2000-24154 RESO RESOLUTION NO. 2000-24154 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING CHANGE ORDERS "5W" THROUGH "7C" WITH DANVILLE - FINDORFF, INC., IN THE AMOUNT OF $86,748, AND APPROPRIATING ADDITIONAL FUNDING, IN THE AMOUNT OF $86,748, FROM UNEXPENDED BALANCE IN GULF BREEZE LOAN POOL, TO PAY FOR THE ABOVE STATED CHANGE ORDERS FOR THE EXPANSION AND RENOVATION OF THE BASS MUSEUM OF ART. WHEREAS, the Mayor and City Commission approved an Agreement with the firms of Spillis Candela & Partners (SC & P) and Arata Isozaki & Associates (Isozaki) for architectural and engineering services for the Expansion and Renovation of the Bass Museum of Art (the Project), on March 26, 1995; and WHEREAS, the Mayor and City Commission approved the Construction Contract with Danville- Findorff, Inc. (DFI) on December 3, 1997; and WHEREAS, the Project is proceeding and is estimated to be completed by November, 2000; and WHEREAS, the approval ofthe attached Change Orders, "5W" through "7C," in the amount of $86,748, will allow the City to complete construction of the Project; and WHEREAS, additional funding, in the amount of $86,748, is thus required beyond the original $8,000,000 project budget in order to cover the above described change orders and such additional funding is available from the unexpended balance in the Gulf Breeze Loan Pool. NOW, THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein approve Change Orders "5W" through "7C" with Danville - Findorff, Inc., in the amount of $86,748, and appropriate additional funding, in the amount of $86,748, from the unexpended balance in the Gulf Breeze Loan Pool, to pay for the above stated change orders for the Expansion and Renovation of the Bass Museum of Art. PASSED AND ADOPTED mIS 8th day of November ,2000 ----~~----------------- MAYOR AITEST:~( r~ CITY CLERK APPROVED f'.S TO FORM & lANGUAGE & fOR EXECUTION F:\WORK\$ALL\CHATRAND\BASS\COl2RESQ,WPD At(, WtP./iJk.. ({) ~ U-en) City AlIol1l8'( Dale ATTACHMENT 1 EXPANSION AND HENOV A nON OF THE BASS MUSEUM PROPOSED CHANGE ORDERS Item Description Reason Comments Amount 5W Upgrade Concrete to Miami Beach Red Architectural Change Concrete color on East side of Bldg. to match City's req'mts $1,983 5X Keystone Modifications at East facade of Exist. Bldg Unforeseen Condition Exist. structural supports not adequate for new keystone $22,821 5Y Existing peeling paint in No. Gallery Unforeseen Condition Exist. paint in a condition where new plaster could not be applied $721 5Z Peeling wallpaper at exist. bldg. Unforeseen Condition Paper deteriorated after constr. began where new plaster could not be applied $331 6A Air Compressor electrical supply Architectural Change Compressor electrical outlet not shown on documents $297 6B Addt'l keystone removed at exist. ooenings Architectural Change Existine windows and doors removed and filled in wi keystone $3,694 6C Electrical supply to Door 110 Owner request Elec. supply to new life safety feature for door $805 6D Concrete floor at Room 512 Unforeseen Condition Exist. floor not level to receive carpet $1,528 6E Cro\'m Molding at Rms. 603, 606, 608, 613 Unforeseen Condition Moldings damaged during asbestos removal $1,170 6F Change existing door ooening Regulatory Agency Door onening had to be changed to meet ADA requirements $421 6G Coordination of Kitchen eauinment Architectural Change Equipment not clearly specified in documents $668 6H New hatch and slab at electrical room Regulatory Agency Hatch requested by Fire Marshall at opening to crawl space $1,819 61 Keystone infill at 2nd FIr. Unforeseen Condition Opening at existing bldg. required new keystone to match bldg. renovations $1,575 6J Test on leaking pipe Unforeseen Condition Exist pipe leaking at So. Gallery was tested to locate condition $296 6K Casting sample for stone sculptures Specifications Documents required casting as a unit price for sculpture repairs $580 6L Sneeze guard light Architectural Change Light added to sneeze guard at cafe serving line $473 6M Existing hoistway repairs Regulatory Agency Required repairs to exist. elevator shaft to comply with codes $2,471 6N Additional roof scuppers at exist. South Gallery Regulatory Agency Added scuppers to comply with new code regulations $3,618 60 Bay Changing Tables Regulatory Agency Added changing tables to comply with new regulations $511 6P Revisions to existing doors Regulatory Agency New doors and openings required to comply with ADA $3,000 6Q Additional emergency light in Courtyard Regulatory Agency Required by Fire Marshall at outside courtyard $2,562 6R Additional roof scuppers at exist. North Gallery Reeulatory Agency Added scupners to comply with new code regulations $3,790 6S Addt'l Sidewalk sprinklers Regulatory Agency Added sprinklers under existing stair and under new open stair $1,011 6T Damaged oipe in existing crawl space Unforeseen Condition Leakinl1: nipe within North Gallery crawl space $574 6U Automatic door onerator for Door 503 Regulatory Al1:ency Door onerator required by ADA official $3,286 6V Modification to door 509 Regulatory Agency Increased door width to comply wi ADA official $2,141 6W Automatic door operator for Door 503 Regulatory Agency Electrical to door ooerator required by ADA official $3,140 6X Addt'l strobes and sprinklers Regulatory Aeency Addt'llife safety items required by Fire Marshall in exist. bldg. and storage r $5,791 6Y Fire sealing in Mech. Room 601 Regulatory Agency Repair of existing wall openine in HV AC Room. $174 6Z Change door 516 Regulatorv Agency Fire Marshall reauested door swing to be changed into the bldg. instead of ou $1,115 7A Encasing of Doors in Existing Mech. Rooms Regulatory Agency Encasing wood doors wi sheet metal as requested by Mechanical insoector $448 7B Addt'l sneakers and strobes Regulatory Agency Added life safety items in loading dock area, Sto. Rm., Mech. Rms, and Toile $6,811 7C Addt'l cane rails and changes to Stair railines Regulatory Agency Added cane rails below existing stairs and changed railings at ramp and stair $7.123 NET TOTAL $86,748 .... CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH. FLORIDA 33139 lO COMMISSION MEMORANDUM NO. g3b-OO TO: Mayor Neisen O. Kasdin and Members oftbe City Commission DATE: November 8, 2000 FROM: Jorge M. Gonzalez \.. ~ City Manager O"~ (J A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING ADDITIONAL FUNDING IN THE AMOUNT OF $86,748 FROM UNEXPENDED BALANCE IN GULF BREEZE LOAN POOL, AND APPROVING CHANGE ORDERS "5W" THROUGH "7C" WITH DANVILLE - FINDORFF, INC., IN THE AMOUNT OF $86,748, FOR THE EXPANSION AND RENOVATION OF THE BASS MUSEUM OF ART. SUBJECT: ADMINISTRATION RECOMMENDATION: Adopt the Resolution. FUNDING: Unexpended balance of the Gulf Breeze Loan. ANALYSIS: On March 26, 1995, the City entered into an agreement with the firms of Spillis Candela & Partners (SC &P) and Arata Isozaki and Associates (Isozaki) for architectural and engineering services for the Expansion and Renovation of the Bass Museum of Art (the Project). On December 3,1997, the Mayor and City Commission approved award of a construction contract to Danville-Findorff, Inc. (DFI). Notice to Proceed with construction of the project was given on February 5,1998 with construction expected to last twenty months. Due to unforeseen circumstances, the construction period has been extended beyond the original twenty (20) months. The renovation of the existing building also experienced numerous unforeseen conditions which necessitated correction and which have added costs to the project. Currently, HV AC conditions at the building are being evaluated by DFI and SC&P because the system as installed is not maintaining the required temperature and relative humidity levels. An independent consulting and test and balance engineering firm was hired to help in the evaluation of all installations as well as the design. Costs for the corrections and evaluations will be borne by SC&P and DFI under their contract responsibilities. AGENDA ITEM Cl K DATE 1\- g-co Commission Memorandum November 8, 2000 Bass Museum of Art Additional Funding Page 2 Corrections and adjustments have been made to the HV AC system and the controls in order to correct the current conditions. A concern with the power supply to the project as well as frequent power outages is being discussed with Florida Power and Light (FPL). The power outages especially are causing the HV AC system to not operate properly and frequently to stop functioning altogether and not start automatically under emergency generating power. This condition is being researched by the consultant and the contractor and will be addressed with FPL. The initial project contingency allowance has now been exhausted. This amount of$618,637 was used initially for awarding the project to DFI, primarily for the six add alternates approved by the City Commission; for change orders during construction approved by the City Commission; for additional services approved for SC&P due to the extended construction period; and for the purchase of track lighting for the museum. The reimbursable allowance of$241 ,840 has also been exhausted. This amount was used for the consultants reimbursables expenses, expenses related to design services, the threshold inspector required by the Building official, and a site survey. The Administration is now requesting that the Mayor and City Commission approve the appropriation of additional funds required for the prompt completion of the construction project. These funds will be used for Change Orders "5W" through "7C", in the amount of $86,748. A listing of each change order, its purpose and amount is attached. All changes and additional work have been verified by the City and by the Architect/Engineer of record, SC&P/lsozaki (Attachment No.1). The Bass Museum Building Committee has reviewed these changes and additional work, and has recommended that they be implemented. The Administration will negotiate additional costs estimated at $5,000 at the end of the project. At that time, the additional time extension requests by DFI will be reviewed and negotiated and the liquidated damages for delays will be assessed. A further request for additional changes and appropriation will also be presented to the City Commission if required. The total approved change order amount for the project is currently at $473,068 including those presented in this commission memorandum and those still pending resolution. This amount represents 7.3% of the original construction value of $6,450,000 and is within the industry standards of 6% to 10% for a renovation project and is $145,069 less than the contingency amount of$618,137 originally assigned to the project. The completion date of the project was extended from September 30,1999 to December 7, 1999 via the previously approved change orders. The contract between the City of Miami Beach and Danville-Findorff, Inc. allows for liquidated damages of $300 per day. The City will pursue collection of liquidated damages from the approved completion date of December 7, 1999 to actual completion date. Attachment.*' .~ 1& L IMDB~DW/J '\I" F~rASS\B . D