Loading...
2007-26554 Reso RESOLUTION NO. 2007-26554 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING FUNDS, IN THE AMOUNT OF $600,000, FROM THE CONVENTION DEVELOPMENT TAX FUND 442, TO FUND THE FOLLOWING: ADDITIONAL SCOPE OF WORK (PHASE II - LIMITED SCOPE), NOT ORIGINALLY INCLUDED WITHIN THE JACKIE GLEASON THEATER ADA AND INTERIOR IMPROVEMENTS PROJECT (PROJECT); ASSOCIATED CHANGE ORDER TO MIAMI SKYLINE CONSTRUCTION CORP. (MIAMI SKYLINE) FOR SAID WORK; TO FURTHER FUND ADDITIONAL DESIGN FEES, ADDITIONAL PROJECT CONTINGENCY, AND ADDITIONAL SOFT COSTS ASSOCIATED WITH SAID ADDITIONAL WORK; AND TO FURTHER FUND CHANGE ORDERS ASSOCIATED WITH PHASE I OF THE PROJECT, DUE TO UNFORESEEN CONDITIONS ENCOUNTERED BY MIAMI SKYLINE DURING EXECUTION OF THE CONSTRUCTION WORK. WHEREAS, in 1996, the City retained the Architectural firm of R.J. Heisenbottle Architects, P.A. to conduct a survey of both the Jackie Gleason Theater of the Performing Arts (TOPA) and the Miami Beach Convention Center (MBCC) to identify those areas that were not in compliance with the provisions of the Americans with Disabilities Act (ADA) (the Project); and WHEREAS, on February 9,2000, an Agreement was executed between the City and A.R.1. Architects, Inc. (d/b/a: SKLARchitecture) (Consultant), for design services to undertake this Project; and WHEREAS, at the City Commission meeting of February 25, 2004, the Mayor and City Commission awarded the Construction Contract for the Jackie Gleason Theater of the Performing Arts ADA and Public Interior Design Enhancement Renovations pursuant to Invitation to Bid No.1 0- 03/04, in the amount of $1 ,975,000, to Miami Skyline (Contractor); and WHEREAS, the City Commission further directed the Administration to negotiate Alternate #4 (Phase II) with the Contractor, or utilize the City's Job Order Contracting (JOC) Program, should additional funds become available, and should the City decide to pursue those improvements at a later date; and WHEREAS, during the construction, the Contractor encountered unforeseen conditions, resulting in additional scope of work; and WHEREAS, at the City Commission meeting of May 16, 2007, the City Commission approved and authorized the Mayor and City Clerk to execute an Agreement with Live Nation for the management and operation of TOPA; and WHEREAS, pursuant to the above, the City has agreed to proceed with the improvements of two (2) of the restrooms included within Phase II (Alternate #4); estimated to be completed by November 2007, to meet Live Nation's event schedule; and WHEREAS, the City has opted to proceed with these improvements with the Contractor; and WHEREAS, the City seeks authorization to appropriate additional funds, in the amount of $600,000; and WHEREAS, these funds will finance the construction cost, construction contingency, design fees, and additional soft costs associated with the additional scope of work (Phase II-limited scope at this time), estimated at $350,000; and WHEREAS, additionally, these funds will finance Change Orders, in the estimated amount of $112,653, associated with Phase I of the Project (as a result of unforeseen conditions experienced during the construction of Phase I of the Project). NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approves the appropriation of funds, in the amount of $600,000, from the Convention Development Tax Fund 442, to fund the following: additional scope of work (Phase II - limited scope), not originally included within the Jackie Gleason Theater ADA and Interior Improvements Project (Project); associated change order to Miami Skyline Construction Corp. (Miami Skyline) for said work; to further fund additional design fees, additional Project contingency, and additional soft costs associated with said additional work; and to further fund Change Orders associated with Phase I of the Project, due to unforeseen conditions encountered by Miami Skyline during the execution of the construction work. /1 /1 PASSED and ADOPTED this 6th day ,2007. ATTEST: JJId f ~ CITY CLERK Robert Parcher T:\AGE N DA \2007\jun0607\Consent\S- TOP A ADA-02-06 .06 .07- APPROVED AS TO FORM & LANGUAGE 6 FOR EXECUTION i:./; /6} Date COMMISSION ITEM SUMMARY Condensed Title: A resolution of the Mayor and City Commission of the City of Miami Beach, Florida, appropriating funds, in the amount of $600,000, from the Convention Development Tax Fund 442; said appropriation to fund additional scope of work, design fees, project contingency, and additional associated soft costs for the Jackie Gleason Theater of the Performinq Arts (TOPA). Issue: I Shall the City Commission approve the resolution? Item Summarv/Recommendation: In 2000, an Agreement was executed between the City and SKLARchitecture (Consultant), for design services to make improvements to both the Jackie Gleason Theater of the Performing Arts (TOPA) and the Miami Beach Convention Center to comply with the provisions of the Americans with Disabilities Act (ADA). In 2004, the Mayor and City Commission awarded the contract (Base Bid and Alternate #1; Phase I) to Miami Skyline Construction Corp. (Contractor), and further directed the Administration to negotiate Alternate #4 (Phase II) with the Contractor, or utilize the City's Job Order Contracting (JOC) Program, should additional funds become available and should the City decide to pursue those improvements at a later date (Resolution No. 2004-25503). During the construction, the Contractor encountered unforeseen conditions resulting in additional scope of work. The Administration seeks authorization to execute applicable change orders upon successful negotiations and upon approval of additional appropriation of funds. Additionally, at the City Commission meeting of May 16,2007, the City Commission approved and authorized the Mayor and City Clerk to execute a Management Agreement with Live Nation Worldwide, Inc. Live Nation intends to occupy and close the facility to the public for renovations by the middle of June 2007. Proposed improvements, as well as staffing efforts, will proceed through the balance of the summer. Pursuant to the above, the City has agreed to proceed with the improvements of two (2) of the restrooms included within Phase II (Alternate #4) at this time to be completed by November 2007, to meet Live Nation's event schedule. The City has opted to proceed with these improvements with the current Contractor. Should Live Nation and the City decide to proceed with additional improvements including, but not limited to, the remaining Phase II improvements, a separate timeline will need to be negotiated between the City and Live Nation. The Administration seeks authorization to negotiate such improvements with Live Nation, and furthermore, the Administration seeks authorization to negotiate with Miami Skyline Construction Corp. for the construction of these future improvements. Finally, the City seeks authorization to appropriate additional funds in the not to exceed amount of $600,000. These funds will finance the construction cost, construction contingency, design fees, and additional soft costs associated with the additional scope of work (Phase II - limited scope at this time). Additionally, these funds will finance change orders associated with Phase I of the Project as a result of unforeseen conditions experienced during the construction of Phase I of the Project. The Administration recommends approval of the Resolution. Advisory Board Recommendation: I N/A Financial Information: Source of Amount Account Approved CIP 1 $600,000 442 CDT Funds o I" Total $600,000 Financial Impact Summary: Ci Clerk's Office Le islative Trackin Nu Menicucci, xl. 6958 tD ,.,. er MI BEACH AGENDA ITEM DATE C7C. ftJ -6 - 0 7 ~ MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachR.gov COMMISSION MEMORANDUM FROM: Mayor David Dermer and Members rr t,he 9ty C~m_mis~on Jorge M. Gonzalez, City Manager ~ .~ -\)-i June 6, 2007 TO: DATE: SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING FUNDS, IN THE AMOUNT OF $600,000, FROM THE CONVENTION DEVELOPMENT TAX FUND 442; SAID APPROPRIATION TO FUND ADDITIONAL SCOPE OF WORK (PHASE II - LIMITED SCOPE), NOT ORIGINALLY INCLUDED WITHIN THE JACKIE GLEASON THEATER ADA AND INTERIOR IMPROVEMENTS PROJECT (PROJECT); AND SAID APPROPRIATION TO FURTHER FUND THE ASSOCIATED CHANGE ORDER TO MIAMI SKYLINE CONSTRUCTION CORP. (MIAMI SKYLINE) PURSUANT TO RESOLUTION NO. 2004-25503 FOR SAID WORK; AND SAID APPROPRIATION TO FURTHER FUND ADDITIONAL DESIGN FEES, PROJECT CONTINGENCY, AND SOFT COSTS ASSOCIATED WITH THIS WORK; AND SAID APPROPRIATION TO FURTHER FUND CHANGE ORDERS ASSOCIATED WITH PHASE I OF THE PROJECT DUE TO UNFORESEEN CONDITIONS ENCOUNTERED BY MIAMI SKYLINE DURING EXECUTION OF THE CONSTRUCTION WORK. ADMINISTRATION RECOMMENDATION Adopt the Resolution. FUNDING Funding to be appropriated from the Convention Development Tax Fund 442. ANALYSIS In 1996, the City retained the Architectural firm of R.J. Heisenbottle Architects, P.A to conduct a survey of both the Jackie Gleason Theater of the Performing Arts (JGT) and the Miami Beach Convention Center (Convention Center) to identify those areas that were not in compliance with the provisions of the Americans with Disabilities Act (ADA). As a result of this study, the City budgeted funds to renovate certain restrooms at the Miami Beach Convention Center and the JGT to bring both buildings into compliance with the requirements of the ADA On February 9,2000, an Agreement was executed between the City and AR.1. Architects, Inc. (d/b/a: SKLARchitecture, (Consultant) for design services to undertake this project. On March 3, 2003, Invitation to Bid No. 27-02/03 was issued for the JGT ADA and Interior Renovations. City Commission Memorandum June 6, 2007 ADA and Interior Renovations For The Jackie Gleason Theater of The Performing Arts Page 20f3 At the City Commission meeting of February 25, 2004, the Mayor and City Commission awarded the contract (Base Bid and Alternate #1; Phase I) to Miami Skyline Construction Corp. (Miami Skyline), the second lowest bidder, and further directed the Administration to negotiate Alternate #4 (Phase II) with Miami Skyline, or utilize the City's Job Order Contracting (JOC) Program, should additional funds become available, and should the City decide to pursue those improvements at a later date. The lowest bidder, Tran Construction, Inc., was deemed non responsive pursuant to Section 2-487(A) (3) of the City Code. A second Notice to Proceed for the Project was issued on May 4, 2004, and reached Substantial Completion on December 10, 2004. While executing the construction scope of work, the Contractor encountered unforeseen conditions resulting in additional scope of work. Change Orders 1 through 4 were funded through previously appropriated Project's contingency. Change Orders 5 through 9, although also funded through the previously appropriated Project's contingency, are pending execution due to the availability of said funds. Therefore, the Administration seeks authorization to execute said change orders upon successful negotiations and upon approval of additional appropriation of funds. Additionally, the Contractor experienced extended General Conditions as a result of the unforeseen conditions encountered and interruption of work schedules as a result of events at the JGT that impacted the progress of the work resulting in Change Order 10. Said change order is currently being negotiated; therefore, it is not included within the current funding appropriation, but will be presented to the City Commission at a later date. On February 25, 2004, a contingency of 10% was approved for the Project per Resolution No. 2004-25503. Since then, the City has noted that for projects such as these (extensive renovations of existing facilities), a ten percent (10%) contingency is not sufficient to cover unforeseen conditions, and determined that, a twenty percent (20%) contingency allowance should be allotted for. The total estimated aggregate amount for Change Orders 1 - 10, for the renovations of Phase I of the Project would not exceed seventeen percent (17%). During a Special Commission Meeting, the City Commission made its decision to maintain the Facility as a single night or limited run rental venue that would be managed by an international live entertainment company that would incur the risk of programming for the facility, while guaranteeing the City a base return. Resolution No. 2006-26377, authorized the Administration to negotiate with Live Nation Worldwide, Inc., a publicly-traded company, that manages and operates live venues, and promotes and produces live entertainment events. At the City Commission meeting of May 16, 2007, the City Commission approved and authorized the Mayor and City Clerk to execute a Management Agreement with Live Nation Worldwide, Inc. Live Nation intends to occupy and close the facility to the public for renovations by the middle of June 2007. Proposed improvements, as well as staffing efforts, will proceed through the balance of the summer. Live Nation proposes to reopen the facility as the "Fillmore Miami Beach at the Jackie Gleason Theater" this Fall. Pursuant to the above, the City has agreed to proceed with the improvements of two (2) of the restrooms included within Phase II (Alternate #4) at this time. Per Live Nation's event schedule, the work needs to be completed by November 2007. Pursuant to Resolution No. 2004-25503, the City has opted to proceed with these improvements with Miami Skyline, and upon successful negotiations, issue a change order to Miami Skyline for this work. Should Live Nation and the City decide to proceed with additional improvements including, but not limited to, the remaining Phase II improvements, a separate timeline will need to be discussed between the City and Live Nation. Finally, the City seeks authorization to appropriate additional funds in the amount of $600,000. These funds will finance the construction costs, construction contingency, design City Commission Memorandum June 6, 2007 ADA and Interior Renovations For The Jackie Gleason Theater of The Performing Arts Page 3 0'3 fees, and additional soft costs associated with the additional scope of work (Phase II - limited scope at this time) estimated at $350,000. Additionally, these funds will finance change orders associated with Phase I of the Project as a result of unforeseen conditions encountered during the construction of Phase I of the Project (refer to Attachment "A"). Also, an additional estimated amount of funds are being requested within the City's Fiscal Year (FY) 07/08 Capital Budget Plan to fund additional future improvements, should the City decide to pursue them. Any portions of the $600,000 not utilized, will be used in the Project's budget for future improvements. CONCLUSION Based on the analysis, the Administration recommends that the City Commission appropriate funds, in the amount of $600,000, from the Convention Development Tax fund 442; said appropriation to fund additional scope of work (Phase II - limited scope), not originally included within the Jackie Gleason Theater ADA and Interior Improvements Project; and said appropriation to further fund the associated change order to Miami Skyline Construction Corp., pursuant to Resolution No. 2004-25503; and said appropriation to further fund additional design fees, Project contingency, and soft costs associated with this work; and said appropriation to further fund change orders associated with Phase I due to unforeseen conditions encountered by Miami Skyline during the execution of the construction work. Attachments T:\AGENDA \2007\jun0607\Consent\S- TOP A ADA-02-06.06.07 - MEMO .Rev..doc A 11 A~\-\V\l:. NT II A " _AlA Document G701'" - 2001 Change Order PROJECT: (Name and addressl Jackie Gleason TOPA & Renovations 1901 CONVENTION CTR. DR. ~O~~JrRit/b~~(NJJ-an~~J;";sS) CMB-1& [MB- 2 TaPA M i.a m i Sky 1 i n e Con s t r u c t i oCbNTRACT DATE' 705 NE 130Th Street . Nor t h . li ami, F L 33 16 1 CONTRACT FOR: G e n era 1 Con s t r u c t ion CHANGE ORDER NUMBER: Int. DATE: March 26, 2007 ARCHITECT'S PROJECT NUMBER: 005 OWNER ijj ARCHITECT Ii CONTRACTOR ag FIELD 0 OTHER 0 The Contract is changed as follows: (Include, where applicable. any undisputed amount attributable to previously executed Construction Change Directives) PCO # 87A FIRE SPRINKLER WORK AND REPAIRS $24,386.45 The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (~~35~ {IHlGhaI1p~ by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be The Contract Time will be (increased) (decreased) (unchanged) by 0 ) days The date of Substantial Completion as of the date of this Change Order therefore is $ 1,975,000.00 $ 73,577.44 $ 2,048,577.44 $ 24,386.45 $ 2,072,963.89 (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER, SKLARchitecture Miami Skyline Const. City of Miami Beach ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) 2310 Hollywood Blvd 705 NE 130TH Street 1700 Convention Ctr. Dr. '" ~'Z!,f! ~ F] 33161 ,M~!l.; a.orb. FL 33139 BY (Signature) BY (Signature) 0. t a..... .d i _~ ~C:).dr ~ ~ '-" tL,-Nu ry Me n i cue c i (Typed name) . (Typed name) Ari.l, Sklar (Typed name) 3. -z..,. t:J1 DATE ~-".)-2.8_ O'-~ DATE DATE CAUTION: You should sign an original AlA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AlA Document G701 TII - 2001. Copyright @ 1979, 1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AJA- Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution 01 this AIA<8 Document, or any portion 01 It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AlA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. _AlA Document G701" - 2001 Change Order PROJECT: (Name and address) CHANGE ORDER NUMBER: 0 0 6 Jackie Gleason TOPA Int. & Renov~tions DATE: ~'arch 26,2007 1901 Conventlon Ctr. Dr. Mi ami Be a c h, F 1 3 3 1 3 9 ARCHITECT'S PROJECT NUMBER: TO CONTRACTOR: (Name and address) CMB-1 & CMB-2 TOPA Miami Sky1 ine COnstructi~BNTRACTDATE. 705 NE 130th Street . Nor t h ' ffl ami, F L 3 3 16 1 CONTRACT FOR: G e n era 1 Con s t r u c t ion OWNER Xl< ARCHITECT iJ CONTRACTOR KJ FIELD 0 OTHER 0 The Contract is changed as follows: (Include, where applicable. any undisputed amount attributable to previously executed Construction Change Directives) PCO # 87B FIRE SPRINKLER WORK AND REPAIRS $15,576.22 The original (Contract Sum) (Guaranteed Maximum Price) was $ The net change by previously authorized Change Orders $ The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was $ The (Contract Sum) (Guaranteed Maximum Price) will be (increased). (~~B'Jt~ti) (liQi;8a:B~). by this Change Order in the amount of $ The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be $ The Contract Time will be (increased) (decreased) (unchanged) by ( 0 ) days The date of Substantial Completion as of the date of this Change Order therefore is 1,975,000.00 97,963.89 2,072,963.89 15,576.22 2,088,540.11 (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor. in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. SKLARchitecture ARCHITECT (Firm name) 2310 Hollywood Blvd. Hollywood, F1 33020 ADDRESS Miami Skyline Const. CONTRACTOR (Firm name) 705 NE 130th Street Nor t h Mia m i i;l F 1 3 3 1 6 1 ADDRESS City of Miami Beach OWNER (Firm name) 1700 COnvention Ctr. Dr. IMYi ami Beach, Fl 33139 ADDRESS Nury Menicucci BY (Signature) Ari 1. Sklar .y(S~ ~ . /~~ (Typed ) V ~."Z.1.~1 c. I a..... ..1\ 0 ?. 0 J.,.. i" ~ '"4.~ .Y(Si~~ (Type name) (Typed name) DATE 03_28_0r DATE DATE CAUTION: You should sign an original AlA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AlA Document G701T11- 2001. Copyright @ 1979,1987,2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING; This AlAe Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlAe Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AlA Contract Documents. e-mail The American Institute of Architects' legal counsel, copyright@aia.org. tAlA Document G701'" - 2001 Change Order PROJECT: (Name and address) Jackie Gleason TOPA Int. & Renovations 1901 COnvention Ctr.Dr. M . . B h F 1 3 3J 3 9 TO bf>WTAA~f&f (Name antfad ress) Miami Skyline Const. 705 NE 130th Street North Miami, Fl 33161 CHANGE ORDER NUMBER: 00 }. DATE: Mar c h 26, 2007 ARCHITECT'S PROJECT NUMBER: CMS-l!&( fMB-2 TOPA OWNER m ARCHITECT III CONTRACTOR ~ FIELD 0 OTHER 0 CONTRACT DATE: CONTRACT FOR: G e n era 1 Con s t rue t ion The Contract is changed as follows: (lncludt:. where applicable, any undisputed amount attributable to previously executed Construction Change Directives) PLEASE SEE ATTACHED EXHIBIT "A" ATTACHED The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be The Contract Time will be (increased) (decreased) (unchanged) by () days The date of Substantial Completion as of the date of this Change Order therefore is $ 1,975,000.00 $ 113,540.11 $ 2,088,540.11 $ 24,621.43 $ 2,113,161.54 (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor. in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. SKLARchitecture ARCHITECT (Firm name) 2310 Hollywood Blvd. Sklar Mia m i S kyJ i n e Con st. CONTRACTOR (Film '!"me) 705 'ME 130th Street ~Qr2'?] 3316] ADDRESS ~ BY (Signa ure) C I ~v J j (') -h o..J,.. ~.,j v-e. '" (Typed name) City of Miami Beach OWNER (Firm name) 1700 Convention Ctr.Dr. I Mfi ami 8 e a c h. F 1 33 1 3 9 ADDRESS BY (Signa Ari. (Typed name) 3.. '%.1 . Of BY (Signature) Nury Menicucc; (Typed name) DATE DATE 03_Zf- 0'" DATE CAUTION: You should sign an original AlA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AlA Document G701 TIll - 2001. Copyright @ 1979, 1987. 2000 and 2001 by The American Institute of Architects, All rights reserved. WARNING: This AlAa Document is protected by U.S. Copyright Law and international Treaties. Unauthorized reproduction or distribution of this AlA- Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AlA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. PCO# 9RevO I PCO# II RevO I PCO# 26RevO I PCO# 28RevO I PCO# 29Rev02 PCO# 30Rev02 PCO# 34Rev02 PCO# 36RevOI PCO# 37RevOI PCO# 38RevOI PCO# 59RevO I PCO# 64Rev02 PCO# 73 PC0#80 PCO# 81 PC0#82 EXHIBIT "A" Jackie Gleason TOPA ADA & Interior Renovations Change Order # 007 Provide Lighting fixture type "SS" Re-route new conduit and wire Restroom # I] Relocation of (4) sprinkler heads in the new soffit areas of 1 It floor lobby Conduit & wire for connection exhaust fan in Restrooms # 8,1], 12 & 17 New Lighting fixtures type A in the Restrooms # 6, 10 & II Provide and install decorative switches Installation of(5) sprinkler heads in the Lobby of the second floor and (2) Dome & (2) sidewalls and (I) at entry. Re-route existing feeder and rewire in the Restroom # 4 Provide and install new lighting fixtures in restroom # 3 Run new conduit and wire for exhaust fan and roof back stage Mounting Arm for torch light fIXture Replace existing duplex receptacles for new GFI receptacles in the Bars # C, H, G, I, J, K, M and N Relocation of (1) additional head in Bathroom # II Installation of (2) pendent heads in lieu of sidewalls installed in Lobby and relocation of (2) in center of dome Provide and install new F/A speaker in the walkway behind elevator Provide and install new F/A strobe light in the ceiling of Women's Bathroom # 3 Total = $2,672.02 $1,436.78 $1,392.47 $1,160.95 $1,453.32 $ 295.28 $1,360.6] $1,900.06 $2,639.45 $1,125.45 $4,477.52 $ 794.54 $ 696.12 $1,465.76 $ 588.47 $ l.l 62.63 $24,621.43 .,,:. a AlA Document G70r" - 2001 Change Order CHANGE ORDER NUMBER: 008 DATE: March 26 t 2007 ARCHITECT'S PROJECT NUMBER: PROJECT: (Name and address) Jackie Gleason TOPA Int. & Renovations 1901 Convention Ctr. Dr. Mia m iB ei c h F 1 33 139 TO CONTRACTOR: (Name and address) CMB -ll&f Mia m i Sky 1 i n e Con s t rue t ion CONTRACT DATE. 705 NE 130th Street . Nor t h Mia m i, F 1 3 3 16 1 CONTRACT FOR: CMB-2 TOPA OWNER IKI ARCHITECT IX) CONTRACTOR IX) FIELD 0 OTHER 0 The Contract is changed as follows: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) PCO # 63REV01 REWIRE ALL EXISTING FIRE ALARM SYSTEM AND PROVIDE NAC PANEL TO TIE EXISTING $24,019.08 The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (des;~~El)::(~Iwl~): by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be The Contract Time will be (increased) (decreased) (unchanged) by 0 ) days The date of Substantial Completion as of the date of this Change Order therefore is S 1,975.000.00 S 138,161.54 S 2,113,161.54 S 24,019.08 S 2,137,180.62 (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. SKLARctiitecture ARCHITECT (Firm name) 2310 Hollywood Blvd. Hollywood, Fl 33020 C-<'~-~// BY (Si8n.ature) ~ ARI SKLAR (Typed name) Miami Skyline COnst. CONTRACTOR (Firm name) 705 NE 130th Street North Miami0 33161 :"ESS ~~ .. 1C y- BY (Signature) BY (SIgnature) .r~ I' if;;,;J J. c.i' R~J('''i ~4:'ZlW R Y MEN I C U C C I (Typed name) (Typed name) City of Miami Beach OWNER (Firm name) 1700 Convention Ctr.Dr. Miami Beach. Fl 33139 ADDRESS ~ .1. '1 . 'i DATE DATE os_Z,g_o+ DATE CAUTION: You should sign an original AlA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AlA Document G701™ - 2001. Copyright @ 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIAfII Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAfII Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AlA Contract Documents. e-mail The American Institute of Architects' legal counsel. copyright@aia.org. "-,.~. a AlA Document G70r" - 2001 Change Order . PROJECT: (Name and address) Jackie Gleason TOPA Int. & Renovations 1901 Conv, Ctr. Dr. CHANGE ORDER NUMBER: 009 DATE: 03/27/07 ARCHITECT'S PROJECT NUMBER: ..)I' 'R h. Fl 13139 1'0 btWTRAtT&f: rN'ame amtaaaress) CM B -1 & Cr-tB - 2 TOP A Miami Skyl ine COnstruct. CONTRACT DATE: 705 NE130TH STREET North Miami, Fl 33161 OWNER IiJ ARCHITECT jgJ CONTRACTOR IKI FIELD 0 OTHER 0 CONTRACT FOR: General COnstruction The Contract is changed as follows: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) PLEASE SEE ATTACHED APPENDIX "A" The original (Contract Sum) (Guaranteed Maximum Price) was $ The net change by previously authorized Change Orders $ The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was $ The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (2~~i~@:t~Wj::i) by this Change Order in the amount of $ The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be $ The Contract Time will be (increased) (decreased) (unchanged) by (0 ) days The date of Substantial Completion as of the date of this Change Order therefore is 1,975,000.00 162,180.62 2,137,180.62 24,049.56 2,161,230.18 (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. SKLARchitecture ARCHITECT (Firm name) 23tO HOllywoOd Blvd. Ho lywood, Fl 33020 ADDRESS ARt L. (Typed name) ,. "Z. 1 · 0, DATE MIAMI SKYLINE CONTRACTOR (Firm name) ~g~t~EMt~gf~ rfr~jf61 ADDRESS ~ BY (Signature) ..s. G I ;;'CP d; 0 R.a..J r-l S -.c..l- (Typed name) CITY OF MIAMI BEACH O~f~~i;c~~f~~~I~~ ~J~jBR. ADDRESS BY (Signature) NURYMENICUCCI (Typed name) () ~ _ 2. ( _ 0 1-. DATE DATE CAUTION: You should sign an original AlA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AlA Document G701™ - 2001. Copyright @ 1979. 1987.2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or dlstribullon of this AlA" Document, or any ponlon of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when compieted. To report copyright vialations af AlA Contract Documents. e-mail The American Institute of Architects' iegal counsel, copyright@aia.arg.