Loading...
2007-26561 Reso RESOLUTION NO. 2007-26561 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, USING PREVIOUSLY APPROPRIATED FUNDS, IN THE AMOUNT OF $305,855, FROM THE CITY'S CAPITAL INVESTMENT UPKEEP ACCOUNT NO. 011- 9509-000676; COMPRISED OF $245,855 FOR THE INSTALLATION OF AN IRRIGATION SYSTEM AND THE RESTORATION AND BEAUTIFICATION OF THE BULB-OUTS ON HARDING AVENUE FROM 76TH TO 85TH STREETS; AND $60,000 FOR THE INSTALLATION OF THE WATER SOURCE REQUIRED TO SERVICE THE IRRIGATION SYSTEM. WHEREAS, the current landscape maintenance contract between the City and Everglades Environmental Care Inc., the City's contractor responsible for the landscaping on Harding Avenue, provides for the performance of additional services such as site landscapelirrigation restoration work, as needed, based on contractually established labor and material pricing set at the time the contract is awarded; and WHEREAS, the bulb-outs on the 7600-8500 blocks of Harding Avenue installed by the Florida Department of Transportation (FOOT) did not include an irrigation system or water source to support one, therefore the landscape materials installed by FOOT have not thrived and are in need of replacement; and WHEREAS, funding, in the amount of $305,855, is available from the Capitol Investment Upkeep Account (CIUA) No. 011-9509-000676, to pay for the installation of a water source, irrigation system, landscape restoration, and beautification of the Harding Avenue bulb-outs; and WHEREAS, $245,855 will be allocated to Everglades Environmental Care Inc., for the installation of the irrigation system and landscape restoration; and $60,000 will be allocated to the City's Public Works Department for the installation of the water source required to service the irrigation system. NOW, THEREFORE, BE IT DULY RESOLVED THAT THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, hereby adopt the resolution using previously appropriated funds, in the amount of $305,855, from the City's Capital Investment Upkeep Account No. 011-9509- 000676; comprised of $245,855 for the installation of an irrigation system and the restoration and beautification of the bulb-outs on Harding Avenue from 76th to 85th Streets; and $60,000 for the installation of the water source required to service the irrigation system. PASSED and ADOPTED this 6th 2007. :~L~CiA~ CITY CLERK David Dermer APPROVED AS TO FORM & LANGUAGE ~ FOR EXECUTION Robert Parcher T:\AGENDA\2007\jun0607\Consent\Harding Avenue Bulb-outs Beautification program~ cR/;~7 City Attorney ..~ Data COMMISSION ITEM SUMMARY Condensed Title: A Resolution using previously appropriated funds in the amount of $305,855 from the City's Capital Investment Upkeep Account for the landscape restoration and beautification of the Harding Avenue bulb-outs. This appropriation is comprised of $245,855 to Environmental Care, Inc., the City's current contractor responsible for the landscape of Harding Avenue and $60,000 to the Public Works De artment for the installation of water ta s re uired to service the irri ation s stem. Commission a rove the Resolution? Item Summary/Recommendation: The City's landscape maintenance contract #09-05/06 awards the on-going landscape maintenance, restoration and beautification of the Harding Avenue bulb-outs to Everglades Environmental Care, Inc. It further provides for the performance of additional services such as site landscape/irrigation restoration work as needed, based on contractually established labor and material pricing set at the time of the contract award. This is beneficial to the City because pricing is pre-established through the competitive bidding process for the term of the contract. Additionally, when the restoration is complete the contractor is responsible for both the material warranty and the long term maintenance of the materials. Should the contractor fail to properly care for this irrigation system plantings, they must replace them as a contractual obligation without question of liability. Also, by utilizing our existing contractors, the timeframe required to complete the needed work is reduced. The bulb-outs on the 7600-8500 blocks of Harding Avenue, installed by the Florida Department of Transportation, did not include an irrigation system or water source to support one, therefore the landscape materials installed by FDOT have not thrived and are in need of replacement. Advisory Board Recommendation: I N/A Financial Information: Source of Amount Account Approved Funds: 1 $305,855 Capital Investment Upkeep Account # 011-9509-000676 @(] 2 3 4 - OBPI Total Financial Impact Summary: Clerk's Office Le islative Trackin : Kevin Smith, Director of Parks & Recreation/ Fred Beckmann, Director of Public Works Si n-Offs: Department Director S KSt JOt FB ReM City Manager (' JMG , , Assistant City Manager T:\AGENDA\2007~un0607\Consent\Harding Avenue Bulb-outs Beautification Pragram summary.doc ~ .... MIAMI BEACH AGENDA ITEM DATE L1I (r~-()( lD MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeochfl.gov COMMISSION MEMORANDUM FROM: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez, City Manager A r '6 June 6, 2007 (,) TO: DATE: SUBJECT: A RESOLUTION OF THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, USING PREVIOUSLY APPROPRIATED FUNDS, IN THE AMOUNT OF $305,855 FROM THE CITY'S CAPITAL INVESTMENT UPKEEP ACCOUNT #011-9509-000676; COMPRISED OF $245,855 TO EVERGLADES ENVIRONMENTAL CARE INC, THE CITY'S APPROVED LANDSCAPE MAINTENANCE CONTRACTOR FOR HARDING AVENUE, FOR THE INSTALLATION OF AN IRRIGATION SYSTEM AND THE RESTORATION AND BEAUTIFICATION OF THE BULB-OUTS ON HARDING AVENUE FROM 76TH TO 85TH STREETS; AND $60,000 TO THE PUBLIC WORKS DEPARTMENT FOR THE INSTALLATION OF THE WATER SOURCE REQUIRED TO SERVICE THE IRRIGATION SYSTEM. ADMINISTRATION RECOMMENDATION Adopt the Resolution, FUNDING Funding, in the amount of $305,855 is available from the Capitol Investment Upkeep Account (CIUA) #011-9509-000676, to pay for the installation of an irrigation system and landscaping restoration of the bulb outs installed along Harding Avenue. ANAL YSIS The current landscape maintenance contract between the City of Miami Beach and Everglades Environmental Care Inc., #09-05/06, the City's contractor responsible for the landscaping on Harding Avenue, provides for the performance of additional services such as site landscapelirrigation restoration work as needed, based on contractually established labor and material pricing set at the time the contract is awarded. This is beneficial to the City because pricing is established through the competitive process included in the landscape maintenance program bid. Furthermore, when the restoration is complete the same contractor is responsible for both the material warranty and the long term maintenance of the materials. Should the contractor fail to properly care for these plantings, they must replace them as a contractual obligation without question of liability. Additionally, by utilizing our existing contractor, the timeframe required to complete the needed work is reduced. The bulb-outs on the 7600-8500 blocks of Harding Avenue installed by the Florida Department of Transportation did not include an irrigation system or water source to support one, therefore the landscape materials installed by FDOT have not thrived and are in need of replacement. City Commission Memorandum -Harding Avenue Restoration Program June 6, 2007 Page 2 of 2 In recognition of the difficult growing conditions present at these locations, a new design was produced by the Greenspace Management Division's Landscape Architect, Ms. Rhonda Gracie, to utilize hardy drought resistant plant selections such as perennial peanut along with small flowering Crepe Myrtle trees, The installation will be managed on behalf of the City by the Greenspace Management Division's Landscape Maintenance Superintendent Ms. Millie McFadden, who is a licensed Landscape Contractor with the State of Florida. Barring unforeseen conditions, it is anticipated that this project will be complete no later than September 30,2007. CONCLUSION The Administration recommends that the Mayor and City Commission approve the Harding Avenue Bulb-outs Landscape Restoration Project in the total amount of $305,855. T:\AGENDA\2007~un0607\Consent\Harding Avenue Bulb-outs Beautification Program.doc