Loading...
2007-26559 Reso RESOLUTION NO. 2007-26559 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, WAIVING BY 5/7THS VOTE, THE COMPETITIVE BIDDING PROCESS, FIND SUCH WAIVER TO BE IN THE BEST INTEREST OF THE CITY, AND AUTHORIZING THE PURCHASE AND INSTALLATION OF THE MONDO ADVANCE GYMNASIUM FLOORING SYSTEM AT THE SCOTT RAKOW YOUTH CENTER GYMNASIUM FROM TRIDENT SURFACING, INC., IN THE ESTIMATED AMOUNT OF $56,500. WHEREAS, the Parks and Recreation Department has determined that the Scott Rakow Youth Center requires the replacement of the gymnasium floor to commence after completion of this years Summer program, prior to the beginning of the new school year, and completed prior to October 1, 2007; and WHEREAS, the current flooring has been in place since the opening of the Youth Center, and has been replaced periodically on an as needed basis; and WHEREAS, after extensive research by Parks and Recreation, it has been determined that the best product on the market at this time is the Mondo Advance Gymnasium System, which is a multipurpose rubber flooring system; and WHEREAS, Mondo has been manufacturing rubber flooring for over 50 years, and their products do not require any coating or resurfacing during their 20 year life expectancy; and WHEREAS, it should be noted that the Scott Rakow Youth Center has had Mondo Flooring in it's ice rink for the past eighteen (18) months and have been very satisfied with the product's durability, ease of maintenance, overall look and functionality; and WHEREAS, Sports Surfaces, Inc. who was awarded a GSA contract and operates out of Albuquerque, New Mexico, would have sub-contracted the project to Trident Surfaces, Inc., an authorized local distributor and installer located in South Florida; and WHEREAS, the City would realize a savings of $3,946 by awarding the project to Trident Surfaces, Inc.; and WHEREAS, Trident Surfaces, Inc. will be responsible for removing and properly disposing of the existing flooring, and installing the new Mondo Advance Gymnasium Flooring System in accordance with the manufacturers specification, to be completed on an agreed upon renovationlconstruction schedule, by the City. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby adopt the attached resolution approving and authorizing the purchase and installation of the Mondo Advance Flooring System at the Scott Rakow Youth Center gymnasium from Trident Surfacing, Inc. in the estimated amount of $56,500. PASSED AND ADOPTED THIS 6 h I 2007. A7C,ST: rU ~ CITY CLERK A YOR ,/ Robert Parcher David Dermer~>' T:\AGENDA\2007\jun0607\Consent\MondoFlooringSystem - Resolution.doc <1- / Agenda Item e.. 7 G- -- Date (p -0 ---07 COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Waiving, By 5/7ths Vote, The Competitive Bidding Process, Finding Such Waiver To Be In The Best Interest OfThe City, And Authorizing The Purchase And Installation Of The Mondo Advance Gymnasium Flooring System At The Scott Rakow Youth Center Gymnasium From Trident Surfaces, Inc., In the Estimated Amount of $56,500. Ke Intended Outcome Su orted: Increase satisfaction with recreational programs. Issue: I Shall the Commission Adopt the Resolution? Item Summary/Recommendation: The Parks and Recreation Director has determined that the Scott Rakow Youth Center requires the replacement of the gymnasium floor to commence after completion of this years Summer program and prior to the beginning of the new school year, and completed prior to October 1,2007. The current flooring has been in place since the opening of the Youth Center, and has been repaired periodically on an as needed basis. After extensive research by Parks and Recreation, it has been determined that the best product on the market at this time is the Mondo Advance Gymnasium System which is a multipurpose rubber flooring system. Because Mondo is able to customize the energy return, slide coefficient, and shock absorption it can be used for anything from a church multipurpose room to a NCAA Division I basketball or volleyball program. Mondo has been manufacturing rubber flooring for over 50 years, and their products do not require any coating or resurfacing during their 20+ year life expectancy. The combination of easy maintenance and durability, which is exhibited in the 10-year warranty, is the reason why Mondo is considered the sport surfacing industry leader. Trident Surfacing, Inc. is the sole South Florida distributor for Mondo Rubber Sports Flooring. They will be responsible for removing and properly disposing of the existing flooring, and installing the new Mondo Advance Gymnasium Flooring System in accordance with the manufacturers specifications, to be completed on an agreed upon renovation/construction schedule, by the City. Adopt the Resolution. Advisory Board Recommendation: I N/A Financial Information: Source of Amount Account Approved Funds: Budget Account No. 1 $43,537.50 011.0950.000342 [16J 2 Budget Account No. $12,962.50 011.0950.000676 3 4 OBPI Total $56,500 Financial Impact Summary: Cit Clerk's Office Le islative Trackin Gus Lopez, Procurement n-Offs: Department Director Assistant City Manager City Manager K 8M 7\jun0607\Consent\MondoFlooringSystemSUMMARY.dac JMG lD 'IIII!F MIAMIBEACH AGENDA ITEM DATE f!., 7 G- &-" -07 & MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov COMMISSION MEMORANDUM DATE: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez, City Manager j /l)" I' June 6, 2007 I 1 ,j TO: FROM: SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, WAIVING, BY 5/7THS VOTE, THE COMPETITITVE BIDDING PROCESS, FIND SUCH WAIVER TO BE IN THE BEST INTEREST OF THE CITY, AND AUTHORIZING THE PURCHASE AND INSTALLATION OF THE MONDO ADVANCE GYMNASIUM FLOORING SYSTEM AT THE SCOTT RAKOW YOUTH CENTER GYMNASIUM FROM TRIDENT SURFACING, INC., IN THE ESTIMATED AMOUNT OF $56,500. ADMINISTRATION RECOMMENDATION Adopt the Resolution. FUNDING $43,537.50 Funding is available from Budget Account No. 011.0950.000342. $12,962.50 Funding is available from Budget Account No. 011.0950.000676. $56,500 - Total ANAL YSIS The Parks and Recreation Department has determined that the Scott Rakow Youth Center requires the replacement of the gymnasium floor to commence after completion of this years Summer program and prior to the beginning of the new school year, and completed prior to October 1, 2007. The current flooring has been in place since the opening of the Youth Center, and has been repaired periodically on an as needed basis. After extensive research by Parks and Recreation, it has been determined that the best product on the market at this time is the Mondo Advance Gymnasium System, which is a multipurpose rubber flooring system. Because Mondo is able to customize the energy return, slide coefficient, and shock absorption it can be used for anything from a church multipurpose room to a NCAA Division I basketball or volleyball program. Mondo has been manufacturing rubber flooring for over 50 years, and their products do not require any coating or resurfacing during their 20+ year life expectancy. This product comes with a 1 O-year warranty. It should be noted that the Scott Rakow Youth Center has had Mondo Flooring in its ice rink for the past eighteen (18) months and have been very satisfied with the product's durability, ease of maintenance, overall look and functionality. Commission Memorandum -Mondo Advance Flooring June 6, 2007 Page 2 of 2 We obtained a comparison from a Federal GSA Contract, which is outlined below: Vendor Square Foot Quote Savings Trident Surfaces 7,400 $59,500 $3,000 Sport Surfaces 7,400 $63,446 $6,946 Sports Surfaces was awarded a GSA contract, which operates out of Albuquerque, New Mexico and would sub this job to Trident Surfaces. However, the cost for Sports Surfaces to provide the needed product and services exceeds that of an authorized local distributor, Trident Surfaces. Although there are several vendors that can provide the Mondo flooring there is only one authorized installer in Florida, Trident Surface, Inc. Trident Surfaces, Inc. is the sole South Florida distributor for Mondo Rubber Sports Flooring. They will be responsible for removing and properly disposing of the existing flooring, and installing the new Mondo Advance Gymnasium Flooring System in accordance with the manufacturers specifications, to be completed on an agreed upon renovationlconstruction schedule, by the City. CONCLUSION The Administration recommends that the Mayor and City Commission adopt the attached resolution approving and authorizing the purchase and installation of the Mondo Advance Flooring System at the Scott Rakow Youth Center gymnasium from Trident Surfacing, Inc., in the estimated amount of $56,500. T:\AGENDA \2007\j un0607\Consent\MondoFlooringSystem MEMO .dac