12
SUBTOTAL 75,491 7.75
91110 Overhead & Fee 10.0% 7,548 0.78
SUBTOTAL 83,039 8.53
80050 Payment & Perform Bond Excluded -
91100 Contingency 5.0% 4,111 0.42
TOTAL PROJECT 87,150 8.95
Coastal Construction Group
Estimate Form 052303
Page 1 of 1
Attachment
IV
Normandy Golf Course Selective Demolition
Miami Beach, Florida
March 30, 2007
QUALIFICA TIONS AND ASSUMPTIONS
I, This estimate is inclusive of plans prepared by Architeknics Architects and Planners
dated February 14,2007 (stamped Coastal Received February 15,2007), Asbestos
report prepared by Professional Service Industries dated June 13, 2006. Any variance
between the qualifications and the plans, the qualifications shall prevail.
2. The purpose of this interior selective demolition project is to further uncover the
integrity of the existing structure. This demolition includes the complete removal of
the interior "build-out" of the clubhouse and sand-blasting the metal joist system in
the Maintenance Building. The design team shall review the existing structure and
determine the scope required for the completion of the Clubhouse and Maintenance
Building.
3, This Estimate is based on a Start Date in April 2007 and completion of the project in
25 working days subject to prompt permit approvals and responses by authorities.
4, Builders Risk Insurance shall be provided by Owner in an amount and form
satisfactory to Contractor. This policy must name Coastal Construction, (Contractor)
as a co-insured and will be required prior to the start of construction. All Builders
Risk insurance deductible costs and costs for under insured (or uninsured) items are
the sole responsibility of the Owner.
5. The following items are specifically excluded from this Proposal:
. Topographical Final Surveys and Elevation Certificates,
· Unforeseen Subsurface Conditions (IE: Contaminated soil removal and
replacement, pockets of unsuitable soil conditions for foundations)
· Testing Services including but not limited to, concrete material, soil density,
glazing, waterproofing, etc,
. Architectural or Engineering Services,
· Environmental Testing. ~r0
6. All costs for all building permits, specialty permits, p=' ,:1 ~:til~, and pirmit
fees shall be paid by the Owner, Individual sub trade permits are included by each
affected Subcontractor. The General Contractor and all affected Subcontractors shall
be responsible for coordinating all associated permits and related requirements
including but not limited to filling out and submitting Permit Applications and
supporting documents.
7. It is assumed that a portion of the project site may be utilized for construction parking
and staging areas throughout the duration of the project at no charge to the Contractor
from the Owner or any authorities having jurisdiction.
8. Payment and Performance Bonds are excluded,
Page 1 oD
Attachment
IV
9. Jobsite Security Services is excluded.
10. Asbestos abatement is included in accordance with the documents prepared by
Professional Service Industries dated June 13,2006. Quantities and locations of
asbestos abatement work are based on this report.
II. The Existing Maintenance Building is assumed to be free of any Hazardous
Materials. Any Hazardous Materials Abatement, Demolition, or Disposal is excluded.
12. DERM & DPEP Filings & Notices are included.
13. Sheet Piling, Shoring, Bracing, or otherwise protecting and stabilizing of existing
structures to remain is Excluded.
14. Fire extinguishers shall be utilized as temporary fire protection for the duration of the
project.
15. The existing roof shall be removed only at areas scheduled to be demolished. An
allowance of $2,500 has been included for associated patch work in these areas only.
In order maintain any warranties that the existing roof may have in place, Coastal
shall attempt to utilize the original roofing contractor (City of Miami Beach to
provide contact information).
16. Any existing roof damage prior to commencement of work shall be the responsibility
of the City of Miami Beach. Roof patch work and repairs associated to the
demolition scope shall be done utilizing above allowance. Damage caused by Coastal
in areas not associated with the demolition scope of work shall be the responsibility
of Coastal.
17. All sidewalks, drives, landscaping, and utilities surrounding the Clubhouse and
Maintenance building shall remain. Restoration, repairs, or alterations of such items
are excluded.
18, Electrical Service for the demolition work shall be supplied by subcontractor
provided generators. Temporary power stations, panels, and other power sources are
excluded.
19. An allowance of $500 is included for all utility disconnects (including but not limited
too: water, electrical, gas). This allowance also includes the cost to provide the
temporary water service required for demolition work.
20. Clubhouse shall receive a temporary construction fence for duration ofthe demotion
process At, ~.~
21. Coastal shall cover'e;c~or ..\a~~o~moval) with standard Pl~OOd material
mounted directly to the exterior walls of the structure. All plywood co{,ers shall be
painted flat white. Note: plywood covers do not provide a watertight seal; water
intrusion is possible.
Page 2 00
Attachment
IV
22, All interior drywall, drywall partition framing (wood and metal), insulation, and
wood paneling shall be removed from the Clubhouse building.
23. Coastal has assumed that the existing structure is supported by a shallow foundation
system. Removal of pilings or other systems not associated / indicated with a shallow
foundation system is excluded as part ofthis estimate.
24. A I O'x 10' section of existing terrazzo flooring shall be refurbished. The intent of this
exercise is to assess the quality ofthe finish floor meets the owners and architects
approval.
25. All precautions will be taken to preserve existing plaster cornice details, wood
ceilings, and fireplaces. Contractor shall be held harmless of any existing damage
and/or new damage caused by construction.
26. Contractor will provide Owner with the option to relocate the existing kitchen
equipment before being disposed of. If this option is exercised all equipment will be
removed and delivered within 50 miles from the site. Contractor is to be held
harmless of any existing damage(s) and/or new damage(s) to the equipment.
Reassembly, installations, restorations, repairs and any other associated work with the
equipment is excluded.
27. With the exception to the kitchen equipment, the demolition Subcontractor shall have
exclusive salvage rights for all materials, furnishings, equipment, and accessories in
or around the building and site. Sorting and distributing of such items shall be
performed on site.
28. The work associated with the removal of the existing FPL vault shall be coordinated
with FPL, however performed by demolition contractor. Any deposits, permits, fees,
or other cost associated with this work is excluded.
29. Exposed steel joist members in the Maintenance Building shall be sandblasted. This
work will be performed to determine if the existing rust can be removed; this does not
provide a guarantee that all rust can be removed.
30. Any associated work with existing fuel tanks is excluded.
31. Maintenance building surrounding area shall be cleaned of all debris and trash. No
work at Clubhouse exterior site.
Page 3 of3
-
'"-
~
(J)
~
o
(!)
z
52
a::
o
~
(J)
'"
w
w
~
'"
...;
z
o
E
...J
o
:ii
w
o
'"
..
iiS
B
..
E
..
=
...
'"
..
c
.Ii
~
u
tl
..
15
It
II
tl
e
6
u
o
E
~
'"
1IJlll.
IIJ
~
~
01
(J)
u
~
~
'it
:>
~
iii
8
:c
:5
:a:
.!!
01
(J)
..
.l<
01
:ii
.l<
....
=
Q)
S
~
u
~
t:
-<
n
'" '"
!;:
'"
01
Iii
.2
..
E
~
...
'" "
j ~
~ ~
U a::
~ ~
l .2
co
II ..
U :;
!l 11
6 2
u iiS
"5
~ ~
~ OJ
..
"
c: ~
::i u;
C.
<II c:
U 0
..
1l :c ~
~ ~ ~
~ g ~
~ <f 06
.2 !! II
en "'5 e
e ~ t)
tJ ~ ~
2 LL
0.1 .. j:l
~ ~ ~
Olfa::-~
flLlJ
M
"
..
il
15
:>
u
01
c:
~
~
..
u
c:
..
c
"
"
'iij
:;;
01
c:
E '6
.. c
~ g
"
.. (J)
'll co
..., 'C:
co n
01 c: ..
~ ~ 0
::; ~ ~
1IJ ~.
5 5 a::
i i ,-
.s U)
or
~r
~
a::lJ
u
Cil
8 co ~ -
~ i u; ca
~ ':< 8 .~ ~
G w .8 c i ~
bg-i} : '56
~~~ :g,~ ~U
~ ~! .~ ~ E ~ I
... m ~ ~ a:: 8 " 0
" ~ ~ LL... a:: ~ E
~oi ~1II SiD
~c:c ~c&t>o
~ J ~ ~.~ S ~ !
" W" iiS ~ Iii ~ D
O@:....O.XOOlWO
C6'~caw:t:m..JE
il E ~ ~ -01 U 1IJ ... ~
...J U CD 4)
a:: ... 0.. .. "E ~ ~ I;
~ ~ ~ ~ ~--~-l~ "
n~il'"
=
..
g
U
~
~
a::
r
I~
M
I
i
I~ 0
w
18. '" ~
! ~ I! ~ ~
~ ~ I: ,~ i
V'"5t)~oc
M~I~.2~
c!lQ.'~mU
o ~ Icf 3: ~
~ i Iff!
~ i ~ i ~
~ ~ g ~ 0
~ ~ ~ ~ ~
~ g ~ ~ ~
ct! ~ 8! ~ 8!
'"
M~'"
'"
..
..
il
~
j:l
"
u
a;
01
c:
'u
c "
Q) ! ~
~ ll.! .~ 11
~ ~ a:: ~
u.. 4) H ~ 6
c6Ct:a::VO
tnaO~~6
'a~i't)~
8. iiS 01 II iii g
! ;ji ! ~ 1 ~
~ m :r c!l ...J "
I I i I i I
a:: a:: 1IJ a:: Cl ~
'" '"
w
Iii
...J
0..
:;;
o
U
'"
a::
~
z
o
;:::
::;
o
:ii
_ow
o
t
~
::l
cO
00
;..
y-
::10
::;"
111111
Cf
00
Ooe
'iiCl)
~>-
~'g
o I'll
E
o
z
I~
on
~
Attachment V I
--
Selective Demolition
Normandy Shores Golf Course
Clubhouse
~
April 13, 2007
Schedule of Values
Please refer to;
Attachment III - General Conditons
Attachment IV - Phase IIA - Selective Demolition Proposal
E Coastal
,
-
(f)
-.J
-
U
Ctl
-
C
0
U
c
0
-
-
> 0
E
Q)
..... C
C Q)
Q) >
E -
u
.s:: Q)
-
(.) Q)
ns U)
::: (f)
<C Q)
~
0
J::
U)
1j
c
Ctl
E
~
0
z
~
~.
0> 0 0 (")
0 0> 0> Q)
~I CO ~ ~ N
0 0 ~ 0>
CO ~ ~ N
N N N .q-
C'! N N N
<t) <t) <t) CO
0 0 0 Q)
(") (") (") r-
CD 0 Q) 0 .q- r-
c:: 0 <t) 0 <t) (")
0> N 0> <t) V
0 "': r- "': ~ ~
it 0> co 0> cO ..--
<t) 0> <t) 0> <t)
<t) r- <t) r- 0>
<t) <t) <t) <t) <t)
0 0 0 0 0
(") (") (") (") (")
=
~
'tJ
c:c:
Q(I
CD 0. 0. 0. 0. 0
e ::l ::l ::l ::l <=
~ e e e a
Q) Q) Q) '- Q)
<9 > <9 > <9 > <9 > C>
~ 'C r- 'C r- 'C r- 'C r- <=
<= 0 <= 0 <= 0 N c: 0 E
a N a N a a N
..-- ~ ~ ~ '0
~ =B <= (") 15 <= (") n c: (") f3 c: (") Q)
a a a (") a a.
2 a (") ::l a (") ::l a ::l a (")
e L- L- co L- X
... C> co Ui C> co Ui C> '0 Ui C> co w
<3 Ul co '0 co '0 co co '0
<= ...J 'C <= ...J 'C c: ...J 'C <= ...J 'C 0
a a a ..Q a :Q a a
() Q) 0 u: () Q) 0 () Q) 0 () Q) 0 u: ,
::l 0 ::l 0 u.. ::l 0 u.. ::l 0 Ul
ai iii N ai iii N ai iii N ai iii N Ul
... E ... 'E ... E Ui E Q)
Ul 0> Q) Ul 0> Q) Ul 0> Q) 0> Q) '-
co <t) :t:: co co <t) :t:: .!!! co <t) :t:: .!!! co <t) ... .!!! a.
a 0> ::l ~ a 0> ::l a 0> ::l a 0> ':; x
() <t) (/') () <t) (/') ~ () <t) (/') ~ () <t) (/') ~ W
.c
N u
t) co Q) Ul
<= -0 '0 .;:: .x
co '0
.s E >. .~ <= c: co
~z Q) .c
c:: Q) ~ co C>
0 :t:: '- i:5 ~ co
<= .c
U .c () co '- ~
~ >.= co
co Ul c: .!!2 c: Q)
<= u.. 'C c: '- c: 0 'C
co '0 .c co co ::l m co
0 W () 0 ~ <9 I- ~
i L-
a L-
...
l! 0
t: fIl
- III
t: Q) 0 .!!!
> Q)
;: - t: u
l ;: u t: e
:l ::l Q) E
u ... "0 "0 11.
Q) ... t:
- )( Ul Q) c( ClI
t: W t: - ... t:
Q) - 0 t: U ;:
"0 u () ';: l! :!::
III Q) , Q) ... E
l!:! '(5' l!:! Q. t:
L- ::l 0 Q)
11. 11. 11. (/') () 11.
ell
Ol
'"
n.
~
.......
\/)
~
o
u
II
e MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miomi Beach, Florida 33139, www.miamibeochR.gov
TO:
FROM:
DATE:
COMMISSION MEMORANDUM
Mayor David Dermer and Members of the City Commission
Jorge M, Gonzalez, City Manager ~ tI-"-r
May 1 0, 2006. (/ '-
SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH, FLORIDA, WAIVING BY 517THS VOTE, THE FORMAL
COMPETITIVE BIDDING REQUIREMENTS, FINDING SUCH WAIVER TO BE
IN THE BEST INTEREST OF THE CITY, AND AUTHORIZING THE CITY
MANAGER, AS THE CITY'S DESIGNEE, TO TAKE ALL NECESSARY)
ACTIONS TO PROCURE THE NECESSARY CONSTRUCTION SERVICES
FOR THE RENOVATION OF THE NORMANDY SHORES CLUBHOUSE,
1\(, _ \ ;rJerr~+td AND THE CONSTRUCTION OF THE NEW GOLF COURSE MAINTENANCE
BUILDING, CART BARN, AND TWO (2) RESTROOM BUILDINGS (THE
-tk:.\ fr, 1tI.eM. PROJECT), AS FOLLOWS: (1) AUTHORIZING THE CITY MANAGER TO
NEGOTIATE ( IN CONJUNCTION WITH THE CITY'S CAPITAL
tkt fu C {_~o"VlIMPROVEMENTS OFFICE (CIP)) AND EXECUTE AN AGREEMENT FOR
PRE-CONSTRUCTION SERVICES, IN AN AMOUNT NOT TO EXCEED
J(.M 6 );-hOI\ .!;d /II t $50,000, WITH THE FIRM OF COASTAL CONSTRUCTION COMPANY AND,
UPON SATISFACTORY COMPLETION OF SAID PRE-CONSTRUCTION
^Ud .n, jO J,u.l. -h SERVICES; (2) AUTHORIZING THE CITY MANAGER TO NEGOTIATE (IN
~ 6"'''''1)1'''''~' ~~~~~~~~f:G':~:Mil~~~NfH ~X;;SU;:L ~g~:r~~TT~g~ ~~~~~~
FOR THE CONSTRUCTION OF THE AFORESTATED PROJECT; IN THE
EVENT THE ADMINISTRATION IS UNSUCCESSFUL IN NEGOTIATING AN
AGREEMENT(S) WITH COASTAL CONSTRUCTION COMPANY,
AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE AN
AGREEMENT(S) WITH THE SECOND RECOMMENDED FIRM OF PIRTLE
CONSTRUCTION COMPANY; IN THE EVENT THE ADMINISTRATION IS
UNSUCCESSFUL IN NEGOTIATING AN AGREEMENT(S) WITH PIRTLE
CONSTRUCTION COMPANY, AUTHORIZING THE CITY MANAGER TO
NEGOTIATE AND EXECUTE AN AGREEMENT(S) WITH THE THIRD
RECOMMENDED FIRM OF THE TOWER GROUP; IN THE EVENT THE
ADMINISTRATION IS UNSUCCESSFUL IN NEGOTIATING AN
AGREEMENT(S) WITH THE TOWER GROUP, AUTHORIZING THE CITY
MANAGER TO NEGOTIATE AND EXECUTE AN AGREEMENT(S) WITH THE
FOURTH RECOMMENDED FIRM OF SUFFOLK CONSTRUCTION
COMPANY; IN THE EVENT THE ADMINISTRATION IS UNSUCCESSFUL IN
NEGOTIATING AN AGREEMENT(S) WITH SUFFOLK CONSTRUCTION
COMPANY, AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND
EXECUTE AN AGREEMENT(S) WITH THE FIFTH RECOMMENDED FIRM
OF TURNER CONSTRUCTION COMPANY; PROVIDED FURTHER THAT
THE AFORESTATED PRE-CONSTRUCTION SERVICES AGREEMENT AND
GMP AGREEMENT SHALL BE SUBJECT TO RATIFICATION BY THE
MAYOR AND CITY COMMISSION AT A FUTURE MEETING; IN THE