Loading...
Amendment No. 8 - CH2M Hill7oo1- 24361 AMENDMENT NO. 8 TO THE PROFESSIONAL LANDSCAPE ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND CH2M Hill, DATED MAY 16, 2001, FOR THE PROVISION OF PROFESSIONAL SERVICES ASSOCIATED DESIGN OF ALTERNATIVE PARKING IN AN AMOUNT NOT -TO -EXCEED $24,900.00 FOR NEIGHBORHOOD NO. 8 — BAYSHORE AND SUNSET ISLANDS PROJECT. This Amendment No. 8 to the Agreement made and entered this 1 day of SPT-EMkEk , 20 oto, by and between the CITY OF MIAMI BEACH, a Municipal Corporation existing under the laws of the State of Florida (hereinafter referred to as CITY), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and CH2M Hill, having its offices at 800 Fairway Drive, Suite 350, Deerfield Beach, Florida, 33441(hereinafter referred to as CONSULTANT). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 134-99/00, the Mayor and City Commission adopted Resolution No. 2001-24387, on May 16, 2001, approving and authorizing the Mayor and City Clerk to execute an Agreement with CH2M Hill, for Professional Services for the Bayshore and Sunset Islands Streetscape Right -of - Way Neighborhood Project (the Project); and WHEREAS, the Agreement provides for the detailed planning services for various streetscape / landscape / utility improvements within the Bayshore and Sunset Islands neighborhood; and WHEREAS, the Agreement was executed for a not -to -exceed amount of $133,174.00; and WHEREAS, the planning effortforthe Bayshore and Sunset Islands neighborhood has been completed and detail design activities are underway; and WHEREAS, on December 10, 2003, the Mayor and City Commission adopted Resolution No. 2003-25432, approving additional design services as Amendment No. 1 to the Agreement, for planning, design, permitting, bidding / award and construction administrative services for the Bayshore and Sunset Islands neighborhood for a not -to - exceed amount of $1,913,302.00; and resulting in a revised contract fee of Page 1 of 6 MB:4008 Amendment No.8 12 11 06 1 $2,046,476.00, and WHEREAS, on February 24, 2005, Amendment No. 2 to the Agreement was executed, to re -package Sunset Islands 1 and 2 from Bid Package 8D to Bid Package 8B, for $0.00; resulting in a revised contract fee of $2,046,476.00 ,and WHEREAS, on November 8, 2005, Amendment No. 3 to the Agreement was executed to include the completion of a topographic survey along Pine Tree Drive from West 28th Street to West 40tri Street along the east side of the road, for a not -to -exceed amount of $12,850.00; resulting in a revised contract fee of $2,059,326.00 and WHEREAS, on February 17, 2006, Amendment No. 4 to the Agreement was executed to include the evaluation, permitting and preparation of construction cost alternatives for the installation of curbs/valley gutters to Sunset Islands 1 and 2; for a not - to -exceed amount of $2,500.00 resulting in a revised contract fee of $2,061,826.00; and WHEREAS, on February 16, 2006, Amendment No. 5 to the Agreement was executed to include the installation of four (4) drainage test wells to provide additional information for the preparation of a Letter of Reasonable Assurance to be submitted to the Florida Department of Environmental Protection (FDEP), as required in the permit application for the Project; for a not -to -exceed amount of $55,863.00 resulting in a revised contract fee of $2,117,689.00; and WHEREAS, on September 6, 2006, Amendment No. 6 to the Agreement was executed to include the installation of "P3.2" classified water main replacements required by the City's Public Works Department; for a not -to -exceed amount of $372,230.00 resulting in a revised contract fee of $2,489,919.00; and WHEREAS, on September 9, 2006, Amendment No. 7 to the Agreement was executed to include the installation of bike lanes/routes required by the City's Public Works Department in a not to exceed fee of $58,128.00 resulting in a revised contract fee of $2,548,047.00; and WHEREAS, this Amendment No. 8, to include the installation of alternative parking in the Lake Pancoast area; for a not -to -exceed amount of $24,900.00 resulting in a revised contract fee of $2,572,947.00; and WHEREAS, this proposal has been evaluated by Hazen & Sawyer, the City's Program Manager, and the CIP Office, and NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: Page 2 of 6 MB:4008 Amendment No.8 12 11 06 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 8. 2. MODIFICATIONS The Agreement is amended as defined in Schedule "A- 8", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 8. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 8 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH 401 Jorg-j . Ch. ■ . n• Dire •j •r, CIP Office 196tALtu, City Clerk Robert Parcher ATTEST: / 1 `-4 c+ ot,—/iLL SECRETARY Mor a de I ?Aar .Dnrca-r1 Print Name Print Name and Title By CONSUL T: CH2M HILL By Sign u re We G1 CIN , 1/i 62- ti /dew� Page 3 of 6 MB:4008 Amendment No.8 12 11 06 APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION 5-3 Al gfneytk\V : to SCHEDULE "A- 8" SCOPE OF SERVICES Schedule "A" entitled, "Scope of Services", is amended as follows: ADD the following under Task 5 — ADDITIONAL SERVICES, after the language added for Amendment No.1: Task 5.6 — Design of Alternative Parking in Lake Pancoast area: The Consultant shall provide detailed design services for producing contract documents (specifications and drawings) as needed for the construction of alternative parking in the Bayshore Neighborhood as noted below. In this effort, the Consultant shall be bound by the requirements stipulated in TASK 2 — DESIGN SERVICES as adopted via Resolution No. 2003-25432, on December 10, 2003, approving and authorizing the Mayor and City Clerk to execute an Agreement with CH2M Hill for Professional Services for the Bayshore Neighborhood Right of Way Improvement Project. Due to limited parking and permit parking signage added in areas of the Bayshore neighborhood — Lake Pancoast, new additional parking is required based on the attached neighborhood map and assumptions. In general, new alternative parking shall be included as follows: 1. W 24th Terrace from Pine Tree Dr. to Flamingo Place: On one side of the road (north side). Design to match what is currently proposed on W 24th Terrace from Flamingo PI. to Flamingo Drive. Design will be based on road cross section sketch A - attached. 2. Flamingo Place from W 24th Terrace to W 25th St.: Open pavers with 8 inch header curb on both sides of road. Design will be based on road cross section sketch B - attached. 3. W 25th St. from Flamingo Dr. to Flamingo Place: Open pavers with 8 inch header curb on both sides of road. Design will be based on road cross section sketch B - attached. 4. W 25th St. from Flamingo Place to Pinetree: Open pavers with curb on one side of road (south side). Design will be based on road cross section sketch B - attached. Consultant shall re -visit storm water calculation models with the additional impervious areas being created by the pavers required to implement the new alternative parking. There are no existing catch basins in these areas. No new stormwater collection system is included as part of this scope. For the scope of this Amendment, it is assumed approximately 400 linear feet of exfiltration trenches under the open pavers and eight (8) new catch basins will address additional runoff. In addition, it is assumed that that the primary physical components of the proposed stormwater system will not require re -design (no impact to Page 4 of 6 MB:4008 Amendment No.8 12 11 06 number of wells, Pump station size, pump sizes, etc). If it is determined that the additional impervious area created by the open pavers results in impacts to the current stormwater design, a separate design revision Amendment will be requested by the Consultant. In addition to revising existing design documents as necessary to accommodate new alternative parking, the Consultant shall also revisit the encroachment tabulations, as new removals will result from this effort. Demolition drawings shall be revised to indicate the removal of additional encroachments. Landscape drawings shall illustrate revised sight triangle locations. In addition, the new alternative parking improvements shall be added to the 90% construction cost estimate. TIME OF COMPLETION Additional design services contemplated by this Amendment are to be incorporated into the Bid Package 8B 100% design documents and submitted to the City by July 31, 2007. PAYMENT AND COMPENSATION The method of calculating the fees for the aforementioned proposed architectural and engineering services is established in Exhibit `A8' attached, based on estimated labor plus direct costs. The total fee proposed for this Scope of Work shall be on a not -to -exceed basis in the amount of $24,900.00. Invoicing will be monthly and based on hourly rates as defined in the current agreement between CH2M HILL and the City of Miami Beach. CONSULTANT's request for additional services is attached for reference purposes. COMPENSATION • Original Agreement amount $133,174.00. • Amendment No. 1 (Design services for the Bayshore and Sunset Islands Neighborhood) amount $1,913,302.00. • Amendment No. 2 (Re -packaging of Sunset Islands 1 and 2 from Bid Package 8D to Bid Package 8B) amount $0.00 • Amendment No. 3 (Completion of additional topographic survey along Pine Tree Drive) amount $12,850.00. • Amendment No. 4 (Opinion of design, permitting and evaluation of construction cost alternatives for the installation of curbs/valley gutters to Sunset Islands 1 and 2) amount $2,500.00. • Amendment No. 5 (Installation of four (4) drainage test wells) amount $55,863.00. • Amendment No. 6 (Design services for installation of "P3.2" water mains) amount $372,230.00 Page 5 of 6 MB:4008 Amendment No.8 12 11 06 • Amendment No. 7 (Design services for the installation of bike lanes/routes) amount $58,128.00 • Amendment No. 8 (Design services for the construction of alternative parking in Lake Pancoast area) amount $24,900.00 • Revised Agreement amount $2,572,947.00 Page 6 of 6 MB: 4008 Amendment No.8 12 11 06 CH2MHILL September 20, 2006 Mr. Suresh Mistry, PE Engineering Coordinator Hazen and Sawyer, PC 975 Arthur Godfrey Road, Suite 211 Miami Beach, FL 33140 CH2M HILL One Harvard Circle West Palm Beach, FL 33499-1923 Tel 561.515.6500 Fax 561.515.6502 RE: Additional Design Services for Right -of -Way Infrastructure Improvements Program - Neighborhood No 8 Bayshore and Sunset Islands: Alternative Parking Dear Mr. Mistry: As per our Negotiations meeting on August 11, 2006, we are pleased to re -submit the attached fee proposal for additional Design Services for the following item: Alternative Parking. The fee requested to perform this work is $24,900 as detailed in the attached Summary Sheet and backup information. The detailed Scope of Work for the Design Services to be provided is as follows: Alternative Parking: Due to limited parking and permit parking signage added in areas of the Bayshore neighborhood - Lake Pancoast, new additional parking is required based on the attached neighborhood map and assumptions. Detailed Scope of Work for new alternative parking is as follows: 1. W 24th Terr from Pine Tree Dr. to Flamingo Place: On one side of the road (north side). Design to match what is currently proposed on W 24th Terr from Flamingo Pl. to Flamingo Drive. Design will be based on road cross section sketch A - attached. 2. Flamingo Place from W 24th Terr to W 25th St.: Open pavers with 8 inch header curb on both sides of road. Design will be based on road cross section sketch B - attached. 3. W 25th St. from Flamingo Dr. to Flamingo Place: Open pavers with 8 inch header curb on both sides of road. Design will be based on road cross section sketch B - attached. 4. W 25th St. from Flamingo Place to Pinetree: Open pavers with curb on one side of road (south side). Design will be based on road cross section sketch B - attached. The services to be provided for alternative parking are as follows: COPYRIGHT 2006 BY CI12M HILL, INC. • COMPANY CONFIDENTIAL Page 2 September 20, 2006 o Modify existing Design Documents for the Bayshore neighborhood, as necessary, to incorporate new alternative parking. o Modify/re-run existing stormwater calculation models with the additional impervious areas. o For Package C, submit alternative parking drawings at the 60% design stage to the Program Manager for review four (4) weeks for the Notice to Proceed. o Revise and incorporate the design drawings for the new alternative parking into the 90% Design Documents for Package C within four (4) weeks of receipt of Program Manager's 60% review comments. o Revise Opinion of Probable Construction Cost to include alternative parking. o Revise Storm water Permit application to include exfiltration trendies under open pavers. The additional design services to be provided for new alternative parking are based on the following assumptions: o There are no existing catch basins in these areas. No new stormwater collection system is included as part of this scope of work. It is assumed that approximately 400 linear ft of exfiltration trenches under the open pavers plus 8 new catch basins will address additional stormwater runoff. o Alternative parking areas will be 8 ft. 6 inches wide and will be placed beside the existing roads. They will be delineated with an 8 inch header curb along the perimeter of the open pavers. o Re-evaluation of encroachments will be required for the new alternative parking. Demolition drawings will show removal of additional encroachments, existing aprons and swales. Existing landscaping drawings will be modified; however, no additional landscaping is required in this area. o Modifications to the existing topographic survey are not required for the new alternative parking. o Modifications to the existing geotechnical subcontract with Nutting Engineers to be amended. Current project reimbursables from existing task 6.4 Geotechnical to cover additional percolation tests at proposed exfiltration locations under new alternative parking areas. Subconsultant's fee not to exceed $1000. COPYRIGHT 2006 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL Page 3 September 20, 2006 o No special permit applications or costs are included in the fee. o Additional meetings with residents, City Commission or other City Departments are not included in the fee. It is anticipated that the final delivery of the Bayshore/Sunset Islands - 100% Design Documents for Package C will be submitted to the Program Manager as shown on the attached time table. If you have any questions, concerns or require additional information, please do not hesitate to contact me at your convenience. Sincerely, Pilar Doran, P.E. Sr. Project Manager CH2M HILL WPB/ Cc: File COPYRIGHT 2006 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL e c -t C— r r „ • 44, t•-• 1 :a e.- • r , <-4 ( t-Nt Vie 30' -o" it (... _,... veil k.. 1 - <c." 't,-- C>er ....-..- • i Pot ($1‘e i 0t\o-f 4 ove • .5 C11 e-• • .(3.0 t -c) 4 6 et e i r - " • r 1 It Cp,v. Pi 1\ 4 tea._ c4. r- 4mmmrt.\ 1---777:71L $ I - NOI1V0019IQ1dOS o u^L .lvl13 d 0 m CT _ -,e ±°0 °8 g8 /0 S\ \ §w 0 7 \ I 1 \ ƒ 4 / I % \ wa - \ \o o0 R0 4$ 0 EL W 0 2 0 o 0- 0 zw $ |$ a) § E ƒ Z§ 1 - () G K § ea! < eCC \°i\ 00 °$ .°0 .°0 / %§ f 0 \ & \ \ 0Z . Q % CO �� I C) co cc w00 00 o0 00 -00 ® u 0 a 0 0 0 0 ® e k L / to / ' / o 0 P. . .a 0 3 % 0 m CDCD / k CV / 0 \°} °S8 °0 Q0 4 S \ o a @ e $ VI / o\ < o§ \R o/yg k¢ at ,r f G 2 0) °0 @0 °0 g8 C. LO k \ ° _ CO <t' \En VI I 0 0 w � c E . 0 in L d w m w u u a ¥ \ k § < 2 < \ § viCsi j�E / kk /k /k 2 ® /\\ m2 q2 e2 =2 m0) jjLLG§w Dw Dw D� -gywm =uG®0 w Ow Ow Ow ow zz2\00 f\ ILL 0 00 \ (73< $$ \/ /$ [/ k u(-1@0000 CO 00 00 0 0<o=RI I- I- H- i- I- ee - 22 o o 0 o e # \ 0 % 0 fa / $ )\ VI, f6/ 0 $ ¥ � 0 \6 \o '- i- < m 0 0 m m o m o, TASK DESCRIPTION Bayshore Package C - Alternative Parking J C) co Q 0 1- J co L ) a'4"� 0 o w J 0 Hcri ce co co 0 NI W 0 I (D(o VIO O y'N N c a,I • c L. LJJ CO CO O Q 6) 6) O 6) (D CC) 0) 0) d V tit` oowoA-0(oo� N • N O O d ' N h ti N N L LO O O). r T (O N N O O ct t O O (f> M co r T Lo r T T N N co co co c7 Q coco co O N N co co co c7 co co co co VN - 6) Cr) r T N c) C0 CO CO CO O o 0o 0 (0 O C) t- Lo Lc) co T O O O 0) r r N C7) 6) 0) Cr) CO N f~ O O N N (.D (C CO 0 0 L[) N N T r N 6) 6) 0) O C) ts- r` CO CO CO Co ! N O 0 0 CO CO (V co co T T d' 4 Lo L(7 0 0 0 0 N N N WICi 0 r r O O O O Ir 4 4 T r W z_I :.7 tY Z II (/) W 1r` t- o o N N 1 T CO 0 CO 0 to o) c Cr) Cr) to CO N N N N 'Cr ti I� I,- Ln Lf) U - W 0 0 66 66 0 46,-,-- o 0 0 0 zl a d 2 10 6) Ln LO 00 rr Nt- N- t- h-- 1"-- in IX 1 T r N N T r T T N CO CO CO N N ✓ 0 0 0 O O O O O O 16 0 0 0 O O W VI n O III Ce FS 1 1 a 0 j d N W 4J L o !C O is O G. I-- C a : _cu saooi-li off_ (DEC_c N N od Do D) 0) a'. cc;c: c o acOc o Em oo E fdc cmUO oro u'm � ca m mE LLL u- E i d Li_ vo D EL- "0 LI ALL �u O` 0 E -o LL m y cco v coCa m U U° (CO '0 C C C C Cd C (0 , co it W I= LU tL._ a L N I --v) I -C/) I- ti) HU) F- Ou) I— Z7) cL c L L L L L L L to J N N • N NI N N N N N@ CV N N O 3 L o 0 1 1y c c m m `�°E22 �0 s ❑zoo (12CLa � cn a. n a (nu) (/) aJJ �, �+ T N co o Lc) (D r- CO 0) 0 r N CO V 0 c r r r r .1 -- al G) c .co • O IN N N E2 itO 0 ffiN 0 M N D E o -- n o a N BId Package C - Tasks NTP on Add'1