Loading...
475-2004 RDA ResoRESOLUTION NO. 475-2004 A RESOLUTION OF THE CHAIRMAN AND THE MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY RATIFYING AN AGREEMENT WITH MC HARRY ASSOCIATES FOR THE COLLINS PARK CULTURAL CENTER IMPROVEMENT PROJECT; AND APPROPRIATING FUNDS, IN AN AMOUNT NOT TO EXCEED $471,899, FROM CITY CENTER REDEVELOPMENT AREA TAX INCREMENT FUNDS. WHEREAS, on September 23, 1998, the Mayor and City Commission adopted Resolution No.98-22904, authorizing the Mayor and City Clerk to execute an Agreement with the firm of Robert A.M. Stern Architects (Stern) for the Architectural and Engineering Design of a Regional Library, and a Master Plan for Collins Park and the Cultural Campus Streetscape (the Agreement) (the Project); and WHEREAS, on January 6, 1999, the Mayor and City Commission authorized appropriation of the funding necessary to implement the Agreement with Stern for the Project; and WHEREAS, on November 2, 1999, the voters of Miami Beach approved the issuance of an approximately $92 Million General Obligation Bond, which included recommended improvements for complete renovation of Collins Park ($1.8 million was allocated for the costs for the renovation); and WHEREAS, the Administration and Stern agreed to negotiate and proceed with Project design in Phases; approval was given to Stern to complete the design and construction drawings of the Regional Library; the Master Plan for Collins Park; and Cultural Campus Streetscape; and WHEREAS, when the Collins Park Phase was ready to begin, the City and Stern could not reach an agreement on a fair market price for the implementation of the Master Plan design; and WHEREAS, the Collins Park Oversight Committee made a recommendation on January 16, 2004, to terminate negotiations with Stern, and add the scope for the design phase of Collins Park, parking lot and streetscape, to Request for Qualifications (RFQ) No. 02- 03/04, and to do both projects at the same time with a single consultant; and WHEREAS, RFQ No. 02-03/04 for the Rotunda Renovation Project was issued on October 29, 2003; on February 9, 2004 Addendum No. 4 to the RFQ was issued, which included the additional scope of work for the design of renovations to Collins Park; and WHEREAS, responses to the RFQ were received by the opening date of February 27, 2004; and WHEREAS, the Evaluation Committee met and ranked MC Harry Associates (MC Harry) as the top firm, and the City Commission authorized the Administration to negotiate on April 14, 2004; and WHEREAS, on July 28, 2004, pursuant to Resolution No. 2004-25652, the Mayor and City Commission approved a Professional Services Agreement with MC Harry , in the amount of $657,072, which included work for the design of renovation to Collins Park for planning, design, bid/award, and construction administration services; and WHEREAS, the Administration recommends that the RDA hereby ratify the Agreement, and appropriate the necessary funding for the Agreement. NOW THERE BE IT DULY RESOLVED BY CHAIRMAN AND THE MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY OF MIAMI BEACH, FLORIDA, that the Chairman and the Members hereby ratify an Agreement with MC Harry Associates for the Collins Park Cultural Center Improvement Project, and appropriating funds in an amount not to exceed $471,899 from City Center Redevelopment Area Tax Increment Funds. PASSED AND ADOPTED this 28th day ATTEST: f~(il, ~~ SECRETARY Robert Parcher T:\AGENDA\2004\Ju12804\Regular\RDA Resolution -Collins Park Cultural Center.doc APPROVED AS TO FORM 8~ LANGUAGE 8~ FOR EXECUTION I ment Aaenc~tt _ Dato David Dermer CITY OF MIAMI BEACH REDEVELOPMENT AGENCY ITEM SUMMARY Condensed Title: A Resolution of the Chairman and members of the Redevelopment Agency of the City of Miami Beach, Florida, appropriating funds in an amount of $471,899 from the City Center Redevelopment Agency in order to execute an agreement with MC Harry Associates in the amount of $657,072 for A/E professional services required for the Collins Park Cultural Center Improvement Project. Issue: Shall the Chairman and Members of the Redevelopment Agency approve the appropriation of $471,899 from the City Center Redevelopment Agency in order to execute an agreement with MC Harry Associates in the amount of $657,072 (See attachment A, B, and C) for A/E professional services required for the Collins Park, Parking Lot, Streetscape Improvements, and Rotunda Renovation? item Sum naation: Robert A.M. Stern Architect was hired initially to design the Regional Library, Collins Park, and Cultural Campus Streetscape projects, with the design to proceed in Phases. Approval was given to Stern to complete the Design and Construction Drawings of the Regional Library, the Master Plan for Collins Park, and Cultural Campus Streetscape. Unfortunately at the time the Collins Park Phase was ready to begin, agreement on a complete and satisfactory amount was not achieved between the Administration and Stern for the implementation of the master plan design. The Collins Park Oversight Committee made a recommendation on January 16, 2004 to terminate all negotiations with Stern and add the scope for the Design phase of Collins Park, Parking Lot and Streetscape to the Rotunda Renovation Request for Qualification (RFQ) No 02-03/04 and to do both Projects at the same time with a single consultant. Responses to the RFQ were received by the opening date of February 27, 2004. The Evaluation Committee met and ranked MC Harry Associates as the top firm and the City Commission authorized the Administration to negotiate a fee on April 14, 2004. Substantial agreement was reached on the scope and fees for the project. City Staff negotiated a total planning, design and construction administration services and reimbursable fee of $657,072 (See attachment A, B, and C). The fee represents approximately 11 % of the total overall construction project estimate of $5.5 million. The Administration believes the proposed fee is appropriate for the effort required during the planning, design and construction administration phases. The Administration recommends that MC Harry be awarded a total A/E fee of $657,072. Adviso Board Recommendation: Financial Information: City Clerk's Office Legislative Tracking: ~ Luz Maria Ciccia Sign-Offs: e ment Director Assistant Cit Mana er Cit Mana er c,~~ S-CoIIPKSt II-02-07282004-Imc-02 AGENDA ITEM 33 DATE ? - 2 -U CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www.miamibeachfl.aov REDEVELOPMENT AGENCY MEMORANDUM To: Chairman and Members of Date: July28, 2004 The Redevelopment Agency From: Jorge M. Gonzalez ~ ~^~ City Manager Subject: A RESOLUTION OF THE CHAIRMAN AND THE MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY RATIFYING AN AGREEMENT WITH MC HARRY ASSOCIATES FOR THE COLLINS PARK CULTURAL CENTER IMPROVEMENT PROJECT; AND APPROPRIATING FUNDS IN AN AMOUNT NOT TO EXCEED $471,899 FROM CITY CENTER REDEVELOPMENT AREA TAX INCREMENT FUNDS. ADMINISTRATION RECOMENDATION Adopt the Resolution FUNDING Funding in the amount of $471,899 is available from the City Center Redevelopment Area Tax Increment Funds. ANALYSIS On September 23, 1998 the Mayor and City Commission adopted Resolution No.98- 22904, authorizing the Mayor and City Clerk to execute an Agreement with the firm of Robert A.M. Stern Architects (Stern) for the Architectural and Engineering Design of a Regional Library, and a Master Plan for Collins Park and the Cultural Campus Streetscape. On January 6, 1999, the Mayor and City Commission authorized appropriation of the funding necessary to implement the Agreement with Stern for the project. On November 2, 1999 the voters of Miami Beach approved the issuance of an approximately $92 Million General Obligation Bond, which included recommended improvements for complete renovation of Collins Park. $1.8 million was allocated for the costs for the renovation. The Administration and Stern agreed to negotiate and proceed with project design in Phases. Approval was given to Stern to complete the Design and Construction Drawings of the Regional Library, the Master Plan for Collins Park, and Cultural Campus Streetscape. When the Collins Park Phase was ready to begin, the City and Stern could not reach an agreement on a fair market price for the implementation of the master plan design. Stern requested a total fee of $774,785 for the design of Collins Park, which did not include the Rotunda. In comparison, MC Harry Associates' fee for Collins Park, including the Rotunda Redevelopment Agency Memorandum July 28, 2004 Collins Park Cultural Center Page 2 of 3 is $657,072. The Collins Park Oversight Committee made a recommendation on January 16, 2004 to terminate all negotiations with Stern, add the scope for the Design phase of Collins Park, Parking Lot and Streetscape to the Rotunda Renovation Request for Qualifications (RFQ) No. 02-03/04 and to do both Projects at the same time with a single consultant. RFQ No. 02-03/04 for the Rotunda Renovation Project was issued on October 29, 2003. On February 9, 2004 Addendum No. 4 to the RFQ was issued, which included the additional scope of work for the design of renovations to Collins Park. The project scope added to the RFQ through Addendum No. 4 included renovations to Collins Park, the Parking Lotto the East of the park, and adjacent Streetscape Improvements. The scope of services for this portion of the project will include planning, design, bidding, and construction administration services, and are further detailed below. • Collins Park Renovation of existing park includes landscaping, irrigation, lighting, hardscape, including but not limited to curbs, sidewalk, drainage and ADA ramps, and street furniture as described in the Collins Park Master Plan originally prepared by the Architectural firm of Robert A.M. Stern. Design must include coordinated design documents for the installation of proposed Art-In-Public Places opportunities. 21St Street Parking Lot Renovation of existing parking lot, including new landscaping, irrigation, lighting, and proposed hardscape improvements, including but not limited to curbs, sidewalks, drainage and ADA ramps. Design may include a transition area and pavilion between parking lot and existing beach (public restroom and beachwalk). Streetscape Renovation of existing streetscape including replacement of existing sidewalks, lighting, irrigation, landscaping, street paving, street furniture, drainage and waterline improvement. Streetscape improvements should compliment and be consistent with the surrounding area improvements and the Collins Park Master Plan. It is estimated that the total cost for construction of these desired improvements will be approximately $5.5 million, to be funded mainly from the 1999 General Obligation Bond funds, City Center Redevelopment Agency (RDA) Tax Increments Funds (TIF), and Parking Enterprise Funds. It is important to note that only the Collins Park portion of the project can be funded with the 1999 General Obligation funds. Responses to the RFQ were received by the opening date of February 27, 2004. The Evaluation Committee met and ranked MC Harry Associates (MC Harry) as the top firm and the City Commission authorized the Administration to negotiate a fee on April 14, 2004. Initial negotiation sessions were held in May and June 2004 and substantial agreement was reached on the scope and fees for the project. Redevelopment Agency Memorandum July 28, 2004 Collins Park Cultural Center Page 3 of 3 City staff negotiated a total planning, design and construction administration services and reimbursable fee of $657,072. The breakdown of this fee by man-hours is provided in Attachment A, by phase (Planning, Design, Bid/Award and Construction Administration) in Attachment B, and an outline of MC Harry's schedule of hourly rates is provided in Attachment C. This fee represents approximately 11 % of the total overall construction project estimate of $5.5 million. Construction Administration services, in the amount of $168,148, are included in the negotiated fee. This amount results in a cost of $13,000 per month for the services provided by the consultant during construction based on an estimated construction timeframe of thirteen (13) months. MC Harry has agreed to include two months of additional Construction Administration services at no additional cost to the City if the Project exceeds the estimated schedule of thirteen (13) months. After the additional two months, MC Harry and the City have agreed that the consultant will provide additional services at a not to exceed cost of eighty percent (80%) of the monthly cost of Construction Administration services established in the negotiated fee. This will result in additional services at a not to exceed an estimated cost of $10,000 per month if the construction schedule were to be delayed. The Consultant declined to price an unlimited Construction Administration term. The final duration on the construction schedule will be determined during negotiations on the final language of the Agreement with MC Harry. At that time the final cost for the monthly charges on Construction Administration services will be included in the Agreement. The City believes this to be a fair approach to account for possible delays in the construction process. Any Construction Administration services due to delays deemed to be the responsibility of MC Harry will be provided by the consultant at no cost. Based on the above, the Administration recommends the proposed fee as appropriate for the effort required during the planning, design and construction administration phases. CONCLUSION Therefore, the Administration recommends that the Redevelopment Agency ratify the Agreement and appropriate the necessary funding for the Agreement. T:\AGENDA\2004\Ju12804\Regular\RDA Memo -Collins Park Cultural Center.doc *~t~lrN.R.~.t J4 m~ d~ a ~i o ~ o mo - b y. d x r~ O C a d N ~ O y ~ ~. W m 71 ~_ o ~~ ds a~ o- ~~ o~ mT ~ m ~ d O C a d W m m N O_ V n m 2 o d o ~ $. b W N fD pp N N w- m a w ~, u i j m a >~ n e m w C O N m 0 ~1 D j 0 H ~i T N a n D y -i -1 N CIO ~ T1 V I ;0 ,Z7 L C'f y o c o 6 2 z 0 0 O o ,i I a u~la ~ Nm 2 ~ s°. ~ ~ ~ `' ~ N ~ x ~ ~ ~ ~ ~ ~ D ~ ~ ~ ~ -nil0 oi~p Amm' Q °. 9 =~a~s '. Mm;°~= o r- ..oOm mmm~nc is ° ~ w. f z z pp °- dlZ,hO morn N~<v 3!~ cm ~ °n >?:'v n°s2cm~7 ~ A «« ~~y~~ti NI~~C~,y~ ~vm ~ ~ ~ '~ o °n_ ggn a ~ o °n_ z ? m m m m ~j "' ~ mr-~i p'~GZ]'^~mlZ ~ D ~c S <! $° =~dm =~~~~c~'~~ < m 2: ~°i~vna'av'Apyicvi~ 3j~ ~ m e N' m ~ N r F A m y z m A ~~ i v O~itmn= z~~'i ~ m ~ 3 g ; ~ _ ? z o y ~ ~ o f° 5 ~ z~lzl~pALo'~ i a I~ol F ~ ° z p ~ m " ~ N~ Av ml~zz m °' o < O < ~ v ti3i T ~ 0 0 ~ ~ i ml zi~m N m N y T i n ~ d .,wm~ o g 9 9 ti t a. _ ~ `" a m, N m ~ ~ M rr u" ri«««« c m $. ~ a e s~~~~ ~ ~ ~ ~ xgN~ ~ tl S u N ~ g « ~'D mmm n~w~~mw ~~ o: ~ ~ Fa p 6 UU ~ 9 w m m m m O N ~ m N N m OJ N m 4. 85 ~ x' 'm MW JI N A ± V M ~~ M D NCI p 'O m OO N A m f0 > m o• ~ .4 ° m m wN ml Nlw O ai9 q ~O~O i0 r O.O ~~+ 2 O N «+m00A $e XN irm N~~'m w.~. ~ M N M moo m. ~ N o ~ b o Ni+ 8~ o 8 a u S e j '^ ° J'ol of i ~ ~'iv m gN a O+ OO~N~ ~ N O P O O N 01 N Q A O O Y ~.:... + N m A N m '~. w q X H ~ ~ M Oil O ,O N y M n J D ~ ~ u, O w S a iT Ai N w N m $ p~ N ~ m m A m ~ m g.. X N D N r Oi g N J` a m yy O J. ~j A L,j N ' _ ~ N M ~ M W r M O :' ~ m O m Qp+ U m ,qN m N S° W S o A v g m t v, 0 ~ ~ fM N O O O «n O N O O ~ Q O A A A m _ _ N M a jj~s ~ O 1 t"J W ONO O°i p 'S moos $ m N « m x> ti o ~ o o- ~ O ~ ~q "~ ~d A O O O ~' ~ r V ° N ~ ~ y O a t~ 0 Q B" 0 c oni V n ~ $ d m N ,~ T p ~^ ~..~ s N N QA -_ W p July 21, 2004 Collins Park Cultural Center Project Schedule "B" itemized schedule of compensation MCHarry Associates, Inc. 2780 SW Douglas Road Miami, Florida 33133 305-445-3765 Phase FEE/PHASE FEE/SECTION 1 Planning Services (Schematic) $54,513.00 SECTION 1 Streetscape 39% $21,491.00 SECTION 2 Parking Lot 7°,6 $4,087.00 SECTION 3 Collins Park 23°,6 $12,581.00 SECTION 4 Rotunda 30°,6 $16,354.00 2a Design Development $133,248.00 SECTION 1 Streetscape 40°,G $53,407.00 SECTION 2 Parking Lot 8°,G $10,157.00 SECTION 3 Collins Park 23°~6 $31,264.00 SECTION 4 Rotunda 29°,6 $38,420.00 2b Construction Documents $218,975.00 SECTION 1 Streetscape 39°~ $84,979.00 SECTION 2 Parking Lot 7°,6 $16,161.00 SECTION 3 Collins Park 23°,6 $49,745.00 SECTION 4 Rotunda 31 °,6 $68,090.00 3 Bidding 8~ Award Services $22,188.00 SECTION 1 Streetscape 45°,6 $9,997.00 SECTION 2 Parking Lot 9°,6 $1,901.00 SECTION 3 Collins Park 26°,6 $5,852.00 SECTION 4 Rotunda 20°~ $4,438.00 4 Construction Administration Services [365 DAYS] $168,148.00 SECTION 1 Streetscape 45°,6 $75,761.00 SECTION 2 Parking Lot 9°~6 $14,408.00 SECTION 3 Collins Park 26°~ $44,349.00 SECTION 4 Rotunda 20°,ii $33,630.00 SUB TOTAL BASIC SERVICE FEE $ 597,072.00 OTHER DIRECT COSTS Reproduction Costs $10,000.00 SECTION 1 Streetscape 41% $4,100.00 SECTION 2 Parking Lot 8% $800.00 SECTION 3 Collins Park 24% $2,400.00 SECTION 4 Rotunda 27% $2,700.00 Surveying $30,000.00 SECTION 1 Streetscape 45% $13,500.00 SECTION 2 Parking Lot 15% $4,500.00 SECTION 3 Collins Park 24% $7,225.00 SECTION 4 Rotunda 16% $4,775.00 Geotechnical Engineering $10,000.00 SECTION 1 Streetscape 25% $2,500.00 SECTION 2 Parking Lot 25% $2,500.00 SECTION 3 Collins Park 0% $0.00 SECTION 4 Rotunda 50% $5,000.00 Underground Utility Verification $10,000.00 SECTION 1 Streetscape 50% $5,000.00 SECTION 2 Parking Lot 20% $2,000.00 SECTION 3 Collins Park 20% $2,000.00 SECTION 4 Rotunda 10% $1,000.00 SUB TOTAL OTHER DIRECT COSTS $60,000.00 Total Professional Services and Expenses $ 657,072.00 July 21, 2004 Collins Park Cultural Center Project MCHarry Associates, Inc. 2780 SW Douglas Road Miami, Florida 33133 305-445-3765 Schedule "B" Itemized schedule of compensation Phase FEE/PHASE FEE/SECTION SUMMARY OF FEES BY SECTION $597,072.00 SECTION 1 Streetscape 41 % $245,635.00 SECTION 2 Parking Lot 8% $46,714.00 SECTION 3 Collins Park 24% $143,791.00 SECTION 4 Rotunda 27% $160 932 00 SUMMARY OF DIRECT COSTS BY SECTION $60,000.00 SECTION 1 Streetscape 42% $25,100.00 SECTION 2 Parking Lot 16% $9,800.00 SECTION 3 Collins Park 19% $11,625.00 SECTION 4 Rotunda 22% $13 475 00 SUMMARY ALL FEES and DIRECT COST $657,072.00 SECTION 1 Streetscape 41% $270,735.00 SECTION 2 Parking Lot 9% $56,514.00 SECTION 3 Collins Park 24% $155,416.00 SECTION 4 Rotunda 27% $174 407 00 July 2004 Collins Park Cultural Center Project Schedule "C" Schedule of Hourly Rates M.C. Harry Associates, Inc. 2780 SW Douglas Road Miami, Florida 33133 305 445 3765 BILLING RATE PRINCIPAL $ 150.00 Project Manger -Senior $ 126.00 Project Manger $ 111.00 Engineer $ 126.00 Archnea $ 99.00 Engineer $ 99.00 Senior Inspectcx $ 87.00 Specifications ~Nritter $ 78.00 Inspector $ 169.00 Technical Drafting -Senior $ 67.00 Technical Drafting $ 58.00 Architect /Engineer Intern $ 41.00 Clerical /Administrative $ 45.00